HomeMy WebLinkAbout06-77 • Resolution No. 06-77 RESOLUTION AUTHORIZING EXECUTION OF A LOCAL AGENCY AGREEMENT WITH THE ILLINOIS DEPARTMENT OF TRANSPORTATION FOR USE OF FEDERAL FUNDS FOR RIGHT OF WAY ACQUISITION IN THE DUNDEE/SUMMIT INTERSECTION IMPROVEMENTS PROJECT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Ed Schock,Mayor,be and is hereby authorized and directed to execute a Local Agency Agreement with the Illinois Department of Transportation on behalf of the City of Elgin for use of federal funds for right of way acquisition in connection with the Dundee/Summit Intersection Improvements Project, a copy of which is attached hereto and made a part hereof by reference. s/Ed Schock Ed Schock, Mayor Presented: April 12, 2006 Adopted: April 12, 2006 Omnibus Vote: Yeas: 7 Nays: 0 Attest: s/Dolonna Mecum Dolonna Mecum, City Clerk f , 0OFEt.Ci # , ., City of Elgin , ( . IF °irI fl I)\*. - January 29, 2009 RE: Resolution No. 06-77 Agreement with Illinois Department of Transportation for federal participation in ROW acquisition for the Dundee/ Summit Intersection Improvements Project To Whom It May Concern: The document listed above was sent out for signatures to another entity and an executed copy was never returned to the City Clerk's office for record retention. Attached is the un-executed copy that was sent out for signature. Thank you. SPEED MESSAGE �J9 MOM ,(.1o•"-L Diu r't.‹... .� • r \; v A/.. ` `.,. ( ..-al,A-A 0 �.�" ) DATE • • ('A.- ,t,e,"7"..1 Cl�..�j,;'fie: 1)-1A4:961...„ I SIGNED ;1 r WIIsonJones® WHITE-ORIGINAL CANARY-DUPLICATE 44-900•Duplicate MEMO TO: Loni Mecum, City Clerk FROM: Steve Pertzborn, Senior Engineer SUBJECT: Dundee/Summit Intersection Improvements DATE: May 22,2006 Attached are 6 copies of the revised Local Agency Agreement for Federal Participation for right of way acquisition for the subject project. This agreement was authorized by City Council at its March 22, 2006 meeting. The forms that were previously submitted have been updated and IDOT has requested that the new forms be signed by the Mayor. Please have the Mayor sign the forms and return all 6 of them to me. I need to forward these to IDOT ASAP. Call me at X5964 if you have any questions. Local Agency State Contract Day Labor Local Contract RR Force Account 0 Illinois Department • of Transportation City of Elgin X Local Agency Agreement Section Fund Type ITEP Number for Federal Participation 00-00170-00-CH STA/STU Construction Engineering Right-of-Way Job Number Project Number Job Number Project Number Job Number Project Number R-91-012-04 M-CMM-8003(398 This Agreement is made and entered into between the above local agency hereinafter referred to as the"LA"and the state of Illinois, acting by and through its Department of Transportation, hereinafter referred to as"STATE". The STATE and LA jointly propose to improve the designated location as described below. The improvement shall be constructed in accordance with plans approved by the STATE and the STATE's policies and procedures approved and/or required by the Federal Highway Administration hereinafter referred to as"FHWA". Location Local Name Intersection of Summit Street and Dundee Avenue Route FAU 2525 Length 0.379 miles Termini 500'-600'in each direction of intersection Current Jurisdiction LA Existing Str. No N/A Project Description Right of way acquisition for the subject project Division of Cost Type of Work FHWA % STATE % LA % Total Participating Construction ( ) ( ) ( ) Non-Participating Construction ( ) ( ) ( ) Preliminary Engineering ( ) ( ) ( ) Construction Engineering ( ) ( ) ( ) Right of Way 120,000 ( * ) 162,500 ( ** ) 192,500 ( BAL ) 475,000 Railroads ( ) ( ) ( ) Utilities ( ) ( ) ( ) TOTAL $ 120,000 $ 162,500 $ 192,500 $ 475,000 *Maximum FHWA(STA)participation 80% not to exceed$120,000. **Maximum FHWA(STU).participation 50%not to exceed$162,500. NOTE: The costs shown in the Division of Cost table are approximate and subject to change. The final LA share is dependent on the final Federal and State participation. The actual costs will be used in the final division of cost for billing and reimbursment. If funding is not a percentage of the total,place an asterisk in the space provided for the percentage and explain above. The Federal share of construction engineering may not exceed 15%of the Federal share of the final construction cost. Local Agency Appropriation By execution of this Agreement, the LA is indicating sufficient funds have been set aside to cover the local share of the project cost and additional funds will be appropriated, if required,to cover the LA's total cost. Method of Financing(State Contract Work) METHOD A---Lump Sum(95%of LA Obligation) METHOD B--- Monthly Payments of 1 METHOD C---LA's Share divided by estimated total cost multiplied by actual progress payment. (See page two for details of the above methods and the financing of Day Labor and Local Contracts) Page 1 of 4 BLR 05310(Rev. 1/06) Printed on 5/22/2006 8:21:40 AM Agreement Provisions THE LA AGREES: (1) To acquire in its name, or in the name of the state if on the state highway system,all right-of-way necessary for this project in accordance with the requirements of Titles II and III of the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, and established state policies and procedures. Prior to advertising for bids,the LA shall certify to the STATE that all requirements of Titles II and III of said Uniform Act have been satisfied. The disposition of encroachments,if any,will be cooperatively determined by representatives of the LA, and STATE and the FHWA, if required. (2) To provide for all utility adjustments, and to regulate the use of the right-of-way of this improvement by utilities, public and private, in accordance with the current Utility Accommodation Policy for Local Agency Highway and Street Systems. (3) To provide for surveys and the preparation of plans for the proposed improvement and engineering supervision during construction of the proposed improvement. (4) To retain jurisdiction of the completed improvement unless specified otherwise by addendum(addendum should be accompanied by a location map). If the improvement location is currently under road district jurisdiction, an addendum is required. (5) To maintain or cause to