HomeMy WebLinkAbout10-237 Resolution No. 10-237 RESOLUTION • • AUTHORIZING EXECUTION OF AN ILLINOIS ENVIRONMENTAL PROTECTION AGENCY GRANT APPLICATION FOR STORMWATER MANAGEMENT BEST PRACTICES FOR THE ERIE STREET DETENTION BASIN RETROFIT PROJECT • BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Sean R. Stegall, City Manager, be and is hereby authorized and directed to execute an Illinois • Environmental Protection Agency grant application on behalf of the City of Elgin in connection with the stormwater best management practices for the Erie Street Detention Basin Retrofit Project. s/ Ed Schock Ed Schock, Mayor • Presented: December 15, 2010 Adopted: December 15, 2010 Vote: Yeas: 7 Nays: 0 Attest: s/Diane Robertson Diane Robertson, City Clerk • Pull ON Wca D for:` - • of ❑ Telephoned ❑ Returned your call ❑ Came in ❑ Will call again LI,Please return the call • ❑ See me • Message: s� a � Phone: Date)\S-AD Time • By _ __ lbi •FORTTO MAYOR & MEMBERS OF CITY COUNCIL E LG I I\J THE CITY IN THE SUBURBS MEETING DATE: December 15, 2010 INITIATIVE C: Resolution in Support of Three Grant Applications for Stormwater Management Best Practices COMMUNITY GOAL • Neighborhood Vitality OBJECTIVE • Provide documented support from the city council for three stormwater management best practices grant applications PURPOSE • To apply for funding wherever possible in order to reduce surface runoff and improve the water quality of Elgin II RECOMMENDATION • Approve a resolution for each of three grant applications to be submitted to the Illinois Environmental Protection Agency through the Illinois Green Infrastructure Grant program. BACKGROUND The city has been utilizing consultants to pursue grant opportunities in which the consultant is not paid to apply for a grant, but is guaranteed the first right to a project if they actually obtain a grant on behalf of the city. In September of 2010, the Illinois Environmental Protection Agency (IEPA) announced the establishment of the Illinois Green Infrastructure Grant (IGIG). The IGIG is designed to "fund green infrastructure best management practices to control stormwater runoff for water quality protection in Illinois". The grant is divided into three categories. Pursuant to this grant, city staff began working with two consultant teams to submit two applications under one category and one application under another category. Staff did not pursue an application for the third IIIcategory because the category only offered funding for smaller demonstration projects. Due to several project changes, specific project information and costs only became available to staff within the last week. Therefore while this grant is due on December 15, it is also being submitted to city council for approval. If council decides not to approve pursuing these grants, Elgin's applications will be withdrawn by December 16. The projects to be applied for are as follows (each project represents one application): Project 1.Stormwater Best Management Practices for the SWAN Neighborhood Trotter and Associates This project is being applied for under the Combined Sewer Overflow (CSO) Rehabilitation Category which requires that the project be contained within an area served by combined sewers. Due to a demonstrated interest in pursuing stormwater management initiatives, it is felt the SWAN neighborhood is an excellent candidate for implementing stormwater best management practices. The project entails a comprehensive stormwater management campaign specifically focusing on areas that will not see actual combined sewer pipe separation for at least 10 years. The project will see the installation of 20 to 30 bio-swales located in the parkway, at least three modular bio-retention basins as well as one to two trial permeable paver alleyways (images of each of these improvements are attached as A, B and C respectively). All improvements serve the purpose of reducing surface runoff and filtering • pollutants from storm andrain water. A large component of this campaign will involve outreach and the participation of the SWAN neighbors. Efforts will be made not only to ensure property owners agree with the installation of said improvements but to also have them actively