Loading...
HomeMy WebLinkAbout04-72 • Resolution No. 04-72 RESOLUTION AUTHORIZING EXECUTION OF AN AGREEMENT WITH COLLINS ENGINEERS, INC. FOR THE 2004/2005 BRIDGE INSPECTION PROJECT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that David M.Dorgan,City Manager,and Dolonna Mecum,City Clerk,be and are hereby authorized and directed to execute an agreement on behalf of the City of Elgin with Collins Engineers,Inc. for the 2004/2005 Bridge Inspection Project, a copy of which is attached hereto and made a part hereof by reference. s/Ed Schock Ed Schock, Mayor Presented: March 31, 2004 Adopted: March 31, 2004 Omnibus Vote: Yeas: 6 Nays: 0 Attest: s/Dolonna Mecum Dolonna Mecum, City Clerk AGREEMENT THIS AGREEMENT,made and entered into this3/S7day of m c(4 , 2004,by and between the CITY OF ELGIN, an Illinois municipal corporation (hereinafter referred to as "CITY") and Collins Engineers, Inc. (hereinafter referred to as "ENGINEER"). WHEREAS, the CITY desires to engage the ENGINEER to furnish certain professional services in connection with the 2004/2005 Bridge Inspection (hereinafter referred to as the"PROJECT"). AND WHEREAS, the ENGINEER represents that he is in compliance with Illinois Statutes relating to professional registration of individuals and has the necessary expertise and experience to furnish such services upon the terms and conditions set forth herein below. NOW, THEREFORE, for and in consideration of the mutual undertakings as set forth herein, and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the City and the ENGINEER agree that the City does hereby retain the ENGINEER to act for and represent the City in the engineering matters involved in the Project as set forth herein subject to the following terms conditions and stipulations,to wit: I. SCOPE OF SERVICES The ENGINEER will provide the services necessary to complete the following tasks: Submit all inspection report forms required by the Illinois Department of Transportation to their Bureau of Local Roads; update the previous years inspection report forms; and provide a short- format inspection report with cost summaries of recommended repairs for each structure. Detailed scope of services is attached hereto as Attachment A. II. PROGRESS REPORTS An outline project milestone schedule is provided herein under. • • 2004 Inspections Start Finish Notice to Proceed 4/02/04 - -- Field Inspection(weather permitting) 4/05/04 4/30/04 Evaluation, Recommendation & Reports 5/03/04 6/11/04 City Review of Records 6/14/04 6/18/04 Revise Records 6/21/04 6/25/04 Submit Final Documents 6/30/04 2005 Inspections Start Finish Field Inspection(weather permitting) 4/04/05 4/29/05 Evaluation,Recommendation & Reports 5/02/05 6/10/05 City Review of Records 6/13/05 6/17/05 Revise Records 6/20/05 6/24/05 Submit Final Documents 6/30/05 III. WORK PRODUCTS All work products prepared by the ENGINEER pursuant hereto including,but not limited too,reports, designs, calculations, work drawings, studies,photographs, models and recommendations shall be the property of the CITY and shall be delivered to the CITY upon request of the DIRECTOR provided, however, that the ENGINEER may retain copies of such work products for its records. Such work products are not intended or represented to be suitable for reuse by the CITY on any extension to the PROJECT or on any other project, and such reuse shall be at the sole risk of the CITY without liability or legal exposure to the ENGINEER. IV. PAYMENTS TO THE ENGINEER(Not To Exceed Method) A. For services provided the ENGINEER shall be reimbursed at the rate of 2.88 times the direct hourly rate of personnel employed on this PROJECT, with the total fee not to exceed $25,223 for services rendered in 2004 and$14,756 for services 3 rendered in 2005 regardless of the actual costs incurred by the ENGINEER unless substantial modifications to the scope of the work are authorized in writing by the CITY. B. A summary of the fee calculations is attached hereto as Attachments B, B1, B2, B3, B4 and B5. C. The CITY shall make periodic payments to the ENGINEER based upon actual progress within 30 days after receipt and approval of invoice. Said periodic payments to the ENGINEER shall not exceed the amounts shown on Attachment B, and full payments for each task shall not be made until the task is completed and accepted by the CITY. V. INVOICES A. The ENGINEER shall submit invoices in a format approved by the CITY. B. The ENGINEER shall maintain records showing actual time devoted and cost incurred. The ENGINEER shall permit the authorized representative of the CITY to inspect and audit all data and records of the ENGINEER for work done under this Agreement. The ENGINEER shall make these records available at reasonable times during the Agreement period, and for a year after termination of this Agreement. VI. TERMINATION OF AGREEMENT Notwithstanding any other provision hereof, the CITY may terminate this Agreement at any time upon fifteen(15) days prior written notice to the ENGINEER. In the event that