be maintained,in a manner satisfactory to the STATE and FHWA,the completed improvement,or that portion of the completed improvement within its jurisdiction as established by addendum referred to in item 4 above. (6) To comply with all applicable Executive Orders and Federal Highway Acts pursuant to the Equal Employment Opportunity and Nondiscrimination Regulations required by the U.S. Department of Transportation. • (7) To maintain,for a minimum of 3 years after the completion of the contract,adequate books, records and supporting documents to verify the amounts, recipients and uses of all disbursements of funds passing in conjunction with the contract;the contract and all books, records and supporting documents related to the contract shall be available for review and audit by the Auditor General and the department;and the LA agrees to cooperate fully with any audit conducted by the Auditor General and the department; and to provide full access to all relevant materials. Failure to maintain the books, records and supporting documents required by this section shall establish a presumption in favor of the STATE for the recovery of any funds paid by the STATE under the contract for which adequate books, records and supporting documentation are not available to support their purported disbursement. (8) To provide if required,for the improvement of any railroad-highway grade crossing and rail crossing protection within the limits of the proposed improvement; (9) To comply with Federal requirements or possibly lose(partial or total)Federal participation as determined by the FHWA; (10) (State Contracts Only) That the method of payment designated on page one will be as follows: Method A- Lump Sum Payment. Upon award of the contract for this improvement,the LA will pay to the STATE, in lump sum, an amount equal to 95%of the LA's estimated obligation incurred under this Agreement, and will pay to the STATE the remainder of the LA's obligation(including any nonparticipating costs)in a lump sum, upon completion of the project based upon final costs. Method B- Monthly Payments. Upon award of the contract for this improvement,the LA will pay to the STATE,a specified amount each month for an estimated period of months,or until 95%of the LA's estimated obligation under the provisions of the Agreement has been paid, and will pay to the STATE the remainder of the LA's obligation(including any nonparticipating costs)in a lump sum, upon completion of the project based upon final costs. Method C- Progress Payments. Upon receipt of the contractor's first and subsequent progressive bills for this improvement,the LA will pay to the STATE, an amount equal to the LA's share of the construction cost divided by the estimated total cost, multiplied by the actual payment(appropriately adjusted for nonparticipating costs)made to the contractor until the entire obligation incurred under this Agreement has been paid. (11) (Day Labor or Local Contracts) To provide or cause to be provided all of the initial funding,equipment,labor, material and services necessary to construct the complete project. (12) (Preliminary Engineering) In the event that right-of-way acquisition for,or actual construction of the project for which this preliminary engineering is undertaken with Federal participation is not started by the close of the tenth fiscal year following the fiscal year in which this agreement is executed,the LA will repay the STATE any Federal funds received under the terms of this Agreement. (13) (Right-of-Way Acquisition) In the event that the actual construction of the project on this right-of-way is not undertaken by the close of the twentieth fiscal year following the fiscal year in which this Agreement is executed,the LA will repay the STATE any Federal Funds received under the terms of this Agreement. (14) (Railroad Related Work Only) The estimates and general layout plans for at-grade crossing improvements should be forwarded to the Rail Safety and Project Engineer, Room 204, Illinois Department of Transportation, 2300 South Dirksen Parkway, Springfield, Illinois, 62764. Approval of the estimates and general layout plans should be obtained prior to the commencement of railroad related work. All railroad related work is also subject to approval be the Illinois Commerce Commission(ICC). Final inspection for railroad related work should be coordinated through appropriate IDOT District Bureau of Local Roads and Streets office. Plans and preemption times for signal related work that will be interconnected with traffic signals shall be submitted to the ICC for review and approval prior to the commencement of work. Signal related work involving interconnects with state maintained traffic signals should also be coordinated with the IDOT's District Bureau of Operations. Page 2 of 4 BLR 05310(Rev. 1/06) Printed on 5/22/2006 8:21:40 AM The LA is responsible for the payment of the railroad related expenses in accordance with the LA/railroad agreement prior to ' requesting reimbursement from IDOT. Requests for reimbursement should be sent to the appropriate IDOT District Bureau of Local Roads and Streets office. Engineer's Payment Estimates in accordance with the Division of Cost on page one. (15) And certifies to the best of its knowledge and belief its officials: (a) are not presently debarred, suspended, proposed for debarment,declared ineligible or voluntarily excluded from covered transactions by any Federal department or agency; (b) have not within a three-year period preceding this Agreement been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain or performing a public(Federal, State or local)transaction or contract under a public transaction;violation of Federal or State antitrust statutes or commission of embezzlement,theft,forgery, bribery,falsification or destruction of records, making false statements receiving stolen property; (c) are not presently indicted for or otherwise criminally or civilly charged by a governmental entity(Federal, State, local)with commission of any of the offenses enumerated in item(b)of this certification;and (d) have not within a three-year period preceding the Agreement had one or more public transactions(Federal, State, local) terminated for cause or default. (16) To