HomeMy WebLinkAbout11-116 Resolution No. 11-116 RESOLUTION APPROVING CHANGE ORDER NO. 1 AND FINAL FOR THE CONTRACT WITH ROBERT E. HUMMEL CONSTRUCTION COMPANY FOR 2010 DETENTION BASIN RETROFIT PROJECT AT HOLMES ROAD AND MCLEAN BOULEVARD WHEREAS, the City of Elgin has heretofore entered into a contract with Robert E. Hummel Construction Company for 2010 Detention Basin Retrofit Project at Holmes Road and McLean Boulevard; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 and Final, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Sean R, Stegall, City Manager, be and is hereby authorized and directed to execute Change Order No. 1 and Final, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: July 13,2011 Adopted: July 13, 2011 Omnibus Vote: Yeas: 7 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk E LG I N THE CITY IN THE SUBURBS CHANGE ORDER ELGIN, ILLINOIS PROJECT 2010 DETENTION BASIN RETROFIT AT HOLMES ROAD AND MCLEAN BOULEVARD CHANGE ORDER NO. 1 AND FINAL CONTRACT: Detention Basin Retrofit—Holmes Road and McLean Boulevard. Bid Number 10-555 SCOPE: This change order provides for an increase in the original contract price to provide for the re- moval of a portion of the concrete channel and replacement with stone rip-rap and additional stone rip-rap to address erosion. These items increase the overall cost and the time frame of the project. REASONS FOR CHANGE: The inclusion of the above items and the increase to contract quantities were requested by the City to be included in this contract. The change is germane to the original contract as signed, and was not foreseeable at the time the original contract was signed; and the changes are au- thorized by law and are in the best interests of the City. SUMMARY OF CHANGES IN CONTRACT AMOUNT: The changes to the contract included removal of the concrete channel that was originally scheduled to be rubblized however due to the channel being constructed with wire mess in the concrete, it needed to be removed and replaced with clean stone rip-rap material. There was no record of wire mess being installed in the concrete channel and there- fore was unforeseen during design. In addition, there was an area adjacent to the remaining concrete channel that was subject to erosion after disturbance and additional rip-rap was placed to slow the flow of stormwater and prevent further erosion. ORIGINAL CONTRACT AMOUNT: $ 70,142.60 CHANGE ORDER No. 1 Added pay item for stone rip-rap $ 8,313.84 Added pay item for removal of concrete channel $ 1,304.00 Added pay item for earth excavation $ 108.00 Deduction in awarded contract items (copy attached) $ 1,970.00(-) TOTAL FOR CHANGE ORDER NO. 1: ADD $ 7,755.84 TOTAL REVISED CONTRACT AMOUNT: $ 77,898.44 The original amount of the contract with Robert E. Hummel Construction Company is$70,142.60.This Change Order No. 1 and Final will increase the original contract amount by a total of$7,755.84, that sum representing eleven percent (11%) of the original contract amount. The new contract amount, in- clusive of all change orders is $77,898.44 with a final payment of$15,632.30 being due he contractor. A copy of the final contract quantities and costs is attached and made part of this change order. 1 OTHER CONTRACT PROVISIONS:The completion date is also revised from December 31, 2010, to May 18, 2011 due to the project delays related to weather and coordination with Davey Resource Group on final planting of the basin. All other contract provisions remain the same. CHANGE ORDER No. 1 AND FINAL Agreed to this 22nd day of June , 2011. Recommended by: ENGIEERING DEPARTMENT By: Joe Evers Title: City Engineer Date: 3// Signature. Accepted by: ROBERT E. HUMMEL CONSTRUCTION COMPANY Party of the Second Part (Contractor) By: /Co/5 zr E /�rv�ir-ram Title: /7/2es_ Date: Z3--74!