HomeMy WebLinkAbout20-46 Resolution No. 20-46
RESOLUTION
AUTHORIZING EXECUTION OF AN AGREEMENT WITH BURNS & MCDONNELL, INC.
FOR PROFESSIONAL SERVICES IN CONNECTION WITH THE 2020 RESIDENTIAL
RESURFACING-SWAN HENDEE
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS,
that pursuant to Elgin Municipal Code Section 5.02.020B(9)the City Council hereby finds that an
exception to the requirements of the procurement ordinance is.necessary.and in the best interest of
the city; and .
BE IT FURTHER RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,
ILLINOIS, that Richard G. Kozal, City Manager, and Kimberly A. Dewis, City Clerk, be and are
hereby authorized and directed to execute an Agreement on behalf of the City of Elgin with Burns
&McDonnell, Inc., for professional services in connection with the 2020 Residential Resurfacing-
SWAN Hendee, a copy of which is attached hereto and made a part hereof by reference.
s/David J. Kaptain
David J. Kaptain, Mayor .
Presented: April 8, 2020
Adopted: April 8, 2020
Vote: Yeas: 9 Nays: 0
Attest:
s/Kimberly Dewis
Kimberly Dewis, City Clerk
Resolution No. 20-46
RESOLUTION
AUTHORIZING EXECUTION OF AN AGREEMENT WITH BURNS & MCDONNELL, INC.
FOR PROFESSIONAL SERVICES IN CONNECTION WITH THE 2020 RESIDENTIAL
RESURFACING-SWAN HENDEE
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS,
that pursuant to Elgin Municipal Code Section 5.02.020B(9) the City Council hereby finds that an
exception to the requirements of the procurement ordinance is necessary and in the best interest of
the city; and
BE IT FURTHER RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,
ILLINOIS, that Richard G. Kozal, City Manager, and Kimberly A. Dewis, City Clerk, be and are
hereby authorized and directed to execute an Agreement on behalf of the City of Elgin with Burns
&McDonnell, Inc., for professional services in connection with the 2020 Residential Resurfacing-
SWAN Hendee, a copy of which is attached hereto and made a part hereof by reference.
David J. Kaptain, Mayor
Presented: April 8, 2020
Adopted:
Vote: Yeas Nays:
Recorded:
Attest:
Kimberly A. Dewis, City Clerk
AGREEMENT
THIS AGREEMENT is made and entered into this 8th day of April, 2020, by and
between the CITY OF ELGIN, an Illinois municipal corporation (hereinafter referred to as
"CITY") and Burns and McDonnell Engineering Company, a Missouri corporation, authorized to
do business in the State of Illinois, (hereinafter referred to as "ENGINEER").
WHEREAS, the CITY desires to engage the ENGINEER to furnish certain professional
services in the form of providing design engineering services in connection with roadway
improvements for the 2020 Resurfacing Program-SWAN- Hendee (hereinafter referred to as the
PROJECT); and
WHEREAS, the ENGINEER represents that it is in compliance with Illinois Statutes
relating to professional registration of individuals and has the necessary expertise and experience
to furnish such services upon the terms and conditions set forth herein below.
NOW, THEREFORE, it is hereby agreed by and between the CITY and the ENGINEER
that the CITY does hereby retain the ENGINEER for and in consideration of the mutual promises
and covenants contained herein, the sufficiency of which is hereby acknowledged to act for and
represent it in the engineering matters involved in the PROJECT as described herein, subject to
the following terms and conditions and stipulations, to-wit:
1. SCOPE OF SERVICES
A. All work.hereunder shall be performed under the direction of the Director of Public
Works of the CITY, herein after referred to as the "DIRECTOR".
B. The scope of services for the Project shall include providing design engineering
services and bidding services for the Project including, but not limited to, milling
and resurfacing of existing pavement, roadway patching, some replacement of
sidewalk and curb and gutter, ADA improvements and other miscellaneous
improvements as may be required.