include the certifications, listed in item 15 above and all other certifications required by State statutes, in every contract, including procurement of materials and leases of equipment. (17) (State Contracts) That execution of this agreement constitutes the LA's concurrence in the award of the construction contract to the responsible low bidder as determined by the STATE. (18) That for agreements exceeding $100,000 in federal funds,execution of this Agreement constitutes the LA's certification that: (a) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned,to any person for influencing or attempting to influence an officer or employee of any agency,a Member of Congress,an officer or employee of Congress or any employee of a Member of Congress in connection with the awarding of any Federal contract,the making of any cooperative agreement,and the extension, continuation,renewal, amendment or modification of any Federal contract, grant, loan or cooperative agreement. (b) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress or an employee of a Member of Congress,in connection with this Federal contract,grant,loan or cooperative agreement,the undersigned shall complete and submit Standard Form-LLL, "Disclosure Form to Report Lobbying", in accordance with its instructions. (c) The LA shall require that the language of this certification be included in the award documents for all subawards at all ties (including subcontracts,subgrants and contracts under grants,loans and cooperative agreements)and that all subrecipients shall certify and disclose accordingly. (19) To regulate parking and traffic in accordance with the approved project report. (20) To regulate encroachments on public right-of-way in accordance with current Illinois Compiled Statutes. (21) To regulate the discharge of sanitary sewage into any storm water drainage system constructed with this improvement in accordance with current Illinois Compiled Statutes. (22) That the LA may invoice the STATE monthly for the FHWA and/or STATE share of the costs incurred for this phase of the improvement. The LA will submit supporting documentation with each request for reimbursement from the STATE. Supporting documentation is defined as verification of payment,certified time sheets,vendor invoices,vendor receipts, and other documentation supporting the requested reimbursement amount. (23) To complete this phase of the project within three years from the date this agreement is approved by the STATE if this portion of the project described in the Project Description does not exceed$1,000,000(five years if the project costs exceed $1,000,000). (24) Upon completion of this phase of the improvement,the LA will submit to the STATE a complete and detailed final invoice with all applicable supporting supporting documentation of all incurred costs, less previous payments,no later than one year from the date of completion of this phase of the improvement. If a final invoice is not received within one year of completion of this phase of the improvement,the most recent invoice may be considered the final invoice and the obligation of the funds closed. THE STATE AGREES: (1) To provide such guidance, assistance and supervision and to monitor and perform audits to the extent necessary to assure validity of the LA's certification of compliance with Titles II and III requirements. (2) (State Contracts) To receive bids for the construction of the proposed improvement when the plans have been approved by the STATE'(and FHWA, if required)and to award a contract for construction of the proposed improvement,after receipt of a satisfactory bid. (3) (Day Labor) To authorize the LA to proceed with the construction of the improvement when Agreed Unit Prices are approved and to reimburse the LA for that portion of the cost payable from Federal and/or State funds based on the Agreed Unit Prices and Engineer's Payment Estimates in accordance with the Division of Cost on page one. Page 3 of 4 BLR 05310(Rev. 1/06) Printed on 5/22/2006 8:21:40 AM (4) (Local Contracts) That for agreements with Federal and/or State funds in engineering, right-of-way, utility work and/or construction work: (a) To reimburse the LA for the Federal and/or State share on the basis of periodic billings, provided said billings contain sufficient cost information and show evidence of payment by the LA. (b) To provide independent assurance sampling,to furnish off-site material inspection and testing at sources normally visited by STATE inspectors of steel, cement,aggregate,structural steel and other materials customarily tested by the STATE. IT IS MUTUALLY AGREED: (1) That this Agreement and the covenants contained herein shall become null and void in the event that the FHWA does not approve the proposed improvement for Federal-aid participation or the contract covering the construction work contemplated herein is not awarded within three years of the date of execution of this Agreement. (2) This Agreement shall be binding upon the parties,their successors and assigns. (3) For contracts awarded by the LA,the LA shall not discriminate on the basis of race,color, national origin or sex in the award and performance of any USDOT—assisted contract or in the administration of its DBE program or the requirements of 49 CFR part 26. The LA shall take all necessary and reasonable steps under 49 CFR part 26 to ensure nondiscrimination in the award and administration of USDOT—assisted contracts. The LA's DBE program,as required by 49 CFR part 26 and as approved by USDOT, is incorporated by reference in this Agreement. Upon notification to the recipient of its failure to carry out its approved program,the department may impose sanctions as provided for under part 26 and may, in appropriate cases,refer the matter for enforcement under 18 U.S.C. 1001 and/or the Program Fraud Civil Remedies Act of 1986(31 U.S.C. 3801 et seq.). In the absence of a USDOT—approved LA DBE Program or on State awarded contracts,this Agreement shall be administered under the provisions of the STATE's USDOT approved Disadvantaged Business Enterprise Program. (4) In cases where the STATE is reimbursing the LA, obligations of the STATE shall cease immediately without penalty or further payment being required if,in any fiscal