HomeMy WebLinkAbout19-1115 FH Paschen City of Elgin Memorandum VIA E-MAIL Date: November 15, 2019 To: Rich Hoke, Building Maintenance Superintendent From: Michael R. Gehrman, Assistant Corporation Counsel Subject: Agreement with F.H. Paschen, S.M. Nielsen& Associates, LLC Attached pursuant to your request please find an agreement which I have negotiated, drafted, and had signed by F.H. Paschen, S.M.Nielsen&Associates, LLC. You should be sure to review the terms of the agreement, particularly as to price and materials to confirm that it conforms to your wishes and understanding. Once signed, you should return the signed agreement to Mark Holmes at mholmes@FHPaschen.com, and provide a copy to Kim Dewis for her records. MRG MRG/vlm Attachment cc: Christopher J. Beck(via e-mail w/attachment) Approved: William A. Cogley CITY OF ELGIN AGREEMENT WITH F.H.PASCHEN,S.N.NIELSEN&ASSOCIATES LLC THIS AGREEMENT is made and entered into this day of , 2019, by and between the City of Elgin, Illinois, a municipal corporation (hereinafter referred to as the "CITY")and F.H.Paschen, S.N.Nielsen&Associates LLC,an Illinois limited liability company, (hereinafter referred to as "PASCHEN"). ARTICLE I. DEFINITION. This "CONTRACT" as used herein shall mean this Agreement; the terms of a joint purchasing agreement with the National Cooperative Purchasing Alliance ("NCPA") dated December 3, 2018 incorporated hereto and made a part hereof by reference, and PASCHEN'S proposal for the Leo Nelson Riverside Water Treatment Plant, for a Water Plant Chiller and attendant installation dated July 15,2019,(hereinafter referred to as"Chiller")attached hereto and made a part hereof as Attachment A. Notwithstanding anything to the contrary contained in the aforementioned NCPA contract or Attachment A, PASCHEN'S price for the Chiller and installation thereof pursuant to this CONTRACT shall be for a total price of $169,988.21. PASCHEN guarantees the availability of the goods to be provided. In the event of any conflict between the terms of this Agreement and the terms of Attachment A or the NCPA, the terms of this Agreement shall supersede and control. In the event of any conflict between the terms of the NCPA and Attachment A,the terms of the NCPA shall supersede and control. ARTICLE H. SCOPE OF WORK. PASCHEN shall provide the goods and services described in this CONTRACT, at the prices and terms contained herein. ARTICLE M. TERMINATION. The following shall constitute events of default under this CONTRACT: (a) any material misrepresentation made by PASCHEN to the CITY; or (b) any failure by PASCHEN to perform any of its obligations under this CONTRACT including,but not limited to, any of the following: (i)failure to commence performance of this CONTRACT at the time specified in this CONTRACT; (ii) failure to perform this CONTRACT with sufficient personnel and equipment or to deliver product to ensure the performance or completion of this CONTRACT within the specified time;(iii)failure to perform this CONTRACT in a workmanlike manner reasonably satisfactory to the CITY;(iv)failure to promptly re-perform within reasonable time the services that were rejected by the CITY as erroneous or unsatisfactory; (v) failure to comply with a material term of this CONTRACT, including, but not limited to, the Affirmative Action requirements; or(vi) any other acts specifically and expressly stated in this CONTRACT as constituting a basis for termination for cause. The CITY may terminate this CONTRACT for its convenience for any reason upon fourteen (14) days