Loading...
HomeMy WebLinkAbout22-0914 John Burns Construction Olq September 14, 2022 Agenda Bid Item: #1 — 22-031; Riverside Water Treatment Plant Main Switchgear Improvements ($9,135,000 and Change Order No. 1 (Reduction $300,500) City of Elgin -- - Change Order ELGIN, ILLINOIS PROJECT RIVERSIDE WTP MAIN SWITCHGEAR IMPROVEMENTS CHANGE ORDER No. 1 CONTRACT: The Work of this Contract is generally described as construction of electrical distribution system improvements, including, but not limited to sitework, yard piping, structural, architectural, heat- ing, ventilation, air conditioning, plumbing, electrical, and instrumentation and control work. (Bid No. 22-031). SCOPE: The low responsive bid for the contract exceeds the City's budgeted funds. The City and the Contractor have engaged in negotiations to negotiate an adjustment of the bid price in order to bring the bid within the amount of available funds by eliminating independent deductive items specified in the invitation for bids. Change Order No. I includes the following reductions in the scope of work for the contract and reductions in the contract price: l. Decrease Allowance A-1 by $25,000. Reduce contract amount by $25,000. 2. Remove Allowances A-2,A-3, A-5,and A-7. Reduce contract amount by $55,000. 3. Remove Allowance A-9 (delete contaminated soil removal). Reduce contract amount by $40,000. 4. Remove requirement to haul CCDD spoils off site. Reduce contract amount by $15,500. 5. Reduce length of PDC by 4'-0" and remove one vertical switchgear section along with two asso- ciated spare breakers. Reduce contract amount by $165,000. Total contract price reductions$300,500.00 REASONS FOR CHANGE: Remove project elements to reduce the contract price within the amount of available funds. DETERMINATION: This Change Order is germane to the original contract as signed and the Change Order is in the best interest of the City of Elgin and is authorized by law. SUMMARY OF CHANGES IN CONTRACT AMOUNT: Removing project elements. ORIGINAL CONTRACT AMOUNT: $9,135,000 CHANGE ORDER No. 1 SCOPE REDUCTIONS $300,500 TOTAL FOR CHANGE ORDER NO. l DEDUCT $300,500 PREVIOUS CHANGE ORDER(S): N/A $0 TOTAL OF PREVIOUS CHANGE ORDERS: $0 TOTAL. REVISED CONTRACT AMOUNT: $8,834,500 The original amount of the contract with John Burns Construction is $9,135,000. Change Order No. I will decrease the original contract amount by a total of$300,500, that sum representing 3.3% percent of the original contract amount. The new contract amount, inclusive of all change orders is$8,834,500. OTHER CONTRACT PROVISIONS: All other contract provisions remain the same. CHANGE ORDER No. 1 Agreed to this 14 day of September . 2022. Recommended by: PUBLIC SERVICES UNIT—WATER By: Enti I,lui5 Title: V&fts— O;reG for Date: qg f 80� Signature: Accepted by: JOHN BURNS CONCSTRUCTION Party of the Second Part(Contractor) By: Title: Date: Signature. a:::�-�;g Approved by: CITY OF ELGIN Party of the First Part(Owner) By: Richard G. Kozal Title: City Manager Date: Septemb 022 Signature: ►' Legal Dept\Agrecmen Change Or er c -Jon �- id an 9-7-22.doc