HomeMy WebLinkAbout12-139 Resolution No. 12-139
RESOLUTION
APPROVING CHANGE ORDER NO. 1 AND FINAL IN THE CONTRACT WITH
F. H. PASCHEN, S. N. NIELSEN & ASSOCIATES, LLC
FOR THE EASTSIDE RECREATION CENTER
RENOVATION PROJECT
WHEREAS, the City of Elgin has heretofore entered into a contract with F. H. Paschen, S. N.
Nielsen & Associates, LLC for the Eastside Recreation Center Renovation Project; and
WHEREAS, it is necessary and desirable to modify the terms of the contract as is described
in Change Order No. 1 and Final, attached hereto.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
ELGIN, ILLINOIS, that Sean R, Stegall, City Manager, be and is hereby authorized and directed to
execute Change Order No. 1 and Final, a copy of which is attached hereto and made a part hereof by
reference.
s/ David J. Kaptain
David J. Kaptain, Mayor
Presented: September 12, 2012
Adopted: September 12, 2012
Vote: Yeas: 5 Nays: 2
Attest:
s/ Kimberly Dewis
Kimberly Dewis, City Clerk
U, , § City of Elgin Change Order
t
I!
ELGIN, ILLINOIS
PROJECT NUMBER: 039929
CHANGE ORDER No. 1 and FINAL
CONTRACT: JOC bid for East Side Recreation Center Retaining Wall and Classroom Renovations
SCOPE: Additional work on the retaining wall due to poor soil conditions and extended length. Addi-
tional unstable soil was removed and new gravel was brought in and compacted to provide a solid foun-
dation to build the retaining wall on. Approximately 15' of additional length was also added to the wall
to provide proper grades.
In the class room area some additional framing was done to clean up areas not included in the original
scope. Additional outlets and data boxes were also added to some locations. Sprinkler heads were low-
ered and adjusted for a future drop ceiling and to accommodate some changes in partitions. Additional
doors were added due to delays in the main construction contract.
REASONS FOR CHANGE: Change order number 1 is in the best interests of the City of Elgin and au-
thorized by law. Due to concealed conditions and delays in the main construction contract, the circum-
stances said to necessitate the change in in the contract were not reasonably foreseeable at the time the
contract was signed. Change order number 1 is germane to the original contract as signed.
SUMMARY OF CHANGES IN CONTRACT AMOUNT: The scope of the original contract is being
amended to include changes to the retaining wall and the classroom area.
ORIGINAL CONTRACT AMOUNT: $165,424.00
CHANGE ORDER No. 1 and Final
Changes to the retaining wall and classroom area as
detailed in F. H. Paschen Job Order Number 012747.A $56,075.11
TOTAL FOR CHANGE ORDER NO. 1 and Final: ADD $56,075.11
TOTAL REVISED CONTRACT AMOUNT: $221,499.11
The original amount of the contract with F.H. Paschen is $165,424.00. Change Order No. 1 and final
totaling $56,075.11 will increase the original contract amount by a total of$56,075.11, that sum repre-
senting thirty four percent(34%) of the original contract amount. The new contract amount, inclusive of
all change orders is $221,499.11.
OTHER CONTRACT PROVISIONS: All other contract provisions remain the same.
CHANGE ORDER No. 1 and Final
Agreed to this 22nd day of August, 2012.
Recommended by:
Building Maintenance Department
By: Rich Hoke
Title: Building Maintenance Superintendent
Date: August 22, 2012
Signature:
Accepted by:
F. H. Paschen, S. N. Nielsen & Associates LLC
Party of the Second Part(Contractor)
By: icY1 2iV,'l,'r
Title: 46c+ Pro j-r[d- Ma#1c��-ram
Date: cS/0)- 7/ ' ()—
Signature:
Approved by:
CITY OF ELGIN
Party of the First Part(Owner)
By: Sean R. Stegall
Title: City Manager
Date: September 12, 2012
Signature: 11401d etirti(
F:\Legal Dept\forms\Change Order Form.doc
i
REPORT TO MAYOR . MEMBERS OF Ci T Y COUNCIL E LG I N
THE CITY IN THE SUBURBS-
AGENDA ITEM: C
MEETING DATE: August 22, 2012
ITEM:
Change Order No. 1 and Final with F. H. Paschen for Job Order Contracting Bid at East Side Rec-
reation Center
($56,075)
OBJECTIVE:
Complete work in the classroom area and a retaining wall at the East Side Recreation Center in
relation to the Park and Recreation Facility Construction grant.
RECOMMENDATION:
Approve a change order with F. H. Paschen for work related to the classroom area and a retain-
ing wall at the East Side Recreation Center in the amount of$56,075.
BACKGROUND
The city council approved an agreement with the Illinois Department of Natural Resources
(IDNR) for a Park and Recreation Facility Construction (PARC) grant at its December 21, 2011
meeting for a renovation to the East Side Recreation Center (ERC). Because of timing issues re-
lated to weather and the facility's schedule, it was decided that the masonry work and this job
order contracting package would be bid separately while other components of the project were
being evaluated. The job order contract was approved at the June 27, 2012 city council meeting
and is moving along at a rapid pace to get the classrooms ready for the start of school.