participate in the installation of these improvements. Over 80 potential bio-swale and 24 potential modular bio-retention basins sites have been identified in case property owners do not wish to have these items installed in their parkway. SWAN BMP Campaign Estimated Project Cost $ 750,000 Grant(85%) $ 637,500 City Match (15%) $ 112,500 Project 2. Lords Park Permeable Paver Parking Lot Engineering Enterprises Incorporated The project is being applied for under the Storm water Infiltration Category which requires that the project must help reduce stormwater runoff and increase filtration of stormwater to improve water quality. Based on the recommendations from the Lord's Park Task Force, city staff pursued retrofitting an existing parking lot in Lords Park to a permeable paver parking lot. 111 h 2 • The lot is located on the northern end of the park, northeast of the pool. A location map is attached. Lord's Park Permeable Lot Estimated Project Cost $ 223,755 Grant (75%) $ 167,816 City Match (25%) $ 55,939 Project 3. Erie Street Detention Basin Retrofit Engineering Enterprises Incorporated This project is also being applied for under the Stormwater Infiltration Category and entails the conversion of a city owned and maintained detention basin to one with a more environmentally sensitive design. The basin included in this application is located north of the intersection of Erie Street and S. Maple Street. This basin currently contains a concrete channel, constructed to prevent the bottom of the basin from becoming soft and wet so it can be mowed by maintenance staff. While a common design years ago, this channelized design is outdated and provides little to no water quality benefits. This project would see the conversion of the basin into one complete with native • plantings, a 1.5 acre bioswale and multiple stormwater treatment forebays at the basin inlets. The native plantings and bioswale will promote infiltration and aid in water quality by providing stormwater treatment while the forebays create an area for suspended solids to settle in an isolated location that can be accessed easily from City streets for maintenance. While the city owns many basins that could have been selected, this basin was chosen for its size and relatively low recreational value. It was selected in consultation with Elgin's engineering department. A similar project is currently being completed on the detention basin at the corner of Holmes Rd. and McLean Blvd. This application represents an extension of those efforts. It should also be noted that a continuation of Elgin's basin retrofit program is one of the goals of the water sustainability working group. Erie Street Basin Retrofit Estimated Project Cost $ 313,654 Grant(75%) $ 235,241 City Match (25%) $ 78,414 • ice_ 3 OPERATIONAL ANALYSIS I ` The grants, if approved, will provide significant funding to accomplish stormwater best management practices the city otherwise would not have been able to perform. These projects have potential to increase Elgin's water quality as well as reduce stormwater runoff. There is maintenance associated with the upkeep of these best management practices. Permeable paved parking lots and alleys require that the porous "filler" material be vacuumed up and replaced periodically. The frequency of this maintenance depends on the volume of traffic seen by the road. City staff believes that pursuing a permeable paved parking lot at Lords Park represents a low-traffic volume scenario and should not require undue amounts of maintenance. The proposed permeable alley ways may require more maintenance, which is why applications are only being made for one to two. These alleyways will serve as a trial to see how effective or ineffective are permeable paved roadways. Bioswales require periodic inspection but can be maintained by the resident. Maintenance requirements will be part of the educational outreach campaign in the SWAN neighborhood to ensure the bioswales receive proper care. Maintenance includes weeding for the first few years after installation. Once the native plantings mature, weeding becomes less necessary. In the spring, taller dead plant material should be removed and composted. Annually