HomeMy WebLinkAbout21-115 Resolution No. 21-115
RESOLUTION
AUTHORIZING EXECUTION OF AN AGREEMENT WITH GEWALT HAMILTON
ASSOCIATES,INC. FOR PROFESSIONAL SERVICES IN CONNECTION WITH THE 2021
CDBG NEIGHBORHOOD STREETS RESURFACING PROJECT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that
pursuant to Elgin Municipal Code Section 5.02.020B(9) the City Council hereby finds that an
exception to the requirements of the procurement ordinance is necessary and in the best interest of
the city; and
BE IT FURTHER RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,
ILLINOIS, that Richard G. Kozal, City Manager, and Kimberly A. Dewis, City Clerk, be and are
hereby authorized and directed to execute an Agreement on behalf of the City of Elgin with Gewalt
Hamilton Associates, Inc., for professional services in connection with the 2021 CDBG
Neighborhood Streets Resurfacing Project,a copy of which is attached hereto and made apart hereof
by reference.
s/David J. Kaptain
David J. Kaptain, Mayor
Presented: August 11, 2021
Adopted: August 11, 2021
Omnibus Vote: Yeas: 9 Nays: 0
Attest:
s/Kimberly Dewis
Kimberly Dewis, City Clerk
AGREEMENT
THIS AGREEMENT is made and entered into this 11th day of August , 2021 , by
and between the CITY OF ELGIN, an Illinois municipal corporation (hereinafter referred to as
"CITY") and Gewalt Hamilton Associates, Inc., an Illinois corporation (hereinafter referred to as
"ENGINEER").
WHEREAS, the CITY desires to engage the ENGINEER to furnish certain professional
services in connection with the 2021 CDBG Neighborhood Streets Resurfacing Project
(hereinafter referred to as the PROJECT); and
WHEREAS, the ENGINEER represents that it is in compliance with Illinois Statutes
relating to professional registration of individuals and has the necessary expertise and experience
to furnish such services upon the terms and conditions set forth herein below.
NOW, THEREFORE, it is hereby agreed by and between the CITY and the ENGINEER
that the CITY does hereby retain the ENGINEER for and in consideration of the mutual promises
and covenants contained herein, the sufficiency of which is hereby acknowledged to act for and
represent it in the engineering matters involved in the PROJECT as described herein, subject to
the following terms and conditions and stipulations,to-wit:
1. SCOPE OF SERVICES
A. All work hereunder shall be performed under the direction of the Director of Public
Works of the CITY,herein after referred to as the"DIRECTOR".
B. Services included are as follows: Construction full time observation, report
preparation and distribution,resident correspondence,quantity verification,County
coordination, and construction layout, as needed.
C. A detailed Scope of Services for the PROJECT is attached hereto as Attachment A,
and incorporated into this Agreement by this reference.
D. This Agreement with the ENGINEER is germane to the original Agreement with
the ENGINEER with respect to the PROJECT as signed and this Agreement is in
the best interest of the CITY and authorized by law.
2. PROGRESS REPORTS
A. An outline project milestone schedule is provided hereinunder.
a.July 28,2021;Construction Contract Award
b.August 12,2021; Construction Engineering Services Notice to Proceed
c.August 16,2021;Begin Construction
d.October 1,2021; Substantial construction completion
e.October 8,2021;Final Project Close out
B. A detailed project schedule for the PROJECT is included as Attachment B,attached
hereto, and incorporated into this Agreement by this reference. Progress will be
recorded on the project schedule and submitted monthly as a component of the
Status Report described in C below.
C. The ENGINEER will submit to the DIRECTOR monthly a status report keyed to
the project schedule. A brief narrative will be provided identifying progress,
findings and outstanding issues.