this Agreement is so terminated, the ENGINEER shall be paid for services actually performed and reimbursable expenses actually incurred prior to termination, except that reimbursement shall not exceed the task amounts set forth under Paragraph IV above. VII. TERM This Agreement shall become effective as of the date the ENGINEER is given a notice to proceed and,unless terminated for cause or pursuant to Article V, shall be deemed concluded on the date the CITY determines that all of the ENGINEER's 4 work under this agreement is completed. A determination of completion shall not constitute a waiver of any rights or claims which the CITY may have or thereafter acquire with respect to any term or provision of the Agreement. VIII. NOTICE OF CLAIM If the ENGINEER wishes to make a claim for additional compensation as a result of action taken by the CITY,the ENGINEER shall give written notice of his claim within 15 days after occurrence of such action. No claim for additional compensation shall be valid unless so made. Any changes in the ENGINEER's fee shall be valid only to the extent that such changes are included in writing signed by the CITY and the ENGINEER. Regardless of the decision of the DIRECTOR relative to a claim submitted by the ENGINEER, all work required under this Agreement as determined by the DIRECTOR shall proceed without interruption. IX. BREACH OF CONTRACT If either party violates or breaches any term of this Agreement, such violation or breach shall be deemed to constitute a default, and the other party has the right to seek such administrative, contractual or legal remedies as may be suitable to the violation or breach; and, in addition, if either party,by reason of any default, fails within fifteen (15) days after notice thereof by the other party to comply with the conditions of the Agreement, the other party may terminate this Agreement. X. INDEMNIFICATION To the fullest extent permitted by law, ENGINEER agrees to and shall indemnify, defend and hold harmless the CITY, its officers, employees, agents,boards and commissions from and against any and all claims, suits,judgments, costs, attorney's fees, damages or other relief, including but not limited to workers' compensation claims, in any way resulting from or arising out of negligent actions or omissions of the ENGINEER in connection herewith, including negligence or omissions of employees or agents of the ENGINEER arising out of the performance of this Agreement. In the event of any action against the CITY,its officers, employees, agents,boards or commissions, covered by the foregoing duty to indemnify, defend and hold harmless such action shall be defended by legal counsel of the CITY's choosing. XI. NO PERSONAL LIABILITY 5 No official, director, officer, agent or employee of the CITY shall be charged personally or held contractually liable under any term or provision of this Agreement or because of their execution, approval or attempted execution of this Agreement. XII. INSURANCE A. Comprehensive Liability. The ENGINEER shall provide, pay for and maintain in effect, during the term of this Agreement, a policy of comprehensive general liability insurance written in occurrence form with limits of at least $1,000,000 aggregate for bodily injury and$1,000,000 aggregate for property damage. The ENGINEER shall deliver to the DIRECTOR a Certification of Insurance naming the CITY AS ADDITIONAL INSURED. The policy shall not be modified or terminated without thirty(30) days prior written notice to the DIRECTOR. The Certificate of Insurance which shall include Contractual obligation assumed by the ENGINEER under Article X entitled "Indemnification" shall be provided. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the CITY. There shall be no endorsement or modification of this insurance to make it excess over other available insurance, alternatively,if the insurance states that it is excess or prorate, it shall be endorsed to be primary with respect to the CITY. B. Comprehensive Automobile Liability. Comprehensive Automobile Liability Insurance written in occurrence form covering all owned, non-owned and hired motor vehicles with limits of not less than $500,000 per occurrence for damage to property. C. Combined Single Limit Policy. The requirements for insurance coverage for the general liability and auto exposures may be met with a combined single limit of$1,000,000 per occurrence subject to a$1,000,000 aggregate. D. Professional Liability. The ENGINEER shall carry Engineer's Professional Liability Insurance covering claims resulting from error, omissions or negligent acts with a combined single limit of not less than $1,000,000 per occurrence. A Certificate of Insurance shall be submitted to the DIRECTOR as evidence of insurance protection. The policy shall not be modified or terminated 6 without thirty(30) days prior written notice to the DIRECTOR. XIII. CONSTRUCTION MEANS,METHODS,TECHNIQUES, SEQUENCES, PROCEDURES AND SAFETY The ENGINEER shall not have control over or charge of and