HomeMy WebLinkAbout20-55 Resolution No. 20-55
RESOLUTION
AUTHORIZING EXECUTION OF A CHANGE ORDER NO. 1 AND FINAL WITH
SCHROEDER ASPHALT SERVICES, INC. FOR 2019 MISCELLANEOUS CIVIL
IMPROVEMENTS AT AIRLITE WATER TREATMENT PLANT AND SLADE WATER
METER SHOP
WHEREAS,the City of Elgin has heretofore entered into a contract with Schroeder Asphalt
Services, Inc. for 2019 miscellaneous civil improvements at the Airlite Water Treatment Plant and
Slade Water Meter Shop; and
WHEREAS,it is necessary and desirable to modify the terms of the contract as is described
in Change Order No. 1 and Final attached hereto.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
ELGIN,ILLINOIS,that Richard G.Kozal,City Manager,be and is hereby authorized and directed to
execute Change Order No. 1 and Final,a copy of which is attached hereto and made a part hereof by
reference.
s/David J. Kaptain
David J. Kaptain, Mayor
Presented: April 22, 2020
Adopted: April 22, 2020
Vote: Yeas: 9 Nays: 0
Attest:
s/Kimberly Dewis
Kimberly Dewis, City Clerk
r
City of Elgin Chan eg Order
ELGIN,ILLINOIS
PROJECT#409775
CHANGE ORDER No. 1
CONTRACT: 2019 Misc. Civil Improvements(Airlite WTP& Slade Meter Shop)
Bid No. 19-045
SCOPE:
Installation of Bike Path Extension through the Slade Meter Shop south park area, which will
be 327 feet in length by 10 feet in width. The path will include a 9.0 inch excavation, a 6.0 inch
aggregate base, an 1.50 inch asphalt binder course, an 1.50 inch surface asphalt course, in-
stallation of a 12.0 inch corrugated metal pipe culvert (15.0— linear feet length) and landscape
restoration pursuant to the attached plan. The total price of the bike path work is $36,200;
however, $11,226.46 in project savings from the Airlite WTP Parking lot upgrades will be uti-
lized, which will bring the total of this change order to $24,973.54.
REASONS FOR CHANGE:
Staff recognized an opportunity to improve bike path continuity in conjunction with the Slade
Meter Shop parking lot improvement project. The change order is germane to the original con-
tract as signed. The change order is in the best interests of the City of Elgin and is authorized
by law.
SUMMARY OF CHANGES IN CONTRACT AMOUNT:
New bike path addition is adding to scope of work and cost of project.
ORIGINAL CONTRACT AMOUNT: $438,006.51
CHANGE ORDER NO. 001
Proposed New Bike Path $36,200.00
Credit at Airlite WTP (Quantity Adjustment) ($11,226.46)
TOTAL FOR CHANGE ORDER NO. 001: ADD $24,973.54
PREVIOUS CHANGE ORDER(S):
Change Order No. N/A $0.00
TOTAL OF PREVIOUS CHANGE ORDERS: ADD $0.00
TOTAL REVISED CONTRACT AMOUNT: $462,980.05
The original amount of the contract with Schroeder Asphalt is $438,006.51.This Change Order No. 1
will increase the original contract amount by a total of$24,973.54, that sum representing five and seven
tenths percent(5.70%) of the original contract amount.The new contract amount, inclusive of this
change order is$462,980.05.
OTHER CONTRACT PROVISIONS: Extend the final completion of the project to May 30, 2020.
CHANGE ORDER No.001
Agreed to this22 day of April , 2020 .
Recommended by:
Water Department
By: Eric Weiss
Title: Water Director
Date: Al2ril 15 2020
Signature:
Accepted by:
Schroeder Asphalt Services,Inc.
Party of the Second Part(Contractor)
By: Grace Foss
Title: Corporate Secretary
Date: 4/16/2020
Signature.
Approved by:
CITY OF ELGIN
Party of the First Part(Owner)
By: Richard G. Kozal
Title: Cid Manager
Date: A r i
-007
Signature:
FAL.egal DepfformAChange Order Form.doc nor(
1 2 3 4 S 6 7 e
9 10 11 12 13 14
75(
74(
m
y 73(
z
72(
71(
9(
NOTES:
1. GRADING MUST NOT DISTURB EXISTING TREES
2. GRADING
2.1. CUT AREA: 35.52 CU YD
2.2. FILL AREA 33.86 CU YO
3. SEE PROFILE FOR EXISTING AND PROPOSED
PATH CENTERLINES
4. ADAREOUIREMENTS
3.1. CROSSSLOPE: MAX2%
3.2. LONGITUDE SLOPE: MAX 5%
4. BIKE PATH
4.1. WIDTH:8 FEET
4.2 CROSS SLOPE: 1% EAST TO WEST -
5. BIKE PATH SECTION:
5.1. 1.54NCH SURFACE
5.2. 1.64NCH BINDER
5.3. 6 -INCH AGGREGATE
00
dMe I by I ckd I dewiPtion
411520 TJK SC I ISSUED FOR BID
A
B
C
51
C
NORTH
F
o m e m
8CI3EMFEET
ISSUED G
FOR CONSTRUCTION
BURNS
N&MEDONNELL
2110 W ADAMS. SUITE 2700
CH3CA2� a606 H
LICENSEE 140. 164.001310
ata alai
APRIL 2020 I T. KAROL
designed checked
T. KAROL S CREDE
I� I
ELGIN
THE CRY W THE 5ANk1RYs
Kane Canny, IBimis
SLADE AVE BIKE PAT"
J
Project I .1ad
tzztoa
atawiay ,aV.
C001 — 0
sheet 1 01 1 0ee4
file
e;
PROPOSED
PATH
GRADE
PROPOSED
PATH
CONNECT PROPOSED PATH
TO EXISTING PATH
CONNECT PROPOSED PATH
'
TO EXISTING ROADWAY
EXISTING
GROUND
10
roo
00 101
00 10
0 103
HOD 400
10
NOTES:
1. GRADING MUST NOT DISTURB EXISTING TREES
2. GRADING
2.1. CUT AREA: 35.52 CU YD
2.2. FILL AREA 33.86 CU YO
3. SEE PROFILE FOR EXISTING AND PROPOSED
PATH CENTERLINES
4. ADAREOUIREMENTS
3.1. CROSSSLOPE: MAX2%
3.2. LONGITUDE SLOPE: MAX 5%
4. BIKE PATH
4.1. WIDTH:8 FEET
4.2 CROSS SLOPE: 1% EAST TO WEST -
5. BIKE PATH SECTION:
5.1. 1.54NCH SURFACE
5.2. 1.64NCH BINDER
5.3. 6 -INCH AGGREGATE
00
dMe I by I ckd I dewiPtion
411520 TJK SC I ISSUED FOR BID
A
B
C
51
C
NORTH
F
o m e m
8CI3EMFEET
ISSUED G
FOR CONSTRUCTION
BURNS
N&MEDONNELL
2110 W ADAMS. SUITE 2700
CH3CA2� a606 H
LICENSEE 140. 164.001310
ata alai
APRIL 2020 I T. KAROL
designed checked
T. KAROL S CREDE
I� I
ELGIN
THE CRY W THE 5ANk1RYs
Kane Canny, IBimis
SLADE AVE BIKE PAT"
J
Project I .1ad
tzztoa
atawiay ,aV.
C001 — 0
sheet 1 01 1 0ee4
file