year,the Illinois General Assembly or applicable Federal Funding source fails to appropriate or otherwise make available funds for the work contemplated herein. (5) All projects for the construction of fixed works which are financed in whole or in part with funds provided by this Agreement and/or amendment shall be subject to the Prevailing Wage Act(820 ILCS 130/0.01 et seq.)unless the provisions of that Act exempt its application. ADDENDA Additional information and/or stipulations are hereby attached and identified below as being a part of this Agreement. Number 1 Location Map (Insert addendum numbers and titles as applicable) The LA further agrees,as a condition of payment,that it accepts and will comply with the applicable provisions set forth in this Agreement and all addenda indicated above. APPROVED APPROVED State of Illinois Name Ed Schock Department of Transportation Title Mayor,City of Elgin County Board Chairperson/MayorNillage President/etc. Timothy W.Martin,Secretary Signature e=c_dea4r•J%--/ Date Date ! / 'Z o n //-, By: Milton R.Sees,Director of Highways/Chief Highway Engineer TIN Number NOTE: If signature is by an APPOINTED official, a resolution authorizing Ellen Schanzle-Haskins,Chief Counsel said appointed official to execute this agreement is required. Ann Sundeen,Director of Finance and Administration Page 4 of 4 BLR 05310(Rev. 1/06) Printed on 5/22/2006 8:21:40 AM t-ti( oF EEC City of Elgin Agenda Item No. ,op `p FED�e kO r' k1 March 17, 2006 G 1,11 IIr III °"" r TO: Mayor and Members of the City Council :r . FINANCIALLY STABLE CITYGCIVERNMENT EFFICIENT SERVICES, FROM: Olufemi Folarin, City Manager AND QUALITY INFRASTRUCTURE John Loete, Public Works Dire or SUBJECT: Local Agency Agreement with the Illinois Department of Transportation (IDOT) for Federal Participation in the Dundee/Summit Intersection Improvements Proj ect PURPOSE The purpose of this memorandum is to provide the Mayor and members of the City Council with information to consider executing an agreement with IDOT authorizing use of federal funds for right-of-way(R.O.W.) acquisition for the Dundee/Summit Intersection Improvements Project. RECOMMENDATION It is recommended that the City Council authorize the City Manager to execute the Local Agency Agreement with IDOT. BACKGROUND At its meeting on October 13, 1999, the City Council authorized the hiring of a consultant (Baxter & Woodman) to complete the Phase I (preliminary) design engineering for the subject intersection. Part of Phase I engineering is the identification of additional R.O.W. needs. Baxter & Woodman has identified the need to obtain nine (9) R.O.W. parcels and 2 temporary easement parcels. In order to utilize available federal funding for this project to purchase R.O.W., the City must execute the subject Local Agency Agreement with IDOT. Once the agreement is executed by both agencies, the City can begin the process of obtaining the R.O.W. The estimated cost for the additional R.O.W. is currently $475,000. Available federal funds for R.O.W. acquisition totals $282,500. The City would be required to pay the balance or $192,500. The actual final cost to the City may be higher depending upon the final negotiated price of each parcel. A copy of the Local Agency Agreement is attached as Exhibit A. IP , , .. Dundee/Summit Intersection Improvements Projects March 17, 2006 Page 2 COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED None 91/ FINANCIAL IMPACT A. The agreement being approved has no direct cost to the City but the R.O.W. purchase that will result will have a City cost of at least $192,500. Funding for the purchases, as well as the construction, is budgeted in the upcoming 2006 General Obligation Bond Issue, project number 339755, "Dundee/Summit Intersection Improvements (ROW Acquisition/ Construction)" in the amount of$2,297,760. The exact cost of the purchase will not be known until the acquisition process is complete. L GAL IMPACT one. ALTERNATIVES• 1. Authorize execution of the Local Agency Agreement 2. Do not authorize execution of the agreement. Respectfully submitted for Council consideration. (do) Attachment Illinois Department of Transport / Springfield, Illinois/62764V `=� I 2300 South Dirksen Parkway MAY 2 0 2011 May 07, 2011 By City of Elgin Project: CMM-8003(398) Section 00-00170-00-CH Job No. R-91-012-04 Diane Robertson City Clerk 150 Dexter Ct. Elgin, IL. 60120 Dear Ms. Robertson: The amendment between the city of Elgin and the state of Illinois for the above project was executed by the department on May 05, 2011. Your copy of the executed amendment is attached. Sincerely, ami,llfa %a/wife. Darrell W. Lewis, P. E. Acting Bureau Chief of Local Roads and Streets Cc- Diane O'Keefe Attn: Chris Holt Joseph Evers, Municipal Engineer Joanne Woodworth, Project Control Jeff South ilfinots Department0 Local Agency State Contract Day Labor Local Contract RR Force Account of Transportation City of Elgin ❑ 0 ® ❑ Local Agency Amendment#1 for Section: 00-00170-00-CH Fund Type: STA ITEP Number: Federal Participation Construction Engineering Right-of-Way Job Number Project Number Job Number Project Number Job Number Project Number R-91-012-04 CMM-8003(398) This Amendment is made and entered into between the above local agency hereinafter referred to as the"LA'and the state of Illinois,acting by and through its Department of Transportation,hereinafter referred to as"STATE". The STATE and LA jointly propose to improve the designated location as described below. The improvement shall be constructed in accordance with plans approved by the STATE and the STATE's policies and procedures approved and/or required by the Federal Highway Administration hereinafter referred to as"FHWA". BE IT MUTUALLY AGREED that all remaining provisions of the original agreement not altered by this Amendment shall remain in full force and effect and the Amendment shall be binding upon and inure to the benefit of the parties hereto,their successors and assigns. Amended Division of Cost Type of Work FHWA % STATE % LA % Total Participating Construction ( ) ( ) ( ) Non-Participating Construction ( ) ( ) ( ) Preliminary Engineering ( ) ( ) ( ) Construction Engineering ( ) ( ) ( ) Right of Way 617,000 ( ) ( ) 155,000 ( BAL ) 772,000 Railroads ( ) ( ) ( ) Utilities ( ) ( ) ( ) Materials TOTAL $ 617,000 $ $ 155,000 $ 772,000 'Maximum FHWA(STA)Participation 80%not to exceed$617,000. NOTE: The costs shown in the Division of Cost table are approximate and subject to change. The final LA share is dependent on the final Federal and State participation. The actual costs will be used in the final division of cost for billing and reimbursment. If funding is not a percentage of the total,place an asterisk in the space provided for the percentage and explain above. The Federal share of construction engineering may not exceed 15%of the Federal share of the final construction cost. The LA further agrees,as a condition of payment,that it accepts and will comply with the applicable provisions set forth in this Agreement and all addenda indicated above. APPROVED ••OVED Local Agency State of Illinois •-p• merit of Transportation Edward Schock &Mil 5 r!