Loading...
HomeMy WebLinkAbout21-189 Resolution No. 21-189 RESOLUTION AUTHORIZING EXECUTION OF A CHANGE ORDER NO. 1 AND FINAL WITH J.A. JOHNSON PAVING CO. FOR 2021 COLUMBINE SQUARE RESURFACING PROJECT (BID 21-049) WHEREAS,the City of Elgin has heretofore entered into a contract with J.A.Johnson Paving Co. for 2021 Columbine Square resurfacing project(Bid 21-049); and WHEREAS, it is necessary and desirable to modify the terms of the agreement as is described in Change Order No. 1 and Final attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Richard G.Kozal,City Manager,be and is hereby authorized and directed to execute Change Order No. 1 and Final,a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: December 15, 2021 Adopted: December 15, 2021 Omnibus Vote: Yeas: 9 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk I j City of Elgin Change Order ELGIN,ILLINOIS PROJECT No.290003,409883,and 509962 CHANGE ORDER No. 1 AND FINAL CONTRACT: 2021 Columbine Square Resurfacing Project—Bid 21-049 SCOPE: As construction of the Lords Park pedestrian and bicycle bath proceeded, several long-term safety and maintenance issues were noted by Staff. To resolve those issues, the elevation and grade along a portion of the path were lowered to better match the existing ground elevation which eliminated significant grade changes and "drop-offs" at the edge of the path. In doing so, Staff was able to elimi- nate steep slopes next to the path,which improves safety to path users and allows for more efficient and effective long-term site maintenance. REASONS FOR CHANGE: • The path design elevation was established to minimize earth excavation and potential grade is- sues on the uphill side of the path, which at the time were considered more problematic than downhill slopes. • The work performed under this Change Order is a direct extension of the scope and intent of the original contract as signed. • The implemented construction changes improves safety to path users and allows for more effi- cient and effective long-term site maintenance which is in the best interests of the City of Elgin. • The changes provided in this Change Order are germane to the original contract as signed and this Change Order is in the best interest of the City of Elgin and authorized by law. SUMMARY OF CHANGES IN CONTRACT AMOUNT: [State whether contract is being amended as to cost. If the subject contract is being amended as to scope and cost, briefly describe the scope of changes.] ORIGINAL CONTRACT AMOUNT: $ 1,035,228.00 CHANGE ORDER No. I and Final TOPSOIL EXCAVATION AND PLACEMENT -$1,960.00 TOPSOIL FURNISH AND PLACE, VAR DEPTH $486.00 EARTH EXCAVATION $16,080.90 SEEDING, CLASS 2A $825.00 AGGREGATE BASE COURSE,TYPE A 6" $6,877.27 HOT MIX ASPHALT BINDER CSE, IL-9.5,N50 -$8,120.00 HOT-MIX ASPHALT SURFACE CSE, IL-9.5, MIX "D",N50 $6,027.90 HOT-MIX ASPHALT SURFACE REMOVAL, 1.5" -$71.50 PIPE CULVERTS, CLASS C,TYPE 1 6" -$1,900.00 TREE TRIMMING -$190.00 BIKE PATH: FULL DEPTH PAVEMENT REMOVAL $570.00 LANDSCAPE EROSION CONTROL BLANKETS $14,895.80 UNDERCUTS LORDS PARK $4,663.10 4.0 OZ FABRIC 1 1. TOTAL FOR CHANGE ORDER NO. I and FINAL: ADD $39,485.47 PREVIOUS CHANGE ORDER(S):None $0.00 TOTAL OF PREVIOUS CHANGE ORDERS: ADD $39,485.47 TOTAL REVISED CONTRACT AMOUNT: $1,074,713.47 The original amount of the contract with J.A.Johnson Paving Co. is$1,035,228.00. Change Order No. 1 and Final will increase the original contract amount by a total of$39,485.47 that sum representing 3.8 1%of the original contract amount.The new contract amount, inclusive of all change orders is $1,074,713.47. OTHER CONTRACT PROVISIONS: All other contract provisions remain the same. CHANGE ORDER No. 1 and Final Agreed to this 15 day of December ,2021. Recommended by: Public Works Department By: Mike Pubentz Title: Public Works Director Date: November 19, 2021 Digitally signed by Mike 8obent, /� DN:<n-Mike PobenMo=City ofElgin.—Engirt ong, Signature' M I e P u e n tz email=p,,Wn"-Wityafelgin.arg'c=US Date'.2021.12.08 11:311.06-06'00' Accepted by: J.A.Johnson Paving Co. Party of the Second Part(Contractor) By: 01e„A h n.s 6 Title: j''E�.S Date: Signature: Approved by: I CITY OF ELGIN Party of the First Part(Owner) By: Richard G. Kozal Title: City Manager Date: Decem , 021 Signature: