Resolution No. 20-53
RESOLUTION
AUTHORIZING EXECUTION OF AN INTERGOVERNMENTAL AGREEMENT
BETWEEN THE CITY OF ELGIN AND THE VILLAGE OF BARTLETT FOR THE COSTS
ASSOCIATED WITH THE RESURFACING OF LAMBERT LANE
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that
David J. Kaptain, Mayor, and Kimberly A. Dewis, City Clerk, be and are hereby authorized and
directed to execute an Intergovernmental Agreement on behalf of the City of Elgin with the Village
of Bartlett,for the costs associated with the resurfacing of Lambert Lane,a copy of which is attached
hereto and made a part hereof by reference.
s/David J. Kaptain
David J. Kaptain, Mayor
Presented: April 22, 2020
Adopted: April 22, 2020
Vote: Yeas: 9 Nays: 0
Attest:
s/Kimberly Dewis
Kimberly Dewis, City Clerk
RESOLUTION 2020-39-R
A RESOLUTION APPROVING AN INTERGOVERNMENTAL AGREEMENT
BETWEEN THE CITY OF ELGIN AND THE VILLAGE OF BARTLETT FOR THE
SETTING AND SHARING OF COSTS FOR THE RESURFACING OF LAMBERT
LANE IN BOTH MUNICIPALITIES
WHEREAS, the Village of Bartlett and the City of Elgin (collectively known as the
"Municipalities") are desirous of participating in the resurfacing of Lambert Lane between
both Municipalities which would enhance the health, safety and welfare of both
municipalities; and
WHEREAS, both Municipalities are provided with Motor Fuel Tax funds from the
State of Illinois for repairing of local roads; and
WHEREAS, both municipalities concur that a joint resurfacing project for Lambert
Lane between the communities would be beneficial as a cost-savings measure;
NOW THEREFORE, BE IT RESOLVED by the President and Board of Trustees
of the Village of Bartlett, Cook, DuPage and Kane Counties, Illinois, as follows:
SECTION ONE: The Intergovernmental Agreement Between the City of
Elgin and the Village of Bartlett for the Setting and Sharing of Costs for the Resurfacing
of Lambert Lane in both municipalities, a true and correct copy of which is attached
hereto, be and the same is hereby approved.
SECTION TWO: That the Village President and the Village Clerk are
hereby authorized and directed to sign and attest, respectively, the Agreement on behalf
of the Village of Bartlett.
1
SECTION THREE: SEVERABILITY. The various provisions of this
Resolution are to be considered as severable, and of any part or portion of this Resolution
shall be held invalid by any Court of competent jurisdiction, such decision shall not affect
the validity of the remaining provisions of this Resolution.
SECTION FOUR: REPEAL OF PRIOR RESOLUTIONS. All prior
Ordinances and Resolutions in conflict or inconsistent herewith are hereby expressly
repealed only to the extent of such conflict or inconsistency.
SECTION FIVE: EFFECTIVE DATE. This Resolution shall be in full
force and effect upon passage and approval.
ROLL CALL VOTE:
AYES: Trustees Camerer, Carbonaro, Deyne, Gabrenya, Hopkins, Reinke
NAYS: None
ABSENT: None
PASSED: April 21 , 2020
APPROVED: April 21 , 2020
Kevin Wallace, Village President
ATTEST:
Lorna Gile i lage Clerk
2
CERTIFICATION
I, the undersigned, do hereby certify that I am the Village Clerk of the Village of Bartlett,
Cook, DuPage, and Kane Counties, Illinois, and that the foregoing is a true, complete and
exact copy of Resolution 2020-39-R, enacted on April 21 , 2020, and approved on April
21 , 2020, as the same appeared from the official records of the Village of Bartlett.
o r n 9 Gil s, ilia g e Clerk ~ P L •�
••. r8 9'�
3
INTERGOVERNMENTAL AGREEMENT BETWEEN THE CITY OF ELGIN AND THE
VILLAGE OF BARTLETT FOR THE COSTS ASSOCIATED WITH THE
RESURFACING OF LAMBERT LANE
This Agreement is entered into by and between the Village of Bartlett, a home rule
municipal corporation of Cook, DuPage and Kane Counties, Illinois (the "Village"), and
the City of Elgin, a home rule municipal corporation of Cook and Kane Counties, Illinois
(the "City"), collectively known as the "Municipalities".
A. The Municipalities shall approve Motor Fuel Tax (MFT) Resolutions through the
Illinois Department of Transportation (IDOT).
B. The Municipalities believe it to be in the best interests to have the entire length of
Lambert Lane resurfaced from Spaulding Road to Lake Street (US Route 20) (the
"Project"). The majority of which is in Bartlett's jurisdiction with the northern portion
from Belcourt Lane to Route 20 within Elgin's boundaries. Such portion of Lambert
Lane within Elgin boundaries is hereinafter referred to as the "Elgin Portion of
Lambert Lane".
C. The Project includes removing and replacing asphalt, manhole adjustments and
curb and gutter.
D. The Village of Bartlett has included the Elgin Portion of Lambert Lane in its bid for
its MFT Resurfacing Project 2020 Various Streets and shall select the low and
responsive bidder (the contract with such bidder pursuant to such bid is hereinafter
referred to as the "Contract").
E. The Village of Bartlett shall oversee the Project and manage the Contract with the
Contractor selected as part of its annual MFT Resurfacing Project. Such Village
management and oversight shall include, but is not limited to, construction
observation, inspections and testing. The Elgin Portion of Lambert Lane shall be
resurfaced and improved as provided in the Contract.
