Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
09-8
Resolution No. 09-8 RESOLUTION AUTHORIZING EXECUTION OF AN ASSET TRANSFER AGREEMENT WITH ELGIN RECREATION CENTER BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Olufemi Folarin,City Manager,be and is hereby authorized and directed to execute an agreement on behalf of the City of Elgin with the Elgin Recreation Center for asset transfer, a copy of which is attached hereto and made a part hereof by reference. s/ Ed Schock Ed Schock, Mayor Presented: January 14, 2009 Adopted: January 14, 2009 Omnibus Vote: Yeas: 5 Nays: 0 Attest: s/Diane Robertson Diane Robertson, City Clerk ASSET TRANSFER AGREEMENT THIS AGREEMENT is hereby made and entered into this / 1 day o , 2009, by and between the City of Elgin, Illinois, a municipal corporation (hereinaft r referre to as "City") and Elgin Recreation Center, an Illinois not-for-profit corporation(hereinafter referred to as "ERC"). WHEREAS, ERC has ceased operations as a recreation center at the real property located at 1080 E. Chicago Street, Elgin, Illinois (hereinafter referred to as "Building"); and WHEREAS, City is the owner of the Building, and has determined it to be in its best interests to assume some of the functions and operations previously performed by ERC at the Building; and WHEREAS, ERC wishes to sell its assets and personal property located at the Building to City and City has determined it to be in its best interests to purchase such assets. NOW, THEREFORE, in consideration of the mutual promises and covenants contained herein, the sufficiency of which is hereby mutually acknowledged, the parties hereto hereby agree as follows: 1. The above recitals are hereby incorporated into and made a part of this agreement. 2. The City hereby agrees to purchase from ERC and ERC hereby agrees to sell to the City the assets and personal property of ERC listed on Attachment A attached hereto and made a part hereof by this reference for the total sum of$38,250.50 (such assets and personal property are hereinafter collectively referred to as the"Equipment"). The City shall pay ERC for such Equipment within thirty(30) days following the entry into and execution of this Agreement as set forth in Section 3 hereof. The execution of this Agreement by ERC shall constitute and be construed as a Bill of Sale for such Equipment conveying all right, title and interest thereto from the ERC to the City. The parties hereby agree that the date when the equipment was physically transferred to the City was March 25, 2008, that the equipment is currently located at the facility located at 1080 East Chicago Street, Elgin, Illinois, and that such Equipment is being transferred in AS IS condition, with no representations or warranties as to its condition or usefulness. The parties hereby further agree that the price being paid by the City for the Equipment is fair and reasonable under all circumstances and that no improper private benefit has resulted or will result from this agreement, it being the intention of the parties to comply with applicable Internal Revenue Service regulations and other laws concerning tax exempt organizations. 