HomeMy WebLinkAbout21-93 Resolution No. 21-93
RESOLUTION
AUTHORIZING EXECUTION OF AMENDMENT AGREEMENT NO. 1 WITH HR GREEN,
INC. FOR DESIGN ENGINEERING SERVICES IN CONNECTION WITH THE 2021
GIFFORD PARK RESURFACING PROJECT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS,
that pursuant to Elgin Municipal Code Section 5.02.020B(9) the City Council hereby finds that
an exception to the requirements of the procurement ordinance is necessary and in the best
interest of the city; and
BE IT FURTHER RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,
ILLINOIS, that Richard G. Kozal, City Manager, and Kimberly A. Dewis, City Clerk, be and are
hereby authorized and directed to execute Amendment Agreement No. 1 on behalf of the City of
Elgin with HR Green, Inc., for design engineering services in connection with the 2021 Gifford
Park Resurfacing Project, a copy of which is attached hereto and made a part hereof by
reference.
s/David J. Kaptain
David J. Kaptain, Mayor
Presented: June 23, 2021
Adopted: June 23, 2021
Omnibus Vote: Yeas: 9 Nays: 0
Attest:
s/Kimberly Dewis
Kimberly Dewis, City Clerk
AMENDMENT AGREEMENT NO. 1
THIS AMENDMENT AGREEMENT No. 1 is hereby made and entered into this 23 day
of June , 2021,by and between the City of Elgin, Illinois, a municipal corporation
(hereinafter referred to as the "City"), and HR GREEN, INC., an IOWA corporation, authorized
to do business in the State of Illinois(hereinafter referred to as"Engineer").
WHEREAS,the City and Engineer hereto have previously entered into an agreement dated
February 10,2021 (hereinafter referred to as"Original Agreement"),wherein the City engaged the
Engineer to furnish certain professional services in connection with CITY OF ELGIN 2021
GIFFORD PARK RESURFACING PROJECT(hereinafter referred to as the"Project"); and
WHEREAS, the City has determined that the proposed scope of the Project should be
further modified to include the additional Supplemental Professional Engineering Services
described herein (hereinafter referred to as"Supplemental Services"); and
WHEREAS,the Original Agreement provides for a maximum payment of$55,600.00;and
WHEREAS,the parties hereto have determined and agree that the total maximum payment
for the Supplemental Services described in this Amendment Agreement No. 1 shall be in the
amount of$7,900.00; and
WHEREAS,the changes contemplated by this Amendment Agreement No. 1 are germane
to the Original Agreement as signed; and this Amendment Agreement No. 1 is in the best
interests of City and is authorized by law.
NOW,THEREFORE,for and in consideration of the mutual undertakings provided herein,
and other good and valuable consideration,the receipt and sufficiency of which is hereby mutually
acknowledged,the parties hereto agree as follows:
1. The above recitals are incorporated into and made part of this Agreement as if fully recited
herein.
2. Section 1 of the Original Agreement is hereby further amended by adding a new additional
subparagraph D thereto to read as follows:
"D. The ENGINEER shall provide the additional engineering services to
include preparation of plans and specifications for CITY street, alley, and
parking lot maintenance per the terms of the Original Scope of Services at
the following locations: Cooper-Congdon alley, Prairie-Villa Flag alley,
Lillie-Forest alley, West & East Forest-Preston alley, Cherry Street alley,
Spring-Center alley, Richert Court, Hill Avenue, Porter Street, and the
Hawthorne Hill Nature Center Parking Lot"
3. That Section 2 of the Original Agreement is hereby further amended by adding the
following to the end of Subparagraph B:
"B. Engineer shall provide the Supplemental Services provided for in Amendment
Agreement No. 1 by July 1, 2021."
4. That Section 4 of the Original Agreement is hereby amended by adding the following
paragraph C and Payment Schedule to read as follows:
"C. For services described in Amendment Agreement No. 1,Engineer shall be paid a lump
sum and total maximum fee of$7,900.00 for the services to be provided pursuant to this
Amendment Agreement No. 1,regardless of the actual time or actual costs incurred by the
Engineer unless substantial modifications and scope of work are authorized in writing by
the City and approved pursuant to a further written amendment to this Agreement. For the
purposes of clarification, the total fees to be paid to the Engineer pursuant to the Original
Agreement and this Amendment Agreement No. 1 now total $63,500.00. The detailed
basis of the additional fee associated with Amendment Agreement No. 1 is included in
Attachment A-1 and is based on hourly rates of personnel utilized. The attached Standard
Schedule of Charges dated January 2021 will be utilized for this Project."
