HomeMy WebLinkAbout21-189 Resolution No. 21-189
RESOLUTION
AUTHORIZING EXECUTION OF A CHANGE ORDER NO. 1 AND FINAL WITH J.A.
JOHNSON PAVING CO. FOR 2021 COLUMBINE SQUARE RESURFACING PROJECT
(BID 21-049)
WHEREAS,the City of Elgin has heretofore entered into a contract with J.A.Johnson Paving
Co. for 2021 Columbine Square resurfacing project(Bid 21-049); and
WHEREAS, it is necessary and desirable to modify the terms of the agreement as is
described in Change Order No. 1 and Final attached hereto.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
ELGIN,ILLINOIS,that Richard G.Kozal,City Manager,be and is hereby authorized and directed to
execute Change Order No. 1 and Final,a copy of which is attached hereto and made a part hereof by
reference.
s/David J. Kaptain
David J. Kaptain, Mayor
Presented: December 15, 2021
Adopted: December 15, 2021
Omnibus Vote: Yeas: 9 Nays: 0
Attest:
s/Kimberly Dewis
Kimberly Dewis, City Clerk
I
j City of Elgin Change Order
ELGIN,ILLINOIS
PROJECT No.290003,409883,and 509962
CHANGE ORDER No. 1 AND FINAL
CONTRACT: 2021 Columbine Square Resurfacing Project—Bid 21-049
SCOPE: As construction of the Lords Park pedestrian and bicycle bath proceeded, several long-term
safety and maintenance issues were noted by Staff. To resolve those issues, the elevation and grade
along a portion of the path were lowered to better match the existing ground elevation which eliminated
significant grade changes and "drop-offs" at the edge of the path. In doing so, Staff was able to elimi-
nate steep slopes next to the path,which improves safety to path users and allows for more efficient and
effective long-term site maintenance.
REASONS FOR CHANGE:
• The path design elevation was established to minimize earth excavation and potential grade is-
sues on the uphill side of the path, which at the time were considered more problematic than
downhill slopes.
• The work performed under this Change Order is a direct extension of the scope and intent of the
original contract as signed.
• The implemented construction changes improves safety to path users and allows for more effi-
cient and effective long-term site maintenance which is in the best interests of the City of Elgin.
• The changes provided in this Change Order are germane to the original contract as signed and
this Change Order is in the best interest of the City of Elgin and authorized by law.
SUMMARY OF CHANGES IN CONTRACT AMOUNT: [State whether contract is being amended
as to cost. If the subject contract is being amended as to scope and cost, briefly describe the scope of
changes.]
ORIGINAL CONTRACT AMOUNT: $ 1,035,228.00
CHANGE ORDER No. I and Final
TOPSOIL EXCAVATION AND PLACEMENT -$1,960.00
TOPSOIL FURNISH AND PLACE, VAR DEPTH $486.00
EARTH EXCAVATION $16,080.90
SEEDING, CLASS 2A $825.00
AGGREGATE BASE COURSE,TYPE A 6" $6,877.27
HOT MIX ASPHALT BINDER CSE, IL-9.5,N50 -$8,120.00
HOT-MIX ASPHALT SURFACE CSE, IL-9.5, MIX "D",N50 $6,027.90
HOT-MIX ASPHALT SURFACE REMOVAL, 1.5" -$71.50
PIPE CULVERTS, CLASS C,TYPE 1 6" -$1,900.00
TREE TRIMMING -$190.00
BIKE PATH: FULL DEPTH PAVEMENT REMOVAL $570.00
LANDSCAPE EROSION CONTROL BLANKETS $14,895.80
UNDERCUTS LORDS PARK $4,663.10
4.0 OZ FABRIC 1 1.
TOTAL FOR CHANGE ORDER NO. I and FINAL: ADD $39,485.47
PREVIOUS CHANGE ORDER(S):None $0.00
TOTAL OF PREVIOUS CHANGE ORDERS: ADD $39,485.47
TOTAL REVISED CONTRACT AMOUNT: $1,074,713.47
The original amount of the contract with J.A.Johnson Paving Co. is$1,035,228.00. Change Order No. 1
and Final will increase the original contract amount by a total of$39,485.47 that sum representing
3.8 1%of the original contract amount.The new contract amount, inclusive of all change orders is
$1,074,713.47.
OTHER CONTRACT PROVISIONS: All other contract provisions remain the same.
CHANGE ORDER No. 1 and Final
Agreed to this 15 day of December ,2021.
Recommended by:
Public Works Department
By: Mike Pubentz
Title: Public Works Director
Date: November 19, 2021
Digitally signed by Mike 8obent,
/� DN:<n-Mike
PobenMo=City ofElgin.—Engirt ong,
Signature' M I e P u e n tz email=p,,Wn"-Wityafelgin.arg'c=US
Date'.2021.12.08 11:311.06-06'00'
Accepted by:
J.A.Johnson Paving Co.
Party of the Second Part(Contractor)
By: 01e„A h n.s 6
Title: j''E�.S
Date:
Signature:
Approved by:
I
CITY OF ELGIN
Party of the First Part(Owner)
By: Richard G. Kozal
Title: City Manager
Date: Decem , 021
Signature: