HomeMy WebLinkAbout22-128 Resolution No. 22-128 RESOLUTION AUTHORIZING EXECUTION OF A CHANGE ORDER NO. 1 WITH ENGINEERING ENTERPRISES, INC. AND JOEL KENNEDY CONSTRUCTION CORP. FOR 2021 LEAD SERVICE LINE REPLACEMENT PROGRAM (Bid No. 21-004A) WHEREAS, the City of Elgin has heretofore entered into a contract with Engineering Enterprises, Inc. and Joel Kennedy Construction Corp. for 2021 Lead Service Line Replacement Program (Bid No. 21-004A); and WHEREAS,it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Richard G.Kozal,City Manager,be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: July 27, 2022 Adopted: July 27, 2022 Omnibus Vote: Yeas: 8 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk City of Elgin Chanae Order ELGIN,ILLINOIS PROJECT 21-004A CHANGE ORDER NO. 1 AND FINAL CONTRACT: 2021 Lead Service Line Replacement Program(Bid No. 21-004A) SCOPE: As part of the existing project scope, new copper service shall be installed downstream of the meter to the point of the (new or existing) downstream ball valve. Elgin's plumbing code requires the installation of a drain valve between the meter and the downstream ball valve. The drain valve was not included in the bidding documents as drain valves were not anticipated to be installed. In addition, during the home assessment phase of the construction contract, staff has encountered a few copper water services upstream of the meter (i.e., between the foundation and the meter), though it is suspected to be lead between the house and the b-box. To be certain, the contractor will pothole the service downstream of the b-box to confirm the service line material. If found to be copper, a fee for potholing the service will be warranted. If lead or galvanized,the potholing fee is waived the service will be replaced. Potholing was not included in the bidding documents as it was anticipated all services were known to be lead on the private side. REASONS FOR CHANGE: • The circumstances said to necessitate the change in performance in this change order were not reasonably foreseeable at the time the contract was signed. • The changes provided in this changer order are germane to the original contract as signed. • The change order is in the best interests of the City of Elgin and authorized by law. SUMMARY OF CHANGES IN CONTRACT AMOUNT: The contract amount is revised to add cost and quantity for the installation of 275 drain valves at$90.00 per valve installed, and for 25 potholes at $250 for each performed, for a total estimated change in contract amount of$31,000, as follows: ORIGINAL CONTRACT AMOUNT: $4,221,307.00 CHANGE ORDER NO. 1 AND FINAL Installation of Drain Valve $24,750.00 Pothole Water Services $6,250.00 TOTAL FOR CHANGE ORDER NO. 1 AND FINAL: ADD $31,000 PREVIOUS CHANGE ORDER(S): None TOTAL OF PREVIOUS CHANGE ORDERS: ADD $0 TOTAL REVISED CONTRACT AMOUNT: $4,252,307.00 1 The original amount of the contract with Joel Kennedy Constructing Corp. is $4,221,307.00. Change Order No. I and Final will increase the original contract amount by a total of$31,000.00, that sum representing 0.73% of the original contract amount. The new contract amount, inclusive of all change orders, is$4,252,307.00. OTHER CONTRACT PROVISIONS: All other contract provisions shall remain the same. CHANGE ORDER No. 1 AND FINAL Agreed to this 27 day of _July ,2022. Recommended by: Water Department By: Eric Weiss Title: Watery Director Date: 7l �ao%z — --- _ Signature: Engineering Enterprises,Inc.(Construction Engineer) By: Julie A. Morrison P.E. Title: Sr.PM/Principal 7/11/22 Date: h, Signature: Accepted by: Joel Kennedy Constructing Corp. (Contractor) By: j o{cL Title: -'2f�5 DEC Date: t d L Z Signature: 2 Approved by: CITY OF ELGIN By: Richard G. Kozal Title:City Manager _ Date: Jul 2 r Signature. Legal DeptftTeemenAChange Order-Joel Kennedy Consnction Corp-2021 LSLR Program-7-11-22.docx 3