3. The parties hereby agree that the City's payment to ERC of the $38,250.50 for the purchase of the Equipment referred to in the preceding Section 2 hereof, shall be deemed paid, distributed and satisfied as follows: (a) The previous payment by the City on behalf of ERC for a Nicor gas bill for the Building in the amount of$4,113.21. (b) The payment by the City of$28,887.92 within thirty (30) days following the entry into and the execution of this agreement for the payoff of the ERC line of credit principal balance for line of credit account number 00450577550002. (c) The payment by the City of$2,242.70 to ERC within thirty (30) days of the entry into and execution of this agreement for miscellaneous remaining expenses of ERC relating to ERC's previous operation of the Building and wrap up of business. (d) The performance by the City of $3,007.67 of the outstanding grant obligations of ERC referred to in Section 5 hereof 4. ERC and the undersigned person executing this agreement on behalf of ERC jointly and severally warrant and represent that all Equipment is owned wholly and solely by ERC and that there are no liens or encumbrances on any of the Equipment; nor shall ERC permit, allow or cause any such liens or encumbrances to be placed on the Equipment subsequent to the date of this agreement. 5. The City agrees to perform the following outstanding grant obligations of ERC: (a) The Squire Village grant obligation totaling $340. (b) The Elgin Township grant obligation totaling $ 2,667.67. 6. The City and ERC hereby further agree that upon execution of this agreement the City will assist ERC staff to take down the current Elgin Recreation Center website. 7. This agreement shall be subject to the laws of the State of Illinois. Venue for the enforcement of any rights and the resolution of any disputes arising out of or in connection with the provisions or performance of this Agreement shall be in the Circuit Court of Kane County, Illinois. 8. The terms of this Agreement shall be severable. In the event that any of the terms or provisions of this Agreement are deemed to be void or otherwise unenforceable for any reason,the remainder of this Agreement shall remain in full force and effect. 9. This Agreement shall not be construed so as to create a joint venture, employment, partnership or other agency relationship between the parties hereto. 10. ERC shall, at its own and sole expense, on or before September 30, 2008, provide direct first-class U.S. mail notice to all known users, customers, vendors or other entities which have had any interactions with ERC, and shall publish in the Elgin Courier News, notice in the following form: 2 "NOTICE OF CHANGE OF MANAGEMENT AND NON-AGENCY STATUS Notice is hereby given that the Elgin Recreation Center, an Illinois not- for-profit corporation, through no fault of its own, has ceased all operations at the facility located at 1080 