HomeMy WebLinkAbout21-107 Resolution No. 21-107
RESOLUTION
AUTHORIZING EXECUTION OF A CHANGE ORDER NO. 2 WITH RAMBOLL
AMERICAS INTEGRATED SOLUTIONS, INC. F/K/A O'BRIEN& GERE, INC. OF NORTH
AMERICA FOR THE ENVIRONMENTAL REMEDIATION OF CITY OF ELGIN
PROPERTY AT 40 ANN STREET,ELGIN, ILLINOIS
WHEREAS,the City of Elgin has heretofore entered into a contract with Ramboll Americas
Integrated Solutions,Inc.f/k/a O'Brien&Gere,Inc.of North America for environmental remediation
of City of Elgin property at 40 Ann Street, Elgin, Illinois; and
WHEREAS,it is necessary and desirable to modify the terms of the contract as is described
in Change Order No. 2 attached hereto.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
ELGIN, ILLINOIS,that pursuant to Elgin Municipal Code Section 5.02.020B(9)the City Council
hereby finds that an exception to the requirements of the procurement ordinance is necessary and in
the best interest of the city; and
BE IT FURTHER RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,
ILLINOIS,that Richard G.Kozal,City Manager,be and is hereby authorized and directed to execute
Change Order No. 2, a copy of which is attached hereto and made a part hereof by reference.
s/David J. Kaptain
David J. Kaptain, Mayor
Presented: July 28, 2021
Adopted: July 28, 2021
Vote: Yeas: 9 Nays: 0
Attest:
s/Kimberly Dewis
Kimberly Dewis, City Clerk
i
r City of Elgin Change Order
CHANGE ORDER No. 2
PROJECT: Environmental remediation of City of Elgin property at 40 Ann Street, Elgin, Illinois
CONTRACT: August 26, 2020 Agreement between the City of Elgin and O'Brien & Gere, Inc. of
North America,part of Ramboll and its affiliates, ("Consultant') for environmental remediation services
including 40 Ann Street, Elgin, IL.
SCOPE: Provide for additional soil remediation services for the city-owned property at 40 Ann Street,
Elgin, IL,pursuant to the Consultant's proposal dated April 28, 2021, attached hereto as Exhibit A.
REASONS FOR CHANGE: Additional contaminated soils were encountered beyond the anticipated
limits of excavation in a remediation area at the southerly portion of the subject property and an area ad-
jacent to the Ann Street right-of-way. Additional excavation and removal of these contaminated soils is
appropriate.
• The circumstances said to necessitate the change in performance were not reasonably foreseeable
at the time the contract was signed
• The change is germane to the original contract as signed
• The change order is in the best interests of the City of Elgin and authorized by law
SUMMARY OF CHANGES IN CONTRACT AMOUNT: The cost of the contract is being increased
pursuant to this Change Order No. 2 as follows:
ORIGINAL CONTRACT AMOUNT: 1 275 195.00
CHANGE ORDER NO. 1 $55,828.00
CHANGE ORDER NO. 2
Additional remediation services $122,590.00
TOTAL FOR CHANGE ORDER NO. 2: ADD $122,590.00
TOTAL REVISED CONTRACT AMOUNT: $1,453,613.00
The original amount of the contract with O'Brien & Gere, Inc. of North America Inc. is $1,275,195.00.
Change Order No. 1 dated December 16, 2020, added$55,828.00 to the amount of the contract. Change
Order No. 2 totaling $122,590.00 will increase the original contract amount by a total of$122,590.00,
that sum representing a 9.6 percent increase of the original contract amount. The new contract amount,
inclusive of all change orders is$1,453,613.00.
SCHEDULE: Consultant will conduct the additional work authorized pursuant to this Change Order
No. 2 within six weeks after receipt of authorization to proceed, weather permitting.
OTHER CONTRACT PROVISIONS: All other contract provisions of the original contract dated Au-
gust 26,2020, as previously amended by Change Order No. 1, remain the same.
CHANGE ORDER No. 2
Agreed to this 28th day of July, 2021.
Accepted by:
RAMBOLL AMERICAS INTEGRATED SOLUTIONS,INC,tka O'BRIEN& GERE,INC. OF
NORTH AMERICA
By: John M. Nardozzi
Title: Senior Managing Engineer
Date: July 19, 2021
Signature:
W.