( (Print or Type Name) :ry Hannig itary of Transportatio Date it Mayor (County Board Chairperson/Mayor/Village President/etc.) e.„„.. .....„,tge,,,a , 4 --2,a.— &I' (Signature) Date 410 i-! '1111 ... )14' A t Christi :-ed, I -ctor of Hig;f ays/Chi=•Pgineer Date The above signature certifies the agency's TIN number is - / 36-6005862 conducting business as a Governmental A A = 1 =41 Entity. en J.Schan' '''!s irs, ( hief Counsei —'D�te NOTE: If signature is by an APPOINTED official,a resolution authorizing said appointed official to execute this agreement 1 is required. Matthew R. Hughes, recto f Finance and Administr io Date Printed 12/8/2010 BLR 05311 (Rev.03/23/10) Illinois Department of Transportation Division of Highways/Region One/District One D a 201 West Center Court/Schaumburg, Illinois 601 96-1 096 LOCAL ROADS AND STREETS FEB 2 5 2010 Request Final Invoice for Project Close-Out City of Elgin By Location: FAU 2525/ Dundee Avenue and Summit Street Intersection Section No.: 00-00170-00-CH Project No.: M-CMM-8003(398) Job No.: R-91-012-04 Kane County February 22, 2010 Ms. Diane Robertson City Clerk VIA CERTIFIED MAIL City of Elgin 150 Dexter Court Elgin, IL 60120 Dear Ms. Robertson: We have been notified by our Central Office that they would like to close the above- referenced project. Attached is the Agreement associated with the referenced project. Additionally, we are also providing instructions for accessing information on payments made by the Department. Please review the project documents and submit a request for final reimbursement. If further reimbursements are not applicable, please notify our office accordingly. Otherwise, duplicate copies of the documentation listed below should be prepared and submitted to the Agreements Technician, Bureau of Local Roads and Streets, at the address listed above for further processing: • A simple letter asking for Federal Reimbursement; • A completed Invoice (BLR 05620). This form may be obtained from our Web site at: http://www.dot.state.il.us/Forms/BLR%2005620.doc; • • Copies of all cancelled checks paid for the project or a letter from the recipient that payment was made if cancelled check(s) is/are not available; • Listing and itemization of all direct costs and unit rates for each direct cost item; • Listing of employees by classification; time spent by each employee on the project for the invoice service period (note: make sure the time charges are for the service dates shown on the invoice and that they are within the period of the obligated funds.); and the hourly rate of the employee(s). Please verify that the computations for total employee labor costs are correct; • Low bid amount and award date, if available. Ms. Diane Robertson February 22, 2010 Page 2 A response is required by March 8, 2010, otherwise we will assume that additional invoices are not forthcoming and may proceed with closing the project. Please note that once the project is closed future requests for reimbursement will not be considered. If you have any questions or need additional information, please contact Temi Latinwo, Agreement Technician, at(847) 705-4179 or via email at DOT.D1.BLRS@illinois.gov. Very truly yours, Diane M. O'Keefe, P.E. Deputy Director of Highways, Region Onp Engineer *0/1 By: Christopher J. Holt, P.E. Bureau Chief of Local Roads and Streets Attachment cc: Joseph Evers, P.E., City Engineer, City of Elgin no/att. David Lawry, Director of Public Works, City of Elgin no/att. Illinois Department Payment Verifications of Transportation The State has made available the ability to review and verify payments via the Internet. If a payment is pending or the review of all payment information for a specified period is required, the Comptroller's Web site may be accessed to verify payment status. Access to this information is available through the Where's My Check Section of the Department's Web site at: http://www.dot.il.qov/check.html. The information is also available through the Comptroller's Web site by visiting the Vendor Payments Section at: http://www.wh1.ioc.state.il.us/QuickTakeNend/. Note that both sites are secure and will require the Taxpayer Identification Number(TIN) provided at the time of the funding agreement to gain access. The following are brief instructions to navigate through the Comptroller's Web site once the TIN has been entered: • Once the TIN has been entered, the Vendor Summary Page will appear; select"Payments"from this section. • The Warrants Page should be displayed. Under the header Selection Criteria, scroll down to 494—Transportation and select "Find Warrants,"which is located at the bottom of the screen. • The Warrants Section should display; this should include the warrant(check) number and the issue date. Note that if the payment amount expected is not shown on the Vendor Warrants Screen, one or more of the following may have occurred: 1. The check has not been processed with the TIN entered on the Vendor Login screen; 2. The invoice has not been processed by the Department; and/or 3. The invoice has not been processed by the Comptroller. If the agency has multiple TINs, please revisit the Vendor Login screen and attempt the same process with all possibilities. (In order to avoid this in the future, include the preferred TIN on all future funding agreements.) Please note that the Catalog of Federal Domestic Assistance Program