Loading...
HomeMy WebLinkAbout19-137 • Resolution No. 19-137 RESOLUTION • AUTHORIZING EXECUTION OF A CHANGE ORDER NO. 1 AND FINAL WITH US DIGITAL DESIGNS, INC. FOR FIRE STATION ALERTING SYSTEM WHEREAS,the City of Elgin has heretofore entered into a contract with US Digital Designs, Inc. for the installation of fire station alerting system; and WHEREAS, it is necessary and desirable to modify the terms of the contract as,is described in Change Order No. 1 and Final attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Richard G. Kozal, City Manager,be and is hereby authorized and directed to execute Change Order No. 1 and Final, a copy of which is attached hereto and made a part hereof by reference. • s/David J. Kaptain David J. Kaptain, Mayor Presented: October 9, 2019 Adopted: October 9, 2019 Omnibus Vote: Yeas: 8. Nays: 0 Attest: s/Kimberly Dewis • Kimberly Dewis, City Clerk . City of Elgin Change Order OF qc f›,~1;4•, r '4/1 - r •1 ELGIN, ILLINOIS `41yfG PROJECT: US Digital Designs, Inc. Agreement For Fire Station Alerting System RATED"� CHANGE ORDER NO. 1 AND FINAL CONTRACT: This project is a replacement of the existing fire station alerting system. The fire station alerting system is utilized by the Emergency Communications division to notify the seven fire stations when a response is needed. SCOPE: When the original proposal was submitted for approval,the cost of installation was based on the equipment that was ordered. Since the approval of the purchase by the.council, the installation contractor has reviewed the hardware being installed and reduced installation costs by$40,907.89. For their account- ing purposes, US Digital Design requested an updated purchase order to reflect the new pricing. REASONS FOR CHANGE: • The circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed. • The change is germane to the original contract as signed. • The change order is in the best interests of the City of Elgin and is authorized by law. SUMMARY OF CHANGES IN CONTRACT AMOUNT: The contract is being amended to decrease the contract amount and to result in a refund to the city. The changes will not result in a change to the contract provisions or contract time for work to be completed. ORIGINAL CONTRACT AMOUNT: $444,158.00 CHANGE ORDER No: 1 Reduction in hardware installation costs $40,907.89 TOTAL FOR CHANGE ORDER NO. 1: $40,907.89 PREVIOUS CHANGE ORDER(S): NONE TOTAL OF PREVIOUS CHANGE ORDERS: N/A TOTAL REVISED CONTRACT AMOUNT: $403,250.11 The original amount of the contract with US Digital Designs is $444,158.00. Change Order No. 1 will decrease the original contract amount by a total of$40,907.89, that sum representing percent 9.2% of the original contract amount. The new contract amount, inclusive of all change orders is $403,250.11. OTHER CONTRACT PROVISIONS: All other contract provisions remain the same. CHANGE ORDER NO. 1 AND FINAL Agreed to this 9th day of October ,2019. Recommended by: FIRE DEPARTEMENT By:David A. Schmidt Title: Fire Chief Date: September , 019 Signature: Accepted by: US DIGITAL DESIGNS,CONTRACTOR Party of the Second Part(Contractor) By: Domini A, .1 oni Title: Vice resid-nt Date: MEIMIr Signatur- , • Approved by: CITY OF ELGIN Party of the First Part(Owner) By:Richard G. Kozal Title: City Manager Date: Octobe. a. 9 Signature: /