3. WORK PRODUCTS
All work product prepared by the ENGINEER pursuant hereto including, but not limited to,
reports, plans, designs, calculations, work drawings, studies, photographs, models and
recommendations shall be the property of the CITY and shall be delivered to the CITY upon
request of the DIRECTOR; provided, however, that the ENGINEER may retain copies of such
work product for its records. ENGINEER'S execution of this Agreement shall constitute
ENGINEER'S conveyance and assignment of all right,title and interest, including but not limited
to any copyright interest, by the ENGINEER to the CITY of all such work product prepared by
the ENGINEER pursuant to this Agreement. The CITY shall have the right either on its own or
through such other engineers as determined by the CITY to utilize and/or amend such work
product. Any such amendment to such work product shall be at the sole risk of the CITY. Such
work product is not intended or represented to be suitable for reuse by the CITY on any extension
to the PROJECT or on any other project, and such reuse shall be at the sole risk of the CITY
without liability or legal exposure to the ENGINEER.
4. PAYMENTS TO THE ENGINEER(Not To Exceed Method)
A. For services provided the ENGINEER shall be paid at the rates indicated on
Attachment C, attached with the total fee not to exceed $63,500.00 regardless of
the actual costs incurred by the ENGINEER unless substantial modifications to the
scope of the work are authorized in writing by the DIRECTOR, and approved by
way of written amendment to this Agreement executed by the parties.
B. For outside services provided by other firms or subconsultants,the CITY shall pay
the ENGINEER the invoiced fee to the ENGINEER. The cost of any such outside
services is included within the total not-to-exceed amount of$63,500.00 provided
for in Section 4A above.
C. The cost of any such reimbursable expenses is included within the total not-to-
exceed amount of $63,500.00 provided for in Section 4A above. Reimbursable
costs include company vehicle use and resident documentation generation.
D. The CITY shall make periodic payments to the ENGINEER based upon actual
progress within 30 days after receipt and approval of invoice. Said periodic
payments to the ENGINEER shall not exceed the amounts shown in the following
-2-
schedule, and full payments for each task shall not be made until the task is
completed and accepted by the DIRECTOR.
Invoice Anticipated Date of Estimated Percentage of Estimated Percentage
Number Invoice Amount of Work Amount of Work
Invoice Completed Remaining Remaining
1 August 27,2021 $15,875.00 25% $47,625.00 75%
2 1 September 17,2021 1 $31,750.00 1 75% 1 $15,875.00 1 25%
3 October 18, 2021 1 $15,875.00 1 100% 1 0% 10%
E. A summary of expected tasks, labor efforts, fees and direct costs is attached as
Attachment D.
5. INVOICES
A. The ENGINEER shall submit invoices in a format approved by the CITY. Progress
reports(2C above)will be included with all payment requests.
B. The ENGINEER shall maintain records showing actual time devoted and cost
incurred. The ENGINEER shall permit the authorized representative of the CITY
to inspect and audit all data and records of the ENGINEER for work done under
this Agreement. The ENGINEER shall make these records available at reasonable
times during the Agreement period, and for a year after termination of this
Agreement.
6. TERMINATION OF AGREEMENT
Notwithstanding any other provision hereof,the CITY may terminate this Agreement at any time
upon fifteen (15) days prior written notice to the ENGINEER. In the event that this Agreement is
so terminated, the ENGINEER shall be paid for services actually performed and reimbursable
expenses actually incurred prior to termination, except that reimbursement shall not exceed the
task amounts set forth under section 4 above.
7. TERM
This Agreement shall become effective as of the date the ENGINEER is given a notice to proceed
and, unless terminated for cause or pursuant to section 6, shall be deemed concluded on the date
the CITY determines that all of the ENGINEER's work under this Agreement is completed. A
determination of completion shall not constitute a waiver of any rights or claims which the CITY
may have or thereafter acquire with respect to any term or provision of the Agreement.