C. A detailed Scope of Services for the PROJECT is attached hereto as Attachment A,
and incorporated into this Agreement by this reference.
2. PROGRESS REPORTS
A. An outline project milestone schedule is provided hereinunder: (1) Notice to
Proceed April 27;2020. (2)Advertise for Bids May 29,2020. (3)Bid Opening June
12, 2020. (4) Start Construction July 6, 2020. (4) Construction Completed October
31, 2020.
B. A detailed project schedule for the PROJECT is included as Attachment B,attached
hereto, and incorporated into this Agreement by this reference. Progress will be
recorded on the project schedule and submitted monthly as a component of the
Status Report described in C below.
C. The ENGINEER will submit to the DIRECTOR monthly a status report keyed to
the project schedule. A brief narrative will be provided identifying progress,
findings and outstanding issues.
3. WORK PRODUCTS
All work product prepared by the ENGINEER pursuant hereto including, but not limited to,
reports, plans, designs, calculations, work drawings, studies, photographs, models and
recommendations shall be the property of the CITY and shall be delivered to the CITY upon
request of the DIRECTOR; provided, however, that the ENGINEER may retain copies of such
work product for its records. ENGINEER'S execution of this Agreement shall constitute
ENGINEER'S conveyance and assignment of all right, title and interest, including but not limited
to any copyright interest, by the ENGINEER to the CITY of all such work product prepared by
the ENGINEER pursuant to this Agreement. The CITY shall have the right either on its own or
through such other engineers as determined by the CITY to utilize and/or amend such work
product.. Any such amendment to such work product shall be at the sole risk of the CITY. Such
work product is not intended or represented to be suitable for reuse by the CITY on any extension
to the PROJECT or on any other project, and such reuse shall be at the sole risk of the CITY
without liability or legal exposure to the ENGINEER.
4. PAYMENTS TO THE ENGINEER (Not To Exceed Method)
A. For services provided the ENGINEER shall be paid at the rate of 3.0 times the W2
hourly rate of personnel employed on this PROJECT, with the total fees and
expenses not to exceed $59,330.00 regardless of the actual costs incurred by. the
ENGINEER unless substantial modifications to the scope of the work are
authorized in writing by the DIRECTOR; and approved by way of written
amendment to this Agreement executed by the parties.
B. For outside services provided by other firms or subconsultants, the CITY shall pay
the ENGINEER the invoiced fee to the ENGINEER, plus ten percent(10%). The
cost of any such outside services is included within the total not-to-exceed amount
of$59,330.00 provided for in Section 4A above.
C Other reimbursable components of the fee include (1) Geotechnical Investigation
(Rubino Engineering) and (2) CCDD Investigation & LPC-663 (Rubino
Engineering). The cost of any such reimbursable expenses is included within the
total not-to-exceed amount of$59,330.00 provided for in Section 4A above.
D. See Attachment C incorporated herein by this reference for labor breakdown and
reimbursable components.
E. The CITY shall make periodic payments to the ENGINEER based upon actual
progress within 30 days after receipt and approval of invoice. Said periodic
- 2 -
payments to the ENGINEER shall not exceed the amounts shown in Attachment C .
and full payments for each task shall not be made until the task is completed and
accepted by the DIRECTOR.
5. INVOICES
A. The ENGINEER shall submit invoices in a format approved by the CITY. Progress
reports (2C above) will be included with all payment requests.
B. The ENGINEER shall maintain records showing actual time devoted and cost
incurred. The ENGINEER shall permit the authorized representative of the CITY
to inspect and audit all data and records of the ENGINEER for work done under
this Agreement. The ENGINEER shall make these records available at reasonable
times during the Agreement period, and for a year after termination of this
Agreement.
6. TERMINATION OF AGREEMENT
Notwithstanding any other provision hereof, the CITY may terminate this Agreement at any time
upon fifteen (15) days prior written notice to the ENGINEER. In the event that this Agreement is
so terminated, the ENGINEER shall be paid for services actually performed and reimbursable
expenses actually incurred prior to termination, except that reimbursement shall not exceed the
task amounts set forth under section 4 above.