prior written notice without penalty. Notwithstanding anything to the contrary herein,in the event of such termination by the CITY,the CITY's liability to PASCHEN shall be limited to reasonable payment for and goods and/or services already provided by PASCHEN on a pro rata basis pursuant to this CONTRACT. ARTICLE IV. DAMAGES. From any sums due to PASCHEN pursuant to this CONTRACT, the CITY may keep for its own the whole or any part of such expenses, losses and damages incurred by the CITY as a consequence of procuring goods or services as a result of any failure, omission,negligence or mistake of PASCHEN in providing the goods or services provided in this CONTRACT. n i ARTICLE V. GOVERNING LAWS AND VENUE. This CONTRACT is subject to and governed by the laws of the State of Illinois. Venue for the resolution of any disputes or the enforcement of any rights arising out of or in connection with this CONTRACT shall be the Circuit Court of Kane County, Illinois. PASCHEN hereby irrevocably consents to the jurisdiction of the Circuit Court of Kane County, Illinois for the enforcement of any rights, the resolution of any disputes and/or for the purposes of any lawsuit brought pursuant to this agreement or the subject matter hereof, and PASCHEN agrees that service by first class U.S. mail to 5515 N. East River Road, Chicago, Illinois, 60656 shall constitute effective service. Both parties hereto waive any rights to a jury. ARTICLE VI, AFFIRMATIVE ACTION. PASCHEN will not discriminate against any employee or applicant for employment because of race, color, religion, sex, ancestry, national origin, place of birth, age or physical handicap which would not interfere with the efficient performance of the job in question. PASCHEN will take affirmative action to comply with the provisions of Elgin Municipal Code Section 3.12.100 and will require any subcontractor to submit to the CITY a written commitment to comply with those provisions. PASCHEN will distribute copies of this commitment to all persons who participate in recruitment, screening, referral and selection of job applicants and prospective subcontractors. PASCHEN agrees that the provisions of Chapter 3.12 of the Elgin Municipal Code, 1976, is hereby incorporated by reference, as if set out verbatim. ARTICLE VH. AMENDMENTS. There shall be no modification of this CONTRACT,except in writing and executed with the same formalities of the original. ARTICLE VM. NOTICES. Any notice given under this CONTRACT shall be in writing and shall be deemed to have been given when hand delivered or deposited in the U.S. mail, certified or registered, return receipt requested, addressed, if to PASCHEN, at 5515 N. East River Road, Chicago, IL 60656 to the attention of the project manager or undersigned representative, and if to the CITY, to the attention of Richard Hoke, 150 Dexter Court, Elgin, IL 60120, or to such other address and/or authorized representatives as either party shall designate in writing to the other in the manner herein provided. ARTICLE IX. INDEMNIFICATION. To the fullest extent permitted by law, PASCHEN agrees to and shall indemnify,defend and hold harmless the CITY,its officers,employees,boards and commissions from and against any and all claims, suits, judgments, costs, attorneys fees, damages or any and all other relief or liability arising out of or resulting from or through or alleged to arise out of any acts or negligent acts or omissions of PASCHEN or PASCHEN'S officers, employees, agents or subcontractors in the performance of this CONTRACT including, but