number for all Department of Transportation Funded Projects is 20.205. il�int� Co t tTransportation ?300 South Diri:sen Farkviay I Springfield. Illinoi ��s 1 62764 November 15, 2006 \S‘'C\4 Q,;\ City of Elgin kya, Sect on 00-00170-00-CH CMM-8003 98 �� ,'° )A-�S Project M � ) gip``,, C Job No. R-91-012-04 8 1 V�0� SlRt RORDS �► Dolonna L. Mecum City Clerk 150 Dexter Ct. Elgin, IL. 60120 Dear Ms. Mecum: The agreement between the city of Elgin and the state of Illinois for the above project was executed by the department on October 27, 2006. Your copy of the executed agreement is attached. Sincerel , i) Z/ilefek Charles J. Ingersoll, P. E. Engineer of Local Roads and Streets • cc- Diane O'keefe Attn: Chris Holt Joseph Evers, Municipal Engineer Barry Wright (Acting) Attn: Debbie Marks Chuck Schmitt Local Agency State Contract Day Labor Local Contract RR Force Account VIllinois Department `'4 of Transportation City of Elgin x Local Agency Agreement Section Fund Type ITEP Number for Federal Participation 00-00170-00-CH STA/STU Construction Engineering Right-of-Way_ Job Number Project Number Job Number Project Number Job Number Project Number R-91-012-04 M-CMM-8003(398 This Agreement is made and entered into between the above local agency hereinafter referred to as the"LA" and the state of Illinois, acting by and through its Department of Transportation, hereinafter referred to as"STATE". The STATE and LA jointly propose to improve the designated location as described below. The improvement shall be constructed in accordance with plans approved by the STATE and the STATE's policies and procedures approved and/or required by the Federal Highway Administration hereinafter referred to as"FHWA". Location Local Name Intersection of Summit Street and Dundee Avenue Route FAU 2525 Length 0.379 miles Termini 500'-600'in each direction of intersection Current Jurisdiction LA Existing Str.No N/A Project Description Right of way acquisition for the subject project • Division of Cost Type of Work FHWA % STATE % LA % Total Participating Construction ( ) ( ) ( ) Non-Participating Construction ( ) ( ) ( ) Preliminary Engineering ( ) ( ) ( ) Construction Engineering ( ) ( ) ( ) Right of Way 120,000 ( ) 162,500 ( " ) 192,500 ( BAL ) 475,000 Railroads ( ) ( ) ( ) • Utilities ( ) ( ) ( ) TOTAL $ 120,000 $ 162,500 $ 192,500 $ 475,000 *Maximum FHWA(STA)participation 80%not to exceed$120,000. **Maximum FHWA(STU)participation 50%not to exceed$162,500. NOTE: The costs shown in the Division of Cost table are approximate and subject to change. The final LA share is dependent on the final Federal and State participation. The actual costs will be used in the final division of cost for billing and reimbursment. If funding is not a percentage of the total,place an asterisk in the space provided for the percentage and explain above. The Federal share of construction engineering may not exceed 15%of the Federal share of the final construction cost. Local Agency Appropriation By execution of this Agreement,the LA is indicating sufficient funds have been set aside to cover the local share of the project cost and additional funds will be appropriated, if required,to cover the LA's total cost. Method of Financing(State Contract Work) METHOD A--Lump Sum(95% of LA Obligation) METHOD B-- Monthly Payments of METHOD C—LA's Share divided by estimated total cost multiplied by actual progress payment. (See page two for details of the above methods and the financing of Day Labor and Local Contracts) Page 1 of 4 BLR 05310(Rev.1/06) Printed on 5/22/2006 8:21:40 AM • A Agreement Provisions THE LA AGREES: (1) To acquire in its name, or in the name of the state if on the state highway system,all right-of-way necessary for this project in accordance with the requirements of Titles II and III of the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, and established state policies and procedures. Prior to advertising for bids,the LA shall certify to the STATE that all requirements of Titles II and III of said Uniform Act have been satisfied. The disposition of encroachments,if any,will be cooperatively determined by representatives of the LA, and STATE and the FHWA, if required. (2) To provide for all utility adjustments, and to regulate the use of the right-of-way of this improvement by utilities,public and private, in accordance with the current Utility Accommodation Policy for Local Agency Highway and Street Systems. (3) To provide for surveys and the preparation of plans for the proposed improvement and engineering supervision during construction of the proposed improvement. (4) To retain jurisdiction of the completed improvement unless specified otherwise by addendum(addendum should be accompanied by a location map). If the improvement location is currently under road district jurisdiction,an addendum is required. (5) To maintain or cause to be maintained, in a manner satisfactory to the STATE and FHWA,the completed improvement, or that portion of the completed improvement within its jurisdiction as established by addendum referred to in item 4 above. (6) To comply with all applicable Executive Orders and Federal Highway Acts pursuant to the Equal Employment Opportunity and Nondiscrimination Regulations required by the U.S. Department of Transportation. (7) To maintain,for a minimum of 3 years after the completion of the contract,adequate books,records and supporting documents to verify the amounts,recipients and uses of all disbursements of funds passing in conjunction with the contract;the contract and all books, records and supporting documents related to the contract shall be available for review and audit by the Auditor General and the department;and the LA agrees to cooperate fully with any audit conducted by the Auditor General and the department; and to provide full access to all relevant materials.Failure to maintain the books,records and supporting documents required by this section shall establish a presumption in favor of the STATE for the recovery of any funds paid by the STATE under the contract for which adequate books, records and supporting documentation are not available to support their purported disbursement. (8) To provide if required,for the improvement of any railroad-highway grade crossing and rail crossing