Approved by:
CITY OF ELGIN
By: Richard G. Kozal
Title: City Manager
Date: July 28
Signature:
FALegal Dept\Agreement\O'Brien&Gere Engineers-Change Order No.2-40 Ann St-7-16-21.docx
EXHIBIT A
ENVIRONMENT
& HEALTH
Mr. William A. Cogley
Corporation Counsel
City of Elgin
150 Dexter Court
Elgin, IL 60120
Via email: cogley w@citvofelain.org
Request for Change Order No. 2 — Additional Soil Remediation
Services
Former Elgin Public Works Yard— 40 Ann Street
Dear Mr. Cogley: April 28,2021
Ramboll Americas Integrated Solutions, Inc., fka O'Brien & Gere Inc. of North
America, (Ramboll) is submitting this Change Order Request to provide for Ramboll
additional soil remediation services at the above referenced site. 333 W. Wacker Drive
Suite 2700
BACKGROUND Chicago, IL60606
USA
ELGIN PUBLIC WORKS YARD — 40 ANN STREET
T 312-288-3800
Of the six Soil Remediation Areas (SRAs) on the site, all six have been excavated www.ramboll.com
to the originally planned limits or further; including expansion of SRAs #4 and #5
associated with Change Order #1. Under Ramboll's existing contract with the City
of Elgin dated August 16, 2020, soil remediation services at the 40 Ann Street site Ref. 1950100024/63429
that were initiated in late August 2020 have proceeded such that the authorized
soil remediation quantities have been reached. Please refer to Exhibit B, where the
completed excavation areas are shown in blue shading.
However, based on the last completed confirmation soil samples, one soil sample
did not meet the remediation objectives. The single failed sample occurs at SRA4-
EW-098 as shown on Exhibit B, and is situated between SRA#4 and SRA#5. Full
attainment of the remedial objectives for the site will require the removal of
additional impacted soils in this area of the site and based on observed site
conditions it is considered necessary to remove the soil between SRA#4 and
SRA#5. Exhibit B shows this additional excavation area in yellow shading.
Further, in consultation with the City, it is noted that the confirmation samples
along the southeast boundary of the site indicate that further contamination is
present in the right-of-way of Ann Street. This area is not part of the defined Site
Remediation boundary per the original contract limits; however, removal of
impacted soils in this area is considered appropriate to facilitate future site
redevelopment. This area comprises a triangular shaped area between the westerly
end of Ann Street and the diagonally sloping property line of the Site (orange
shading on Exhibit B).
The current set of confirmation sample data supports the conclusion that further
remediation is warranted. At present, a total of six samples (SRA4-EW-093, SRA4-
EW-094, SRA4-EW-095, SRA4-EW-089, SRA4-EW-061 and SRA4-EW-097) are
1/4
CO#2-Elgin 40 Ann Street Addl Remediation.docx
m
above the soil remediation objectives. Extending the soil remediation to include this triangular shaped area
enable the remediation objectives to be attained without the introduction of any additional site use
restrictions, engineered barriers, or other controls which could impact the redevelopment plans for the site.
Further, the completion of this area will eliminate the need to return to this area in the event future
redevelopment activities impact this area.
In consultation with Ramboll's remediation subcontractor, Stiles, Inc. the following issues are impacting the
cost to complete the goals of the project:
• An additional site mobilization is required by the contractor to perform the remediation work.
• Fencing will be needed to protect the excavation area, especially since it is in the immediate area of
the existing bike path.
• Waste disposal costs have increased significantly since the project was originally bid in March 2020.
Stiles has recommended a change in the landfill (previously Orchard Hills Landfill in Davis Junction,
IL; proposed Winnebago County landfill owned by Waste Connections). During 2020, the Orchard
Hills facility was acquired by Waste Management from Advanced Disposal. Waste Management
allowed the landfill to accept the soils from this project through 2020, but will no longer accept waste
at the same disposal rate in 2021. To mitigate that cost increase, the change to the Winnebago
County facility is the recommended option.
• Backfill costs have increased by 20%.