OPERATIONAL ANALYSIS
The construction of the retaining wall revealed that the soils were wet and not compacted,
making them unsuitable for the footing of the wall. As a remedial measure, additional soil had
to be removed approximately four feet deep and four feet wide over the length of the wall.
Gravel was also added and compacted to provide a solid base for the wall. These changes to the
retaining wall account for the majority of the increase necessitating the change order.
Additional work was also done in the classroom area to insure completion for the start of the
school season including:
■ Removing unused telephone and HVAC equipment
h
1
• Adding electrical outlets and data jacks in the computer lab
• Moving sprinkler heads to accommodate future drop ceiling
• Adding floor repairs and vinyl flooring in multi-purpose room and kitchen
• Studding and drywall over masonry walls in three class rooms
• Adding door a frames from class room area to main building
• Installing electrical outlets for equipment in the storage room
The full scope of the different contracts was still being finalized at the time the job order con-
tract (JOC) was awarded and the classroom items were not anticipated at that time. While
some of the classroom items were originally anticipated to be completed as a part of the main
contract, the bidding delays relating to this project necessitate completing the classroom com-
ponents now to ensure the classroom area reopens on time for the school year.
All of the JOC pricing is pre-bid and based on the catalog unit price.
INTERESTED PERSONS CONTACTED
None.
FINANCIAL ANALYSIS
Staff is recommending approval of the change order with the JOC contractor, F. H. Paschen in
the amount of$56,075.11 for a new contract amount of$221,499.11.
The total cost of the facility improvements to the ERC was originally projected to be $2,454,800.
The PARC grant of $1,841,100 will fund 75 percent of this amount, with the city contributing
the balance of $613,700. The city will be required to up front the entire project cost of
$2,454,800. However, under the terms of the agreement, a reimbursement request can and will
be submitted to the IDNR once the project has reached 50 percent completion. The balance of
the project costs will be reimbursed to the city once the entire project is completed.
Additional exterior improvements to the ERC, including repaving the parking lot, sidewalk re-
placement and landscaping have been identified and will be completed using public services
staff. The cost of materials related to these improvements has been estimated at $140,300.
General fund contingency funds will be used to finance this project.
BUDGET IMPACT
FUND(S) ACCOUNT(S) PROJECT AMOUNT AMOUNT
#(S) BUDGETED AVAILABLE
Riverboat Lease 276-0000-791.92-36 039929 $2,528,100 $1,861,754
J �
2
LEGAL IMPACT
None.
ALTERNATIVES
The city council could choose to not approve the change order and stop all work immediately.
NEXT STEPS
1. Execute the change order.
2. Complete the project.
Originator: Rich Hoke, Building Maintenance Superintendent
Final Review: Colleen Lavery, Chief Financial Officer
Richard G. Kozal, Assistant City Manager/Chief Operating Officer
William A. Cogley, Corporation Counsel/Chief Development Officer
Sean R. Stegall, City Manager
ATTACHMENTS
A. Change Order Contract
B. Change Order Summary
J�►
3
11 OF E4c.
�--tr Change Order
City of Elgin g
ELGIN,ILLINOIS
PROJECT NUMBER: 039929
CHANGE ORDER No. 1 and FINAL
CONTRACT: JOC bid for East Side Recreation Center Retaining Wall and Classroom Renovations
SCOPE: Additional work on the retaining wall due to poor soil conditions and extended length. Addi-
tional unstable soil was removed and new gravel was brought in and compacted to provide a solid foun-
dation to build the retaining wall on. Approximately 15' of additional length was also added to the wall
to provide proper grades.
In the class room area some additional framing was done to clean up areas not included in the original
scope. Additional outlets and data boxes were also added to some locations. Sprinkler heads were low-
ered and adjusted for a future drop ceiling and to accommodate some changes in partitions. Additional
doors were added due to delays in the main construction contract.
REASONS FOR CHANGE: Change order number 1 is in the best interests of the City of Elgin and au-
thorized by law. Due to concealed conditions and delays in the main construction contract, the circum-
stances said to necessitate the change in in the contract were not reasonably foreseeable at the time the
contract was signed. Change order number 1 is germane to the original contract as signed.
SUMMARY OF CHANGES IN CONTRACT AMOUNT: The scope of the original contract is being
amended to include changes to the retaining wall and the classroom area.
ORIGINAL CONTRACT AMOUNT: $165,424.00
CHANGE ORDER No. 1 and Final
Changes to the retaining wall and classroom area as
detailed in F. H. Paschen Job Order Number 012747.A $56,075.11
TOTAL FOR CHANGE ORDER NO. 1 and Final: ADD $56,075.11
TOTAL REVISED CONTRACT AMOUNT: $221,499.11
The original amount of the contract with F.H. Paschen is $165,424.00. Change Order No. 1 and final
totaling $56,075.11 will increase the original contract amount by a total of$56,075.11, that sum repre-
senting thirty four percent(34%) of the original contract amount. The new contract amount, inclusive of
all change orders is $221,499.11.