not limited to, all goods delivered or services or work performed hereunder. In the event of any action against the CITY,its officers,employees,agents,boards or commissions covered by the foregoing duty to indemnify,defend and hold harmless,such action shall be defended by legal counsel of the CITY's choosing. ARTICLE X. PUBLICITY. PASCHEN may not use, in any form or medium, the name of the City of Elgin for public advertising unless prior written permission is granted by the CITY. -2- ARTICLE XI. APPROPRIATIONS. The fiscal year of the CITY is the twelve (12)-month period ending December 31. The obligations of the CITY under any contract for any fiscal year are subject to and contingent upon the appropriation of funds sufficient to discharge the obligations which accrue in that fiscal year and authorization to spend such funds for the purposes of this CONTRACT. If, for any fiscal year during the term of this CONTRACT, sufficient funds for the discharge of the CITY's obligations under this CONTRACT are not appropriated and authorized, then this CONTRACT shall terminate as of the last day of the preceding fiscal year,or when such appropriated and authorized funds are exhausted,whichever is later, without liability to the CITY for damages,penalties or other charges on account of such termination. ARTICLE XII.ENTIRE AGREEMENT. This CONTRACT embodies the whole agreement of the parties hereto regarding the subject matter hereof. There shall been no promises, terms, conditions or obligations other than those contained herein, and this CONTRACT shall supersede all previous communications, representations or agreements, either verbal, implied or written, between the parties regarding the subject matter hereof. ARTICLE X1111.COMPLIANCE WITH LAWS. Notwithstanding any other provision of this CONTRACT, it is expressly agreed and understood that in connection with the performance of this CONTRACT, PASCHEN shall comply with all applicable federal, state, city and other requirements of law including,but not limited to,any applicable requirements regarding prevailing wages, minimum wage, workplace safety and legal status of employees. Without limiting the foregoing,PASCHEN hereby certifies,represents and warrants to the CITY that all PASCHEN'S .employees and/or agents who will be providing products and/or services with respect to this CONTRACT shall be legally authorized to work in the United States. PASCHEN shall also at its. expense secure all permits and licenses,pay all charges and fees and give all notices necessary and incident to the due and lawful prosecution of the work, and/or the products and/or services to be provided for in this CONTRACT. The CITY shall have the right to audit any records in the possession or control of PASCHEN to determine PASCHEN'S compliance with the provisions of this section. In the event the CITY proceeds with such an audit PASCHEN shall make available to the CITY PASCHEN'S relevant records at no cost to the CITY.CITY shall pay any and all costs associated with any such audit. ARTICLE XIV, SIGNATURE. The person signing this CONTRACT certifies that s/he has been authorized by PASCHEN to commit PASCHEN contractually and has been authorized to execute this CONTRACT on its behalf. ARTICLE XV. EXECUTION. This CONTRACT may be executed in counterparts, each of which shall be an original and all of which shall constitute one and the same CONTRACT. For the purposes of executing this CONTRACT,any signed copy of this CONTRACT,whether signed by hand or any other means, and/or transmitted