replacing any mulch is also recommended. The conversion of the stormwater detention basin will result in less maintenance as city staff will not need to mow or maintain the landscaping in the basin. The basin will consist mostly of native prairie grasses requiring low amounts of maintenance. INTERESTED PERSONS CONTACTED While no public outreach for these applications have been done, several internal stakeholders have been contacted including Kyla Jacobsen, Water Superintendent, Randy Reopelle, Parks and Recreation Director, and Dave Lawry, General Services Director FINANCIAL ANALYSIS The IGIG does require a match of 15% for the Combined Sewer Overflow (CSO) Rehabilitation Category as well as 25% for the Stormwater Infiltration Category. If all three grants were to be awarded, the City's match would total $246,853. The IGIG is also a reimbursement grant which requires the city to upfront the project costs as incurred and subsequently submit for reimbursement. The grant allows for monthly reimbursements which will reduce out of pocket costs. Projects under this grant may take anywhere from six to 36 months. 4 • The city is committing to fund its share of the IGIG projects by approving the three resolutions. If the city receives a grant, it will then be required to identify a funding source and/or a previously approved funded project will need to be deferred BUDGET IMPACT FUND(S) ACCOUNT(S) PROJECT#(S) AMOUNT AMOUNT BUDGETED AVAILABLE N/A N/A N/A N/A N/A LEGAL IMPACT If approved, changes will need to be made to the Municipal code to accommodate bioswales and longer prairie grasses in the parkway. ALTERNATIVE COURSES OF ACTION The council may choose to accept none, one, two or all of these grant opportunities and in doing so,the staff would need to finalize the funding sources to proceed. • NEXT STEPS 1. Finalize the grant applications by including a resolution with each committing to the appropriate funding 2. Submit all grant applications, agreed to by the city to the IEPA Prepared by: Aaron Cosentino, Management Analyst Reviewed by: Colleen Lavery, Chief Financial Officer Reviewed by: William A. Cogley, Corporation Counsel/Chief Development Officer Final Review by: Richard G. Kozal, Assistant City Manager/Chief Operating Officer Approved by: r4 Se n R. Stegall, City Manag-/ • iI� o 5 ATTACHMENTS A: Bioswale example B: Bio-retention module C: Permeable paver alleyway D: Location map of Lords Park parking lot 6 0 ill 1 . • 1 r 1 wow 11 �v jnili • ilisilli A, 1 I •M't t 111:111:1 C allilill • A 1„,. r a. C ei , r .• • • i ego, , 4_ .., . • . „Di Z. _, { 1 --' •.•-• r ,,, . .fk M t'it. as- I . }oh a 11110' N P. 101 an aPM,. i o • r R 0 a. ,, '4144,-;..-r•, •. .-'w _•._._• -.___L..__. _ II """\■''tarla `mss -yr is. • • .00111111113, wit 41~04 IS MPS 1144? la, ri ,' Oars.,.r.r,....rw g 13.10•111.104 WOO. °iclpc°IN uoi1uO1)JcOtg • • • Aspow- -9 . . • ,# .� 1i v r ..r (�s icnurL A IuoIr. {anti — ,.x10U ut saaed5 xq r) .1(1) 3ut1 pow uoUUuaJ of • S 0 'ita if . 1.4 r) ..i , .4.7 .. . 1 .1 i . • .-1 i ( . • . .... ': - cri . • , i 1 1 , • , . Orremil eilD . 1 � • r-11 fr-- ' i * _ ,t,..4 1 i 71 . . , -4 4 . . � �. N r 1 f �( .l, ..•• .1 �:J . ' X 4t. -...r s , I ; a ,1r01111.n. n (...-0 V r w tr 1I • • • City of Elgin �� LORDS PARK • ) •0 IA CONCEPT MASTER PLAN 11,15,10 529 N. BARRON BLVD. GRAYSLAKE, IL 60030 847.223.1891 847.223.1892 (FAX) 3ddeaignatudio03ddesignstudo.corn ' •. - f t `. i'�``." pm.. r asaaaa� 1 :. r 4 '''',',* 7 , ki . . .- • / , Proposed permeable paver fr. f',' parking lot 0' • f 1 44+ 1111 4i A o .r pre o s2. I Ill 4":y 4 w, 411 4. MIL ` a 4 Report to Mayor& Members of City Council E LG I N • THE CITY IN THE SUBURBS MEETING DATE: December 15, 2010 INITIATIVE B: Grant for Improvements to Eastside Recreation Center COMMUNITY GOAL • Recreational, leisure, and cultural opportunities for all citizens OBJECTIVE • Make needed improvements to the Eastside Recreation Center PURPOSE • To approve pursuing a grant with the Illinois Department of Natural Resources to assist with the funding of improvements to the Eastside Recreation Center RECOMMENDATION • Approve the attached Resolution of Authorization • _ BACKGROUND The city purchased the Eastside