OTHER CONTRACT PROVISIONS: All other contract provisions remain the same.
CHANGE ORDER No. 1 and Final
Agreed to this 22nd day of August, 2012.
Recommended by:
Building Maintenance Department
By: Rich Hoke
Title: Building Maintenance Superintendent
Date: August 22, 2012
Signature:
Accepted by:
F. H. Paschen
Party of the Second Part(Contractor)
By:
Title:
Date:
Signature:
Approved by:
CITY OF ELGIN
Party of the First Part(Owner)
By: Sean R. Stegall
Title: City Manager
Date:
Signature:
F:\Legal Dept\forms\Change Order Form.doc
Job Order Contract
Proposal Review Summary -CSI
Date: August 11,2012
Contract Number: 11-082
Job Order Number: 012747.A
Job Order Title: City of Elgin-east side recreation center owner directed changes
Contractor: F.H.Paschen,S. N. Nielsen&Associates LLC
Proposal Value: $56,075.11
Proposal Name: Elgin Eastside Rec Center Interior Renovations-Additional Work
Proposal Submitted: 08/09/2012
01 -General Requirements: $4,599.92
02-Site Work: $427.23
03-Concrete: $3,373.09
05-Metals: $70.42
06-Wood, Plastic,and Composites: $451.33
08-Openings: $1,399.87
09-Finishes: $13,907.54
13-Special Construction: $323.05
21 -Fire Suppression: $8,148.48
23-Heating,Ventilating,And Air-Conditioning(HVAC): $671.24
26-Electrical: $2,919.32
31 -Earthwork: $3,568.27
32-Exterior Improvements: $16,215.35
Proposal Total $56,075.11
This proposal total represents the correct total for the proposal. Any discrepancy between line totals,
sub-totals and the proposal total is due to rounding of the line totals and sub-totals.
The Percent of NPP on this Proposal: 0.00%
Proposal Review Summary-CSI Page 1 of 1
8/11/2012
•
Job Order Contract
Proposal Review Detail -CSI
Date: August 11,2012
Contract Number: 11-082
Job Order Number: 012747.A
Job Order Title: City of Elgin-east side recreation center owner directed changes
Contractor: F.H. Paschen,S.N.Nielsen&Associates LLC
Proposal Value: $56,075.11
Proposal Name: Elgin Eastside Rec Center Interior Renovations-Additional Work
Proposal Submitted: 08/09/2012
Adjustment Factor(s)Used: 1.0100-Phase 1 Normal Working Hours
Rec# CSI Number Mod. UOM Description Line Total
01 -General Requirements
1 01 22 23 00 0049 DAY 20'Electric,Scissor Platform Lift $112.30
Quantity Unit Price Factor Total
Installation 100 x 111.19 x 1.0100 = $112.30
Contractors Note: Lift on site one additional day
Categoryl: Fire Sprinkler
2 01 22 23 00 0049 DAY 20'Electric,Scissor Platform Lift $336.91
Quantity Unit Price Factor Total
Installation 3.00 x 111.19 x 1.0100 = $336.91
Contractors Note: Lift on site three additional days for additional electric work.
Categoryl: Electric
3 01 22 23 00 0050 WK 20'Electric,Scissor Platform Lift $496.48
Quantity Unit Price Factor Total
Installation 2.00 x 245.78 x 1.0100 = $496.48
Contractors Note: Lift on site two additional weeks.
Categoryl: Carpentry/Drywall/Paint
4 01 22 23 00 0147 DAY 700 LB Capacity,36"Wide,Skid-Steer Loader(Bobcat)With Full-Time $828.20
Operator
Quantity Unit Price Factor Total
Installation 1.00 x 820.00 x 1.0100 = $828.20
Contractors Note: Bobcat onsite one additional day over original proposal due to water main repair.
Categoryl: Retaining Wall
Additional Work
5 01 22 23 00 0589 DAY 12,000 GPH,2"Discharge,100'Maximum Head,Gas Powered Portable $68.91
Trash Pump
Quantity Unit Price Factor Total
Installation 1.00 x 68.23 x 1.0100 = $68.91
Contractors Note: Pump on site for dewatering of trench during water main repair.
Categoryl: Retaining Wall
Additional Work
6 01 22 23 00 0642 DAY 2"Inside Diameter,20'Length,Suction Hose With Couplings $9.56
Quantity Unit Price Factor Total
Installation 1.00 x 9.47 x 1.0100 = $9.56
Contractors Note: Pump on site during water main repair.
Categoryl: Retaining Wall
Additional Work
7 01 22 23 00 0658 DAY 2"Inside Diameter,50'Length,Discharge Hose Wth Couplings $19.01
Quantity Unit Price Factor Total
Installation 1.00 x 18.82 x 1.0100 = $19.01
Contractors Note: Pump on site during water main repair.