by fax machine or e-mail shall constitute and be construed in all manners and respects as an original document. The signature of any party on a copy of this CONTRACT transmitted by fax machine or e-mail shall be considered for these purposes as an original signature and shall have the same legal effect as an original signature. Any such faxed or e-mailed copy of this CONTRACT shall be considered to have the same binding legal effect as an original document. At the request of either party any fax or e-mail copy of this -3 - V CONTRACT shall be re-executed by the parties in an original form. No party to this CONTRACT shall raise the use of fax machine or e-mail as a defense to this CONTRACT and shall forever waive such defense. ARTICLE XVI. ASSIGNMENT. DELEGATIONS AND SUBCONTRACTORS. Any assignment,delegation,novation or subcontracting shall be subject to all the terms,conditions and other provisions of this CONTRACT and PASCHEN shall remain liable to the CITY with respect to each and every item, condition and other provision hereof to the same extent that PASCHEN would have been obligated if it had done the work itself and no assignment,novation,delegation or subcontract had been made. Any proposed subcontractor shall require the CITY's advanced written approval. ARTICLE XVII. INDEPENDENT CONTRACTOR NO PARTNERSHIP OR AGENCY. PASCHEN is an independent Contractor pursuant to this agreement. This CONTRACT shall not be construed so as to create a partnership,joint venture, employment or other agency relationship between the parties hereto. IN WITNESS WHEREOF the parties have hereto set their hands the day and year first above written. CITY OF ELGIN: F.H. PASCHEN, S.N.NIELSEN& SOCIATES LLC By: Richard G. Kozal,City Manager Attest: By: Name/Print: z Z-c Title: e City Clerk p:1i-gal Dept\AgeemantTuchen Agr-Riverside Chiller hutall-10-28-19.docx -4- ATTACHMENT A Elgin Riverside Water Plant Chiller Scope of Work • Provide and install structural steel work per project drawings including crane lift • Provide and install new roof curb and rails as needed for new chiller and associated piping • Provide crane lift and labor to install owner supplied chiller and cooling coil • Provide and install(1)new recirculating pump • Provide and install Sch 80 PVC supply,return,and fill piping as required • Provide and install pipe insulation as required • Provide and install stand alone controls for new chiller • Provide and install new 480v 100 amp feed to rooftop chiller from existing switch gear • Provide and install new circuits for 120v 20 amp convenience outlet and freeze protection circuit • Provide and install conduit for control wiring • Install 208v 20 amp circuit for new pump in basement • Cut and patch existing roof as required to complete this scope of work F.H.PASCHEN,S.N.NIELSEN&ASSOCIATES LLC F.H. PASCHEN 5515 N. East River Road,Chicago, IL 60656 p.773.444.3474 f.773,693.0064 1 www.fhpaschen.com FIN? Final Estimate Leo Wright F.H. Paschen ?KN 0000 - NCPA- Base Term -4/02/2018 to 4/30/2019 5 Elgin Riverside Water Plant Chiller- NCPA RQN 2019-9387774737 FH Pasdten,S.N.Nielsen Leo Wright Estimator: Leo Wright Summary of tagged estimates... Division Summary (MF04) 01-General Requirements $57,357.50 26-Electrical $17,599.75 02-Existing Conditions $1,250.00 27-Communications 03-Concrete $1,330.00 28-Electronic Safety and Security 04-Masonry 31-Earthwork 05-Metals $8,370.80 32-Exterior Improvements 06-Wood,Plastics,and Composites 33-Utilities 07-Thermal and Moisture Protection_ 34-Transportation 08-Openings 35-Waterway