Loading...
HomeMy WebLinkAbout19-162 I Resolution No. 19-162 RESOLUTION AUTHORIZING EXECUTION OF AMENDMENT AGREEMENT NO. 1 WITH ENGINEERING ENTERPRISES, INC. FOR SUPPLEMENTAL PROFESSIONAL ENGINEERING SERVICES IN CONNECTION WITH THE LEAD SERVICE LINE REPLACEMENT (LSLR) PROJECT PLAN BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that pursuant to Elgin Municipal Code Section 5.02.020B(9)the City Council hereby finds that an exception to the requirements of the procurement ordinance is necessary and in the best interest of the city; and BE IT FURTHER RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Richard G. Kozal, City Manager, and Kimberly A. Dewis, City Clerk, be and are hereby authorized and directed to execute Amendment Agreement No. 1 on behalf of the City of Elgin with Engineering Enterprises, Inc. for supplemental professional engineering services in connection with the Lead Service Line Replacement (LSLR) Project Plan, a copy of which is attached hereto and made a part hereof by reference. s/ David J. Kaptain David J. Kaptain, Mayor Presented: December 4, 2019 Adopted: December 4, 2019 Omnibus Vote: Yeas: 9 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk AMENDMENT AGREEMENT No. 1 THIS AMENDMENT AGREEMENT No. 1 is hereby made and entered into this 4th day of December , 2019, by and between the City of Elgin, Illinois, a municipal corporation (hereinafter referred to as the "City"), and Engineering Enterprises, Inc., an Illinois corporation (hereinafter referred to as "Engineer"). WHEREAS, the City and Engineer hereto have previously entered into an agreement dated May 9, 2018 (hereinafter referred to as "ORIGINAL AGREEMENT"), wherein the City engaged the Engineer to furnish certain professional services in connection with the LEAD SERVICE LINE REPLACEMENT(LSLR) PROGRAM IMPLEMENTATION PLAN; and WHEREAS, the parties hereto have determined it to be in their best interest to amend Original Agreement; and WHEREAS, the City has determined that the proposed scope of the Project should be modified to include Supplemental Professional Engineering Services for the LEAD SERVICE LINE REPLACEMENT (LSLR) PROJECT PLAN; and WHEREAS, the Original Agreement provides for a maximum payment of$48,392.00; and WHEREAS, the parties hereto have determined and agree that the total maximum payment for the Supplemental Services described in this Amendment Agreement No. 1 shall be in the amount of$24,400.00; and WHEREAS, the changes contemplated by this Amendment Agreement No. 1 are germane to the Original Agreement as signed; and this Amendment Agreement No. 1 is in the best interests of City and is authorized by law. NOW, THEREFORE, for and in consideration of the mutual promises and covenants provided for herein, and other good and valuable consideration, the sufficiency of which is hereby acknowledged, the parties hereto agree as follows: 1. The above recitals are incorporated into and made a part of this agreement as if fully recited hereby. 2. That Section 1 of the Original Agreement is hereby amended by adding the following subparagraph D thereto to read as follows: "The Engineer shall also provide Supplemental Services for the Project which includes the Professional Engineering for the LEAD SERVICE LINE REPLACEMENT (LSLR) PROJECT PLAN in accordance with Attachment A-1 and Engineer shall furnish such Supplemental Services for the Project as outlined and detailed in Attachment C-1," 3. That Section 2 of the Original Agreement is hereby amended by adding the following to the end of Subparagraph B: "B. Engineer shall provide the Supplemental Services provided for in Amendment Agreement No. 1 in accordance with the schedule outlined herein and detailed in Attachment B-1." 