Payment Schedule for Supplemental Services
ESTIMATED ESTIMATED VALUE ESTIMATED INVOICE
DATE %COMPLETE OF WORK COMPLETE VALUE
July 1, 2021 100 $7,900.00 $7,900.00
Total 100% $7,900.00
5. That except as amended in this Amendment Agreement No. 1 the Original Agreement shall
remain in full force and effect.
6. That in the event of any conflict between the terms of the Original Agreement and the
provisions in this Amendment Agreement No. 1, the provisions of this Amendment
Agreement No. 1 shall control.
7. This Amendment Agreement may be executed in counterparts, each of which shall be an
original and all of which shall constitute one and the same agreement. For the purposes of
executing this Amendment Agreement, any signed copy of this Amendment Agreement
transmitted by fax machine or e-mail shall be treated in all manners and respects as an
original document. The signature of any party on a copy of this Amendment Agreement
transmitted by fax machine or e-mail shall be considered for these purposes as an original
signature and shall have the same legal effect as an original signature. Any such faxed or
e-mailed copy of this Amendment Agreement shall be considered to have the same binding
legal effect as an original document. At the request of either party any fax or e-mail copy
of this Amendment Agreement shall be re-executed by the parties in an original form. No
party to this Amendment Agreement shall raise the use of fax machine or e-mail as a
defense to this Amendment Agreement and shall forever waive such defense.
IN WITNESS WHEREOF, the undersigned have entered into and executed this
Amendment Agreement No. 1 as of the date and year first written above.
CITY CONSULTANT
By: By: Miemors. ai.sga4.4
City Manager Its Vice President
Atte t: Attest:
A4vo6/
City Clerk Its Executive Assistant
1--fRThJ
HRGreenu
ATTACHMENT A - 1
PROFESSIONAL SERVICES AGREEMENT AMENDMENT
For
City of Elgin 2021 Gifford Park Resurfacing Project
Preliminary Engineering Services
Mike Pubentz
City of Elgin
150 Dexter Court
Elgin, IL, 60120
847.931.6081
Akram Chaudhry, P.E.
Vice President
HR Green, Inc.
420 N Front Street
McHenry, IL, 60050
HR Green Project Number: 200067
Version 2.1 02212019
TABLE OF CONTENTS
1.0 PROJECT UNDERSTANDING
2.0 SCOPE OF SERVICES
3.0 PROFESSIONAL SERVICES FEE
Version2.1 02212019
THIS AGREEMENT is between CITY OF ELGIN (hereafter "CLIENT") and HR GREEN, INC.
(hereafter"COMPANY").
1.0 Project Understanding
1.1 General Understanding
This agreement hereby amends the original professional services agreement dated
February 10, 2021 for the 2021 Gifford Park Resurfacing Project. CLIENT has requested
additional locations to be included in the project at the following areas: Cooper-Congdon
alley, Prairie-Villa Flag alley, Lillie-Forest alley, West & East Forest-Preston alley, Cherry
Street alley, Spring-Center alley, Richert Court, Hill Avenue, Porter Street, and the
Hawthorne Hill Nature Center parking lot.
The work will include Preliminary Engineering tasks required for the preparation of proposal
documents, location map, typical sections, construction details, project specifications,
construction cost estimates, and all other related work necessary to complete the additions
for the proposal documents. Preparation of Preliminary Engineering documents will follow
CLIENT and Illinois Department of Transportation (IDOT) MFT standards and procedures.
2.0 Scope of Services
The CLIENT agrees to employ COMPANY to perform the following services:
2.1 PRELIMINARY ENGINEERING
A. Field Evaluation
COMPANY will perform a thorough field evaluation of the streets to be improved. The
field evaluation will obtain measurements, define the pavement improvement strategy,
and review existing sidewalk ramps for compliance with current ADA standards.
B. Quantity Calculations
From the field evaluation and measurements, COMPANY develop the related
quantities and opinions of probable construction cost. These costs will be determined
using pay items and the latest historical unit prices available for the area.
C. Roadway Design
Roadway typical sections, location maps, and construction details will be developed
showing resurfacing limits, sidewalk ramp locations, pavement patching, utility
structure adjustments, and curb improvements.
3.0 Professional Services Fee
3.1 Invoices
Invoices for COMPANY's services shall be submitted, on a monthly basis. Invoices shall
be due and payable within 30 days upon receipt.
3.2 Payment
The CLIENT AGREES to pay COMPANY on the following basis:
TASK HOURS COSTS
Preliminary Engineering
Field Visits, Project Administration 12 $1,710
Calculations and Quantities 16 $2,190
Roadway Design and Special Provisions 24 $4,000
Sub-Total 52 $7,900
Project Total 52 $7,900.00