8. NOTICE OF CLAIM
If the ENGINEER wishes to make a claim for additional compensation as a result of action taken
by the CITY,the ENGINEER shall give written notice of his claim within 15 days after occurrence
of such action. No claim for additional compensation shall be valid unless so made. Any changes
-3 -
in the ENGINEER's fee shall be valid only to the extent that such changes are included in writing
signed by the CITY and the ENGINEER. Regardless of the decision of the DIRECTOR relative
to a claim submitted by the ENGINEER, all work required under this Agreement as determined
by the DIRECTOR shall proceed without interruption.
9. BREACH OF CONTRACT
If either party violates or breaches any term of this Agreement, such violation or breach shall be
deemed to constitute a default, and the other party has the right to seek such administrative,
contractual or legal remedies as may be suitable to the violation or breach; and, in addition, if
either party,by reason of any default,fails within fifteen(15)days after notice thereof by the other
party to comply with the conditions of the Agreement, the other party may terminate this
Agreement. Notwithstanding the foregoing, or anything else to the contrary in this Agreement,
with the sole exception of an action to recover the monies the CITY has agreed to pay to the
ENGINEER pursuant to section 4 hereof, no action shall be commenced by the ENGINEER
against the CITY for monetary damages. ENGINEER hereby further waives any and all claims or
rights to interest on money claimed to be due pursuant to this Agreement, and waives any and all
such rights to interest which it claims it may otherwise be entitled pursuant to law, including, but
not limited to,the Local Government Prompt Payment Act(50 ILCS 50111, et seq.), as amended,
or the Illinois Interest Act(815 ILCS 205/1,et seq.),as amended. The parties hereto further agree
that any action by the ENGINEER arising out of this Agreement must be filed within one year of
the date the alleged cause of action arose or the same will be time-barred. The provisions of this
section shall survive any expiration,completion and/or termination of this Agreement.
10. INDEMNIFICATION
To the fullest extent permitted by law,ENGINEER agrees to and shall indemnify,defend and hold
harmless the CITY, its officers,employees,agents,boards and commissions from and against any
and all claims, suits,judgments, costs, attorneys fees, damages or other relief, including but not
limited to workers compensation claims, in any way resulting from or arising out of negligent
actions or omissions of the ENGINEER in connection herewith,including negligence or omissions
of employees or agents of the ENGINEER arising out of the performance of this Agreement. In
the event of any action against the CITY, its officers, employees, agents,boards or commissions,
covered by the foregoing duty to indemnify, defend and hold harmless such action shall be
defended by legal counsel of the CITY's choosing. The provisions of this section shall survive any
expiration and/or termination of this Agreement.
11. NO PERSONAL LIABILITY
No official, director, officer, agent or employee of the CITY shall be charged personally or held
contractually liable under any term or provision of this Agreement or because of their execution,
approval or attempted execution of this Agreement.
-4-
12. INSURANCE
The ENGINEER shall provide,pay for and maintain in effect, during the term of this Agreement,
the following types and amounts of insurance:
A. Comprehensive Liability. The ENGINEER shall provide, pay for and maintain
in effect, during the term of this Agreement, a policy of comprehensive general
liability insurance with limits of at least$1,000,000 aggregate for bodily injury and
$1,000,000 aggregate for property damage.
The ENGINEER shall deliver to the DIRECTOR a Certification of Insurance
naming the CITY as additional insured. The policy shall not be modified or
terminated without thirty(30)days prior written notice to the DIRECTOR.
The Certificate of Insurance which shall include Contractual obligation assumed by
the ENGINEER under Article 10 entitled"Indemnification" shall be provided.
This insurance shall apply as primary insurance with respect to any other insurance
or self-insurance programs afforded to the CITY. There shall be no endorsement
or modification of this insurance to make it excess over other available insurance,
alternatively,if the insurance states that it is excess or prorated,it shall be endorsed
to be primary with respect to the CITY.
B. Comprehensive Automobile Liability. Comprehensive Automobile Liability
Insurance covering all owned, non-owned and hired motor vehicles with limits of
not less than$500,000 per occurrence for damage to property.
