HomeMy WebLinkAbout20-5 Resolution No. 20-5 RESOLUTION AUTHORIZING EXECUTION OF A CHANGE ORDER NO. 1 AND FINAL WITH MR. DAVID'S, INC. FOR CARPET AND FLOORING REPLACEMENT AT THE EDWARD SHOCK CENTRE OF ELGIN WHEREAS, the City of Elgin has heretofore entered into a contract with Mr. David's, Inc. for carpet and flooring replacement at the Edward Shock Centre of Elgin; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 and Final attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Richard G.Kozal,City Manager,be and is hereby authorized and directed to execute Change Order No. 1 and Final,a copy of which is attached hereto and made a part hereof by reference. s/ David J. Kaptain David J. Kaptain, Mayor Presented: January 8, 2020 Adopted: January 8, 2020 Omnibus Vote: Yeas: 9 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk • City of Elgin Change Order ELGIN,ILLINOIS PROJECT:M00044 CHANGE ORDER No. 1 AND FINAL CONTRACT: Carpet and flooring replacement 2018 (Bid No. 18-027) SCOPE: Make repairs to flooring in various areas that were not known at the time of the bid.The con- ditions requiring repairs developed as a result of moisture penetration through the concrete under the flooring and therefore could not be reasonably foreseen at the time of the bid.These conditions were verified by City staff and charged on a time and material basis. REASONS FOR CHANGE: Since the repairs necessitating the sealing of the concrete work were not planned,the circumstances said to necessitate the change in performance were not reasonably foreseea- ble at the time the contract was signed.The change is germane to the original contract as signed and the change order is in the best interests of the City of Elgin and authorized by law. SUMMARY OF CHANGES IN.CONTRACT AMOUNT: • ORIGINAL CONTRACT AMOUNT: $184,557.00 - Remove VCT replacement at Hemmen and Centre Deduct$4,516 Furnish and install moisture mitigation Add $19,511.00 LVT areas at the Centre Labor escalation due to delays by the City Add $893.00 • Material escalation due to delays by the City Add $1,535.00 LVT product only TOTAL FOR CHANGE ORDER NO. 1 and Final: ADD $17,423.00 TOTAL REVISED CONTRACT AMOUNT: $201,980.00 The original amount of the contract with Mr. Davids,Inc. is$184,557.00. Change Order No. 1 and Final will increase the original contract amount by a total of$17,423.00,that sum represents nine and four tenths percent(9.4%)of the original contract amount. The new contract amount,inclusive of all change orders is$201,980.00. OTHER CONTRACT PROVISIONS:All other contract provisions remain the same. • s CHANGE ORDER NUMBER lAND FINAL Agreed to this January 8, 2020 Recommended by: Building Maintenance Department By: Rich Hoke • Title:Building Maintenance Superintendent Date:D , Signature: U Accepted by: j Mr.Davids,Inc. Party of the Second Part(Contractor) By:Brian Groth Title: Senior Project Executive Date:December 4,2019 Signature:I ....3. { `. Approved by: CITY OF ELGIN Party of the First Part(Owner) By:Rick Kozal Title: City Manager Date: Janua :, alwrr Signature: F:1L.ega]Dept\forms\Change Ordcr Form.doc