Recreation Center (ERC) in 2007. A new roof and some structural improvements were made in 2008, but since that time the city has not had the funds to make any additional significant improvements. The building is not air conditioned, has a failing boiler system, is not ADA or Illinois Accessibility code compliant, is very energy inefficient, is lacking partitioned programming areas, and esthetically is not appealing to potential users. Although the facility is somewhat busy during the winter months, due mostly to the popularity of the indoor soccer field, the rest of the year it is underutilized due to many of the above listed factors. On October 15, 2010, the Illinois Department of Natural Resources (IDNR) announced a new grant program titled the Park and Recreational Facility Construction Grant Program (PARC). The focus of this program is to help local units of government build or renovate recreation facilities. This is the first time the IDNR, or any other state or federal agency, has offered a grant program of this type. The maximum amount of funding per application is $2.5 million. This is a reimbursable grant program with the state portion being 75% and the local match being 25%. The city recently entered into a contract with DLA Architects to assist with the grant application process. They coordinated efforts with city staff and Laura Ross (the city's grant consultant) to accelerate the completion of the application, as the majority of the grant application was due in Springfield by November 29. The remaining documentation, including the attached resolution of authorization, must be submitted by year's end. OPERATIONAL ANALYSIS The proposed improvements will make the ERC safer, more aesthetically appealing, less costly to operate, expand programming areas and more comfortable for the users. The improvements will also help to bring the building into ADA and Illinois Accessibility code compliance. Although the building is relatively busy during the winter months, there are still portions of it that are underutilized. Large open areas need partitioning walls to create program rooms which can be used to offer additional programs. During the summer the facility is extremely underutilized due to the lack of air conditioning and the large number of windows on the south side of the building. Currently, the ERC has about 95,000 visits annually. It is estimated that this number can be at least doubled to 200,000 annually with the proposed improvements. The proposed improvements are identified in the attached floor plans. The estimated cost of the proposed improvements is $2,454,800. The costs of the individual improvements are identified in the attached PARC—4 Development Data document. INTERESTED PERSONS CONTACTED 1 alThe needed improvements to the ERC were discussed during the Park and Recreation Master Planning process. The needed improvements are specifically identified in the draft Park and Recreation Master Plan, which the city council will be considering at the December 15 Committee of the Whole. The Park and Recreation Advisory Board discussed the ERC PARC grant at their November meeting and made a recommendation to the city council that the city pursue this grant as the facility needs these improvements. FINANCIAL ANALYSIS The improvements will help to make the facility more energy efficient and allow for increased programming opportunities which has the potential to enhance revenues. The total cost of the project is estimated at $2,454,800. The city would need to finance the total cost of the project and request a 75% reimbursement of $1,841,000 from the IDNR once the project is completed. The net cost to the city for the ERC improvements would be $613,700. IF the grant is awarded, actual work on the improvements is expected to begin in 2012 Therefore, funds for this project would need to be identified and included in the city's 2012 budget. BUDGET IMPACT FUND(S) ACCOUNT(S) PROJECT#(S) AMOUNT AMOUNT BUDGETED AVAILABLE N/A N/A N/A N/A N/A • LEGAL IMPACT The grant requires compliance with various regulations including, but not limited to, the requirement that the city keep the facility open to the general public during reasonable hours consistent with