shall not be responsible for construction means,methods, techniques, sequences or procedures, or for safety precautions and programs in connection with the construction, unless specifically identified in the Scope of Services. XIV. NONDISCRIMINATION In all hiring or employment made possible or resulting from this Agreement, there shall be no discrimination against any employee or applicant for employment because of sex, age, race, color, creed,national origin,marital status, of the presence of any sensory,mental or physical handicap, unless based upon a bona fide occupational qualification, and this requirement shall apply to,but not be limited to, the following: employment advertising, layoff or termination,rates of pay or other forms of compensation and selection for training, including apprenticeship. No person shall be denied or subjected to discrimination in receipt of the benefit of any services or activities made possible by or resulting from this Agreement on the grounds of sex,race, color, creed, national origin, age except minimum age and retirement provisions, marital status or the presence of any sensory,mental or physical handicap. Any violation of this provision shall be considered a violation of a material provision of this Agreement and shall be grounds for cancellation, termination or suspension, in whole or in part, of the Agreement by the CITY. XV. ASSIGNMENT AND SUCCESSORS This Agreement and each and every portion thereof shall be binding upon the successors and the assigns of the parties hereto;provided,however, that no assignment shall be made without the prior written consent of the CITY. XVI, DELEGATIONS AND SUBCONTRACTORS Any assignment, delegation or subcontracting shall be subject to all the terms, conditions and other provisions of this Agreement and the ENGINEER shall remain liable to the CITY with respect to each and every item, condition and other provision hereof to the same extent that the ENGINEER would have been obligated if it had done the work itself and no assignment, delegation or subcontract had been made. Any proposed subcontractor shall require the CITY's advanced written approval. 7 XVII. NO CO-PARTNERSHIP OR AGENCY This agreement shall not be construed so as to create a partnership,joint venture, employment or other agency relationship between the parties hereto. XVIII. SEVERABILITY The parties intend and agreed that, if any paragraph, sub-paragraph,phrase, clause or other provision of this Agreement, or any portion thereof, shall be held to be void or otherwise unenforceable, all other portions of this Agreement shall remain in full force and effect. XIX. HEADINGS The headings of the several paragraphs of this Agreement are inserted only as a matter of convenience and for reference and in no way are they intended to define, limit or describe the scope of intent of any provision of this Agreement,nor shall they be construed to affect in any manner the terms and provisions hereof or the interpretation or construction thereof. XX.MODIFICATION OR AMENDMENT This Agreement and its attachments constitutes the entire Agreement of the parties on the subject matter hereof and may not be changed, modified, discharged or extended except by written amendment duly executed by the parties. Each party agrees that no representations or warranties shall be binding upon the other party unless expressed in writing herein or in a duly executed amendment hereof, or change order as herein provided. XXI. APPLICABLE LAW This Agreement shall be deemed to have been made in, and shall be construed in accordance with the laws of the State of Illinois. Venue for the resolution of any disputes or the enforcement of any rights pursuant to this agreement shall be in the Circuit Court of Kane County, Illinois. XXII. NEWS RELEASES The ENGINEER may not issue any news releases without prior approval from the DIRECTOR, nor will the ENGINEER make public proposals developed under this Agreement without prior written approval from the DIRECTOR prior to said documentation becoming matters of public record. 8 XXIII. COOPERATION WITH OTHER CONSULTANTS The ENGINEER shall cooperate with any other consultants in the CITY's employ or any work associated with the PROJECT. XXIV. INTERFERENCE WITH PUBLIC CONTRACTING The ENGINEER certifies hereby that it is not barred from bidding on this contract as a result of a violation of 720 ILCS 5/33E et seq. Or any similar state or federal statute regarding bid rigging. XXV. SEXUAL HARASSMENT As a condition of this contract, the ENGINEER shall have written sexual harassment policies that include, at a minimum, the following information: A. the illegality of sexual harassment; B. the definition of sexual harassment under state law; C. a description of sexual harassment,utilizing examples; D. the vendor's internal complaint process including penalties; E. the legal recourse, investigative and complaint process available through the Illinois Department of Human Rights, and the Illinois Human Rights Commission; F. directions on how to contact the department and commission; G. protection against retaliation as provided by Section 6-101 of the Human Rights Act. A copy of the policies must be provided to the Department of Human Rights upon request 775 ILCS 5/2-105. XXVI. WRITTEN COMMUNICATIONS All recommendations and other communications by the ENGINEER to the DIRECTOR and to other participants which may affect cost or time of completion, shall be made or confirmed in writing. The DIRECTOR may also require other recommendations and communications by the ENGINEER be made or confirmed in writing. 