• Although asphalt costs have also increased for 2021, Ramboll can absorb the material cost for
replacement of the bike path within the existing budget. The maximum replacement area is now
evaluated to be 125 LF.
To proceed with the remediation and meet the City's objectives for minimal restrictions on the property,
Ramboll proposes this Change Order #2 to provide funding for additional soil remediation services.
SCOPE OF SERVICES
Ramboll will perform the following additional remediation services at the site:
• Remobilization to the site; installation of safety fencing around the work area.
• Advance the excavation between SRA#4 and SRA#5 to eliminate contamination that exists in this region.
Located north of the property boundary and the bike path, the east-west limits of the excavation will be
defined by previous wall samples collected within SRA#4 and SRA#5. This will effectively conjoin these
two SRAs in which clean perimeter samples have been obtained and currently is occupied by clean
aggregate stone backfill. Expected depth of excavation is between 8-10 feet with an area of
approximately 1,700 square feet. This additional excavation area is within the property boundary of 40
Ann Street. The target area is depicted in Exhibit B as the yellow shaded area. The estimated additional
work quantities are as follows:
— 1,100 tons of impacted soil for removal and landfill disposal
— 1,175 tons of CA-6 backfill
— 40 CY of clean topsoil for restoration
• Continue the excavation from Change Order #1 to pursue impacted soils just outside the property
boundaries of the 40 Ann Street parcel. This region is the City of Elgin's property associated with the Ann
Street right of way and includes part of the bike path. Forming a triangle region as depicted in Exhibit B,
the area is approximately 800 square feet and located southeast of the property boundaries and north of
2/4
CO#2-Elgin 40 Ann Street Addl Remediation.docx
the Gail Borden Library. Expected depth of excavation is between 8-10 feet and will link to the other
excavated portions of 40 Ann Street at the property boundaries. The estimated additional work quantities
are as follows:
- 550 tons of impacted soil for removal and landfill disposal
- 575 tons of CA-6 backfill
- 20 CY of clean topsoil for restoration
• Oversight corresponding to additional work, Ramboll personnel will be present during excavation to
continue field management of subcontractors, coordination of utility clearance and sample collection for
up to 5 additional days of service.
• Additional soil samples will be required for the expanded excavation area. Ramboll anticipates 15 samples
will be required to confirm attainment of soil remediation objectives. Existing budget is available for this
laboratory work.
SCHEDULE
Ramboll will conduct the work within 6 weeks after receipt of authorization to proceed, weather permitting.
If this proposal meets with your approval, work may be initiated by returning a signed copy of the attached
Service Order.
BUDGET CHANGE
Ramboll proposes to complete the additional soil remediation work as described herein on a time and
materials/unit cost basis with a Change Order amount not-to-exceed $122,590.00. The Change Order
includes our subcontractor's costs, Ramboll's professional labor costs, travel and direct expenses required to
complete this scope of work.
The proposed additional work is estimated as follows and is broken down in more detail on Attachment 1:
Task No. Task Description Estimated Effort Estimated Cost
(hours)
CO-2.1 Subcontractor Costs -Additional Services $108,850
------- ---------------- -_, ----- ------- .... _. ---------------- ._-___
CO-2 2 Ramboll Oversight and Coordination 86 $11,890
-- -___- ---- _ ---_.-
CO-2.3 Other Direct Costs- Vehicles, Field Equip, Per Diem $1,850
Total 86 $122,590
The fee estimates are based on the project assumptions stated herein. All unit rates for subcontract work
will be held the same as the original contract and Ramboll will maintain the same labor rates through
June 20, 2021. Services will be performed in accordance with the terms and conditions of the Agreement
between Ramboll Americas Integrated Solutions, Inc. (formerly O'Brien & Gere Inc. of North America) and
the City of Elgin dated August 26, 2020.
3/4
C0#2-Elgin 40 Ann Street Addl Remediation.docx
-
We appreciate the opportunity to provide this proposal and look forward completing this project to meet the
objectives of the City of Elgin. Please feel free to contact the undersigned at 630-881-7226 or via email at
John.NardozziCdramboll.com, if you have any questions regarding this proposal.
Sincerely,
RAMBOLL AMERICAS ENGINEERING SOLUTIONS, INC.