the type of facility and obtain from the IDNR written approval for any change or conversion of approved outdoor recreation use of the project site prior to initiating such change or conversion. ALTERNATIVE COURSES OF ACTION The city could choose not to approve the grant's Resolution of Authorization, in which case the grant application would be withdrawn. NEXT STEPS 1. Once the Resolution of Authorization is approved it needs to be signed and sent to Springfield 2. Contact the city's legislators and ask for letters of support be sent to the IDNR Prepared by: Rich Hoke, Building Maintenance Superintendent Reviewed by: Dave Lawry, General Services Director Reviewed by: Colleen Lavery, Chief Financial Officer Reviewed by: William A. Cogley, Corporation Counsel/Chief Development Officer Final Review by: Richard G. Kozal, Assistant City Manager/Chief Operating Officer Approved by: e / Se n R. Stegall, City Mangy:er • 111 ATTACHMENTS A: Resolution of Authorization B: Floor Plans C: PARC 4—Development Data !Ci , STATE OF ILLINOIS/IDNR PARC-3 RESOLUTION OF AUTHORIZATION PARC PROJECT APPLICATION • 1.Project Sponsor: 2.Project Title: The hereby certifies and acknowledges that it has 100%of the funds (local project sponsor) necessary to complete the pending PARC project within the timeframes specified herein for project execution,and that failure to adhere to the specified project timeframe or failure to proceed with the project because of insufficient funds or change in local recreation priorities is sufficient cause for project grant termination which will also result in the ineligibility of the local project sponsor for subsequent Illinois DNR outdoor recreation grant assistance consideration in the next two(2)consecutive grant cycles following project termination. ALL Projects It is understood that the project should be completed within the timeframe established in the project agreement and the Final Billing reimbursement request will be submitted to IDNR as soon as possible after project completion. The further acknowledges and certifies that it will comply with all (local project sponsor) terms,conditions and regulations of 1)the Park and Recreational Facility Construction Grant Program(PARC) (17 IL Adm.Code 3070) 2)the federal Uniform Relocation Assistance&Real Property Acquisition Policies Act of 1970(P,L.91-646)and/or the Illinois Displaced Persons Relocation Act(310 ILCS 40 et.seq.),as applicable,3)the Illinois Human Rights Act(775 ILCS 5/1- 101 et.seq.),4)Title VI of the Civil Rights Act of 1964,(P.L.83-352),5)the Age Discrimination Act of 1975(P.L.94-135),6)the Civil Rights Restoration Act of 1988,(P.L. 100-259)and 7)the Americans with Disabilities Act of 1990(PL 101-336);and will • maintain the project area in an attractive and safe condition,keep the facilities open to the general public during reasonable hours consistent with the type of facility, cease any fanning operations, and obtain from the Illinois DNR written approval for any change or conversion of approved outdoor recreation use of the project site prior to initiating such change or conversion;and for property acquired with PARC assistance,agree to place a covenant restriction on the project property deed at the time of recording that stipulates the property must be used,in perpetuity,for public outdoor recreation purposes in accordance with the PARC programs and cannot be sold or exchanged,in whole or part,to another party without approval from the Illinois DNR. BE IT FURTHER PROVIDED that the certifies to the best of its (local project sponsor) knowledge that the information provided within the attached application is true and correct. This Resolution of Authorization has been duly discussed and adopted by the (local project sponsor) at a legal meeting held on the day of ,20 (Authorized Signature) A 1 1 bSTED BY: (title) (tom) 4111 ATTACHMENT A-10 FLOOR PLANS CITY OF ELGIN PARKS AND REC.DEPT _ I 85'47 EASTSIDE RECREATION CENTER RENOVATION / / REMOVE EXISTING TOILET ROOM AND INSTALL NEW UNISEX-CUT TOILET ROOM DOOR IN CMU WALLMEN'S&WOMEN'S • TOILET ROOMS - JANITOR I I II II • COUNTER r II ^' II BIKF}REPAIR AIt�• - 7:•IN IL—_ .