9 XXVII. NOTICES All notices, reports and documents required under this Agreement shall be in writing and shall be mailed by First Class Mail,postage prepaid, addressed as follows: A. As to CITY: JOHN LOETE, P.E. Director of Public Works City of Elgin 150 Dexter Court Elgin, Illinois 60120-5555 B. As to ENGINEER: Louis P. Chrzasc, Regional Manager Collins Engineers, Inc. 123 North Wacker Drive Suite 300 Chicago, Illinois 60606 10 IN WITNESS WHEREOF, the undersigned have placed their hands and seals upon and executed this Agreement in triplicate as though each copy hereof was an original and that there are no other oral agreements that have not been reduced to writing in this statement. For the CITY: ATTEST: THE CITY OF ELGIN 7fla-a _BY1' l^4� y-�1� B� City Clerk; City Manager (SEAL) ', 1 .j For the ENGINEER: Dated this 8 day of ✓l Ar`L , A.D., 2004. ATTEST: By/s4, oz-P/Vd )5 BY Z, ecretary President sea o� �r i/„yh}y 1 �, lee _t rSPA C '',+�, �4 ;# ,o e..- ice" W 11 y,,„41 +4, June2002 Std Agmt • City of Elgin 2004/2005 Bridge Inspections February 2, 2004 SCOPE OF SERVICES Goals and Objectives of the 2004/2005 Bridge Inspection Project The goals and objectives of the 2004/2005 Bridge Inspection Project are to assure the City of the structural integrity of the 14 road bridges, identify capital requirements with respect to completing necessary repairs for the continued safe and satisfactory performance of these bridges, and to satisfy all Illinois Department of Transportation requirements with respect to the structural integrity and rating of these structures, and the preparation and submittal of the proper report forms. Field Inspections Collins will perform the field work using a two-person team, except for the Fox River crossings where a three-person crew will be used. A licensed professional engineer will lead the teams, and be on site at all times during the field work. Each inspection will consist of the following activities: 1. Each bridge component will be inspected to detect deterioration. Scraping and cleaning with a wire brush will be performed as required to assess the state and extent of deterioration. Decks of significant age will also be chain dragged to check for delamination. 2. Sketches of bridge components will be made to record the deterioration. 3. Photographs will be taken of various problem areas for documentation purposes. 4. Measurements of corrosion and translation of bridge components will be made and recorded for proper documentation. 5. The City will be notified immediately upon the discovery of hazardous conditions. Collins' inspection team has the physical ability and equipment necessary to access the bridge components and make the appropriate observations. Collins' team will provide all necessary traffic protection during these inspections. Collins will coordinate with the appropriate authorities police, fire, public works, coast guard, etc.) Report Preparation and Submittal Upon completion of these bridge inspections Collins will prepare and submit all required reports to the Illinois Department of Transportation, Bureau of Local Roads & Streets, in Schaumburg, Illinois. In most cases these reports will be updates of existing reports submitted to IDOT during the last inspection cycle. Anticipated reports include: • Bridge Scour Screening • Inspection Appraisal Report (RIS-R104) • Inventory Status Report (RIS-R105) • Key Turnaround Route Report (RIS-Rl ll) • Bridge Inspection Report (BIR) COLLINS Attatchment A,Page 1 ` City of Elgin 2004/2005 Bridge Inspections February 2, 2004 • Master Report (RIS-R107) • Copy of Bridge Record (BLR5903) • Bridge Inspection Documentation In addition to the required IDOT bridge inspection forms Collins will provide separate reports for 2004 and 2005 summarizing the necessary repairs and budgetary cost estimates to maintain these bridges in safe condition. Repair Recommendations and Cost Estimates Needed repairs will be summarized in the above mentioned "Bridge Inspection Documentation" report. A separate Bridge Capital Needs Report will be prepared for the bridges inspected in 2004 and 2005. PP P P This Capital Needs Report will provide detailed repair recommendations for each of the bridges inspected that year with an estimated cost. This report will include urgently needed repairs and programmed work to be performed at some later date. Repairs required to correct a hazardous condition, identified at the time of the