E. Chicago Street, Elgin, Illinois which is commonly known as Elgin Recreation Center. The Elgin Recreation Center is not a partner, employee or agent of the City of Elgin. Operation of the facility was assumed by the City of Elgin, Illinois beginning on March 25, 2008. Any questions regarding this notice or the subject matter thereof should be directed to Randy Reopelle, Parks and Recreation Director, Telephone (847) 931-6127. The facility formerly known as Elgin Recreation Center shall now be known as Eastside Recreation Center." 11. ERC shall cooperate with the City to execute any documents or perform any other functions which may be reasonably necessary to facilitate the purposes of this agreement. 12. With the signing of this Asset Transfer Agreement, the City and ERC agree that all financial obligations regarding the sale of Equipment and any previous cost of operations by ERC at the Building or otherwise are paid in full. ELGIN RECREATION CENTER CITY OF ELGIN By: c1?/u— By. Olu emi Folarin, City Manager 17/ v � FA Legal Dept\Agreement\Asset Transfer Agr-Elgin Rec Ctr-clean-12-15-08.doc 3 Worksheet for Asset Distribution 4/8/2008 Assets ERC Value CoE Value Asset Value(See attachment ERC Items) $ 38,250 00 i $ 326,930.00 Checking Account on March 21-saving combined $ 8,153.58 Total value of ERC _$ 46,403.581--.-- _._.._.._—._ Total Liabilities ____--__ ------_._-- -- -- — --- — Debts to ERC without LOC $ 2,924.591 Transition cost Line of Credit $ 28,888.00 j Transition cost 3,006.67 Transition cost Grant fund distribution -- _—_ _$-._-.-- —_—__-- --------------._--- Transition funds for one year/distr@end $ _ _ _10,000.00 ` Transition cost Last week's salary(actual) $ _—_„_ ___3,479.10 Transition cost Additional cost of clean up (2 dumpsters@189 $ 378.00 Transition cost Total Liabilities $ 45,197.26 • Attachment "A" Worksheet for Asset Distribution 4/8/2008 Assets ; ERC Value ; Distribution/transference CoE Value Concession Equipment/set up I $ 5_955.001Distribution of Assets r$ 5,475.00 Front Desk Area $ 3,230.00 Distribution of Assets ; $ 200.00 Small Office Upstairs , $ 225.00 Distribution of Assets �_ Big Office upstairs-2 together $ 2,175.00 Distribution of Assets i $ 400.00 Multi Purpose Room $ 665.00 Transferr of Assets ASP storage rooms 1 $ 835,00 Distribution of Assets Classroom with Garage Door t •$ 300.00 Distribution of Assets Computer Lab furniture - - $ 710.00 ' Distribution of Assets ; $ 2,245.00 Conference Room downstairs ' $ 335.00 Furnace Room-Server storage $- 2,925.00 I 1 Office 1 downstairs $ 50.00 ; $ 460.00 Office 2 $ 485.00 { t Office 3 1,010.00 I $ 675.00 Inventory-cleaning&building supplies- -_- $ __-_ 650.00 Distribution of Assets__ - -__- Inventory-concession supplies Soccer Rink Distribution of Assets - _ $ 60,000.00 Weightlifting equipment $ - 16,460.00 Transferr of Assets $ 217,000.00 -- -- -- --- Matts/Mirrors Transferr of Assets , $ 35,00 . 