7. TERM
This Agreement shall become effective as of the date the ENGINEER is given a notice to proceed
and, unless terminated for cause or pursuant to section 6, shall be deemed concluded on the date
the CITY determines that all of the ENGINEER's work under this Agreement is completed. A
determination of completion shall not constitute a waiver of any rights or claims which the CITY
may have or thereafter acquire with respect to any term or provision of the Agreement.
8. NOTICE OF CLAIM
If the ENGINEER wishes to make a claim for additional compensation as a result of action taken
by the CITY,the ENGINEER shall give written notice of.his claim within 15 days after occurrence
of such action. No claim for additional compensation shall be valid unless so made. Any changes
in the ENGINEER's fee shall be valid only to the extent that such changes are included in writing
signed by the CITY and the ENGINEER. Regardless of the decision of the DIRECTOR relative
to a claim submitted by the ENGINEER, all work required under this Agreement as determined
by the DIRECTOR shall proceed without interruption.
9. BREACH OF CONTRACT
If either party violates or breaches any term of this Agreement, such violation or breach shall be
deemed to constitute a default, and the other party has the right to seek such administrative,
- 3 -
contractual or legal remedies as may be suitable to the violation or breach; and, in addition, if
either party,by reason of any default, fails within fifteen(15)days after notice thereof by the other
party to comply with the conditions of the Agreement, the other party may terminate this
Agreement. Notwithstanding the foregoing, or anything else to the contrary in this Agreement,
with the sole exception of an action to recover the monies the CITY has agreed to pay to the
ENGINEER pursuant to section 4 hereof, no action shall be commenced by the ENGINEER
against the CITY for monetary damages. ENGINEER hereby further waives any and all claims or
rights to interest on money claimed to be due pursuant to this Agreement, and waives any and all
such rights to interest which it claims it may otherwise be entitled pursuant to law, including, but
not limited to, the Local Government Prompt Payment Act (50 ILCS 501/1, et seq.), as amended,
or the Illinois Interest Act(815 ILCS 205/1, et seq.), as amended. The parties hereto further agree
that any action by the ENGINEER arising out of this Agreement must be filed within one year of
the date the alleged cause of action arose or the same will be time-barred. The provisions of this
section shall survive any expiration, completion and/or termination of this Agreement.
10. INDEMNIFICATION
To the fullest extent permitted by law,ENGINEER agrees to and shall indemnify,defend and hold
harmless the CITY, its officers, employees, agents, boards and commissions from and against any
and all claims, suits,judgments, costs, attorneys fees, damages or other relief, including but not
limited to workers compensation claims, in any way resulting from or arising out of negligent
actions or omissions of the ENGINEER in connection herewith,including negligence or omissions
of employees or agents of the ENGINEER arising out of the performance of this Agreement. In
the event of any action against the CITY, its officers, employees, agents, boards or commissions,
covered,by the foregoing duty to indemnify, defend and hold harmless such action shall be
defended by legal counsel of the CITY's choosing. The provisions of this section shall survive any
expiration and/or termination of this Agreement.
11. NO PERSONAL LIABILITY
No official, director, officer, agent or employee of the CITY shall be charged personally or held
contractually liable under any term or provision of this Agreement or because of their execution,
approval or attempted execution of this Agreement.
12. INSURANCE
A. Comprehensive Liability. The ENGINEER shall provide, pay for and maintain
in effect, during the term of this Agreement, a policy of comprehensive general
liability insurance with limits of at least$1,000,000 aggregate for bodily injury and
$1,000,000 aggregate for property damage.
The ENGINEER shall deliver to the DIRECTOR a Certification of Insurance
naming the CITY as additional insured. The policy shall not be modified or
terminated without thirty(30) days prior written notice to the DIRECTOR.
- 4 -
The Certificate of Insurance which shall include Contractual obligation assumed by
the ENGINEER under Article 10 entitled "Indemnification" shall be provided.