Categoryl: Retaining Wall
Additional Work
Proposal Review Detail -CSI Page 1 of 9
8/11/2012
•
Proposal Review Detail -CSI Continues.,
Job Order Number: 012747.A
Job Order Title: City of Elgin-east side recreation center owner directed changes
Rec# CSI Number Mod. UOM Description Line Total
01 -General Requirements
8 01 22 23 00 0751 DAY 13 CY Rear Dump Truck With Full-Time Truck Driver $1,313.67
Quantity Unit Price Factor Total
Installation 1.00 x 1,300.66 x 1.0100 = $1,313.67
Contractors Note: Truck on site for loading excavated spoils into during water main repair.
Categoryl: Retaining Wall
Additional Work
9 01 74 19 00 0013 EA 20 CY Dumpster(3 Ton)"Construction Debris"Note:Includes delivery of $386.02
dumpster,rental cost,pick-up cost,hauling,and disposal fee.Non-hazardous
material.
Quantity Unit Price Factor Total
Installation 100 x 382.20 x 1.0100 = $386.02
Contractors Note: Disposal of construction debris.
Categoryl: Flooring
10 01 74 19 00 0013 EA 20 CY Dumpster(3 Ton)"Construction Debris"Note:Includes delivery of $386.02
dumpster,rental cost,pick-up cost,hauling,and disposal fee.Non-hazardous
material.
Quantity Unit Price Factor Total
Installation 1.00 x 382.20 x 1.0100 = $386.02
Contractors Note: Disposal of construction debris.
Categoryl: Carpentry/Drywall/Paint
11 01 74 19 00 0025 CY Dump Fee,Excavated Dirt $64284
Quantity Unit Price Factor Total
Installation 72.00 x 8.84 x 1.0100 = $642.84
Contractors Note: Dump fee for all excavated and removed material.
Categoryl: Retaining Wall
Additional Work
Subtotal for 01 -General Requirements: $4,599.92
02-Site Work
12 02 41 19 13 0067 SF Demo Interior Drywall And Stud Partition Metal/Wood Stud With Drywall 2 S420 23
Sides
Quantity Unit Price Factor Total
Installation 150.00 x 2.82 x 1.0100 = $427.23
Contractors Note: Demo additional wall at kitchen per owner.
Categoryl: Carpentry/Drywall/Paint
Subtotal for 02-Site Work: $427.23
03-Concrete
13 03 01 30 71 0004 SF Patch Floors,1/8"To 1/4",Cementitious Patching Mortar $192.62
Quantity Unit Price Factor Total
Installation 39.00 x 4.89 x 1.0100 = $192.62
Contractors Note: Patch concrete floor as needed. Less than 5%of floor figured
Categoryl: Flooring
14 03 01 30 71 0020 SF Epoxy Repair Cracks And Seals On Concrete,Includes Removal Of Concrete $1,879.69
To 1/2"Depth,Surface Preparation And Cleaning,Repair Of Surface,Grout
And Finish
Quantity Unit Price Factor Total
Installation 39.00 x 47.72 x 1.0100 = $1,879.69
Contractors Note: Crack repair and isolation. Floor prep. Less than 5%of total floor area figured.
Categoryl: Flooring
ProP osai.Review Detail -CSI Page 2 of 9
8/11/2012
•
Proposal Review Detail-CSI Continues..
Job Order Number: 012747.A
Job Order Title: City of Elgin-east side recreation center owner directed changes
Rec# CSI Number Mod. UOM Description Line Total
03-Concrete
15 03 54 00 000002 SF 1/8"Thick Self Leveling Underlayment For Concrete Floors Including Surface $1,300 78
Preparation
Quantity Unit Price Factor Total
Installation 810.00 x 1.59 x 1.0100 = $1,300.78
Contractors Note: Self leveling floor skim coat.
Categoryl: Flooring
Subtotal for 03-Concrete: $3,373.09
05-Metals
16 05 05 23 000265 EA 1/4"Diameter Threaded Stud Powder Actuated Anchor $70.42
Quantity Unit Price Factor Total
Installation 6.00 x 11.62 x 1.0100 = $70.42
Contractors Note: Anchors for ceiling grid shot into concrete deck.
Categoryl: Acoustical Ceiling
Subtotal for 05-Metals: $70.42
06-Wood, Plastic,and Composites
17 06 11 16 000128 LF 2"x8"(5cm x 20cm)Wood Blocking To Steel $127.40
Quantity Unit Price Factor Total
Installation 34.00 x 3.71 x 1.0100 = $127.40
Contractors Note: Wood blocking in kitchen walls per owner.
Categoryl: Carpentry/Drywall/Paint
18 06 46 19 00 0009 LF 3/4"x 1"White Pine Base Shoe,Paint Grade $323.93
Quantity Unit Price Factor Total
Installation 0.00 x 3.65 x 1.0100 = $0.00
Demolition 211.00 x 1.52 x 1.0100 = $323.93
Contractors Note: Remove wood base in corridor.