00 Various Miscellanious Items - $ 2,240.00 j Distribution of Assets ' $ 5,475.00 Totals Assets $ 38 250.00 i I $ 326,930.00 — -- — — —— ---a-- --I --- _ Operating Expenses -- --- ---- - -- Staffing- --- - - - -- - - Salary cost 2/22-3/23 $ - 17,223.59 Transition cost Workman Comp 1 month $ 444.00 Transistion cos _ Benefits $ 259.00 Transition cost --- 1766759 Transition Salary cost - - ; $_ - _.... _ __ - ---f - - - t -Total Liabilities -- __-_ ------- ---------- I Debts to ERC without LO_C _ $ 2,924.59 Transition cost Line of Credit $ 28,888.00 Transition cost -- Grant fund distribution $ 3,006.67 Transition cost Transition funds for one yeaddistr@end +$ 10,000 00 Transition cost Additional cost of clean up (2 dumpsters@189 $ 378.00 Transition cost i Total Liabilities i $ 45 197 26 ERC Obligations _ ._._ ._ _. .. ._ .___ Grants$to be carried forward Squire Village($3,000/yr 2 instlmnts) $ 340.00 Distribution of Assets Elgin Township($4000pd1-08:3mnths spent@$444.44/mnth) i $ 2,666 67 Distribution of Assets I Grants funds forwarded $ (`006.67 ____ Squire Village Grant Funds Spent ` Available Funds ERC q 9 Funds received in house 1-08($5oosch1rsh($1000/op) ! $1,500 Savings - --- - - --- - ----- ----. .--- -- - -- _ 2 Martial Art youth-3 months @$50@yth $ (300.00)i $ 8,153 58 checking .-. . __.. _.- ----_ -- -------•--- --- --- - -1 Boxing yth-3 months @$50@yth $ _ (150.00). $ 8,153.58 $available _ 1 Gym mmbrship 3 months $20; $ (60 00): i 2ASP 2 yth-3months @$25@yth; $ (150 00). Cost to schlarship fund; (660 00) era -_- _ ___ __ ___ Operating Costs on _ _ ____ ___ Transfer of Squire Village grant funds I $ 340.00 ERC !Items - Transfer of Assets (City$) , Distribution of Assets(ERC Owned) Qty Item New N Purchased CoE Value ERC Value Serial# Disposition -_ Facility/Weight Room Used U - 11 Nautilus Machines(Value--$800@) U 2007 $ 8,800.00 D/A City of Elgin - -------- - 3 Garbage cans _- N $ 60.00 Y g D/A City of Elgin 1 Boxing_Ring N 1997 $ 4,000.00 NA D/A City of Elgin _Boxing supplies N - _ _ $ 1,500.00 NA -D/A City of Elgin -- -_- _--2-Martial Art roll out mat N 2000 $ 1,000.00 NA D/A City of Elgin -- 27 Blue Mats_for wrestling N 1996 $ 750.00 NA D/A City of Elgin --- 26 Lockers downstairs U $ 350.00 D/A City of Elgin - -- - - - ---- ____---- 1 Pl _-- -------- -- -3 Bleachers/wheels $ 3,000.00 T/A C of E ..------____ - Weight Lifting Equip(Audit Dec 1 2006) $ 217,000.00 T/A C of E -- ----------------------- _- - Mats&Mirrors(estimate) $ 35,000.00 $ 2,000.00 T/A C of / i o gln -- Total $ 315,000.00 $ 16,460.00 Concession Area -_ - --- --- 1 Soccer Score Keeper_Timer N $ 1,000.00 D/A C of E 1 Pretzel warmer N 2007 $ 1,100.00 16004707 T/A C of E 2 Coffee Pot N 2007 $ 100.00 T/A C of E 1 Slushy machine N 2007 $ 850.00 EZB27275 T/A C of 1 Blender N 2007 $ 125.00 T/A C of 1 Nacho cheese machine U 2006 $ 50.00 NCD-00849 T/A C of E 1 ,Popcorn Machine U 2006 $ 250.00 PM 04414 T/A C of E 4 Pool Tables-recovered Oct 07 N 2004 $ 3,000.00 T/A C of E -- - - - 2007 $ 850.00 -- - - -- - - - - --- 1 Pizza Warmer N D/A City of Elgin 1 Drink Cooler(behind counter) _ 1U 2002 $ 850.00 D/A City of Elgin- __ 1 Candy dispensing