inspection, are assumed to be an emergency and will be handled by the Department of Public Works. COLLINSS Attatchment A,Page 2 LL COST ESTIMATE OF CONSULTANT SERVICES Project: 2004 Elgin Bridge Inspection Office Code Project No.: Select Office Code Client: City Of Elgin FIRM: COLLINS ENGINEERS, INC. DATE: 08-Mar-04 Address: 150 Dexter Court Overhead: 157.31% % Profit: 12.00% City: Elgin State: Illinois Estimate Prepared By: JMH Zip Code: 60120 Contact: Omar Santos,M.A. TASK(PHASE) DIRECT FIXED SUB PERCENT OF GROUP? GROUP2 OX OX PHASE ITEM MANHOURS PAYROLL(1) OVHD COSTS FEE CONSULTANTS TOTAL GRAND TOTAL 001 Field Inspection 2004 80 $2,468 $3,882 $458 $762 $7,570 30% 002 Inspection Reports 2004 80 $2,406 $3,786 $288 $743 $7,223 29% 003 Bridge Capital Needs 2004 48 $1,792 $2,819 $553 $5,165 20% 004 Complete Bridge Records 2004 26 $771 $1,214 $238 $2,223 9% 005 Revise Previous Records 2004 18 $537 $844 $166 $1,547 6% 006 Administration(5%) 10 $519 $816 $160 $1,495 6% 007 008 009 010 011 012 013 014 015 016 017 018 TOTAL 262 $8,494 $13,361 $746 $2,623 $25,223 100% '(1) Staff is paid a premium of$40 per day($5 per hour based on eight hour day)when at the site in a diving capacity D 3 w Project Title: 2004 Elgin Bridge Inspection Project Location: Elgin,Illinois Client Name: City Of Elgin AVERAGE HOURLY RATE Field Inspection 2004 Inspection Reports 2004 Bridge Capital Needs 2004 AVG.HRLY % WGTD % WGTD % WGTD CLASSIFICATION RATE HOURS PART RATE HOURS PART RATE HOURS PART RATE Principal Engineer(E8) $69.81 o 0.00% $0.00 0 0.00% $0.00 8 16.67% $11.64 Principal Engineer(E7) $64.91 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Senior Engineer(E6) $57.06 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Senior Engineer(E5) $41.44 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Engineer(E4) $33.92 40 50.00% $16.96 30 37.50% $12.72 20 41.67% $14.13 Engineer(E3) $30.62_ 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Engineer(E2) $27.77 40 50.00% $13.89 50 62.50% $17.36 20 41.67% $11.57 Engineer(E1) $24.56 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Sr.Engineering Technician(T3) $30.29 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Senior CAD Technician(D3) $36.20 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 CAD Technician(D2) $28.48 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 CAD Technician(D1) $20.00 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Technician(T2) $18.00 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Technician(T1) $13.50 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Clerical(C2) $25.58 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Clerical(C1) $17.04 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 TOTAL _ 80 100.00% $30.85 80 100.00% $30.08 48 100.00% $37.34 Note:Staff is paid$40 per day when in the field in a diving capacity AVERAGE HOURLY RATE Complete Bridge Records 2004 Revise Previous Records 2004 Administration(5%) AVG.HRLY % WGTD % WGTD % WGTD CLASSIFICATION RATE HOURS PART _ RATE HOURS PART RATE HOURS PART RATE Principal Engineer(E8) $69.81 0 0.00% $0.00 0 0.00% $0.00 5 50.00% $34.91 Principal Engineer(E7) $64.91 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Senior Engineer(E6) _ $57.06 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Senior Engineer(E5) $41.44 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Engineer(E4) $33.92 8 30.77% $10.44 6 33.33% $11.31 5 50.00% $16.96 Engineer(E3) $30.62 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Engineer(E2) $27.77 18 69.23% $19.23 12 66.67% $18.51 0 0.00% $0.00 Engineer(E1) $24.56 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Sr.Engineering Technician(T3) $30.29 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Senior CAD Technician(D3) $36.20 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 CAD Technician(D2) $28.48 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 CAD Techncian(D1) $20.00 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Technician(T2) $18.00 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Technician(T1) $13.50 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Clerical(C2) $25.58 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Clerical(Cl) $17.04 0 0.00%+ $0.00 0 0.00% $0.00 0 0.00% $0.00 TOTAL 26 100.00% $29.67 18 100.00% $29.82 10 100.00% $51.87 D d 0 S. 3 CD 7 CO • DIRECT COSTS UNIT NUMBER OF NUMBER OF ITEM SETS SHEETS QUANTITY UNIT PRICE EXTENSION Reproduction for Contract Documents Reports Reproduction tText 18 10 180 Sheet $0.10 $18 [Color Copies 18 10 180 Sheet $1.50 $270 Drawings 0 Sheet $0.15 $0 Total $288 TOTAL FOR CONTRACT DOCUMENTS $288 Inspection Phase Airfare Each $0 Rental Car(Including Gas) Day $75.00 $0 Mileage 515 Miles $0.365 $188 Lodging Day $0 Meals Day $0 Shipping 1 Each $50.00 $50 Long Distance Telephone Day $5.00 $0 Expendable Supplies 6 Day $10.00 $60 14 ft.Boat and Motor 2 Day $80.00 $160 18 ft.Boat,Motor,and Trailer Day $110.00 $0 19 ft.Boat,Motor,and Trailer Day $110.00 $0 20 ft.Boat, Motor,and Trailer Day $150.00 $0 22 ft.Boat,Motor,and Trailer Day $190.00 $0 Recording Fathometer Day $50.00 $0 Automated Hydrographic Survey System Day $345.00 $0 Individual Diving Equipment Day $25.00 $0 Surface Supplied Diving Equipment Day $300.00 $0 Ultrasonic Thickness Meter Day $50.00 $0 Ultrasonic Thickness Meter Week $250.00 $0 Personal Dive Gear Each $25.00 $0 TOTAL FOR INSPECTION PHASE $458 GRAND TOTAL $746 Attarhment R7 __ COST ESTIMATE OF CONSULTANT SERVICES Project: 2005 Elgin Bridge Inspection Office Code Project No.: Select Office Code Client: City Of Elgin FIRM: COLLINS ENGINEERS, INC. DATE: 08-Mar-04 Address: 150 Dexter Court Overhead: 157.31% % Profit: 12.00% City: Elgin State: Illinois Estimate Prepared By: JMH Zip Code: 60120 Contact: Omar Santos,M.A. TASK(PHASE) DIRECT FIXED SUB PERCENT OF GROUP 1 GROUP2 OX OX PHASE ITEM MANHOURS PAYROLL(1) OVHD COSTS FEE CONSULTANTS TOTAL GRAND TOTAL 001 Field Inspection 2005 48 $1,481 $2,329 $344 $457 $4,611 31% 002 Inspection Reports 2005 48 $1,444 $2,271 $160 $446 $4,321 29% _ 003 Bridge Capital Needs 2005 24 $896 $1,410 $277 $2,583 18% 004 Complete Bridge Records 2005 14 $413 $650 $128 $1,191 8% 005 Revise Previous Records 2005 10 $296 $466 $91 $854 6% 006 Administration(5%) 8 $415 $653 $128 $1,196 8% 007 008 009 010 011 012 013 014 015 016 017 018 TOTAL 152 $4,945 $7,780 $504 $1,527 $14,756 100% '(1) Staff is paid a premium of$40 per day($5 per hour based on eight hour day)when at the site in a diving capacity D obi 3 m w w Project Title: 2005 Elgin Bridge Inspection Project Location: Elgin,Illinois Client Name: City Of Elgin AVERAGE HOURLY RATE Field Inspection 2005 Inspection Reports 2005 Bridge Capital Needs 2005 AVG.HRLY % WGTD % WGTD % WGTD CLASSIFICATION RATE HOURS PART RATE HOURS PART RATE HOURS PART RATE Principal Engineer(E8) $69.81 0 0.00% $0.00 0 0.00% $0.00 4 16.67% $11.64 Principal Engineer(E7j $64.91 0 0.00% $0.00 CT 0.00% $0.00 0 0.00% $0.00 Senior Engineer(E6) $57.06 o 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Senior Engineer(E5) $41.44 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Engineer(E4) $33.92 24 50.00% $16.96 18 37.50% $12.72 10 41.67% $14.13 Engineer(E3) $30.62 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Engineer(E2) $27.77 24 50.00% $13.89 30 62.50% $17.36 10 41.67% $11.57 Engineer(El) $24.56 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Sr.Engineering Technician(T3) $30.29 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Senior CAD Technician(D3J $36.20 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 CAD Technician(D2) $28.48 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 CAD Technician(D1) $20.00 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Technician(T2) $18.00 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Technician(T1) $13.50 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Clerical(C2) $25.58 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Clerical(C1) $17.04 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 TOTAL 48 100.00% $30.85 48 100.00% $30.08 24 100.00% $37.34 Note:Staff is paid$40 per day when in the field in a diving capacity AVERAGE HOURLY RATE Complete Bridge Records 2005 Revise Previous Records 2005 Administration(5%) AVG.HRLY % WGTD % WGTD % WGTD CLASSIFICATION RATE HOURS PART RATE HOURS PART RATE HOURS PART RATE Principal Engineer(E8) $69.81 0 0.00% $0.00 0 0.00% $0.00 4 50.00% $34.91 Principal Engineer(E7) $64.91 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Senior Engineer(E6) $57.06 0 0.00%_ $0.00 0 0.00% $0.00 0 0.00% $0.00 Senior Engineer(E5) $41.44 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Engineer(E4) $33.92 4 28.57% $9.69 3 30.00% $10.18 4 50.00°/0 $16.96 Engineer(E3) $30.62 0_ 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Engineer(E2) $27.77 10 71.43% $19.84 7 70.00% $19.44 0 0.00% $0.00 Engineer(E1) $24.56 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Sr.Engineering Technician(T3) _ $30.29 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Senior CAD Technician(D3) $36.20 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 CAD Technician(D2) $28.48 0 0.00% $0.00 0 0.00% $0.00 0_ 0.00% $0.00 CAD Techncian(D1) $20.00 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Technician(T2) $18.00 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Technician(T1) $13.50 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Clerical(C2) $25.58 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 Clerical(C1) $17.04 0 0.00% $0.00 0 0.00% $0.00 0 0.00% $0.00 TOTAL 14 100.00% $29.53 10 100.00% $29.62 8 100.00% $51.87 > C, B m a w A DIRECT COSTS UNIT NUMBER OF NUMBER OF ITEM SETS SHEETS QUANTITY UNIT PRICE EXTENSION Reproduction for Contract Documents Reports Reproduction Text 10 10 100 Sheet $0.10 $10 [Color Copies 10 10 100 Sheet $1.50 $150 Drawings 0 Sheet $0.15 $0 Total $160 TOTAL FOR CONTRACT DOCUMENTS $160 Inspection Phase Airfare Each $0 Rental Car(Including Gas) Day $75.00 $0 Mileage 285 Miles $0.365 $104 Lodging Day $0 Meals Day $0 Shipping 1 Each $50.00 $50 Long Distance Telephone Day $5.00 $0 Expendable Supplies 3 Day $10.00 $30 14 ft. Boat and Motor 2 Day $80.00 $160 18 ft.Boat,Motor,and Trailer Day $110.00 $0 19 ft.Boat,Motor,and Trailer Day $110.00 $0 20 ft. Boat,Motor,and Trailer Day $150.00 $0 22 ft.Boat,Motor,and Trailer Day $190.00 $0 Recording Fathometer Day $50.00 $0 Automated Hydrographic Survey System Day $345.00 $0 Individual Diving Equipment Day $25.00 $0 Surface Supplied Diving Equipment Day $300.00 $0 Ultrasonic Thickness Meter Day $50.00 $0 Ultrasonic Thickness Meter Week $250.00 $0 Personal Dive Gear Each $25.00 $0 TOTAL FOR INSPECTION PHASE $344 GRAND TOTAL $504 _Attachment B5 'T coo O F el 6, i ,' %I y City of Elgin Agenda Item No. R,TEDFE$^a E ��r / L •J° , /0 1 for .March 5, 2004 G f! p it I u 4, agi N .i,, TO: Mayor and Members of the City Council ? FINANCIALLY STABLE CITYGOVERNMENT EFFICIENT SERVICES, AND QUALITY INFRASTRUCTURE FROM: David M. Dorgan, City Manager John M. Loete, Public Works Director SUBJECT: Engineering Service Agreement for 2004/2005 Bridge Inspection Services PURPOSE The purpose of this memorandum is to provide the Mayor and members of the City Council with information to consider entering into an agreement with Collins Engineers Inc to provide engineering services associated with the inspection of City bridges. RECOMMENDATION It is recommended that the City Council approve the engineering agreement with Collins Engineers Inc totaling $25,223 and authorize staff to execute the necessary documents. BACKGROUND This project provides for one inspection for each of fourteen bridges over a two-year period. The 2004 budget includes funding for the inspection of nine highway bridges. In the 2005 budget, staff will request funds to inspect the five remaining bridges. The completion of the highway bridge inspection will maintain the City's compliance with State of Illinois requirements for biennial bridge inspection. The schedule for the bridge inspections is shown below: Bridge/Crossing 2004 2005 Kimball Street over Fox River X Highland Avenue over the Fox River X Chicago Street over the Fox River X National Street over the Fox Rive X Riverside Drive between Highland and Chicago X Villa Street over Willow Creek X Shales Parkway over Poplar Creek X Bluff City Boulevard over Poplar Creek X Eng Service Agreements for 04-05 Bridge Inspection Services March 5,2004 Page 2 Bridge/Crossing(Con't) 2004 2005 Villa Street over Poplar Creek X Royal Boulevard over Tyler Creek X Eagle Road over Tyler Creek X Big Timber Road over Tyler Creek X McLean Boulevard over Tyler Creek X Highland Avenue over Sandy Creek X Maps showing the locations are attached as Exhibit A. Eight consulting firms were invited to submit proposals on the bridge inspection program, including MWH-Montgomery Watson Harza, Teng & Associates, Lonco Inc., HLR-Hampton, Lenzini and Renwick, Inc., Collins Engineers Inc., HNTB, H.W. Lochner Inc., and CMT- Crawford Murphy & Tilly. Staff requested proposals for a two-year period in order to provide consistency in inspecting all of Elgin's highway bridges and to coincide with the State's biennial inspection requirement. Collins Engineers, HLR, HNTB, HW Lochner, and CMT responded to the invitation. A staff selection committee evaluation of the five proposals was conducted, which resulted in Collins Engineers Inc. being selected as the top-rated firm. A copy of the results of the selection process is attached as Exhibit B. Upon selection, Collins Engineers Inc. met with staff to finalize the project scope and negotiate their fee. The final negotiated total fee for the two year duration of the agreement is $39,979.00 The fee per year is $25,223 for 2004 (nine bridges) and $14, 756.00 for 2005 (five bridges) A copy of the proposed engineering services agreement with Collins Engineers Inc. is attached as Exhibit C. COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED None. FINANCIAL IMPACT The cost of the agreement with Collins Engineers, Inc. will total $39,979.00. Funds for each year's inspections will be budgeted for that year in the General Fund Budget, account number 010-3311-752.30-03, Architectural and Engineering Contractual Services. The current balance in that account, $45,833 as of 3/2/04, is adequate to cover the 2004 expense of$25,223. The 2005 expenditure of$14,756.00 will be requested as part of next year's budget. Eng Service Agreements for 04-05 Bridge Inspection Services March 5, 2004 Page 3 T\ r�� NEGAL IMPACT V r �/None. ALTERNATIVES As the biennial inspections are a legal requirement imposed upon the City by the Federal Highway Administration and the Illinois Department of Transportation, and as the City does not have adequate staff time available to conduct the inspections and prepare the reports, the alternatives are: 1. Approve the agreement for contractual services with Collins Engineers Inc. 2. Request to negotiate an agreement with a different consultant engineering firm. 3. Do not approve agreement with possible consequences of State imposed penalties and unchecked deterioration. Respectfully submitted for Council consideration. do Attachment r • , Exhibit A 2004 / 2005 Bridge Inspection Location Maps ¢ ca VZl / CHATEAU p v .. -•,-. DR .. 