Categoryl: Carpentry/Drywall/Paint
Subtotal for 06-Wood, Plastic,and Composites: $451.33
08-Openings
19 08 05 13 00 0010 EA For>1 To 2 SF,Site Installed 20 Gauge Metal Frame For Vision Glass In $164 82
Door,Add
Quantity Unit Price Factor Total
Installation 1.00 x 163.19 x 1.0100 = $164.82
Contractors Note: Frame for door vision panel. Type C door.
Categoryl: Door
20 08 12 13 13 0036 EA 3'x6'-8"Through 7'-2"x5-3/4"Deep Metal Door Frame,16 Gauge $283.14
Quantity Unit Price Factor Total
Installation 100 x 280.34 x 1.0100 = $283.14
Contractors Note: New HM door frame.
Categoryl: Door
21 08 12 13 13 0036 Mod EA For Welded Frames,Add $45.45
Quantity Unit Price Factor Total
Installation 100 x 45.00 x 1.0100 = $45.45
Contractors Note: 'New HM door frame.'
Categoryl: Door
Proposal Review Detail -CSI Page 3 of 9
8/11/2012
•
Proposal Review Detail -CSI Continues..
Job Order Number: 012747.A
Job Order Title: City of Elgin-east side recreation center owner directed changes
Rec# CSI Number Mod. UOM Description Line Total
08-Openings
22 08 12 13 13 0036 Mod EA For 1-1/2 Hour Rating,Add $35.43
Quantity Unit Price Factor Total
Installation 1.00 x 35.08 x 1.0100 = $35.43
Contractors Note: 'New HM door frame.'
Categoryl: Door
23 08 13 13 13 0064 EA 3'x7'x1-3/4"18 Gauge Metal Door(Unrated) $391.84
Quantity Unit Price Factor Total
Installation 100 x 387.96 x 1.0100 = $391.84
Contractors Note: New HM door
Categoryl: Door
24 08 13 13 13 0064 Mod EA For 1 Hour To 1-1/2 Hour Rated Door And FM Label,Add $55.82
Quantity Unit Price Factor Total
Installation 1.00 x 55.27 x 1.0100 = $55.82
Contractors Note: 'New HM door'
Categoryl: Door
25 08 31 13 00 0043 EA 24"x 36"Recessed Steel Access Door With Cam Latch $232.50
Quantity Unit Price Factor Total
Installation 100 x 230.20 x 1.0100 = $232.50
Contractors Note: Access panel installed in new drywall assembly in front of existing electrical panel.
Categoryl: Carpentry/Drywall/Paint
26 08 71 16 00 0027 PR 4-1/2"x 4-1/2"Heavy Duty,Full Mortise,Plain Bearing,Brass/Bronze,Satin $145.06
Chrome Finish Hinge
Quantity Unit Price Factor Total
Installation 1.50 x 95.75 x 1.0100 = $145.06
Contractors Note: Hinges for new HM door.
Categoryl: Door
27 08 81 26 00 0043 SF 60 Minute,Fire Rated Field Installed Glass $45.81
Quantity Unit Price Factor Total
Installation 1.00 x 45.36 x 1.0100 = $45.81
Contractors Note: Fire rated glass installed in fire rated door.
Categoryl: Door
Subtotal for 08 -Openings: $1,399.87
09-Finishes
28 09 22 13 00 0004 SF 1-1/2",25 Gauge,Hat Channel,Drywall Furring Channel,Installed On Walls $2,186.67
16"On Center
Quantity Unit Price Factor Total
Installation 757.00 x 2.86 x 1.0100 = $2,186.67
Contractors Note: Furring channel on additional walls per owner.
Categoryl: Carpentry/Drywall/Paint
29 09 22 13 00 0004 Mod For 20 Gauge,Add $397.58
Quantity Unit Price Factor Total
Installation 757.00 x 0.52 x 1.0100 = $397.58
Categoryl: Carpentry/Drywall/Paint
30 09 22 13 00 0004 Mod For Wall Height>8'To 12',Add $191.14
Quantity Unit Price Factor Total
Installation 757.00 x 0.25 x 1.0100 = $191.14
Categoryl: Carpentry/Drywall/Paint
Proposal Review Detail -CSI Page 4 of 9
8/11/2012
Proposal Review Detail-CSI Continues..