machine N 2004 $ 1,500.00 �D/A City of Elgin __- _ _--_-- -------- - -- 1 Gatoraide Dispensing machine-down U 2007 $ 1,700.00 D/A City of Elgin 1 Small Chest Freezer(ice for slushies) U 2005 $ 150.00 D/A City of Elgin 1 Microwave U 2007 $ 50.00 , D/A City of Elgin - - 3 Metal Blinds behind Vending machines N 2007 $ 100.00 - D/A City of Elgin 1 15"Monitor for Camera Monitor/cameras U 2003 $ 15.00 D/A City of Elgin 1 Rack of 14 Pool Cues N varies $ 100.00 D/A City of Elgin 1 Foos Bat table-lost bats wk 3/17 U 2004 $ 125.00 D/A City of Elgin 1 Concession lighted Billboard U 2007 $ 100.00 D/A City of Elgin 1 Clock N $ 10.00 D/A City of Elgin 1 Cintas First Aid Kid-filled Feb 07 2007 $ 350.00 D/A City of Elgin 1 Projector Screen N 2007 $ 55.00 D/A City of Elgin Value of Concession Area _ _ Totals $ 5,475.00 $ 5,955.00 Value - ERC asset to Cof Elgin ERC Iltems _- Transfer of Assets (City$) - Distribution of Assets(ERC Owned) Front Desk Area - - - ------- - 1 Time Clock New N 2007 $ 45.00 -- D/A City of Elgin - __-- `- �- - - 25.00 D/A City of Elgin 1 Card Laminator _ New N 2007 $ Y ---- 1 Computer for POS/Database U 2006 $ 200.00 T/A City of Elgin _ _ --____- 1 Register for concessions_- -N 2006— $ 50.00 D/A City of Elgin _ -__-__- _ 3_Extension Cords 50'on video games N $ 45.00 D/A City of Elgin - __ -_ -_ 1 Change Machine N 1996 $ 50.00 D/A City of Elgin _ ---._- 1 cabinet for storage behind counter U 2007 $ 15.00 D/A City of Elgin - - - Counter&Sink area U 2007 -- $ - 400.00 D/A City of Elgin----_ ______.__-_ 1 Small safe upstairs under counter U 2004 $ 100.00 D/A City of Elgin - 2 AED Device(upstairs&down) N 2007 -$ 2,500.00 D/A City of Elgin -_ --_---____ T___-_—.-.- —.-.-_.— _____ Total $ 200.00 $ 3,230.00 -_......---.___________. Various Items for Facility Management ---_-- ------------- 3 Scaffold with rollers for lights/high work N 2007 $ 900.00 NA D/A City of Elgin 1 2 Foot Sweeper U $ 15.00 D/A City of Elgin 1 10 foot step ladder N 2007 $ 150.00 D/A City of lgin 1 8 foot step ladder fiberglass N 2006 $ 75.00 rrCeeaning supplies-sumable goods N--- $ 750.00 D/A City of Elgin 2 Mop buckets/mops/sprayers/rags $ 150.00 D/A City of Elgin 5 Leaf rakes $ 50.00 D/A Cityof Elgin 4 Hard rakes $ 40.00 D/A City of Elgin 6 Snow Shovels $ 60.00 D/A City of Elgin 5 Hoes $ 50.00 D/A Cityof Elgin Total $ 2,240.00 Items sold/distributed ------------ __ ---- --- ---- -- - - -- ____ _-. Paramount Weightlifting Bench/300 Ibs- N 1998 to U46 Moving on program 1 1993 Ford Red Cargo Van U 2007 Sold-see Deposits 1 1996 White Ford 15 passenger van U 2007 Sold-see Deposits 4 Bicycles-children's boys&girls N 2007 Elgin Bible Church Various stuffed animals N _ _EBC/Crisis Center Various books gave away at front desk 2 Office Heaters N Sold-see Deposits 1 Water Cooler N Sold_see Deposits -- - 2 Office fans N Sold-see Deposits Value - ERC asset to Cof Elgin ERC |ltenne Transfer ofAssets (City$) � ^ Distribution of Assets(ERCOwned) Som's�oanm� �houo[ffi���� _ Total, Small Office --- ------ -- * 15O�OV D6��dym[�|gin 1 oonxavhai, _ ----�-�--'-- --�--' $ 5OOO D�.C8y'�E�in � ao»oxoomne ������ __ -- '----- --' $ sou ow`ouvm��m 1 Coatu o|ooeu v . . 