protection within the limits of the proposed improvement; (9) To comply with Federal requirements or possibly lose(partial or total)Federal participation as determined by the FHWA; (10) (State Contracts Only) That the method of payment designated on page one will be as follows: Method A- Lump Sum Payment. Upon award of the contract for this improvement,the LA will pay to the STATE, in lump sum, an amount equal to 95%of the LA's estimated obligation incurred under this Agreement, and will pay to the STATE the remainder of the LA's obligation(including any nonparticipating costs)in a lump sum, upon completion of the project based upon final costs. Method B- Monthly Payments. Upon award of the contract for this improvement,the LA will pay to the STATE,a specified amount each month for an estimated period of months,or until 95%of the LA's estimated obligation under the provisions of the Agreement has been paid, and will pay to the STATE the remainder of the LA's obligation(including any nonparticipating costs)in a lump sum,upon completion of the project based upon final costs. Method C- Progress Payments. Upon receipt of the contractor's first and subsequent progressive bills for this improvement,the LA will pay to the STATE, an amount equal to the LA's share of the construction cost divided by the estimated total cost,multiplied by the actual payment(appropriately adjusted for nonparticipating costs)made to the contractor until the entire obligation incurred under this Agreement has been paid. (11) (Day Labor or Local Contracts) To provide or cause to be provided all of the initial funding,equipment,labor, material and services necessary to construct the complete project. (12) (Preliminary Engineering) In the event that right-of-way acquisition for,or actual construction of the project for which this preliminary engineering is undertaken with Federal participation is not started by the close of the tenth fiscal year following the fiscal year in which this agreement is executed,the LA will repay the STATE any Federal funds received under the terms of this Agreement. (13) (Right-of-Way Acquisition) In the event that the actual construction of the project on this right-of-way is not undertaken by the close of the twentieth fiscal year following the fiscal year in which this Agreement is executed,the LA will repay the STATE any Federal Funds received under the terms of this Agreement. (14) (Railroad Related Work Only) The estimates and general layout plans for at-grade crossing improvements should be forwarded to the Rail Safety and Project Engineer, Room 204, Illinois Department of Transportation,2300 South Dirksen Parkway, Springfield, Illinois,62764. Approval of the estimates and general layout plans should be obtained prior to the commencement of railroad related work. All railroad related work is also subject to approval be the Illinois Commerce Commission(ICC). Final inspection for railroad related work should be coordinated through appropriate IDOT District Bureau of Local Roads and Streets office. Plans and preemption times for signal related work that will be interconnected with traffic signals shall be submitted to the ICC for review and approval prior to the commencement of work. Signal related work involving interconnects with state maintained traffic signals should also be coordinated with the IDOT's District Bureau of Operations. Page 2 of 4 BLR 05310(Rev.1/06) Printed on 5/22/2006 8:21:40 AM w ' The LA is responsible for the payment of the railroad related expenses in accordance with the LA/railroad agreement prior to requesting reimbursement from IDOT. Requests for reimbursement should be sent to the appropriate IDOT District Bureau of Local Roads and Streets office. Engineer's Payment Estimates in accordance with the Division of Cost on page one. (15) And certifies to the best of its knowledge and belief its officials: (a) are not presently debarred,suspended, proposed for debarment,declared ineligible or voluntarily excluded from covered transactions by any Federal department or agency; (b) have not within a three-year period preceding this Agreement been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining,attempting to obtain or performing a public(Federal, State or local)transaction or contract under a public transaction;violation of Federal or State antitrust statutes or commission of embezzlement,theft,forgery, bribery,falsification or destruction of records, making false statements receiving stolen property; (c) are not presently indicted for or otherwise criminally or civilly charged by a governmental entity(Federal, State,local)with commission of any of the offenses enumerated in item(b)of this certification;and (d) have not within a three-year period preceding the Agreement had one or more public transactions(Federal,State, local) terminated for cause or default. (16) To include the certifications,listed in item 15 above and all other certifications required by State statutes,in every contract, including procurement of materials and leases of equipment. (17) (State Contracts) That execution of this agreement constitutes the LA's concurrence in the award of the construction contract to the responsible low bidder as determined by the STATE. (18) That for agreements exceeding$100,000 in federal funds,execution of this Agreement constitutes the LA's certification that: (a) No Federal appropriated funds have been paid or will be paid,by or on behalf of the undersigned,to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress,an officer or employee of Congress or any employee of a Member of Congress in connection with the awarding of any Federal contract,the making of any cooperative agreement,and the extension,continuation,renewal,amendment or modification of any Federal contract, grant, loan or cooperative agreement. (b) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency,a Member of Congress,an officer or employee of Congress or an employee of a Member of Congress,in connection with this Federal contract,grant,loan or cooperative agreement,the undersigned shall complete and submit Standard Form-LLL,"Disclosure Form to Report Lobbying",in accordance with its instructions. (c) The LA shall require that the language of this certification be included