C. Combined Single Limit Policy. The requirements for insurance coverage for the
general liability and auto exposures may be met with a combined single limit of
$1,000,000 per occurrence subject to a$1,000,000 aggregate.
D. Professional Liability. The ENGINEER shall carry Engineers Professional
Liability Insurance Covering claims resulting from error, omissions or negligent
acts with a combined single limit of not less than $1,000,000 per occurrence. A
Certificate of Insurance shall be submitted to the DIRECTOR as evidence of
insurance protection. The policy shall not be modified or terminated without thirty
(30)days prior written notice to the DIRECTOR.
13. CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES,
PROCEDURES AND SAFETY
The ENGINEER shall not have control over or charge of and shall not be responsible for
construction means, methods, techniques, sequences or procedures, or for safety precautions and
programs in connection with the construction, unless specifically identified in the Scope of
Services.
- 5 -
14. NONDISCRIMINATION
In all hiring or employment made possible or resulting from this Agreement, there shall be no
discrimination against any employee or applicant for employment because of sex,age,race,color,
creed, national origin,marital status, of the presence of any sensory, mental or physical handicap,
unless based upon a bona fide occupational qualification, and this requirement shall apply to, but
not be limited to, the following: employment advertising, layoff or termination, rates of pay or
other forms of compensation and selection for training, including apprenticeship.
No person shall be denied or subjected to discrimination in receipt of the benefit of any services
or activities made possible by or resulting from this Agreement on the grounds of sex,race,color,
creed, national origin, age except minimum age and retirement provisions, marital status or the
presence of any sensory, mental or physical handicap. Any violation of this provision shall be
considered a violation of a material provision of this Agreement and shall be grounds for
cancellation,termination or suspension, in whole or in part, of the Agreement by the CITY.
15. ASSIGNMENT AND SUCCESSORS
This Agreement and each and every portion thereof shall be binding upon the successors and the
assigns of the parties hereto; provided, however, that no assignment shall be made without the
prior written consent of the CITY.
16. DELEGATIONS AND SUBCONTRACTORS
Any assignment,delegation or subcontracting shall be subject to all the terms,conditions and other
provisions of this Agreement and the ENGINEER shall remain liable to the CITY with respect to
each and every item,condition and other provision hereof to the same extent that the ENGINEER
would have been obligated if it had done the work itself and no assignment, delegation or
subcontract had been made. Any proposed subcontractor shall require the CITY's advanced
written approval.
17. NO CO-PARTNERSHIP OR AGENCY
This Agreement shall not be construed so as to create a partnership,joint venture, employment or
other agency relationship between the parties hereto.
18. SEVERABILITY
The parties intend and agreed that, if any section,sub-section,phrase,clause or other provision of
this Agreement, or any portion thereof, shall be held to be void or otherwise unenforceable, all
other portions of this Agreement shall remain in full force and effect.
19. HEADINGS
The headings of the several sections of this Agreement are inserted only as a matter of convenience
and for reference and in no way are they intended to define, limit or describe the scope of intent of
-6-
any provision of this Agreement,nor shall they be construed to affect in any manner the terms and
provisions hereof or the interpretation or construction thereof.
20. MODIFICATION OR AMENDMENT
This Agreement and its attachments constitutes the entire Agreement of the parties on the subject
matter hereof and may not be changed, modified, discharged or extended except by written
amendment duly executed by the parties. Each party agrees that no representations or warranties
shall be binding upon the other party unless expressed in writing herein or in a duly executed
amendment hereof,or change order as herein provided.
21. APPLICABLE LAW
This Agreement shall be deemed to have been made in,and shall be construed in accordance with
the laws of the State of Illinois.Venue for the resolution of any disputes or the enforcement of any
rights pursuant to this Agreement shall be in the Circuit Court of Kane County, Illinois.
22. NEWS RELEASES
The ENGINEER may not issue any news releases without prior approval from the DIRECTOR,
nor will the ENGINEER make public proposals developed under this Agreement without prior
written approval from the DIRECTOR prior to said documentation becoming matters of public
record.