AA 'NA- A
rnior
. Nardozzi, PE
anaging Engineer
D+1 773-796-4601
M+1 630-881-7226
iohn.nardozziaramboll.com
Attachments: Exhibit B - Location of Additional Soil Remediation
Change Order #2
Attachment 1 - Cost Summary
4/4
C0#2-Elgin 40 Ann Street Addl Remediation.docx
ADDITIONAL REMEDIATION AREA 1
g]ADDITIONAL REMEDIATION AREA 2
CM WORK COMPLETED
t POST EXCAVATION SAMPLING LOCATIONS
® EXCAVATION BOTTOM
® EXCAVATION WALL
a ■ RESAMPLE
Q SAMPLE ACHIEVED REMEDIATION
OBJECTIVE
6 • SAMPLE FAILED REMEDIATION OBJECTIVE
S
■ SAMPLE FAILED SOIL COMPONENT
40 ANN STREET PROPERTY BOUNDARY
L— (SURVEYED)
+�a � SRAS-EW-101
1,700 FT2 _ SRAS EB-023 3�
a �` SRAS-EW-100
n \
SRAS-EW-046 SRA5{B-050
SRA4{W-056 .Z SRAO=E A SRA4-EW-059R SRA5�B-025
` J l
SRA4-E W-059 SRAS-EB-050
SRA 5
SRA4-EB-030 1 SRAs-EW-0aS
SRAd EB-031 SRA4{B-032 8-10 FT
SRASEB-024 SRAS{W-081
jj
-k;
SRA4{B-032H� SRAS{B-024R
` \ SRAS-EW-065
SRA4{W-058 -�
SRA4{W-098 SRAS{B-028 `
',SRAd-EB-033 _, SRAS-EW443* SRAS-EB-021 � SRAS{a Vf151""
SRA4-EB436 SRA4{B-037 ' �j
)�SRAa-EB-037R'' 'SRAd-EB-062 0 10 20
/
I -J Feet
SRA4-EW-061 �_ SRA4-EB-061 SRAS-EW-044 SRAS{W-052
"-'� '"3RA 4 SRA4{w-064 SRA4-EW-097i ;'�.
;:_,•_X SRAd{B-029 : �".�- :. -m- —-——————————
__�___
ER
sRA4-EB-035WJ ! SRA4-EI3 4 SOIL ATOIORDAREA2
SRA4{B-029R SRA4{W-089 BIKE PATH ADDITIONAL S
sRA41W-0641 8-10 FT
SRA4-EB-034R -/SRA4-EW-054 SRA4{W-088
: SRA4{W-096
/ 4SRA4�w-osz AaEwa6a.� AREA 2
% \\ 800 FT2
� 4 SRAd EW-053 SRA4{8-058
SRA4{W-063R \ CITY OF ELGIN
gSRA4-EB-060 gSRA4-Ew-09a FORMER PUBLIC WORKS YARD
SRa4{g-063# SRA4-Ew-053R J ANN STREET =- „-v .. .._. 35-40 ANN STREET
\ x
SRA4-EB-0Sfi
sRAa-Ea-0s9\ ELGIN,KANE COUNTY.ILLINOIS
SRAd-EW-099(� o \ SRA4{W-093 C' CYO
SRA4-EW-090 ...K c..
SRAd-EB-057
Q
SRA4
( -EW-095 \ EXHIBIT B
___—______ �___—_—— SRA4{W-091 RA
. 12 \
Sd EW-092
e^ i l z
CHANGE ORDER TO PROFESSIONAL SERVICES AGREEMENT
Change Order No.: 2 Date: April 28, 2021
Project No.: 1950100024 Proposal No.: 63429
This Service Order to Professional Services Agreement is by and between:
Ramboll Americas Integrated Solutions, Inc. City of Elgin
fka O'Brien &Gere Inc. of NA
333 West Wacker Drive, Suite 2700 150 Dexter Court
Chicago, IL 60606 and Elgin, IL 60120
Telephone: 630 881-7226 Telephone: 847 931 5659
Co le W cit ofel in.or
"RAMBOLL" "CLIENT"
Project Title: Change Order#2-40 Ann Street-Additional Soil Remediation
Scope of Work: Conduct additional soil remediation in southwest portion of site in accordance with Change
Order#2 dated 4/28/2021.