and Marine Transportation 09-Finishes 41-Material Processing and Handling Equipment 10-Specialties 44-Pollution Control Equipment 11-Equipment 46-Water and Wastewater Equipment 12-Fumishings 48-Electric Power Generation 13-Special Construction _ R&R Inlets $12,604.90 14-Conveying Equipment _ Trades $16,427.20 21-Fire Suppression Assemblies 22-Plumbing $26,064.65 FMR 23-Heating,Ventilating,and Air-Conditioning(HVAC) $5,663.20 MF04 Total(Without totalling components) $146,668.00 25-Integrated Automation Totalling Components Priced Line Items $146,668.00 NCPA-Regular Hours (-6.0000%) $(8,800.08) RSMeans NORTH SUBURBAN,IL CCI 201902, 121.90% $32,120.29 Material,Labor,and Equipment Totals(No Totalling Components) Material: $23,476.70 Labor: $112,112.08 Equipment: $8,189.22 Other: $2,890.00 Laborhours: 786.47 Green Line Items:6 $3,507.40 Grand Total $169,988.21 Printed 15 JUL 2019 9:21AM v2.636 Page 1 of 7 Elgin Riverside Water Plant Chiller-NCPA RQN 2019-9387774737 Final Estimate Estimator: Leo Wright Combined estimates... Item Description UM Quantity Unit Cost Total Book 01 - General Requirements 1 01-21-53-50-0550-L Cost adjustment factors,cut&patch to match existing construction,add to Costs 170,000.0000 9.0000% $15,300.00 RSM19FAC construction costs for particular job requirements,maximum L, O&P (Roofing 170,000.0000) 2 01-21-53-50-1450-L Cost adjustment factors,material handling&storage limitation,add to Costs 35,000.0000 7.0000% $2,450.00 RSM19FAC construction costs for particular job requirements,maximum (Electrical 35,000.0000) Adjustment factor for electrical crew working on roof,in basement,and in occupied facility. 3 01-21-53-50-1450-L Cost adjustment factors,material handling&storage limitation,add to Costs 170,000.0000 7.0000% $11,900.00 RSM19FAC O8 construction costs for particular job requirements,maximum (HVAC 170,000.0000) Cost adjustment factor for Mechanical crew working on roof and interior of occupied building 4 01-21-53-50-1750-L Cost adjustment factors,protection of existing work,add to construction costs Costs 170,000.0000 7.0000% $11,900.00 RSM19FAC for particular job requirements,maximum L, O&P (HVAC 170,000.0000) Protection of ebsbng roofing system and building finishes during construction 5 01-54-33-60-2500-2 Rent per day for rent crane truck mounted,hydraulic,25 ton capacity Ea. 1.0000 $533.50 $533.50 RSM19FAC E, O&P (Structural Steel 1.0000) Crane on site for steel work 6 01-54-33-60-2550-2 Rent per day for rent crane truck mounted,hydraulic,33 ton capacity Ea. 1.0000 $990.00 $990.00 RSM19FAC E, O&P (Structural Steel 1.0000) Crane on site for structural steel work on roof 7 01-54-33-60-2550-2 Rent per day for rent crane truck mounted,hydraulic,33 ton capacity Ea. 1.0000 $990.00 $990.00 RSM19FAC E, O&P (HVAC 1.0000) 8 01-54-36-50-1200 Mobilization or demobilization.delivery charge for small equipment,placed in Ea. 2.0000 $196.00 $392.00 RSM19FAC rear of,or towed by pickup truck L,E. O&P (Electrical 2.0000) 9 01-54-36-50-1200 Mobilization or demobilization,delivery charge for small equipment,placed in Ea. 2.0000 $196.00 $392.00 RSM19FAC rear of,or towed by pickup truck L.E. O&P (HVAC 2.0000) 10 01-54-36-50-1300 Mobilization or demobilization,delivery charge for equipment,hauled on 3-ton Ea. 2.0000 $305.00 $610.00 RSM19FAC capacity towed trailer L.E. O&P (HVAC 2.0000) 11 01-54-36-50-1600 Mobilization or demobilization,delivery charge for equipment,hauled on 50-ton Ea. 2.0000 $2,975.00 $5,950.00 RSM19FAC capacity towed trailer L.E, O&P (Structural Steel 2.0000) Mobilize and demobilize crane for structural steel 12 01-54-36-50-1600 Mobilization or demobilization,delivery charge for equipment,hauled on 50-ton Ea. 2.0000 $2,975.00 $5,950.00 RSM19FAC capacity towed trailer L E. O&P (HVAC 2.0000) Printed 15 JUL 2019 911AM v2.636 Page 2 of 7 Elgin Riverside Water Plant Chiller-NCPA RON 2019-9387774737 Final Estimate Estimator: Leo Wright Combined estimates... 