4. That Section 4 of the Original Agreement is hereby amended by adding the following paragraph E and Payment Schedule to read as follows: "E. For services described in Attachments A-1, C-1, Engineer shall be paid a fixed fee (lump sum) of $24,400.00 for the services to be provided pursuant to this Amendment Agreement No. 1, regardless of the actual time or actual costs incurred by the Engineer unless substantial modifications and scope of work are authorized in writing by the City and approved pursuant to a further written amendment to this Agreement. The total fees to be paid to the Engineer pursuant to the Original Agreement and Amendment Agreement No. 1 now total $72,792.00. The detailed basis of the additional fee associated with Amendment Agreement No. 1 is included in Attachment C-1 and is based on hourly rates of personnel utilized. The attached Standard Schedule of Charges dated January 2019 will be utilized for this Project attached hereto as Attachment D." Payment Schedule for Supplemental Services INVOICE ESTIMATED% ESTIMATED VALUE ESTIMATED DATE COMPLETE OF WORK COMPLETE INVOICE VALUE_ 1/31/2020 30% $ 7,320.00 $ 7,320.00 2/29/2020 75% $ 18,300.00 $ 10,980.00 3/31/2020 80% $ 19,520.00 $ 1,220.00 4/30/2002 85% $ 20,740.00 $ 1,220.00 _5/31/2020 90% $ 21,960.00 $ 1,220.00 6/30/2020 100% $ 24,400.00 $ 2,440.00 Total $ 24,400.00 6. That except as amended in this Amendment Agreement No. 1 the Original Agreement shall remain in full force and effect. 7. That in the event of any conflict between the terms of the Original Agreement, and the provisions in this Amendment Agreement No. 1, the provisions of this Amendment Agreement No. 1 shall control. IN WITNESS WHEREOF, the undersigned have entered into and executed this Amendment Agreement as of the date and year first written above. CITY OF CONSULTANT 1 ' W � By: t%//�/� _ri/��_. By: i ' I `iwR. City anager Its Vice President Attest: Attest: .Aa‘-‘'CA ---- 110/i44-)1./ aniirf .., City Clerk Its Executive Assistant ATTACHMENT A-1 SCOPE OF SERVICES LEAD SERVICE LINE REPLACEMENT (LSLR) PROJECT PLAN City of Elgin, Cook and Kane Cos., IL The City of Elgin is currently inventorying lead water service lines within their water distribution system. The City's intent is to implement a multi-year lead service line replacement program utilizing funds from the IEPA Public Water Supply Loan Program (PWSLP). To be eligible for the loan, the City needs to prepare a Drinking Water Project Plan for review and approval by the IEPA. The City is seeking engineering services to prepare the necessary Project Plan. The following list of work items establishes the scope of engineering services for this project: Base Scope — LSLR Project Plan 1. Kick-off meeting with the City. 2. Prepare Request for Information (RFI) and coordinate with the City regarding loan application requirements. 3. Prepare Project Plan including any necessary exhibits and submit to the IEPA. Work includes but is not limited to: • Apply for National Historic Preservation Act and IDNR sign-offs • Complete IEPA Loan Applicant Environmental Checklist • Prepare project cost estimates. • Prepare Existing User Charge and 0, M and R Certification Sheet • Revise Project Plan (if necessary) per comments from the IEPA 4. Prepare and submit to the City the notification for the Preliminary Environmental Impact Determination (PEID) public hearing. Exclusions — LSLR Project Plan 1. Coordination with Army Corps of Engineers if project involves construction in or a near a stream bank, floodway and/or wetland. 2. Coordinating and submitting publications to the newspaper. 3. Obtaining the certified copy of the advertisement for the PEID public hearing. 4. Attending the PEID public hearing. 5. Preparing written correspondence to IEPA regarding comments or questions received at the PEID public hearing. 