23. COOPERATION WITH OTHER CONSULTANTS
The ENGINEER shall cooperate with any other consultants in the CITY's employ or any work
associated with the PROJECT.
24. INTERFERENCE WITH PUBLIC CONTRACTING
The ENGINEER certifies hereby that it is not barred from bidding on this contract as a result of a
violation of 720 ILCS 5/33E et seq. or any similar state or federal statute regarding bid rigging.
25. SEXUAL HARASSMENT
As a condition of this contract,the ENGINEER shall have written sexual harassment policies that
include,at a minimum,the following information:
A. the illegality of sexual harassment;
B. the definition of sexual harassment under state law;
C. a description of sexual harassment, utilizing examples;
D. the vendor's internal complaint process including penalties;
-7 -
E. the legal recourse, investigative and complaint process available through the
Illinois Department of Human Rights, and the Illinois Human Rights Commission;
F. directions on how to contact the department and commission;
G. protection against retaliation as provided by Section 6-101 of the Human Rights
Act.
A copy of the policies shall be provided by ENGINEER to the Department of Human Rights upon
request(775 ILCS 5/2-105).
26. SUBSTANCE ABUSE PROGRAM.
As a condition of this agreement, ENGINEER shall have in place a written substance abuse
prevention program which meets or exceeds the program requirements in the Substance Abuse
Prevention Public Works Project Act at 820 ILCS 265/1 et seq. A copy of such policy shall be
provided to the DIRECTOR prior to the entry into and execution of this agreement.
27. WRITTEN COMMUNICATIONS
All recommendations and other communications by the ENGINEER to the DIRECTOR and to
other participants which may affect cost or time of completion, shall be made or confirmed in
writing. The DIRECTOR may also require other recommendations and communications by the
ENGINEER be made or confirmed in writing.
28. NOTICES
All notices,reports and documents required under this Agreement shall be in writing and shall be
mailed by First Class Mail,postage prepaid, addressed as follows:
A. As to CITY: B. As to ENGINEER:
Mike Pubentz, P.E. Carissa Smith, P.E.
Public Works Director 625 Forest Edge Drive
City of Elgin Vernon Hills, IL 60061
150 Dexter Court
Elgin, Illinois 60120-5555
29. COMPLIANCE WITH LAWS
Notwithstanding any other provision of this Agreement it is expressly agreed and understood that
in connection with the performance of this Agreement that the ENGINEER shall comply with all
applicable Federal, State, City and other requirements of law, including, but not limited to, any
applicable requirements regarding prevailing wages, minimum wage, workplace safety and legal
status of employees. Without limiting the foregoing,ENGINEER hereby certifies,represents and
- 8 -
warrants to the CITY that all ENGINEER'S employees and/or agents who will be providing
products and/or services with respect to this Agreement shall be legally authorized to work in the
United States. ENGINEER shall also at its expense secure all permits and licenses,pay all charges
and fees and give all notices necessary and incident to the due and lawful prosecution of the work,
and/or the products and/or services to be provided for in this Agreement. The CITY shall have the
right to audit any records in the possession or control of the ENGINEER to determine
ENGINEER'S compliance with the provisions of this section. In the event the CITY proceeds
with such an audit the ENGINEER shall make available to the CITY the ENGINEER'S relevant
records at no cost to the CITY. ENGINEER shall pay any and all costs associated with any such
audit.
30. EXECUTION
This agreement may be executed in counterparts, each of which shall be an original and all of
which shall constitute one and the same agreement. For the purposes of executing this agreement,
any signed copy of this agreement transmitted by fax machine or e-mail shall be treated in all
manners and respects as an original document. The signature of any party on a copy of this
agreement transmitted by fax machine or e-mail shall be considered for these purposes as an
original signature and shall have the same legal effect as an original signature. Any such faxed or
e-mailed copy of this agreement shall be considered to have the same binding legal effect as an
original document. At the request of either party any fax or e-mail copy of this agreement shall be
re-executed by the parties in an original form. No party to this agreement shall raise the use of fax
machine or e-mail as a defense to this agreement and shall forever waive such defense.