This insurance shall apply as primary insurance with respect to any other insurance
or self-insurance programs afforded to the CITY. There shall be no endorsement
or modification of this insurance to make it excess over other available insurance,
alternatively, if the insurance states that it is excess or prorated, it shall be endorsed
to be primary with respect to the CITY.
B. Comprehensive Automobile Liability. Comprehensive Automobile Liability
Insurance covering all owned, non-owned and hired motor vehicles with limits of
not less than$500,000 per occurrence for damage to property.
C. Combined Single Limit Policy. The requirements for insurance coverage for the
general liability and auto exposures may be met with a combined single limit of
$1,000,000 per occurrence subject to a $1,000,000 aggregate.
D. Professional Liability. The ENGINEER shall carry Engineers Professional
Liability Insurance Covering claims resulting from error, omissions or negligent
acts with a combined single limit of not less than $1,000,000 per occurrence. A
Certificate of Insurance shall be submitted to the DIRECTOR as evidence of
insurance protection. The policy shall not be modified or terminated without thirty
(30) days prior written notice to the DIRECTOR.
13. CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES,
PROCEDURES AND SAFETY
The ENGINEER shall not have control over or charge of and shall not be responsible for
construction means, methods, techniques, sequences or procedures, or for safety precautions and
programs in connection with the construction, unless specifically identified in the Scope of
Services.
14. NONDISCRIMINATION
In all hiring or employment made possible or resulting from this Agreement, there shall be no
discrimination against any employee or applicant for employment because of sex, age, race, color,
creed, national origin, marital status, of the presence of any sensory, mental or physical handicap,
unless based upon a bona fide occupational qualification, and this requirement shall apply.to, but
not be limited to, the following: employment advertising, layoff or termination, rates of pay or
other forms of compensation and selection for training, including apprenticeship.
No person shall be denied or subjected to discrimination in receipt of the benefit of any services
or activities made possible by or resulting from this Agreement on the grounds of sex, race, color,
creed, national origin, age except minimum age and retirement provisions, marital status or.the
presence of any sensory, mental or physical handicap. Any violation of this provision shall be
- 5 -
considered a violation of a material provision of this Agreement and shall be grounds for
cancellation, termination or suspension, in whole or in part, of the Agreement by the CITY.
15. ASSIGNMENT AND SUCCESSORS
This Agreement and each and every portion thereof shall be binding upon the successors and the
assigns of the parties hereto; provided, however, that no assignment shall be made without the
prior written consent of the CITY.
16. DELEGATIONS AND SUBCONTRACTORS
Any assignment,delegation or subcontracting shall be subject to all the terms,conditions and other
provisions of this Agreement and the ENGINEER shall remain liable to the CITY with respect to
each and every item, condition and other provision hereof to the same extent that the ENGINEER
would have been obligated if it had done the work itself and no assignment, delegation or
subcontract had been made. Any proposed subcontractor shall require the CITY's advanced
written approval.
17. NO CO-PARTNERSHIP OR AGENCY
This Agreement shall not be construed so as to create a partnership,joint venture, employment or
other agency relationship between the parties hereto.
18. SEVERABILITY
The parties intend and agreed that, if any section, sub-section, phrase, clause or other provision of
this Agreement, or any portion thereof, shall be held to be void or otherwise unenforceable, all
other portions of this Agreement shall remain in full force and effect.
19. HEADINGS
The headings of the several sections of this Agreement are inserted only as a matter of convenience
and for reference and in no way are they intended to define, limit or describe the scope of intent of
any provision of this Agreement,nor shall they be construed to affect in any manner the terms and
provisions hereof or the interpretation or construction thereof.
20. MODIFICATION OR AMENDMENT
This Agreement and its attachments constitutes the entire Agreement of the parties on the subject
matter hereof and may not be changed, modified, discharged or extended except by written
amendment duly executed by the parties. Each party agrees that no representations or warranties
shall be binding upon the other party unless expressed in writing herein or in a duly executed
amendment hereof, or change order as herein provided.
