Loading...
HomeMy WebLinkAbout20-0214 All Service Contracting Corp. dv dI1-1- if I -ifI Servic-e, o )fifad 0. Cep, id` x,s FWMM• ti Memorandum City of Elgin 4 viii, 6/e RED F\ • Date: February 11, 2020 To: Richard Kozal, City Manager From: Eric Weiss, Water Director Subject: Change Order No. 1 and Final for Filter Media and Underdrain Replacement Enclosed you will find Change Order No. 1 and Final for the Filter Media and Underdrain Replacement Bid 19-037. The change was necessary to provide additional sand support media upon discovery that the replacement underdrains were two inches shorter than the existing underdrains. The total amount of the change order is $1,493.00, which is less than 1% of the total contract amount. The change order was reviewed by the legal department on February 6, 2020, and the recommended changes have been incorporated. Please contact me with any questions. Thank you. Change Order City of Elgin ELGIN,ILLINOIS PROJECT CHANGE ORDER NO. 1 AND FINAL CONTRACT: Filter Media and Underdrain Replacement(Bid No. 19-037) SCOPE: Additional amount of support media to compensate for the difference in height of new under- drains after installation. REASONS FOR CHANGE: Purchase of an additional 545 cu. ft. of support media to bring the media level of the filters to operation specifications,necessitated by the discovery of the previously existing underdrain height. • The circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed; • The change is germane to the original contract as signed; • The change order is in the best interests of the City of Elgin and authorized by law. SUMMARY OF CHANGES IN CONTRACT AMOUNT: ORIGINAL CONTRACT AMOUNT: $906,520.00 CHANGE ORDER NO. 1 and FINAL Amount of additional material, fine sand $1,493.00 TOTAL FOR CHANGE ORDER NO. 1 and FINAL ADD $1,493.00 PREVIOUS CHANGE ORDER(S): N/A Change Order No.N/A $0.00 TOTAL OF PREVIOUS CHANGE ORDERS: ADD $0.00 TOTAL REVISED CONTRACT AMOUNT: $908,013.00 The original amount of the contract with All Service Contracting Corp. is $906,520.00. Change Order No. 1 and previous change orders totaling$1,493.00 will increase the original contract amount by a total of$1,493.00, that sum representing 0.16%of the original contract amount. The new contract amount, inclusive of all change orders is $908,013.00. OTHER CONTRACT PROVISIONS: All other contract provisions remain the same. CHANGE ORDER NO. 1 AND FINAL Agreed to this Nth day of rtbrtAar , 2020. Recommended by: City of Elgin—Utilities Department-Water By: Eric Weiss Title: Water Director Date: o� 1 �D oW Signature: --A Accepted by: All Service Contracting Corp. Party of the Second Part(Contractor) By: ZP(&ivf /1, A.)ci rC l4cv" Title: Pr e S t d'er^, Date: Z 'z O Signature: K-- Approved by: CITY OF ELGIN Party of the First Part(Owner) By: Richard G. Kozal Title: City Manager Date: '� Signature: Al ,/ F:\Legal Dept\forms\Change Order Form.doc