01 -General Requirements Item Description UM Quantity Unit Cost Total Book 01 -General Requirements Total $57,357.50 02 - Existing Conditions 13 02-41-19-19-0725 Selective demolition,rubbish handling,dumpster,20 C.Y.,5 ton capacity, Week 2.0000 $625.00 $1,250.00 RSM19FAC weekly rental,includes one dump per week,cost to be added to demolition cost M. O&P (HVAC 2.0000) 02 -Existing Conditions Total $1,260.00 03 - Concrete 14 03-82-13-10-1999 Concrete core drilling,includes bit cost,layout and set up time,minimum Job 1.0000 $665.00 $665.00 RSM19FAC equipment/labor charge L,E, O&P (Electrical 1.0000) 15 03-82-13-10-1999 Concrete core drilling,includes bit cost,layout and set up time,minimum Job 1.0000 $665.00 $665.00 RSM19FAC equipment/labor charge L,E. O&P (HVAC 1.0000) 03-Concrete Total $1,330.00 05 - Metals 16 05-05-19-10-1430 Chemical anchor,3/4"diameter x 9-1/2"L,in concrete,brick or stone,incl Ea. 24.0000 $61.50 $1,476.00 RSM19FAC layout,drilling,threaded rod&epoxy cartridge M,L,E. O&P (Structural Steel 24.0000) Threaded rod chemically anchored to existing concrete beam. 17 05-05-21-15-1960 Drilling holes in steel for anchors,up to 1/4"deep,3/4"diameter,incl bit& Ea. 24.0000 $9.55 $229.20 RSM19FAC layout,excludes anchor M,L, O&P (Structural Steel 24.0000) Drilling holes in 12"x12'k1"plate as needed for anchor bolts. 18 05-05-21-90-1300 Welding structural steel in field,single pass,0.1 Ib/LF, 1/8"thick,continuous L.F. 24.0000 $6.10 $146.40 RSM19FAC fillet,down welding,type 6011 M.L.E. O&P (Structural Steel 24.0000) Welding of steel plates to steel piping and plates to W8x10. 19 05-05-21-90-1400 Welding structural steel in field,single pass,0.2 Ib/LF, 3/16"thick,continuous L.F. 16.0000 $12.20 $195.20 RSM19FAC fillet,down welding,type 6011 M,L,E. O&P (Structural Steel 16.0000) Welding of steel angles to W8x10. 20 05-05-23-25-0350 High strength bolt,3/4"dia x 8"L,A325 Type 1,incl washer&nut Ea. 40.0000 $21.00 $840.00 RSM19FAC Gm,M,L. O&P (Structural Steel 40.0000) Mounting bolts for steel beam connections. 21 05-12-23-40-0470 Angle framing,structural steel,2"x2"x1/4",field fabricated,incl cutting&welding L.F. 10.0000 $29.00 $290.00 RSM19FAC Gm,M,L,E, O&P (Structural Steel 10.0000) Steel angles as needed for bracing between steel beams and chiller framing. Printed 15 JUL 2019 9:21AM v2.636 Page 3 of 7 Elgin Riverside Water Plant Chiller-NCPA RQN 2019-9387774737 Final Estimate Estimator: Leo Wright Combined estimates... 05-Metals Item Description UM Quantity Unit Cost Total Book 22 05-12-23-65-0400 Steel plate,structural,for connections&stiffeners, 1/2"T,shop fabricated,incl S.F. 10.0000 $29.50 $295.00 RSM19FAC shop primer Gm,M, O&P (Structural Steel 10.0000) 5"x5"x1/2"steel plates mounted between steel pipe and steel beams. 23 05-12-23-65-0500 Steel plate,structural,for connections&stiffeners, 1"T,shop fabricated,incl S.F. 8.0000 $59.50 $476.00 RSM19FAC shop primer Gm,M, O&P (Structural Steel 8.0000) 12"x12"x1"steel plates mounted between steel pipe and existing concrete beams. 