Job Order Number: 012747.A
Job Order Title: City of Elgin-east side recreation center owner directed changes
Rec# CSI Number Mod. UOM Description Line Total
09-Finishes
31 09 22 16 00 0011 SF 4"Metal Framing Stud,16"On Center,20 Gauge,With Tracks And Runners $1,777.10
Quantity Unit Price Factor Total
Installation 850.00 x 2.07 x 1.0100 = $1,777.10
Contractors Note: New wall framing. 4"steel studs
Categoryl: Carpentry/Drywall/Paint
32 09 22 16 00 0011 Mod _ For Wall Application Where Height>8'To 12',Add $206.04
Quantity Unit Price Factor Total
Installation 850.00 x 0.24 x 1.0100 = $206.04
Categoryl: Carpentry/Drywall/Paint
33 09 22 16 00 0011 Mod For Soffit,Columns Or Beams Application,Add $420.46
Quantity Unit Price Factor Total
Installation 230.00 x 1.81 x 1.0100 = $420.46
Categoryl: Carpentry/Drywall/Paint
34 09 23 13 000005 LF Corner Bead,Galvanized $495.26
Quantity Unit Price Factor Total
Installation 164.00 x 2.99 x 1.0100 = $495.26
Contractors Note: Additional corner bead at corners.
Categoryl: Carpentry/Drywall/Paint
35 09 29 00 00 0006 SF 5/8"Drywall,One Layer,One Face On Wood Or Metal Studs Or Furring $2,040.76
Quantity Unit Price Factor Total
Installation 1,757.00 x 1.15 x 1.0100 = $2,040.76
Contractors Note: Additional 5/8"drywall.
Categoryl: Carpentry/Drywall/Paint
36 09 29 00 00 0006 Mod For Times When The Shortest Distance From Corner to Corner Is<3',Add $179.38
Quantity Unit Price Factor Total
Installation 370.00 x 0.48 x 1.0100 = $179.38
Categoryl: Carpentry/Drywall/Paint
37 09 29 00 00 0006 Moo For Horizontal Ceiling Applications>8'Height,Add $111.50
Quantity Unit Price Factor Total
Installation 230.00 x 0.48 x 1.0100 = $111.50
Categoryl: Carpentry/Drywall/Paint
38 09 29 00 00 0046 SF Tape,Spackle And Finish Drywall Walls Up To 10'Height $1,011.50
Quantity Unit Price Factor Total
Installation 1,757.00 x 0.57 x 1.0100 = $1,011.50
Contractors Note: Finish new drywall areas and joints to existing walls.
Categoryl: Carpentry/Drywall/Paint
39 09 29 00 00 0056 LF Tape,Spackle And Finish Vertical Corners Up To 10'Height Note:Inside or $187.17
outside drywall corners.
Quantity Unit Price Factor Total
Installation 184.00 x 1.13 x 1.0100 = $187.17
Contractors Note: Finish corners
Categoryl: Carpentry/Drywall/Paint
40 09 51 13 00 0004 SF 2'x 4'x 5/8"Fiberglass Acoustical Ceiling Panel $50.54
Quantity Unit Price Factor Total
Installation 36.00 x 1.39 x 1.0100 = $50.54
Contractors Note: New acoustical ceiling panels.
Categoryl: Acoustical Ceiling
Proposal Review Detail -CSI Page 5 of 9
8/11/2012
Proposal Review Detail -CSI Continues..
Job Order Number: 012747.A
Job Order Title: City of Elgin-east side recreation center owner directed changes
Rec# CSI Number Mod. UOM Description Line Total
09-Finishes
41 09 53 23 00 0004 SF T Bar Ceilings Suspension System 2'x 4',Standard 15/16" $78.17
Quantity Unit Price Factor Total
Installation 36.00 x 2.15 x 1.0100 = $78.17
Contractors Note: New 2 x 4 ceiling grid.
Categoryl: Acoustical Ceiling
42 09 65 13 13 0004 LF 4"High 1/8"Rubber Base,Group 2 All(Except White) $267.73
Quantity Unit Price Factor Total
Installation 94.00 x 2.82 x 1.0100 = $267.73
Contractors Note: New vinyl base in kitchen and office.
Categoryl: Flooring
43 09 65 13 33 0005 SF Remove Glue From Concrete Floor Note:For removal of glue from VCT or $711.75
carpet placement.Not to be used in conjunction with demolition tasks
associated with floor tile installation.
Quantity Unit Price Factor Total
Installation 810.00 x 0.87 x 1.0100 = $711.75
Contractors Note: Remove glue and prep floor where existing vinyl flooring is removed
Categoryl: Flooring
44 09 65 19 00 0003 SF Marbleized Pattern Vinyl Composition Tile 1/8"Thick $309.19
Quantity Unit Price Factor Total
Installation 121.00 x 2.53 x 1.0100 = $309.19
Contractors Note: Additional VCT install
Categoryl: Flooring
45 09 65 19 00 0015 LF Vinyl Transition Strip,Brown Or Black $14.18
Quantity Unit Price Factor Total
Installation 9.00 x 1.56 x 1.0100 = $14.18
Contractors Note: Transition strip for VCT at doorways.
Categoryl: Flooring
46 09 68 16 00 0023 SY 22 Ounce,Medium Traffic,Non-Patterned,Nylon Broadloom Carpet $1,044.34
Quantity Unit Price Factor Total
Installation 17.20 x 30.50 x 1.0100 = $529.85
Demolition 90.00 x 5.66 x 1.0100 = $514.49
Contractors Note: Remove existing carpeting and dispose of.