21. APPLICABLE LAW
- 6 -
This Agreement shall be deemed to have been made in, and shall be construed in accordance with
the laws of the State of Illinois. Venue for the resolution of any disputes or the enforcement of any
rights pursuant to this Agreement shall be in the Circuit Court of Kane County, Illinois.
22. NEWS RELEASES
The ENGINEER may not issue any news releases without prior approval from the DIRECTOR,
nor will the ENGINEER make public proposals developed under this Agreement without prior
written approval from the DIRECTOR prior to said documentation becoming matters of public
record.
23. COOPERATION WITH OTHER CONSULTANTS
The ENGINEER shall cooperate with any other consultants in the CITY's employ or any work
associated with the PROJECT.
24. INTERFERENCE WITH PUBLIC CONTRACTING
The ENGINEER certifies hereby that it is not barred from bidding on this contract as a result of a
violation of 720 ILCS.5/33E et seq. or any similar state or federal statute regarding bid rigging.
25. SEXUAL HARASSMENT
As a condition of this contract, the ENGINEER shall have written sexual harassment policies that
include, at a minimum, the following information:
A. the illegality of sexual harassment;
B. the definition of sexual harassment under state law;
C. a description of sexual harassment, utilizing examples;
D. the vendor's internal complaint process including penalties;
E. the legal recourse, investigative and complaint process available through the
Illinois Department of Human Rights, and the Illinois Human Rights Commission;
F. directions on how to contact the department and commission;
G. protection against retaliation as provided by Section 6-101 of the Human Rights
Act.
A copy of the policies shall be provided by ENGINEER to the Department of Human Rights upon
request(775 ILCS 5/2-105).
26. SUBSTANCE ABUSE PROGRAM.
- 7 -
As a condition of this agreement, ENGINEER shall have in place a written substance abuse .
prevention program which meets or.exceeds the program requirements in the Substance Abuse
Prevention Public Works Project Act at 820 ILCS 265/1 et seq. A copy of such policy shall be
provided to the DIRECTOR prior to the entry into and execution of this agreement.
27. WRITTEN COMMUNICATIONS
All recommendations and other communications by the ENGINEER to the DIRECTOR and to
other participants which may affect cost or time of completion, shall be made or confirmed in
writing. The DIRECTOR may also require other recommendations and communications by the
ENGINEER be made or confirmed in writing.
28. NOTICES
All notices, reports and documents required under this Agreement shall be in writing and shall be
mailed by First Class Mail, postage prepaid, addressed as follows:
A. As to CITY: B. As to ENGINEER:
Mike Pubentz, P.E. Stephen T. Crede
Public Works Director Section Manager
City of Elgin Burns&McDonnell Engineering Company, Inc.
150 Dexter Court 1431 Opus Place, Suite 400
Elgin, Illinois 60120-5555 Downers Grove, Illinois 60515
29. COMPLIANCE WITH LAWS
Notwithstanding any other provision of this Agreement it is expressly agreed and understood that
in connection with the performance of this Agreement that the ENGINEER shall comply with all
applicable Federal, State, City and other requirements of law, including, but not limited to, any
applicable requirements regarding prevailing wages, minimum wage, workplace safety and legal
status of employees. Without limiting the foregoing, ENGINEER hereby certifies, represents and
warrants to the CITY that all ENGINEER'S employees and/or agents who will be providing
products and/or services with respect to this Agreement shall be legally authorized to work in the
United States. ENGINEER shall also at its expense secure all permits and licenses,pay all charges
and fees and give all notices necessary and incident to the due and lawful prosecution of the work,
and/or the products and/or services to be provided for in this Agreement. The CITY shall have the
right to audit any records in the possession or control of the ENGINEER to determine
ENGINEER'S compliance with the provisions of this section. In the event the CITY proceeds
with such an audit the ENGINEER shall make available to the CITY the ENGINEER'S relevant
records at no.cost to the CITY. ENGINEER shall pay any and all costs associated with any such
audit.
