HomeMy WebLinkAbout22-127 Resolution No. 22-127 RESOLUTION AUTHORIZING EXECUTION OF A CHANGE ORDER NO. 1 AND FINAL WITH F.H. PASCHEN, S.N. NIELSON & ASSOCIATES, LLC FOR THE BOILER REPLACEMENT AT WING PARK POOL JOB ORDER CONTRACT PROJECT WHEREAS, the City of Elgin has heretofore entered into a contract with F.H. Paschen, S.N. Nielson& Associates, LLC for the boiler replacement at Wing Park Pool job order contract project; and WHEREAS,it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 and Final attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Richard G. Kozal,City Manager,be and is hereby authorized and directed to execute Change Order No. 1 and Final, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: July 27, 2022 Adopted: July 27, 2022 Omnibus Vote: Yeas: 8 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk City Of Elgin - Change Order ELGIN, ILLINOIS PROJECT: M00111 CHANGE ORDER No. 1 AND FINAL CONTRACT: Boiler Replacement at Wing Park Pool (Job Order Contract Project) SCOPE: Additional electrical work required to connect equipment that was not included in the original design drawings and project scope, and additional equipment costs resulting from limited availability of equipment so that the system will be ready to run at the beginning of the pool season. REASONS FOR CHANGE: Since the unanticipated additional labor and equipment costs were related to equipment that was not included in the original scope of work and design drawings, the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed.The change is germane to the original contract as signed and the change order is in the best interests of the City of Elgin and is authorized by law. SUMMARY OF CHANGES IN CONTRACT AMOUNT: ORIGINAL CONTRACT AMOUNT: $700,047.34 Additional electrical work and equipment costs $ 33,556.17 TOTAL FOR CHANGE ORDER NO. 1 AND FINAL: ADD $33,556.17 TOTAL REVISED CONTRACT AMOUNT: $733,603.51 The original amount of the contract with F.H. Paschen is$700,047.34. Change Order No. 1 and Final will increase the original contract amount by a total of$33,556.17,that sum representing four and eight tenths percent(4.8%)of the original contract amount. The new contract amount, inclusive of all change orders is$733,603.51. OTHER CONTRACT PROVISIONS: All other contract provisions remain the same. j i CHANGE ORDER NO. I AND FINAL i Agreed to this 271h day of July,2022. f f Recommended by: BUILDING MAINTENANCE DEPARTMENT By: Rich Hoke Title: Building Maintenance Superintendent Date: July 27,2022 Signature. Accepted by: F.H.PASCHEN,S.N. NIELSON& ASSOCIATES,LLC Party of the Second Part(Contractor) By: - C ►v7 yr � t`i Title: _ (-,rr Date: Signature: Approved by: CITY OF ELGIN Party of the First Pail(Owner) By: Richard G.Kozal Title: City Manager Date: Jul o Signatur L ___