1 Telephone ___ ___ ____ .om.ouy of Elgin ---- $ 225.00 Big ~---' uoos � 45.00 of Elgin _- ` ~~~^'~�� office) @ ---� ' ---- uooa $ 15.00 C o���n__ ~~~''-' -- uuuo_ - $ � 0�V x� _ � ouyv�agm___________ � ^ ---4 Desks/Chairs $ _100.00 D0A City of EkginL______� _ m m --'- uu»s_--- _ $ -30.00- cV�C�Y! --I Desk/drawers $ --15.00 City of Elgin _-__- * 5/)�0 �o»�Ci����g�________ � ^ -- ------'-- --�$_ _-'30.00- T/A City�of Elgin3 Printers '------- - ------� __ $ _2�0 o»�C Elgin �s --- -- --- $ 1s.VV_� D� City of 1 VHS Recorder ocom m� $ 4OVOV /�*c��o��8�______ Co _ -- � --- City of ms --- �------'---�� * 1ou�oo o»��V��.��� � ur'Ty���{�� c«} ---� . _--_-� --- ------�-- --- - -� --' -��mog��u 2004 � $ �75O.00 � 0ACi�ofE�io -- --�--�----------� � $ es�m ox�C��ors�� -- � .emoma�� - _ - - -- �OO Elgin_1 C|m- -_ 2OO7 $ 1 ____ N�N�N��� cz�_-_ --__-__� -- ---'- Total---- - - $ ____40o.00__$ 2,175.00 Multi purpose room _ ---�-'-----��--- ---------- ----' --------- 73 chair @*5 _ - _ _ $ '365/0 D/A CitY�yp��L -___- ---__'----_ m m�c������in _--��T������.���1��_ *o ---�_---� - _ ---_-____ �oo _ '-4�Tables-8'@$15 --- $ --60.00 - o»A City of Elgin_ _1Sofa _---__-- _-- -------- -- -------- -$'-----5.00- o«\City of ElginL------'�- ------ -_�_���'____-'-'- -'_-___--�____- ---__ __-__ _ $__'__-1V�0-_ D�`o_u2 of__�k�n_______'_-_--'____ 1whiteuoam $ 10.00 D/ACity of Elgin Value' ERC asset to CofBoin ' , ERCUt*ms Transfer of Assets (City �) Oiothbutionof Assets (ERCOwned) ,m 3 Square Tob�a8�S � j � ��� � �� �o�oo ow`oaymc�in ----~----- - - � �uoo ox\��'ovs�m 1 P������»o _ - � -��- -�------ ---- -- � 1ozm ox�cuvms�m 1 cmc* ____� -- ���� __� _ - o/*c/ mElgin --- --- ------ * 1oouo �2 uxxmumw�i,uvnmUone,unxa -__ -'- - -- --� - ------ --' � 4OV oo�C�����m L�geGarbage Can�___. �___� ----�--' ���0 ---- --- - -- - - * TotalOO5V0_ ---' ----- ---- �ap onmna storage ��[�� City of mxs --- �---- D»u:����n c��s'x�����X�_- --'- -_-__------' ---- -- Chairs'||�ioones ----'---- ---- --'- -- * �oon o»�Cuyms/�m umonnouinom � -- -_. _ ---------- -----' 50O�OO DK\��vf��in -- *apouppoeo . * _ - --' ----' -- uOOs $ 5O� - O Elgin � GidobySmeRefrigeratorfnr�SP u -� �o ---__-_--__' '--------- '-- ---- 0004 $ 7soo ox\�a������_ I I�L��oze,����eouo,m,�ap u --- ---- - uuoo * oouo oo��Vy�Elgin 1 ��vmomovom,�ap-o-��-p u --- -- -------� ------ m coos $ 15n�o ow.���o���n _ ����H�o»»�«aK�$s�-_ --- ----` $ 2----' Dw. in - --�---' 1 Metal rolling numnm u -_- -� �. � -------'-----��_ Tota- � uum -_ _------ -----' �. -uo-----' ----- ------ - -- ----- '------`----- Classroom with/���eono -- --33 Chairs------ --- U * 16�V0 [/\C������ ----''�-'--�------- '----- � 1ouu ow`�ny���8�_ � sofa u ��--'_ __- -- --------'--- - --- $ �oUV D�.O�y'�Elgin �|caomom'~aonu�� � -__ _. . --------- ---- � -- $ 1O�oO o�.o ofBgin 1 smaller cabinet _ _!� --____ . _ ---�^ .-- -- --- ---------- m $ 7sOO D�`Cuyo��g�__ � oeo� �� ----� ------ - o m - ----`»«»� ---- u * u�o o»���� ��m -� vYP�� ��L!