30. EXECUTION
- 8 -
This agreement may be executed in counterparts, each of which shall be an original and all-of
which shall constitute one and the same agreement. For the purposes of executing this agreement,
any signed copy of this agreement transmitted by fax machine or e-mail shall be treated in all
manners and respects as an original document. The signature of any party on a copy of this
agreement transmitted by fax machine or e-mail shall be considered for these purposes as an
original signature and shall have the same legal effect as an original signature. Any such faxed or
e-mailed copy of this agreement shall be considered to have the same binding legal effect as an
original document. At the request of either party.any fax or e-mail copy of this agreement shall be
re-executed by the parties in an original form. No party to this agreement shall raise the use of fax
machine or e-mail as a defense to this agreement and shall forever waive such defense.
IN WITNESS WHEREOF, the parties hereto have entered into and executed this
Agreement effective as of the date and year first written above.
FOR THE C FOR THE ENGINEER:
By B Y: /
City Manager
Name/Print: Randall L. Patchett, PE
Title: Department Manager
Atte t:
City Clerk
- 9 -
ATTACHMENT "A"
DESIGN, ADMINISTRATION & PLANNING
ENGINEERING ACTIVITIES
FOR
2020 ROADWAY PROGRAM
A. DESIGN
a) Project Location:
Exhibits I establishes the streets and/or areas to be included in the Design
Engineer's bidding and planning documents for the 2020 Roadway.Program.
b. Project Kickoff.
1. Introduction of Project Team
2. Establish lines of communication
3. Acquire existing information including previous reports and plans of recent
development and relevant site information
4. Collect water and combined sewer atlases
5. Interview and document same, the Sewer, Water and Street departments for their
knowledge of issues within the project location
6. Collect and analyze public utility records and notify utility of pending project
C. Inspection of Project Location:
The Design Engineer shall provide site inspection of the entire area as well as
immediately adjacent area. The following shall be included:
1. Physical inspection, including photographs of all manholes, valve vaults, catch
basins and inlets
2. Complete geotechnical investigations where deem necessary by the Design
Engineer
d. Scope of Work Refinement:
Based upon the collection of the above information, the Design Engineer shall
refine the scope of work, including an estimate of cost, and obtain approval from
the City. The Design Engineer shall include alternatives sufficient to insure the
base bid will be below the total budget(when considering testing, publications,
inspections and other typical costs found in construction projects).
e. Construction Documents:
Design Engineer will complete plan sheets as necessary, construction estimates,
construction specifications, bid and contract documents utilizing a City format.
Any alterations or additions to the City format shall be highlighted and fully
explained to the Director or his representative. Plan sheets shall be provided for all
underground work including water main, storm sewer and combined sewer
improvements.
f. Schedulinu:
For this agreement, the Design Engineer shall develop a schedule for all steps from
execution of this agreement to contract award. The schedule shall be updated at a
minimum of every two weeks and.submitted to the Director or his designee.
g. Construction Estimate:
The Design Engineer shall prepare several estimates related to the work the City
desires to have completed under this project. Separate estimates are required for
each of the utilities and separate locations should the project include multiple
locations. In addition; the Design Engineer shall set the project estimates up to
allow for alternates to insure a project may be bid and awarded as close to the
budget as possible.
h. Open House:
The Design Engineer shall locate, schedule and hold open houses for the properties
abutting the project location. One open house is included in this scope of work.
The Design Engineer shall assist the City with preparing notices to be sent to each
abutting property a notice of this open house a minimum of seven calendar days in
advance.
i. Biddine
1. Prepare bid forms, notices and addendum as necessary for bidders.
2. Provide the Notice to Bidders to the City to post with the local newspaper to
ensure the notice is published 10 days in advance of the bid opening.
3. Provide an electronic version of the drawings and specifications to be issued by
the City to prospective bidders.
