HomeMy WebLinkAbout21-156 Resolution No. 21-156 RESOLUTION AUTHORIZING EXECUTION OF A CHANGE ORDER NO. 1 AND FINAL WITH TRINE CONSTRUCTION CORPORATION FOR LORD STREET BASIN COMBINED SEWER SEPARATION PHASE 5 (BID 19-027) WHEREAS,the City of Elgin has heretofore entered into a contract with Trine Construction Corporation for Lord Street basin combined sewer separation phase 5 (Bid 19-027); and WHEREAS,it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 and Final attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS,that pursuant to Elgin Municipal Code Section 5.02.020B(9)the City Council hereby finds that an exception to the requirements of the procurement ordinance is necessary and in the best interest of the city; and BE IT FURTHER RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS,that Richard G.Kozal,City Manager,be and is hereby authorized and directed to execute Change Order No. 1 and Final, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: October 27, 2021 Adopted: October 27, 2021 Omnibus Vote: Yeas: 9 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk City of Elgin Change Order S�OF Et C�� ,i ELGIN,ILLINOIS �irrr PROJECT# CHANGE ORDER No. 1 and Final CONTRACT: Bid No. 19-027-Lord Street Combined Sewer Separation-Phase V SCOPE: During excavation along Illinois Route 31 for the proposed 18-inch PVC sanitary sewer,the contractor encountered challenging ground conditions which caused unexpected curb damage on the west side of Illinois Route 31. These ground conditions required additional landscape restoration, in addition to the concrete curb repair. This change order addresses the cost for these additional items. REASONS FOR CHANGE: The proposed 18-inch PVC dedicated sanitary sewer line was installed on the west side of Illinois Route 31 between Lord Street and Orange Street at a depth of approximately 20.0-feet from existing grade. The existing ground is made up of mostly bank run soil. The bank run consists mostly of sand, dirt, and variable sizes of stone. Once this is disturbed,it is very difficult to maintain trench integrity as the ground continuously falls into the trench. The ground conditions are not stable. At depths of 20.0-feet,it becomes more difficult to maintain the stability of the trench walls. The existing curb along the west side of Illinois Route 31 was undermined and fell into the trench during the necessary excavation activities. The larger trench due to soil instability also increased the area required for landscape restoration, and this caused a cost increase. The changes provided in this Change Order No. 1 and Final are germane to the original contract as signed and this Change Order No. 1 and Final is in the best interest of the City of Elgin and authorized by law. SUMMARY OF CHANGES IN CONTRACT AMOUNT: The additional cost is for the installation of approximately 300.0—linear feet of barrier curb and additional landscaping required for restoration of the affected area on Illinois Route 31 between Lord Street and Orange Street due to poor ground conditions. ORIGINAL CONTRACT AMOUNT: $3,722,353.00 CHANGE ORDER NO. 1 and Final Curb work and landscaping TOTAL FOR CHANGE ORDER NO. 1: ADD $ 41,413.97 PREVIOUS CHANGE ORDER(S): Change Order No.N/A $0.00 TOTAL OF PREVIOUS CHANGE ORDERS: ADD $0.00 TOTAL REVISED CONTRACT AMOUNT: $3,763,766.97 The original amount of the contract with Trine Construction is $3,722,353.00. Change Order No. 1 and Final totaling $41,413.97 will increase the original contract amount by a total of$41,413.97, that sum representing approximately one and eleven hundredths of a percent (1.11%) of the original contract amount. The new contract amount, inclusive of all change orders is $3,763,766.97 OTHER CONTRACT PROVISIONS: All other contract provisions remain the same. CHANGE ORDER No. 1 and Final Agreed to this 27 day of October ,2021. Recommended by: WATER DEPARTMENT By: Eric Weiss Title: Water Director Date: Iv - 6 902 Signature: Accepted by: TRINE CONSTRUCTION CORPORATION Party of the Second Part(Contractor) By: Michael Rendina Title: President Date: /0 -S- L Signature: t Approved by: CITY OF ELGIN -- Party of the First Part(Owner) By: Richard G. Kozal Title: City Manager_ Date: Oct , 2021 Signature: 6‘( F:\Legal Dept\Agreement\Trine Construction-Change Order No.1&Final-Bid 20-037-Misc Sewer Project 2020-Clean 7-20-21.docx it