�y�-__-_ _ Total-__ _--- --���� 300.00 -'�� --- Computer Lab -__-_-- _----'--- _' --- - -------------------- -'1 ' Computer bases 1�00- u __$__1,5OU.uo ThACity of Elgin 20 Monitors@$25 _._______ $ 5V�V0_ ToACu � City of / * u000 �au������_ '-16-p�Y��a!ds��$5'---_'- -------' ----� - ----- .-- --- '----- '-- ------------ - $ V*ou T/����o,s�m _1P�������N��_-'-_- --_ ---- --- ��- —� - -- --'---------� 4�pri?ters @$25 _ $-_.-100.0V_ --_--_-_- T/A City of Elgin— '------ ' _1'o.vVhite Table _ _-_- $ 5.00 D/A�(City vr EkginL-�--_--__-- 16 Desks on.wall @$15 u_ $ 240.0/'_- D/A'oity-!f.E-Igin _---_-__'_---' ^ 4 Center Console Desks @$1s $ 60.00 D/A City mElgin Value- ERC asset toCofElgin • ERC Iltems _ Transfer of Assets (City $) - Distribution of Assets (ERC Owned) • Total $ 460.00$ - 50.00 ---- - Office 2(Middle office downstairs) — — -- -- --_____. ------- ------ 1 Desk/chair(big yellow desk) U $ 75.00 D/A City of Elgin 1 Desk/chair(small graydesk) U $ 35.00 D/A City ofElgin _3_File_C_abinets __ U To Jarrig's for file storage 1 Bigger safe downstairs in office N 2008- $ 275.00 D/A City of Elgin -_- - -- 1 Clock N $ 10.00 - - - -- 1 Office heaters N $ 70.00 D/A City of Elgin 2 6'Tables©$10 N $ 20.00 D/A City of Elgin Total $ 485.00 - --- - - Office 3 -- — - ' — --- ---- 1 cabinet desk/chair N $ 250.00 t T/A City of Elgin-- 1 Computer with programs Jarrig has-programs/files - 1 big desk/chair N $ 200.00 T/A Cityof EI in 1 Credenza N — $ --150.00 T/A City of Elgin 1 Clock N $ 10.00 Bookshelves N $ 75.00 T/A City of Elgin 1 8 phone system N 2004/3 _ $ 1,000.00 D/A City of Elgin $ 675.00 $ 1,010.00 Value - ERC asset to Cof Elgin Salary calculations Item 2/22-3/2 Hr/wage cost ERC Item 3/3-3/16 Hr/wage cost ERC Item 3/17-3/23 Hr/wage cost ERC Salaries Hours _ $/H_r_ Check -- Salaries Hours $/Hr Check Salaries Hours $/Hr Check - Carlos $ 42.76 $ 8.50 $ 363.46 Carlos 66.34 $ 8.50 $ 563.89 Carlos - 36.6 $ 8.50 $-311.10 Bryant $ 77.68 $ 15.00 $ 1,165.20 Bryant 80 $ 15.00 $ 1,200.00 Bryant 40 $ 15.00 $ 600.00 Marc H $ _ 9.21 $ 7.50 $ 69.08 Marc H 20.33 $ 7.50 $ 152.48 Marc H 7.62 $ 7.50 $_- 57_15 Patty $ 11.51 $ 15.00 $ 172.65 Patty 27.43 $ 15.00 $ 411.45 Patty - 11.56 $ _ 15.00 $ 173.40 Pedro $ 27.23 $ 7.50 $ 204.23 Pedro 37.35 $ 7.50 $ 280.13 Pedro 29.54 $ 7.50 $ 221.55 Rubin $ 25.98 $ 7.50 $ 194.85 Rubin _ 66.56 $ 7.50 $ 499.20 _Rubin 34.68 $ 7.50 $ 260.10 32.35 $ 8.00 $ 258.80 Jose L 12_29 $ 8.00 $ 98.32 Jose L $ 28.71 $ 8.00 $ 229.68 Jose L ---- Juan $ 20.40 $ 8.00 $ 163.20 Juan 41.04 $ 8.00 $ 328.32 Juan - 18.77 $ 8.00 $-_150.16 --T- --- 11.03 $ 12.50 $ 137.88 Maria S $ 12.50 $ - Maria S--_----- $ 20.90 $ 12.50 $ 261.25 Maria S -- -- - -- ---- Ken____ $ 42.88 $ 8.00 $ 343.04 Ken 43.42 $ 8.00 $ 347.36 Ken 22.49 $ 8.00 $ 179.92 Yvette $ - 21.16 $ 7.50 $ 158.70 Yvette 48.03 $ 7.50 $ 360.23 Yvette 7.21 $ 7.50 $ 54.08 Tania $ 69.46 $ 8.00 $. 555.68 Rudy --- 72.15 $ 7.50 $ 541.13 Rudy - 37.29 $ 7.50 $ 279.68 Jane $ 687.00 Julian Julian 40+ $ 670.79 - - - ---------.___.