24 05-12-23-75-0302-8499 Structural steel member, 1 to 2 story building,shop fabricated,for projects less L.F. 48.0000 $19.75 $948.00 RSM19FAC than 2 tons,add(Modified using 05-12-23-75-8499) M,L, O&P (Structural Steel 48.0000) 25 05-12-23-75-9000 Structural steel member,minimum labor/equipment charge Job 1.0000 $3,475.00 $3,475.00 RSM19FAC L,E, O&P (Structural Steel 1.0000) Minumum charge for structural steel installation. 05-Metals Total $8,370.80 22 - Plumbing 26 22-07-19-30-0156 Pipe insulation protective jacketing,PVC,white,48"lengths,20 mil thick,3"ID, L.F. 365.0000 $6.00 $2,190.00 RSM19FAC cut from roll goods,size based on OD of insulation M,L, O&P (HVAC 365.0000) 27 22-07-19-30-0156-1120 Labor adjustment factor(mechanical),general,20'to 24.5'high,add to labor for L.F. 365.0000 $0.86 $313.90 RSM19FAC elevated installation(above floor level),for Division 21,22 and 23 only(Modified L, O&P using 22-01-02-20-1120) (HVAC 365.0000) 28 22-11-13-74-1140 Pipe,plastic,PVC,high impact/pressure,3"diameter,schedule 80,includes L.F. 365.0000 $60.00 $21,900.00 RSM19FAC couplings 10'OC,and hangers 3 per 10' M,L, O&P (HVAC 365.0000) 29 22-11-13-74-1140-1120 Labor adjustment factor(mechanical),general,20'to 24.5'high,add to labor for L.F. 365.0000 $4.55 $1,660.75 RSM19FAC elevated installation(above floor level),for Division 21,22 and 23 only(Modified L, O&P using 22-01-02-20-1120) (HVAC 365.0000) 22-Plumbing Total $26,064.65 23 - Heating, Ventilating, and Air-Conditioning (HVAC) 30 23-05-93-20-0200 Balancing,water,chiller,(Subcontractor's quote including material&labor) Ea. 1.0000 $620.00 $620.00 O P19FAC (HVAC 1.0000) 31 23-05-93-20-1000 Balancing,water,pumps,(Subcontractor's quote including material&labor) Ea. 1.0000 $320.00 $320.00 O P19FAC (HVAC 1.0000) Printed 15 JUL 2019 9:21AM v2.636 Page 4 of 7 Elgin Riverside Water Plant Chiller-NCPA RQN 2019-9387774737 Final Estimate Estimator: Leo Wright Combined estimates... 23-Heating,Ventilating,and Air-Conditioning(HVAC) Item Description UM Quantity Unit Cost Total Book 32 23-05-93-50-0160 Pipe testing,nondestructive hydraulic pressure test,isolate, 1 hour hold,1"to 4" Ea. 1.0000 $990.00 $990.00 RSM19FAC pipe,250-500 LF L, O&P (HVAC 1.0000) 33 23-09-23-10-8050 Control components/DDC system,applications software,basic maintenance Ea. 1.0000 $1,950.00 $1,950.00 O O&P manager software,excl.database entry (HVAC 1.0000) 34 23-21-23-13-9000 Pump,minimum labor/equipment charge Job 1.0000 $435.00 $435.00 RSM19FAC L, O&P (HVAC 1.0000) 35 23-23-23-20-4450 Refrigeration specialties,refrigerant,R-410A,25 lb.disposable cylinder Lb. 44.0000 $12.80 $563.20 RSM19FAc M. O&P (HVAC 44.0000) 36 23-82-16-10-9000 Coil,flanged.minimum labor/equipment charge Job 1.0000 $785.00 $785.00 RSM19FAC L. O&P (HVAC 1.0000) 23-Heating,Ventilating, and Air-Conditioning (HVAC)Total $5,663.20 26 - Electrical 37 26-05-19-90-1200 Wire,copper,stranded,600 volt,#12,type THWN-THHN,normal installation C.L.F. 15.0000 $79.00 $1,185.00 RSM19FAC conditions in wireway,conduit,cable tray M.L, O&P (Electrical 15.0000) 38 26-05-19-90-1450 Wire,copper,stranded,600 volt,#3,type THWN-THHN,normal installation C.L.F. 9.0000 $255.00 $2,295.00 RSM19FAC conditions in wireway,conduit,cable tray M,L, O&P (Electrical 9.0000) 39 26-05-23-10-0200 Control cable,copper,THHN wire with PVC jacket,600 V,6 wires.