F. The low responsive bid for the Contract for the entire Village MFT 2020
Resurfacing Project Various Streets is in the amount of $1,650,403.44. Based
upon the terms of the bid and the Contract and the quantities for the Elgin Portion
of Lambert Lane, the cost to the City for the resurfacing and associated
improvements to the Elgin Portion of Lambert Lane pursuant to this Agreement is
currently calculated as $66,636.78. The calculation of such cost to the City for the
Elgin Portion of Lambert Lane is attached hereto as Attachment A. The City of
Elgin shall reimburse the cost of the unit pricing for the section of the Elgin Portion
of Lambert Lane being resurfaced within its jurisdiction. The Village will provide the
City with copies of the certified payrolls and unit pricing for the materials used. The
City shall then reimburse the Village within thirty (30) days of paying the
Contractor. The Village shall be responsible for all other costs of the Contract and
for the Village MFT 2020 Resurfacing Project Various Streets.
G. The Contract and the work performed pursuant thereto shall be in compliance with
all applicable requirements of law.
H. At the request of the City, the Village shall assign to the City any warranties from
the Contactor with respect to the Elgin Portion of Lambert Lane.
I. This Agreement is not intended nor shall be construed as creating a partnership,
joint venture or employment relationship between the parties.
J. Any amendments to this Agreement must be in writing and signed by both parties.
K. This Agreement will be binding upon and insure to the benefit of any successor
governmental entity which shall assume and perform the duties of either party
without the prior written consent of the other party to this Agreement. This
Agreement may not be assigned without the written consent of the non-assigning
Party.
L. The invalidity of any provision of this Agreement will not impair the validity of any
other provision. If any provision of this Agreement is determined by a court of
competent jurisdiction to be unenforceable, that provision will be deemed
severable and the Agreement may be enforced with the provision severed or
modified by the court.
M. This Agreement will be interpreted and construed in accordance with the laws of
the State of Illinois.
N. Notices hereunder shall be made to the Manager of the municipality to which the
notice is directed by personal service or certified mail, return receipt requested,
delivered to the addressee only.
IN WITNESS WHEREOF, the parties hereto affixed their hands and seals pursuant to an
approving resolution of the corporate authorities of the Villages.
VILLAGE OFB ETT CITY OF ELGIN
CG
Kevin Wallace Dsi6d ptain
Village President Mayor
Date Date
ATTEST:
rna Giless Kimberl ewis
image Clerk City Clerk
_/'�y 0-� - aa- 13 AG
Date Date
ATTACHMENT A
INTERGOVERNMENTAL AGREEMENT BETWEEN THE CITY OF ELGIN AND THE VILLAGE OF BARTLETT
FOR THE COSTS ASSOCIATED WITH THE RESURFACING OF LAMBERT LANE
Elgin Portion of Lambert Lane
Estimated Costs based on Contract Quantities
Reqd Item No. Items Unit Quantity Unit Price Total
Items
X 1 1HMA SURF REM,VARIABLE SY 3066 $1.65 $5,058.90
2 2 HMA SURFACE REMOVAL,2" SY 0 $1.65 $0.00
3 3 HMA PART. DEPTH PATCH 3" SY 0 $30.00 $0.00
4 4 PCC DRIVEWAY REM. & REPL. 6" SY 0 $70.04 $0.00
5 5 HMA DRIVE REM. & REPL. SY 0 $30.00 $0.00
X 6 6 BIT. MATLS. (TACK COAT) LBS 5340 $0.10 $534.00
X 7 7 POLY LEV BIN MM N50 IL.-4. 75, N50 TON 249 $85.00 $21,165.00
X 8 8 HMA SURF. CRS. MIX"D" N50-1-1/2" TON 498 $73.00 $36,354.00
9 9 COMBCONCC&G R&RM3:12 FT 0 $26.78 $0.00
10 10 COMBCONCC&G R&RM6:12 FT 0 $28.27 $0.00
11 11 COMBCONCC&G R&RM6:18 FT 0 $30.90 $0.00
12 12 DRAINAGE STRUCTURE ADJ EA 0 $309.00 $0.00
X 13 13 MANHOLE TO BE ADJUSTED EA 4 $515.00 $2,060.00
14 14 PCC SIDEWALK REM. & REPL. SF 0 $7.10 $0.00
15 15 DETECTABLE WARNING PANELS SF 0 $20.60 $0.00
16 16 TOPSOIL AND SOD SY 0 $8.75 $0.00
17 17 TEMPORARY PAVEMENT MARKING FT 0 $1.50 $0.00
X 18 18 THERMOPLASTIC L &S SF 72.8 $4.12 $299.94
X 19 19 THERMOPLASTIC LINE 4" FT 1159 $0.56 $649.04
X 20 20 THERMOPLASTIC LINE 6" FT 576 $0.77 $443.52
X 21 21 THERMOPLASTIC LINE 12" FT 47 $1.54 $72.38
22 22 THERMOPLASTIC LINE 24" FT 0 $4.12 $0.00
23 23 INFORMATION SIGN EA 0 $278.10 $0.00
24 24 TCPHWY.STA. 701501 LS 0 $28,700.00 $0.00
25 25 TCPHWY. STA. 701701 LS 0 $1.03 $0.00
26 26 TCPHWY. STA. 701801 LS 0 $2,060.00 $0.00
27 27 TCPHWY. STA. 701901 LS 0 $1.03 $0.00
Elgin Portion of Lambert Lane Total Estimate= $66,636.78