------ ---------- ----- -- -1384.62 $ 1 - - T ___ -_- Salley500.00$ 14.32 $ 11.83 $ 169.41 Gina $ Tony Molinar $ 52.50 Al Hererra $ 5.00 $ 9.00 $ 45.00 Ed Rebollar 5.34 $ 7.00 $ 37.38 Demetri T-_ -$ 30.00 Julian $ 1,384.62 $ 1,341.58 -- ------- ._--.. -- - .. Salaries wk 1 $ 6,124.00 Salaries 2&3 $ 6,959.81 Salaries wk 4 $ 3,138.74 ADP Charges $ 84.00 ADP Char es $ 80.08 ADP Charges--- $ 74.55 - FICA $ 571.54 FICA $ 553.30 FICA $ 21 8.73 Unemployment $ 171.83 Unemployment $ 160.10 Unemployment - $ 47.08 - - - ---- Monthly Health Ins $ 249.53 Monthly Health Ins --Monthly Health Ins Cost of 2 wks $ 1,076.90 Cost of 2 wks $ 793.48 Cost of 2 wks $ 340.36 Total Salary $ 7,200.90 . . .L Feb 22-March 2 $ 7,200.90 3/10 to 3/23 total - $ 7,753.29 -- 3/10 to 3/23 total $ 3,479.10 March 3-16 $ 7,753.29 March 17-23 $ 3,479.10 Total Salaries $ 18,433.29 Bench Press Machines # Item Serial Number Condition Repair needed N/U Date Print name 1 Bench Press 1 • BCBTTJ17Q5001—_-GOOD _—_ _ — N 2007 2 Bench Press/with incline 2 BD34D27050001 GOOD N 2007, 3 Bench Press 3 __—__ _ . GOOD N 2007 4 bench press 4 _ BD34101050002 GOOD N _— 2007 5 Bench Press 5 BNBLD27050002 GOOD N 2007 6 Bench Press 6 BNBLB27050001 GOOD N 2007 ERC Iltems Transfer of Assets (City$) Distribution of Assets(ERC Owned) 19 Chairs(go with desks) — D/A City of Elgin _ _ 1 Coat Hanger Cabinet $ 20.00 D/A City of Elgin __—_— __ 1 Server Cabinet/server — Belongs to John Schwann-called 3/14 - _ 1 Overhead Projector(3N9N596C $ 50.00 D/A City of Elgin --- —_ 1 Medium Marker board on wheels $ 5.00 D/A City of Elgin _ 2 small filing cabinets @$10 . $ 20.00 D/A City of Elgin ___ 1 Clock $ 10.00 D/A City of Elgin — -_- _ _ 1 6 sets of new speakers JBL platinum — $ 200.00 D/A City of Elgin 2 Metal Shelving Units in_closet @$50 - $ 100.00 - D/A City of Elgin -- __ Total $ 2,245.00 $ _710.00 -__-_ — r- _ Conference Room Downstairs _ -- 1 Conference Room Table/9 chairs U 2007 $ 150.00 D/A City of Elgin _._ _ 1 Book Shelves U 2007 $ 25.00 D/A City ofElgin -____._. 1 Credenza U 2005 $ 25.00 D/A City of gin --__ __--._-_-_ 1 Small refrigerator N $ 100.00 D/A City ofElgin --- - ---- ---------- 1 Clock N $ 10.00 D/A City of Elgin 1 Coffee Pot N $ 15.00 D/A City of Elgin 1 8'Plastic Table@$10 N $ 10.00 D/A City of Elgin ----------- ----- ------- Total $ 335.00 Furnace Room —.- 1 Computer used as Server New N 2007 $ 1,750.00 T/A City of Elgin 1 Big Boxing Gloves New N 2006 $ 25.00 D/A City of Elgin —_ 1 TV 32"used U 2007 $ 50.00 D/A Cityof Elgin 1 TV 32"with cart U 2006 $ 100.00 D/A City of Elgin Network system components/BU bat N/U 2007 $ 1,000.00 D/A City of Elgin Total $ 2,925.00 Office 1 downstairs(by front door) 1 Desk L shaped/chair $ 250.00 T/A City of Elgin 1 Credenza $ 125.00 T/A City of Elgin - 1 book shelf $ 75.00 T/A City of Elgin 2 closet organizer $ 50.00 D/A Cityof Elgin 1 Clock $ 10.00 - -- - D/A City of Elgin 1 small refrigerator(Julian's personal) Belongs to Juilan 1 back up Hard drive(Julian's personal) Belongs to Juilan Value - ERC asset to Cof Elgin