4. Attend pre-bid meeting with prospective bidders to provide clarification for issues
and concerns from bidders. The Engineer will also distribute minutes from pre-
bid meeting to the City and all meeting attendees with written answers to
concerns/questions from the meeting.
5. The selected Engineer will receive bidder questions and requests for clarification.
Based on these questions and requests, the selected Engineer will prepare addenda
as necessary to respond to the questions presented. Addenda will be issued to the
City for distribution to the bidders.
6. Evaluate the bids and bidders to determine if the bids were submitted in
accordance with the contract documents and if the bidders are qualified to
perform the work. Following this review, a recommendation will be presented to
the City for award of the construction contracts.
Attachment"B"
2020 Roadway Program
i
ELGIN March 31,2020
THE CITY IN THE SUBURBS'
2020
PROPOSED PROJECT TASKS January February March April May June July August September October November December
Notice To Proceed(April 27,2020)
Advertise for Bids(May 29,2020)
Bid Opening(June 12,2020)
Construction Duration(July 6,2020-October 31,2020)
Notice to Proceed Issued
Advertise for Bids
Bid Opening BURNS aMSDONNELL.
Construction
Attachment"C"
In City of Elgin `
II ! Professional Engineering Services for
�1 2020 Street Rehabilitation
ELGIN March 31,2020
THE CITY IN THE SUBURBS'
Crada Apkar Karpl Linares
Te hndvu
A—W, A-1.1, A-10, A-1— Srnkr Srnkr S,.0 51aR A.,i,t.at Avhtrnl A„bmnt Trchnkhn Crural Erirmn Chnrar T1nk
Emir-r EaRi—, Eryli—, Feginrer EnRlorrr E.ginnr EnRiorrr Onkr
Tuk De,crl tie. (17) (t6) (15) (It) (13) (12) II 10 (9) (x) (7) 6) (5) Totrl
Project Management&Coordination
I. Prdecl Kickoff Meeti 2 2 Slav sx5a;12
2. Project Administration/M.——M 8 1 5281.1 sl.776f.t
3. Field Investigation 8 10 le 5200,00 5613,20 $6.77520
J. Ceolechnicnl Investigation&CCDD(Rubino) n 8 S211.2011 X1 "2.96 x22.3•12.16
5a •I x s51,000 S28(.1 S2A82r.1
6. Design Review Meeting $102011 SI432 $9511;12
Design
7.
Specifications x 40 $IIIom, S171.84 SX239.Rt
A. F,ahihil Creation x 32 511,000 S143_0 S(0$5,20
9. unlit Revicw a a a S42.% S2dQ.-K,
10.EOPC 2 x 12 S77N, S?;0x1.76
Bidding Services
11.Bid Assistance 28 S35.80 $1,717.x0
12.Pre-Bid Meeting s11,00 S14,32 S850.32
13.Bid Evaluation&Recommendation 2 a S21 Ax S1.071.118
'15nr1 hmur 0 a 0 a so 0 a 130 ._ o o u I 227
Ilonl hl tilling Rnlc <tl lxl 5-800 $'1500 S-000 5111,100 519001 $16900 51571111 CI1700 51171111 WAX) c7_ 1(x21 SWm
501.00Ml. 50.00 50.00 50.01 SO'nO SI I.RI6.IM1 SII.IRI SII.tRI S211,410.00 54,3x4.181 $11.00 S.O. $11,1x1 S540.00 521.400.00 5780.44 $59,330.44
Rn1e 5hcc1:IIMR620
'sbtal Fee $59,330
EXHIBIT 1
STREETS/AREAS TO BE INCLUDED
Street From To
Washburn Street State Street Hendee Street
Oak Street State Street Hendee Street
Harding Street State Street Hendee Street
Robey Street Willis Street East termini
Hendee Street National Street Souster Avenue
Ashland Avenue Harding Street Souster Avenue
Ryerson Avenue State Street Souster Avenue
Willis Street Lord Street Souster Avenue
Local alley Washburn Street Oak Street
Hawthorne Court Airlite Street City limits