in the award documents for all subawards at all ties (including subcontracts,subgrants and contracts under grants,loans and cooperative agreements)and that all subrecipients shall certify and disclose accordingly. (19) To regulate parking and traffic in accordance with the approved project report. (20) To regulate encroachments on public right-of-way in accordance with current Illinois Compiled Statutes. (21) To regulate the discharge of sanitary sewage into any storm water drainage system constructed with this improvement in accordance with current Illinois Compiled Statutes. (22) That the LA may invoice the STATE monthly for the FHWA and/or STATE share of the costs incurred for this phase of the improvement. The LA will submit supporting documentation with each request for reimbursement from the STATE. Supporting documentation is defined as verification of payment,certified time sheets,vendor invoices,vendor receipts,and other documentation supporting the requested reimbursement amount. (23) To complete this phase of the project within three years from the date this agreement is approved by the STATE if this portion of the project described in the Project Description does not exceed$1,000,000(five years if the project costs exceed$1,000,000). (24) Upon completion of this phase of the improvement,the LA will submit to the STATE a complete and detailed final invoice with all applicable supporting supporting documentation of all incurred costs, less previous payments, no later than one year from the date of completion of this phase of the improvement. If a final invoice is not received within one year of completion of this phase of the improvement,the most recent invoice may be considered the final invoice and the obligation of the funds closed. THE STATE AGREES: (1) To provide such guidance,assistance and supervision and to monitor and perform audits to the extent necessary to assure validity of the LA's certification of compliance with Titles II and III requirements. (2) (State Contracts) To receive bids for the construction of the proposed improvement when the plans have been approved by the STATE'(and FHWA,if required)and to award a contract for construction of the proposed improvement,after receipt of a satisfactory bid. (3) (Day Labor) To authorize the LA to proceed with the construction of the improvement when Agreed Unit Prices are approved and to reimburse the LA for that portion of the cost payable from Federal and/or State funds based on the Agreed Unit Prices and Engineer's Payment Estimates in accordance with the Division of Cost on page one. Page 3of4 BLR 05310(Rev. 1/06) Printed on 5/22/2006 8:21:40 AM (4) (Local Contracts) That for agreements with Federal and/or State funds in engineering, right-of-way,utility work and/or construction work: (a) To reimburse the LA for the Federal and/or State share on the basis of periodic billings, provided said billings contain sufficient cost information and show evidence of payment by the LA. (b) To provide independent assurance sampling,to furnish off-site material inspection and testing at sources normally visited by STATE inspectors of steel,cement,aggregate,structural steel and other materials customarily tested by the STATE. IT IS MUTUALLY AGREED: (1) That this Agreement and the covenants contained herein shall become null and void in the event that the FHWA does not approve the proposed improvement for Federal-aid participation or the contract covering the construction work contemplated herein is not awarded within three years of the date of execution of this Agreement. (2) This Agreement shall be binding upon the parties,their successors and assigns. (3) For contracts awarded by the LA,the LA shall not discriminate on the basis of race,color,national origin or sex in the award and performance of any USDOT—assisted contract or in the administration of its DBE program or the requirements of 49 CFR part 26. The LA shall take all necessary and reasonable steps under 49 CFR part 26 to ensure nondiscrimination in the award and administration of USDOT—assisted contracts. The LA's DBE program, as required by 49 CFR part 26 and as approved by USDOT, is incorporated by reference in this Agreement. Upon notification to the recipient of its failure to carry out its approved program,the department may impose sanctions as provided for under part 26 and may,in appropriate cases,refer the matter for enforcement under 18 U.S.C.1001 and/or the Program Fraud Civil Remedies Act of 1986(31 U.S.C.3801 et seq.). In the absence of a USDOT—approved LA DBE Program or on State awarded contracts,this Agreement shall be administered under the provisions of the STATE's USDOT approved Disadvantaged Business Enterprise Program. (4) In cases where the STATE is reimbursing the LA, obligations of the STATE shall cease immediately without penalty or further payment being required if,in any fiscal year,the Illinois General Assembly or applicable Federal Funding source fails to appropriate or otherwise make available funds for the work contemplated herein. (5) All projects for the construction of fixed works which are financed in whole or in part with funds provided by this Agreement and/or amendment shall be subject to the Prevailing Wage Act(820 ILCS 130/0.01 et seq.)unless the provisions of that Act exempt its application. ADDENDA Additional information and/or stipulations are hereby attached and identified below as being a part of this Agreement. Number 1 Location Map (Insert addendum numbers and titles as applicable) The LA further agrees,as a condition of payment,that it accepts and will comply with the applicable provisions set forth in this Agreement and all addenda indicated above. APPROVED APPROVED State of Wino' Name Ed Schock Departme Tra ortation Title Mayor,City of Elgin County Board Chairpersonn//MayorNillage President/etc. moth W artin, ecretary Signature Date �"r * Date // / co (o fl5 Milton .Sees,Director of Highways/Chief Highway Engineer TIN Number NOTE: If signature is by an APPOINTED official,a resolution authorizing Ellen c nzle-Ha kins,Chief Counsel said appointed official to execute this agreement is required. iptik Ann L.Schneider, Director of Finance&Administration Page 4 of 4 BLR 05310(Rev. 1/06) Printed on 5/22/2006 8:21:40 AM