IN WITNESS WHEREOF, the parties hereto have entered into and executed this
Agreement effective as of the date and year first written above.
FOR THE CITY: FOR THE ENGINEER:
By By:
City Manager
Name/Print: Carissa Smith, P.E.
Title: Senior Engineer
Ztl'6��al-e�
City Clerk
FALegal Dept\AgreemenAENGINEERING AGREEMENT-FORM-clean-10-2-18.docx
-9 -
ATTACHMENT A
SCOPE OF SERVICES
1. Construction Engineering
GHA will provide the following services:
1. Oversee a scheduled pre-construction meeting with project stakeholders prior to
the start of construction and provide the meeting attendees with a summary in the
form of Minutes for their records.
2. Review drawings,diagrams,illustrations,brochures,catalog cuts,shop drawings,
project schedules, and other data which the contractor is required to submit for
conformance with the design concept and compliance with the contract
documents.
3. Attend and moderate weekly meetings on site with the Contractor and City staff.
4. GHA to provide daily and weekly updates to City for their use with their 311
community outreach system.
5. GHA to conduct coordination with the County and facilitate required
documentation for the CDBG funding.
6. GHA will provide dedicated staff certified in IDOT Documentation of Contract
Quantities to serve as the Resident Engineer(R.E.),provide detailed construction
documentation for the project duration, and ensure the site is built to general
conformance with the contract plans and specifications. We will utilize our
IDOT-based documentation format to provide Daily Reports, progress quantity
documentation, Quantity Book to track daily quantities, Pay Estimates,
Authorizations,and numerous other documents. GHA will keep a project box on
site, including all the necessary up-to-date documentation in accordance with
standard procedures and IDOT's Documentation of Contract Quantities guide.
Once complete, we will provide the completed job box to the City upon project
close out.
7. The R.E.will coordinate with the City regarding construction scheduling and any
road closures,parking restrictions, lot closures, etc.
8. GHA will coordinate and distribute bi-lingual resident notifications,approved by
the City, at the beginning of the project and/or any impact to driveway.
9. GHA will provide full-time construction observation of the construction
operations and processes to ensure materials and procedures are in general
conformance with the contract documents.
This proposal is based on an estimated construction schedule of 6 weeks at 40
hours per week for a Staff Engineer or Engineering Technician. If construction
activities extend beyond the estimated 6 weeks,due to tasks out of GHA's control
or the contractor's failure to complete the project within the estimated 6 weeks,
we will request additional service requests to account for GHA's additional time.
10. We are anticipating this project to be on a full-time basis; therefore, GHA will
conduct site visits and generate field reports for each visit within the allocated
time frame.We will measure,record,and provide source documentation daily for
all quantities for which payment will be made, and we will adhere to general
IDOT requirements regarding inspection rates, including, but not limited to,
depth checks,subgrade proof-rolls,yield requirements,and material weight ticket
collection to help facilitate a timely project closeout.
11. If a field change or Authorization is required, whether force account or agreed
unit price,GHA will notify and advise the City prior to making any decisions that
may affect the budget. In addition, our documentation of the Contractor's daily
activities will help provide sufficient information to permit verification of the
nature and costs of any changes in plans or authorized extra work.
12. GHA will contract and coordinate with our subconsultant, who will administer
the quality assurance testing for the field and laboratory requirements regarding
hot-mix asphalt, concrete, soils, and aggregate quality. We will confirm and
document that all the materials used on the site meet or exceed the quality
requirements of the contract.
13. GHA will perform daily traffic control inspections in addition to those required
weekly, and respectively submit deficient remarks to the Contractor with
appropriate corrections requested.
14. GHA will make observations of the utility marks provided by the J.U.L.I.E.
system and address potential conflicts with the Contractor.