#14 C.L.F. 2.0000 $235.00 $470.00 RSM19FAC M.L, O&P (Electrical 2.0000) 40 26-05-29-20-4110 Hangers,channel,steel,16 gauge, 1-5/8"x 13/16" L.F. 80.0000 $16.30 $1,304.00 RSM19FAC M.L, O&P (Electrical 80.0000) 41 26-05-29-20-4114 Hangers,trapeze channel support,steel,12"wide,steel,12 Ga Ea. 25.0000 $110.00 $2,750.00 RSM19FAC M,L, O&P (Electrical 25.0000) 42 26-05-33-13-5020 Electric metallic tubing(EMT),3/4"diameter,to IV high,ind 2 terminations,2 L.F. 700.0000 $7.00 $4,900.00 RSM19FAC field bend elbows, 11 beam damps,and 11 couplings per 100 LF M,L, O&P (Electrical 700.0000) 43 26-05-33-13-5060 Electric metallic tubing(EMT),1-1/4"diameter,to 10'high,ind 2 terminations,2 L.F. 225.0000 $10.75 $2,418.75 RSM19FAC elbows,11 beam damps,and 11 couplings per 100 LF M,L, O&P (Electrical 225.0000) 44 26-05-33-18-0100 Pull boxes,steel,type SC,6"W x 6"H x 4"D,NEMA 1 Ea. 10.0000 $104.00 $1,040.00 RSM19FAC M,L, O&P (Electrical 10.0000) Printed 15 JUL 2019 9:21AM v2.636 Page 5 of 7 Elgin Riverside Water Plant Chiller-NCPA RQN 2019-938777473-t Final Estimate Estimator: Leo Wright Combined estimates... 26-Electrical Item Description UM Quantity Unit Cost Total Book 45 26-05-33-18-0200 Pull boxes,steel,type SC,8"W x 8"H x 4"D,NEMA 1 Ea. 3.0000 $106.00 $318.00 RSM19FAC M,L, O&P (Mectrical 3.0000) 46 26-28-16-10-0400 Circuit breaker,3 pole,600 volt,100 amp,endosed(NEMA 1) Ea. 1.0000 $919.00 $919.00 RSM19FAC M,L, 8 (Electrical 1.0000) New circuit breaker in exisitng panel 26-Electrical Total $17,599.75 R&R Inlets 47 05-12-23-60-0020 Pipe support framing,structural, under 10 plf,shop fabricated Lb. 160.0000 $1.79 $286.40 CUSTOM Gm.M.E. B (Roofing 160.0000) Material only. Custom fabricated and install eight(8)rails 2'long flashed into existing roof system. 48 05-12-23-75-0302 Structural steel beam or girder, 1004on project, 1 to 2 story building,W8x10, L.F. 48.0000 $27.50 $1,320.00 CUSTOM A992 steel,shop fabricated,incl shop primer,bolted connections Gm,M.L,E, O&P (Structural Steel 48.0000) W8x10 steel teams as needed for chiller framing. 49 07-65-23-10-8400 Flexible flashing,rubber,neoprene,cured,1/8"thick S.F. 190.0000 $6.15 $1,168.50 MuS e M (Roofing 190.0000) Material Only. Flashing new rails,ptich pans,portals,curb and misc items. 50 23-64-23-10-0935 Water chiller,scroll,multiple compressor,hermetic,water cooled,35 ton Ea. 1.0000 $9,830.00 $9,830.00 CUSTOM cooling,includes standard controls,excludes water tower L, O&P (HVAC 1.0000) RJR Inlets Total $12,604.90 Trades 51 ELEC Electricians-2019 RSMeans Facilities O&P Rate Hour 32.0000 $92.60 $2,963.20 Trades L, O&P (Electrical 32.0000) Electrical labor hours for terminations,connections,and start up of owner equipment 52 EQHV Equipment Operators,Crane or Shovel-2019 RSMeans Facilities O&P Rate Hour 8.0000 $90.25 $722.00 Trades L, O&P (HVAC 8.0000) Flagger/signal man for crane picks 53 HELP Helpers Average(5 trades)-2019 RSMeans Facilities O&P Rate Hour 24.0000 $63.50 $1,624.00 Trades L, O&P (Roaring 24.0000) Labor hours for material handling for roofing crew 54 HELP Helpers Average(5 trades)-2019 RSMeans Facilities O&P Rate Hour 40.0000 $63.50 $2,540.00 Trades L, O&P (HVAC 40.0000) Labor hours for material handling from parking lot to roof and on roof top. Printed 15 JUL 2019 921AM v2.636 Page 6 of 7 Elgin Riverside Water Plant Chiller-NCPA RQN 2019-938777473-t Final Estimate Estimator: Leo Wright Combined estimates... Trades Item Description UM Quantity Unit Cost Total Book 55 SSWK Structural Steel Workers-2019 RSMeans Facilities O&P Rate Hour 8.0000 $93.25 $746.00 Tom$ L. O&P (HVAC 8.0000) 56 STPI Steamfitters or Pipefitters-2019 RSMeans Facilities O&P Rate Hour 80.0000 $99.15 $7,932.00-403 (HVAC 80.0000) Labor hours for install of owner equipment and connections to owner equipment Trades Total $16,427.20 Estimate Grand Total 169,988.21 Printed 15 JUL 2019 9:21AM v2.636 Page 7 of 7 Elgin Riverside Water Plant Chiller-NCPA RQN 2019-9387774737