Categoryl: Flooring
47 09 69 53 00 0005 EA Machine Cutouts $110.73
Quantity Unit Price Factor Total
Installation 1.00 x 109.63 x 1.0100 = $110.73
Contractors Note: Machine cut-out in door to receive glass vision panel.
Categoryl: Door
48 09 91 13 00 0223 LF Paint Metal Door Frame And Trim,1 Coat Primer,Brush/Roller Work $16.14
Quantity Unit Price Factor Total
Installation 17.00 x 0.94 x 1.0100 = $16.14
Contractors Note: Prime additional door frame
Categoryl: Carpentry/DrywalUPaint
49 09 91 13 000225 LF Paint Metal Door Frame And Trim,2 Coats Paint,Brush/Roller Work $35.54
Quantity Unit Price Factor Total
Installation 17.00 x 2.07 x 1.0100 = $35.54
Contractors Note: Paint additional door frame
Categoryl: Carpentry/Drywall/Paint
Proposal Review Detail -CSI Page 6 of 9
8/11/2012
Proposal Review Detail-CSI Continues..
Job Order Number: 012747.A
Job Order Title: City of Elgin-east side recreation center owner directed changes
Rec# CSI Number Mod. UOM Description Line Total
09-Finishes
50 09 91 23 00 0253 EA Paint Interior Door,Both Faces,1 Coat Primer,Brush/Roller Work $67.52
Quantity Unit Price Factor Total
Installation 1.00 x 66.85 x 1.0100 = $67.52
Contractors Note: Prime additional door
Categoryl: Carpentry/Drywall/Paint
51 09 91 23 00 0255 EA Paint Interior Door,Both Faces,2 Coats Paint,Brush/Roller Work $118.55
Quantity Unit Price Factor Total
Installation 100 x 117.38 x 1.0100 = $118.55
Contractors Note: Paint additional door
Categoryl: Carpentry/Drywall/Paint
52 09 91 43 00 0015 SF Cut And Patch Hole In Drywall To Match Existing,Up To 2 SF Note:Per $1,878.60
location
Quantity Unit Price Factor Total
Installation 125.00 x 14.88 x 1.0100 = $1,878.60
Contractors Note: Patch/repair drywall at all demo locations and where new drywall meets existing surfaces.
Categoryl: Carpentry/Drywall/Paint
Subtotal for 09-Finishes: $13,907.54
13-Special Construction
53 13 34 19 000122 EA Metal Frame Rough Opening For Single Door Opening $323.05
Quantity Unit Price Factor Total
Installation 1.00 x 319.85 x 1.0100 = $323.05
Contractors Note: Framing of door rough opening and header at kitchen where additional wall demo and re-framing was
performed.
Categoryl: Carpentry/Drywall/Paint
Subtotal for 13-Special Construction: $323.05
21 -Fire Suppression
54 21 13 13 00 0007 EA Concealed Piping,Wet Automatic Sprinkler System,Ordinary Hazard Note: $8,148.48
Includes branch pipe and fittings,supports and sprinkler heads with flat or
conical escutcheon.
Quantity Unit Price Factor Total
Installation 20.00 x 403.39 x 1.0100 = $8,148.48
Contractors Note: Modify/add sprinkler piping,and install new sprinkler heads at new drop ceiling height.
Categoryl: Fire Sprinkler
Subtotal for 21 -Fire Suppression: $8,148.48
23-Heating,Ventilating,And Air-Conditioning(HVAC)
55 23 09 23 00 0264 EA Ceiling Mounted Occupancy Sensor $671.24
Quantity Unit Price Factor Total
Installation 3.00 x 221.53 x 1.0100 = $671.24
Contractors Note: Additional occupancy sensors.
Categoryl: Electric
Subtotal for 23-Heating,Ventilating,And Air-Conditionir $671.24
26-Electrical
Proposal Review Detail -CSI Page 7 of 9
8/11/2012
Proposal Review Detail-CSI Continues..
Job Order Number: 012747.A
Job Order Title: City of Elgin-east side recreation center owner directed changes
Rec# CSI Number Mod. UOM Description Line Total
26-Electrical
56 26 01 20 00 0005 EA Existing Circuit Tracing Per Device $80.40
Quantity Unit Price Factor Total
Installation 5.00 x 15.92 x 1.0100 = $80.40
Contractors Note: Existing circuit trace for re-working existing circuits and running new circuits for light fixtures,outlets,and
switches.
Categoryl: Electric
57 26 05 33 00 0006 CLF 1/2"EMT With 4#10 THHN/THWN Assembly Note: Includes conduit,set $1,530.22
screw connectors,set screw couplings,straps,wire as indicated. Not for use
where detail is available.
Quantity Unit Price Factor Total
Installation 240 x 631.28 x 1.0100 = $1,530.22
Contractors Note: Conduit and wire for new electrical circuits and lights.