15. GHA will establish a formal Pay Estimate schedule, and ensure all parties are in
accordance with the intervals. GHA will prepare monthly pay requests for the
City's review and provide the required documentation and correspondence
necessary for the City to recommend payment.We anticipate two(2)pay requests
utilizing the assumed 6-week construction schedule, and one (1) final pay
estimate upon project closure.
16. GHA will schedule a "substantial completion" walk-through upon project
substantial completion with the Contractor and City's representatives to generate
a punch list of deficiencies. Once punch list items are complete, GHA will
coordinate and conduct a final inspection of the project with City representatives.
17. GHA will verify the compliance with all regulatory permits and document the
close out of these permits.
18. GHA will coordinate contract closeout procedures with the Contractor,City, and
permitting agencies to ensure an expedient and productive closeout.
2. Construction Layout
1. GHA will confirm the existing horizontal and vertical site control network that was
established at the time of the existing conditions survey. The horizontal and vertical
control will be offset to areas that will not be disturbed. Control will be maintained
throughout the duration of the project.
2. GHA will layout the proposed sidewalk along Silver Court,per plan,prior to
construction commencing.
3. GHA anticipates one visit per layout entity for a total of one visit. Any additional
visits due to removal or damage of layout stakes will be provided as an additional
service.
- I1 -
ATTACHMENT B
PROJECT SCHEDULE
2021 CDBG Neighborhood Street Resurfacing Program
PROJECT CONSTRUCTION SCHEDULE
7/14/2021
PROPOSED PROJECT TASKS Jul-21 Aug-21 Sep-21 Oct-21
Contract Award (7/28/21)
Construction Engineering Services Notice to Proceed (8/12/21)
Construction Pre-construction meeting(8/12/21)-tentative
Construction Start(8/16/21)
Construction duration (8/16/21—10/1/21)
Substantial Completion (10/1/21)
Final Completion (10/8/21)
ATTACHMENT C
EMPLOYEE CLASSIFICATIONS AND RATES
GHA PROFESSIONAL SERVICES HOURLY RATE GUIDE:
2021
The following rates will remain in effect until December 31, 2021, at which time they are
subject to an annual increase:
PRINCIPAL $ 222.00
CIVIL ENGINEER VI $ 190.00
CIVIL ENGINEER V $ 186.00
CIVIL ENGINEER IV $ 184.00
CIVIL ENGINEER III $ 165.00
CIVIL ENGINEER II $ 155.00
CIVIL ENGINEER 1 $ 135.00
LAND SURVEYOR IV $ 158.00
LAND SURVEYOR III $ 136.00
LAND SURVEYOR II $ 132.00
LAND SURVEYOR 1 $ 124.00
GIS PROFESSIONAL III $ 165.00
GIS PROFESSIONAL II $ 144.00
GIS PROFESSIONAL 1 $ 134.00
AICP II $ 128.00
ENVIRONMENTAL CONS. II $ 140.00
ENVIRONMENTAL CONS. 1 $ 128.00
ENGINEERING TECHNICIAN V $ 184.00
ENGINEERING TECHNICIAN IV $ 140.00
ENGINEERING TECHNICIAN III $ 128.00
ENGINEERING TECHNICIAN II $ 112.00
ENGINEERING TECHNICIAN 1 $ 84.00
ADMINISTRATIVE 1 $ 68.00
Services provided under this Agreement will be billed according to the rates in effect at
the time services are rendered.
- 13 -
ATTACHMENT D
COST BREAKDOWN
1. Construction Layout(12 hours) $ 1,800.00
2. Construction Observation(234 hours) $ 37,000.00
3. Construction Coordination and documentation(80 hours) $ 16,200.00
4. Project Close out(20 hours) $3,000.00
5. Material Testing(Subconsultant)(20 hours) $4,000.00
6.Reimbursables(Vehicle use,Documentation Printing) $ 1,500.00
Total: S63,500.00
- 14 -