/ Signature: rl Approved by: CITY OF ELGIN Party of the First Part (Owner) By: Sean R. Stegall Title: City Manager Date: July 13, 201 Signature: 1 I �II I, .EPORT TO MAYOR & MEMBERS OF CITY COUNCIL E LG I N THE CITY IN THE SUBURBS AGENDA ITEM: E MEETING DATE: June 22, 2011 ITEM: Change Order No. 1 and Final Payment with Robert E. Hummel Construction Company for De- tention Basin Retrofit at Holmes Road and McLean Boulevard ($7,756) OBJECTIVE: Provide additional funding and authorize a final payment to the contractor utilized to retrofit the detention basin due to unforeseen conditions. RECOMMENDATION: Approve Change Order No. 1 in the amount of$7,756 and final payment to Robert E. Hummel Construction Company in the amount of$15,632. BACKGROUND At the November 17, 2010 council meeting, the city awarded the Detention Basin Retrofit at Holmes Road and McLean Boulevard Project to Robert E. Hummel Construction Company (Bid Number 10-055). The construction on this project started in December of 2010, however, due to weather and coordination efforts with Davey Resource Group on the final planting timeline, this project was significantly delayed. The portion of the project involving Robert E. Hummel Construction Company is now substatial- ly complete and is providing the water quality enhancements as intended. OPERATIONAL ANALYSIS At the start of the rubblization process of the existing concrete channel, it was discovered that wire mesh had been incorporated in the original construction of the concrete channel. Because the concrete pieces were intermixed with wire mesh, they could not be utilized as rip-rap ma- terial as intended. Therefore, the concrete needed to be removed and replaced with clean stone rip-rap. In addition, there was a portion of disturbed area from the grading operations that had begun to erode significantly due to the heavy spring rain events and stormwater flow. Additional stone rip-rap was placed to slow the flow of stormwater and prevent further ero- sion. • INTERESTED PERSONS CONTACTED None. FINANCIAL ANALYSIS The original contract amount awarded Robert E. Hummel Construction Company was $70,142.60. The $7,756 change order will increase the contract amount to $77,898.60. The city has been collecting fee-in-lieu of detention per the Kane County ordinance since its adoption in 2002. A portion of these fees were used to fund the original contract amount and there are suf- ficient funds remaining to fund this change order request. BUDGET IMPACT FUND(S) ACCOUNT(S) PROJECT#(S) AMOUNT AMOUNT BUDGETED AVAILABLE General 010-3311-752.92-32 FIL001 $83,860 $21,594 LEGAL IMPACT None. ALTERNATIVES The city council may reject Change Order No. 1 and final with Robert E. Hummel Construction Company. NEXT STEPS 1. Execute the subject change order. 2. Amend the purchase order and make final payment to Robert E. Hummel Construction Company. 2 Originators: Michael L. Hall, Engineer 1 Joseph Evers, City Engineer David L. Lawry, Public Services Director Final Review: Colleen Lavery, Chief Financial Officer William A. Cogley, Corporation Counsel/Chief Development Officer Richard G. Kozal, Assistant City Manager/Chief Operating Officer Approved: Sean R. Stegall, City Manager ATTACHMENTS A. Change Order No. 1 and Final B. Bid Tabulation 3 � I ELGIN THE CITY IN THE SUBURBS CHANGE ORDER ELGIN, ILLINOIS PROJECT 2010 DETENTION BASIN RETROFIT AT HOLMES ROAD AND MCLEAN BOULEVARD CHANGE ORDER NO. 1 AND FINAL CONTRACT: Detention Basin Retrofit—Holmes Road and McLean Boulevard. Bid Number 10-555 SCOPE: This change order provides for an increase in the original contract price to provide for the re- moval of a portion of the concrete channel and replacement with stone rip-rap and additional stone rip-rap to address erosion. These items increase the overall cost and the time frame of the project. REASONS FOR CHANGE: The inclusion of the above items and the increase to contract quantities were requested by the City to be included in this contract. The change is germane to the original contract as signed, and was not foreseeable at the time the original contract was signed; and the changes are au- thorized by law and are in the best interests of the City. SUMMARY OF CHANGES IN CONTRACT AMOUNT: The changes to the contract included removal of the concrete channel that was originally