Summary of Changes in Contract Amount:
The cost of the contract is being increased pursuant to this Change Order#2 as follows:
Original Contract Amount: $1,275,194.00
Net Previous Changes: $55,828,00
Contract Change Order#2 $122,590.00
Revised Contract Amount: $1,453,612.00
Schedule: Ramboll will conduct the additional work authorized pursuant to this Change Order#2 within six weeks
after receipt of authorization to proceed, weather permitting.
The Scope of Work, Estimated Budget, and Schedule described above and authorized by this Change Order
will be performed in accordance with the terms and conditions contained in the Agreement between
Ramboll Americas Integrated Solutions, Inc. (fka O'Brien & Gere Inc. of North America) and CLIENT dated:
August 26, 2020.
.Agreed to by:
RAMBOLL AMERICAS INTEGRATED .CITY OF ELGIN (CLIENT)
SOLUTIONS, INC.
g ature Date Signature Date
Joh M. Nardozzi 4/28/2021
N Oe Name
Senior Managing Engineer
Title Title
• -SUMMARY OF aCOSI
CLIENT:City of Elgin 4/28/2021
PROJECT DESCRIPTION:Change Order#2-40 Ann Street-Additional Soil Remediation
PROJECT/PROPOSAL: 1950100024/63429
RAMBOLL PROJECT MANAGER:J.Nardozzi
Task Number: Change Order#2
Task Description: Additional Soil Remediation
TOTAL
PERSONNEL Rate
Project Manager 2 Hours 12 12
.........................__._....._ .._...__.. _.. ...
l.Nard..i $198 Costs 2376 $2,376
Engineer 3 Hours 22 22
R.Woodruff $130 Costs 2860 $2,860
Engineer 2 Hours 52 52
A.Barb— $115 Costs 5980 $5,980
Hours 86 86
SUBTOTAL LABOR Costs $11,216 $11,216
Administrative 6.0% Fee $673 $673
SUBTOTAL LABOR WITH ADMINISTRATIVE $11,890 1,890
CLIENT:City of Elgin
PROJECT/PROPOSAL: 1950100024/63429
Task Number: Change Order#2
Task Description: Additional Soil Remediation
TOTAL
G W Sampling Supplies $0 $0
Field Equipment(PID,Sampling,GPS) $860 $860
PPE Supplies $300 $300
Vehicles/Mileage $530 $530
BTOTAL EXPENSE$
REBILLABLES
Lodging $0 $0
Meals $0 Sp
Travel(Air,Train,Bus,Cab) $o $0
Safety Audit $0 $0
Rental Vehicles LO
5.0%Fee $0 $0
Sub Total _ $0 _ _$0
Per Diem:Meals&Expenses(GSA Overnig GSA Rates:W No Fee $160 $160
Per Diem:Meals&Expenses(GSA Day Rat GSA Rates: No Fee $0 $0
.. ...._.......__ .._.._..._._�_.._.._.._..._......_...............-......................................
Sub Total $160 $160
Misc.Proj.Materials/Supplies(shipping) ......_........_._....._._....._._....._._....._._........_........_................._........_._....._._....._._.
10.0%Fee $0 $0
Sub Total $0 $0
SUBTOTAL REBILLABLES $160
SUBCONTRACT SERVICES
o t Per
Laboratory Analytical Services number of samples Sample
Soil Confirmation Samples-40 Ann Street 12 48 Hr TAT Budget Avail. $0
TPH Soil Samples-40 Ann Street 48 Hr TAT Budget Avail. $0
$0 $0
$0 So
Analytical Subtotal 0 0 $0 $0
Soil RemedloWn Subcontractor
Stiles,Inc. 40 Ann St:Add'I Soil Rem. $98,955 $98,955
$o $0
$0 $0
SUBCONSULTANTSERVICES
$0 $0
$0 $o
Subtotal $98,955 $98,955
Administrative Fee 10.0%Fee $9,896 $9,896
SUBTOTAL SUB.SERVICES 51 $108,851
"; $122,590
r«r sum,.ry