6. Preparing written correspondence to IEPA regarding comments or questions received during the 10-day comment period following the PEID public hearing. The above scope for the Lead Service Line Replacement Project Plan summarizes the work items that will be completed for this contract. Additional work items, including additional meetings beyond the meetings defined in the above scope shall be considered outside the scope of the base contract and will be billed in accordance with the Standard Schedule of Charges. ENGINEERING ENTERPRISES, INC. \M'Ikyway\EEl_Storage\Docs\PubliclElgim2018\EG1801 Lead Service Line Replacement Program Implementation PIan'PSA\Protect Plan 2019\Attachment Al-Scope 01 CONSULTING ENGINEERS 4EARS rill/ 40,1 ATTACHMENT B-1: E SCHEDULE LG I N PROFESSIONAL ENGINEERING SERVICES FOR THE CrfYINTFESUBURBS Outstanding Service-Every Client-Every Day LEAD SERVICE LINE REPLACEMENT PROJECT PLAN CITY OF ELGIN, COOK AND KANE COS., IL WORK Year: 2019 2020 ITEM Month: November December January Februar March April May NO. WORK ITEM Week Startin•: 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 PROJECT PLANNING 11111 1.00 Project Management and Administration V"' —IP NINIMIIIII 1.01 Kick-Off Meeting with the City . 1111111111111111 1.02 RFI and Coordination with the City _ 1.03 Prepare Project Plan i 1.04 Coordination with the IEPA and PEID Public Hearing Notification DATE: 10/30/2019 ENTERED BY: JAM YEARS �— ATTACHMENT C-1: it ESTIMATE OF LEVEL OF EFFORT AND ASSOCIATED COST FOR J PROFESSIONAL ENGINEERING SERVICES E LG I N LEAD SERVICE LINE REPLACEMENT PROJECT PLAN THE CITY IN 1)-11F SUBURBS Outstanding s...b.-Every Client-Every Day CITY OF ELGIN,COOK AND KANE COS., IL ENTITY: EEI WORK SENIOR ITEM COST WORK PROJECT ROLE: SENIOR PROJECT PROJECT GIS SUB- HOUR PER ITEM PRINCIPAL MANAGER ENGINEER TECH. ADMIN. CONSULTANT SUMM. ITEM NO. WORK ITEM HOURLY RATE: $208 $197 $141 $75 $70 PROJECT PLANNING 1.00 Project Management and Administration 8 16 24 $4,816 1.01 Kick-Off Meeting with the City 4 4 _ 8 $1,620 1.02 RFI and Coordination with the City 20 20 $3,940 1.03 Prepare Project Plan 4 20 50 10 2 86 $12,712 1.04 Coordination with the IE PA and PE ID Public Hearing Notification 4 4 8 $1,352 PROJECT TOTAL: 16 64 54 , 10 2 - 146 $24,440 Notes: DIRECT EXPENSES LABOR EXPENSES See Exclusions on Attachment A-1-Scope of Services Printing= Engineering Expenses= $23,550 Mileage= Drafting Expenses= $750 Administrative Expenses= $140 Subconsultant Expenses= $0 DIRECT EXPENSES= $0 TOTAL LABOR EXPENSES= $24,440 r TOTAL CONTRACT COSTS= $24,440 \1Milkyway\PEI)Storage\Docs\Pubhc1Elgm\2018\EG1801 Lead Service Line Replacement Program Implementation PIah..PSA,Prolecl Plan 20194Attachment Cl lee Schedule eIueJFinal 119-6.121 ATTACHMENT D YEARS 31.41*- .44Standard Schedule of Charges January 1,2019 EMPLOYEE DESIGNATION CLASSIFICATION HOURLY RATE Senior Principal E-4 $208.00 Principal E-3 $203.00 Senior Project Manager E-2 $197.00 Project Manager E-1 $178.00 Senior Project Engineer/Planner/Surveyor II P-6 $165.00 Senior Project Engineer/Planner/Surveyor I P-5 $153.00 Project Engineer/Planner/Surveyor P-4 $141.00 Senior Engineer/Planner/Surveyor P-3 $129.00 Engineer/Planner/Surveyor P-2 $117.00 Associate Engineer/Planner/Surveyor P-1 $106.00 Senior Project Technician II T-6 $153.00 Senior Project Technician I T-5 $141.00 Project Technician T-4 $129.00 Senior Technician T-3 $117.00 Technician T-2 $106.00 Associate Technician T-1 $ 93.00 Engineering/Land Surveying Intern I-1 $ 84.00 GIS Technician G-1 $ 75.00 Administrative Assistant A-3 $ 70.00 CREW RATES,VEHICLES AND REPROGRAPHICS 1 Man Field Crew with Standard Survey Equipment $168.00 2 Man Field Crew with Standard Survey Equipment $262.00 1 Man Field Crew with RTS or GPS* $208.00 2 Man Field Crew with RTS or GPS* $302.00 Vehicle for Construction Observation $15.00 In-House Scanning and Reproduction $0.25/Sq.Ft. (Black&White) $1.00/Sq. Ft. (Color) Reimbursable Direct Costs&Services by Others Cost+ 10% *RTS=Robotic Total Station/GPS=Global Positioning System 52 Wheeler Road, Sugar Grove, IL 60554 - (630)466-6700 tel - (630)466-6701 fax - www.eeiweb.com