scheduled to be rubblized however due to the channel being constructed with wire mess in the concrete, it needed to be removed and replaced with clean stone rip-rap material. There was no record of wire mess being installed in the concrete channel and there- fore was unforeseen during design. In addition, there was an area adjacent to the remaining concrete channel that was subject to erosion after disturbance and additional rip-rap was placed to slow the flow of stormwater and prevent further erosion. ORIGINAL CONTRACT AMOUNT: $ 70,142.60 CHANGE ORDER No. 1 Added pay item for stone rip-rap $ 8,313.84 Added pay item for removal of concrete channel $ 1,304.00 Added pay item for earth excavation $ 108.00 Deduction in awarded contract items (copy attached) $ 1,970.00 (-) TOTAL FOR CHANGE ORDER NO. 1: ADD $ 7,755.84 TOTAL REVISED CONTRACT AMOUNT: $ 77,898.44 The original amount of the contract with Robert E. Hummel Construction Company is $70,142.60. This Change Order No. 1 and Final will increase the original contract amount by a total of$7,755.84, that sum representing eleven percent (11%) of the original contract amount. The new contract amount, in- clusive of all change orders is $77,898.44 with a final payment of$15,632.30 being due he contractor. A copy of the final contract quantities and costs is attached and made part of this change order. OTHER CONTRACT PROVISIONS:The completion date is also revised from December 31, 2010, to May 18, 2011 due to the project delays related to weather and coordination with Davey Resource Group on final planting of the basin. All other contract provisions remain the same. CHANGE ORDER No. 1 AND FINAL Agreed to this 22nd day of June , 2011. Recommended by: ENGIEERING DEPARTMENT By: Joe Evers Title: City Engineer Date: Signature: Accepted by: ROBERT E. HUMMEL CONSTRUCTION COMPANY Party of the Second Part (Contractor) By: Title: Date: Signature: Approved by: CITY OF ELGIN Party of the First Part (Owner) By: Sean R. Stegall Title: City Manager Date: Signature: CITY OF ELGIN Robert E. Hummel Invitation No. 10-055 Construction Co. 1st Payment 2nd Payment Date of Opening: 10/21/10 601 Burnett Road 2/1/2011 TBD Deparment: Engineering Island Lake, IL 60042 Item Amount _ Amount _ Amount Mobilization $5,100.00 $5,100.00 Removal of Concrete Channel $920.00 $920.00 Topsoil Strip to Stockpile $4,560.00 $4,560.00 Earth Excavation $7,600.00 $7,600.00 Topsoil Soil Furnish and Place 6" $17,050.00 $17,050.00 Riprap, Special $8,700.00 $8,700.00 Rublizze Existing Channel $815.00 See Change Order Dewatering $500.00 $500.00 Perimiter Erosion Barrier $1,635.00 $1,635.00 Stablized Contruction Entrance $2,500.00 $2,500.00 Stone Inlet Protection, 60" Pipe $1,000.00 $1,000.00 Stone Inlet Protection 24" Pipe $500.00 $500.00 Stone Outlet Protection $1,000.00 $1,000.00 Temporary Seeding $1,430.00 Removed $275.00 Erosion Control Blanket $14,832.60 $9,817.60 $5,015.00 Constrution Layout $2,000.00 $2,000.00 Total $70,142.60 $62,882.60 $5,290.00 Retainage $6,288.26 Payout $56,594.34 S5,290.00 Change Order Riprap, Special $4,890.00 $4,890.00 $3,423.84 Removal of Concrete Channel $1,304.00 $1,304.00 Earth Excavation $108.00 $108.00 Total $6,302.00 $6,302.00 $3,423.84 Retainage $630.20 Payout $5,671.80 $3,423.84 Total Retainage $6,918.46 $6,918.46 Total Payout $62,266.14 $15,632.30 Total Contract w/CO $77,898.44 Amount of Change Order $7,755.84 i k ELGIN THE CITY IN THE SUBURBS- DATE: July 14,2011 TO: Mike Hall, Engineer I FROM: Jennifer Quinton, Deputy City Clerk SUBJECT: Resolution No. 11-116, Adopted at the July 13, 2011, Council Meeting Enclosed you will find the agreement listed below. Please distribute this agreement to the other party and keep a copy for your records if you wish. If you have any questions please feel free to contact our office 847-931-5660 and we will do our best to assist you. Thank you. • Resolution Approving Change Order No. 1 and Final for the Contract with Robert E. Hummel Construction Company for 2010 Detention Basin Retrofit Project at Holmes Road and McLean Boulevard