Categoryl: Electric
58 26 05 33 00 0174 EA #1542D Junction Box $90.80
Quantity Unit Price Factor Total
Installation 5.00 x 17.98 x 1.0100 = $90.80
Contractors Note: Junction boxes for additonal electrical circuits.
Categoryl: Electric
59 26 09 23 00 0209 EA Mounting Bracket For Occupancy Sensor(Watt Stopper MB)Note:Includes $91.93
J-plate for mounting to HID fixtures or L-plate for mounting to fluorescent
fixtures,walls,shelves and girders.
Quantity Unit Price Factor Total
Installation 3.00 x 30.34 x 1.0100 = $91.93
Contractors Note: Occupancy sensor mounting bracket.
Categoryl: Electric
60 26 27 26 00 0005 EA 1 Gang,20 A,NEMA 5-20,Duplex Receptacle Assembly Note:Includes box, $469.95
receptacle and cover plate
Quantity Unit Price Factor Total
Installation 9.00 x 51.70 x 1.0100 = $469.95
Contractors Note: Additional electrical outlets.
Categoryl: Electric
61 26 27 26 00 0112 EA 1 Gang,20 A,120/277 V,SPST,Switch Assembly Note:Includes box,switch $166.44
and cover plate
Quantity Unit Price Factor Total
Installation 3.00 x 54.93 x 1.0100 = $166.44
Contractors Note: Additional light switches.
Categoryl: Electric
62 26 51 13 00 0048 EA 3 TB Lamps,2'x 4',Prismatic Lensed,Lay-In/Troffer Fluorescent Fixture $151.01
Quantity Unit Price Factor Total
Installation 100 x 149.51 x 1.0100 = $151.01
Contractors Note: Additional light in closet of computer room.
Categoryl: Electric
63 26 53 00 00 0004 EA Single Face,Thermoplastic Housing,LED Exit Sign With Battery Back-Up $338.57
Excludes Quantity Unit Price Factor Total
Material Installation 6.00 x 55.87 x 1.0100 = $338.57
Contractors Note: Install new exit lights.
Categoryl: Electric
Subtotal for 26-Electrical: $2,919.32
31 -Earthwork
Proposal Review Detail -CSI Page 8 of 9
8/11/2012
Proposal Review Detail-CSI Continues..
Job Order Number: 012747.A
Job Order Title: City of Elgin-east side recreation center owner directed changes
Rec# CSI Number Mod. UOM Description Line Total
31 -Earthwork
64 31 05 16 00 0005 CY #6 Stone Aggregate Fill(3/8"To 3/4"Clean) $408.82
Quantity Unit Price Factor Total
Installation 17.00 x 23.81 x 1.0100 = $408.82
Contractors Note: Stone backfill for water main repair.
Categoryl: Retaining Wall
Additional Work
65 31 05 16 00 0009 CY #7 Stone Aggregate Fill(1/2"To#4) $1,636.89
Quantity Unit Price Factor Total
Installation 62.00 x 26.14 x 1.0100 = $1,636.89
Contractors Note: Stone backfill for water main repair and for additional wall backfill due to massive over excavation of area due
to other trades installing a water main under retaining wall location and FHP's subsequent repairs.
Categoryl: Retaining Wall
Additional Work
66 31 23 36 00 0008 CY Excavation By Hand Greater Than 1 On 4 Slope $376.05
Quantity Unit Price Factor Total
Installation 3.00 x 124.11 x 1.0100 = $376.05
Contractors Note: Hand digging under and around water main to clear for stone backfill.
Categoryl: Retaining Wall
Additional Work
67 31 23 36 00 0011 CY Excavation Around Buried Structures To Remain>4'To 8' $506.86
Quantity Unit Price Factor Total
Installation 72.00 x 6.97 x 1.0100 = $506.86
Contractors Note: Excavation for water main repairs and additional retaining wall.
Categoryl: Retaining Wall
Additional Work
68 31 23 36 00 0045 TON Grade And Compact Sub-base Stone(0-500 Ton)Note:Includes spreading, $639.65
shaping,rough grading,compaction,and watering of imported or stockpiled
material by machine.
Quantity Unit Price Factor Total
Installation 142.00 x 4.46 x 1.0100 = $639.65
Contractors Note: Grade and compact stone backfill.
Categoryl: Retaining Wall
Additional Work
Subtotal for 31 -Earthwork: $3,568.27
32-Exterior Improvements
69 32 32 13 00 0011 LF 10'High With Base,16"Thick Reinforced $16,215.35
Quantity Unit Price Factor Total
Installation 30.00 x 535.16 x 1.0100 = $16,215.35
Contractors Note: Additional 30 feet of retaining wall.
Categoryl: Retaining Wall
Additional Work
Subtotal for 32-Exterior Improvements: $16,215.35
Proposal Total $56,075.11
This proposal total represents the correct total for the proposal. Any discrepancy between line totals,
sub-totals and the proposal total is due to rounding of the line totals and sub-totals.
The Percent of NPP on this Proposal: 0.00%
Proposal Review Detail -CSI Page 9 of 9
8/11/2012