^I . I • : + . NEW GYPSU I LOAALeROGRAM •'' •'I` `T , -- REBUILD VESTIBULE—�— -.. _. FITNESS!BOARD WALL •I:•'Z AEROBICS _ 'I;:� REMOVE EXISTING FITNESS ROOM-NEINNEW DOOR OFFICE `'IIM TOILET ROOMS AND A PLAARHANDRAIL - ' GYPSUM BOARDSTORM,' c; 4 ./. REPLACE WITH NEW WALLS AND CEILING E ` KID'S TOILET r nom ROOMSI GAME AREA CGAME AREA II _ NEW EGRESS NEW GYPSUM I• I •r .1 DOOR BOARD ON WALLS, KITCHENE IE __ PAINT AND NEW— —I STORAGE I. • - • 1111111 •11 FLOORING 1--WW- MULTI-PURPOS I NEW CARPET AND PAINT NEW GYPSU � � � NEW GYPSUM BOARD BOARD WALLS ` IIIC INFILL OVERHEAD --- --- - WALL WITH EGRESS AND DOORS =- ENT TH GYPSUM BOARD WALL. PAINT INDOOR SOCCER STORAGE DOOR 1• ■1110 I ' ENTIRE WALL BOTH I m 0 SIDES ILDANCE NEW PLOORING TUMBLING/ MOVABLE ACROBATICS! • UPPER LEVEL ACCORDIAN CHEERLEADINGi• '----• MI PARTITION WALL I'� — •- 1 NEW GYPSUM BOARD REPAINT WALL W1TII EGRESS THROUGHOUT BOXING DOOR NEW EGRESS VARIOUS DOOR If MARTIAL ARTS 1 NEW COMPUTE',LAB REMOVE A SECTION REPLACE WINDOWS WITH WALL AND DOD•" OF CMU WALL AND TINTED I'INSULATED COMPUTER LAB INSTALL NEW EGRESS GLASS.TYP. jit L . —1.—... .. ... DOOR ELGIN THE ary IN TI-IE stieurtes- . CITY OF ELGIN 66Noll Shl.r Balk.N Ulm I ,60113 Ins 1411206) I T6'167,425r66 UPPER LEVEL PLAN LAL16-:-:. I'.s..0 Olsu,Sunl4 Hm4lc1.4460511 I Those 610.110 WW 11..60llOml+ EASTSIDE RECREATION CENTER I( L FI I.1 F. ('1'5 •..+.,L..,-I.+NI.4n.. NOVEMBER 24,2010 III` Wir474iis w w 41, - • 0 . • 0 , ATTACHMENT A-10 FLOOR PLANS CITY OF ELGIN PARKS AND REC.DEPT EASTSIDE RECREATION CENTER RENOVATION I185'-O MEN'S 8 WOMEN'S / TOILET ROOMS \ i t b4X11 JANITOR REPLACrTOILET OMr--- ,�!' ^ 4 :, ---- MEN'S 8 WOMEN'S WITH A MEN'S ANC) I ..,....i: �►"�I,. TOILET ROOMS Q WOMENS TOILET R,OOP{1 I I I '; .y$ REMOVE EXISTING TOILET I °.1,c X00 THNAND REPLACE FREE WEIGHTS Q EXIS ING 3ATTING °'1.3 CAG IS TO REMAIN --' I I I I I I Q IM I 1 ❑ I INFILI OVERHEAD OQORS ❑ •�IIIIIIIII IQ ❑ ❑ ❑ MULTII-PURPOSE $ BATTING/PITCHING CIRCUIT TRAINING REPLACE HANDRAIL PIitACT'ICE • I SOCCER TRAINING INFILL OVERHEAD DOOR WITH ON STAIR• GYPSUM BOARD WALL. PAINT Q O I I I ENTIRE WALL BOTH SIDES iO I- I I 0 l BELOW STAIRS IS A O rHEADROOM ISSUE- - L--J NEWB'WDEDOUBLEDOORS 0 INSTALL RAILING Q NEW S'WIDE DOUDLE NEW EGRE55 CORRIDOR DOOR ACCESS AND DOORS ! ...,/x1.....:IK'd ❑ O ❑ ❑ CI STOGE J I■ PUMSOCCER ❑ c''' ---- REPLACE WALLS WITH NEW CLUBGYPSUM BOARD WALLS 4111 II `� AND EGRESS DOORS CARDIOVASCULAR IllCORRIDOR Q . . n .- _ v REPLACE STAIRS CORRIDOR � ' GOING TO MEZZANINE. - �="�- REPLACE WINDOWS WITH MECH CONFERENCE I ii"' CHANGING = INSTALL NEW 42'TALL PUMA OFFICE RAILINGS ON MEZZANINE TINTED I•INSULATED SOCCER OFFICE PUMA OFFICE = GLASS,TY?. CLUB SOCCER CLUB \ (LG . NEW CARPET AND . REPLACE WITH NEW/ NEW CARPET,GYPSUM E FJ PAINTING IN OFFICE EGRESS DOOR/ BOARD AND CEILINGS AREA IN CHANGING ROOMS THE 0E1Y IN THE SUBURBS ited."IIMMEI CITY OF ELGIN ,61Nonlo Nano D.k.W EJvo,Ems Will I Moe IAI.111A61 I Fri.11.14111, . td:jder.: LOWER LEVEL PLAN us......,,,.....,.. x.,m.IOW soui I how wixan I INA wyomE, EASTSIDE RECREATION CENTER .1 RC. II I 'I' L L I C .......... �, ....._� .. NOVEMBER 24,2010 -ti • STATE OF ILLINOIS/DEPT OF NATURAL RESOURCES PARC-4/DEVELOPMENT DATA PARC PROJECT APPLICATION Project Sponsor: City of Elgin Project Title: _Eastalde Recreation Center Renovation DEVELOPMENT ITEM UNIT AMOUNT ESTIMATED COSTS Mechanical $1,240,000.00 Plumbing $127,000.00 Electrical $350,000.00 • Demolition $15,000.00 New Walls $38,000.00 Painting $21,000.00 Flooring $98,000.00 Doors& Hardware $98,000.00 Toilet Room Equipment $20,000.00 Windows $245,000.00 Outdoor Sitework $17,000.00 CPA Report Costs (REQUIRED) $2,000.00 A/E Design Fees $183,800.00 (✓)Potential Archaeological Survey TOTAL ESTIMATED COST: $2,454,800.00 (✓) Projects approved for PARC funding may require the completion of an archaeological reconnaissance survey on the project site. Estimated cost for such a survey may be included in the project budget Provide a quarterly expenditure schedule for the grant funds to the best of your knowledge or ability. Use quarterly time increments. Example: Year 1,Quarter 1 =$10K(engineering fees). The project sponsor is not bound to this schedule and revisions can be made during the course of the project as necessary. �� i