1 a' D 35W-14N G'p•P " ��0 34W-14N 0 v. c 3 • 33 5E-- a Z �`� • a RIVER Z _-.-.__- CHUB H 34 ri RD y \w -_ ¢ CORPORATE D• U ¢ la cc ® '� "p p 9. m GATE X' - ) yL SHOPPING m :hire H•OLME$ ® RD I v CENTER Q I' lib ELG/ ELGIN .p D ro, VOYAGEURS St). DAVIS RD TOLL P �p /y Q LANDING a - -- - .z ...,, 4114, O !z FOREST W `t = PRESERVE p iN DUNDEETWP. T42NSz\; _ agRESTELGINTWP T41N DR z . • ; p , •le¢Q TYLER r - '—� cp i. -- fl YE R9- 0v OAKS J Big Timber Road over ' PL A T q T ler Creek * q� TR ATM NT g Iar ,;Rd l o� �-�oq , CO TODD��.�a� \'yt RANCH RD P. NT �?= No.blire33W�� 3N �osoF s' EN*0 C ,�Q go: LXII- !Cel CREEK "�4^'^'�`^�E' L-=_ ALa za I ..�' Ga G - C. Et ' s c k r BIG „- : RD II ® 4%. Big Timbbr JUDSON Bwde w= V F _.t ,=--,, COLLEGE FTd ` -r1 a.. •' F I F.D. a- - S RI;ER EiLt. • RC A 1c ��''-_.-- I SLADE C ER BLUFF R•=_ St.p2 BELLE AV I AVE. TANG y :.. . '.I- 9 =' EA FIE•_ -` l- w �� S•:.• . i` JE' S_HA IN4TER C ON _� AV Z ! „ =r ONGD S E�{ 8077 • `TEAL V. kACILITYRI i RQ—ino ¢.- t AN IL ED �D 1: AVjSlade ® i Z u h $ Da GENESE = Pk ��_ ._ 61 mj COOP R J ; 4 G i___ Q S.N. 045-6300 owns o �� HERMA — ' - McLean Boulevard over ' c s +g �_.ar I -I _ P I RV AV m HOSP V S E I 3 � 2 T ler Creek * -12 „Iv .my- I �� 2 CHESTER • r•rnrrr E r :•Lr_ ' FLING, Wrr' F �i FI, tl . \ C P L GOETHE ST (r w+� :, p _ AVJ�� �� JL1 Z� ��� GOLF = .� +I w NCN INOIS C P O 4 ¢ ¢ ARK h ,� 9 X >I y M INLA�Y g., (g' prj' I COL'`MBI ' � COURSE T .l aI DLO+ L i & ST „c O wl w =�l _ �IARLA•�. SCHILL_� ��_. m JL- c2: .,r Q �v1 _l_ I pI I; r -F 5 - A -j 1 - LARSop i i KASKA " d >�Fi_� Yil Juliarel I� I �+I! ib IALGONAVIODLE I Li.OIS ;_; M.''or iv ?Pit l l =ST 7 DaAnVie�JEFFY RS* V_ �r I AV Pc .' it FRANCIS� `=�� •. i :AGLE RD F S g=SIN ENTERPRISE 07, :t _ Wl ' P:RK O I p cn¢ 7 AIAR PLU _z.:- _ • A _•• ; C. II 71 Y1,pr ..' 1 S.N. 045-6301 .off SUMMIT F.D¢ S. N. 045-6305 '.Qk•a ,,-- s, II Kimball Street over Eagle Road over >wuR•'_ Y • ---` - FREMONT II "' >I I rng r Fox River w L.�. .- R ' Tyler-- 1 n1 AV I�ST �R b Y: Q p HICKORY a = _ y- nlJt ri - Creek �- v�- = :. IJ NG K=vu k �_ Q��N O9L �ir._.C3 - -- y s HERIDA Al j .OA IlA1.!I r a �f ��+ ¢I p1'r i > r FIE t!1 u� Z r_� a G " ON '�q Oj mi� OL _ -FRANKLIJ Blvd < ST Fre )VE Q r+1 -JLST� �, LL(q Ii p"-^^.: - E-., � „ - rp 'iN�o' AIL I, ��1 S.N. 045-6307 � • ,. BLS :.RDENd MORE p. 1 Hi h�2, . r__,,, , I, i JJL1J � REt CE r� �1 s •.B.LIB° j L . Riverside Drive between I ` --'-- _ I• GRA T �mmen�� P.D T ULU 0 i 43 0,\ ` _ , . Irue41 'CITY Highland and Chicago ... -� ez N IGH -_ y •f� .-nter HA�!�` y --VI,SST " r L •✓ P.• t 1 iIIVISIOIN/ ¢ z4 R !Pi' 4%^'q W_ FF--_F y ` "'WKlly Gil' : �� Ir:CNiN'S 4� j=pw St ^ MA 14 5? . . _ Eil- UN! �'ti - -11 G �'' i P �� EI ST 6 CHI AG• S115 �, ENNSY/ILV•. to' .� . :V a �t 9� I p �+ . it I' i - _����A • ~ ' Q ii5TRFFDLST i-"ad ; EAS y `� z S.N. 045-0059cp \ Nun-0 (E,W G� N nn�� I� { I I • , 1q-0a=l��6LH T-s CHANNING N + + 0_ W'3H/ G Highland Avenue over 0 • ''PRAIRI Li. d oi_ST_ PARK r _ a�__ it HE HER,'�_r S' - v i LARKIN , x _ L J� Fox River * - G/ S.N. 045-6304 _ELL4:py p H.S. @- p, i UT( T1 I, 4 1 T`' .. •.z /�`T,�p.® p t� " w ` = -- BOA I '_ --- E SH LEf -i I J L¢ I Is,- 1- .-4iL._ = ¢ ,4 HIG�A DS .`1 RI National Street over 1D°� P� ` ATHLETIC kl � �Z S.N. 045-0058 T Fox River Marga - FIELD y.... T " _�. y'•K� �9 9�` mP �.�h ;' N r; p ;;� 2' Chicago Street over T r p�-� { al o Np Q I O �, u �!a E E t_a �1 -____ C. U =„_ * �0 CLOG S r,I�� _ __ IF $ Fox River ..�Y'k r•, . . 3 d" z: .',N WALN}1 "1 „ S7� ' r �� 1 SH_ERMA m I �I w 01 � . . . �._:: .., 4 �5� �iPPLAZA'• 'W M ER �T� EY R •i' z STI i, I ¢ r u� wyy �d+S.C. ti� q� KATE - a ; wl i 'O ETRA p 0 \ '"x TOWN > ;, w .A li A_ .z ST a� LOpyBI g TAT. t Ngi z -I W I = A HBURI� _Li_ t �, \gou ra ti CO 1; & m Ep =�I� i r tu9 I gj i '> v� Qq Si' BE ut _ 4 g LILIIA_Nf1 1ST Z./ I- OAK L__ r._ _ '444.44* COUNTRY �' S r I"..`� .• ,COUNTRY u�� S O w�— I Q Ij - ._ _IN L:•SEN h Van ii PLAZA ..,4,-,- y G • •w_,L-ORAN rE> I -,i O I w HA DINGt, -- �'1 „ Nos a " F-• cpJ. p ti ro2 ��¢� -�_ `- _" 5T .. _ -_' _''_..a •L .ARFl�LD1 • ._° �fF7'j wi _ n�+m tl zj WL_MO'ROAN .� �� -- 0[6ti = S .. • I C IL\1 - - - II • �RvD :."COIVGDON JL Vi Z �� •I' ='I = - AV I-A 4 I r¢. . •.PPLr Y G Z �I KEEP' u At' ` el N 09".I' PG(OR I I ,_ m• EE G '; AV I ( . GREEN r e_ RESTBURY DR SHOE¢ h COOPkR •U .I • . AV I' FSHERMAN PA >I �Gl!!iL i m;° ubb/o �L•�. iwo s - m HOSP SLAbE ] _ GE AV PATRICIA ` w } I 33W-12N Av ti Q , ` f , a. o ELGIN Z CHESTER 1 IZ m0 O•.- LN AV rla/-�. Ili 2 _ AV" 9)y PqN I Gr !�,Bedford Q L 6 MC. i S Z-1Q, �. LINCOLN AV 9 9 CT a� � L 1 , Ct m 'b� p, 8 ¢ „.1-- Im 32W-12N 31 W- L I ST O w w COLUMBIA O 4�d}`;� cc o- ,":. / �. a. 24- O m F, AVM � �� U �9 Be _ DALE • :IN _ LARSEN .. -_ Gi D M �,V ALGONA AV 1MIDDLE I m TJ -ri L" eC�00� i-_.�. �— �I,i a Rif ¢ ` A (SNA i 0 Ai 5 0 O "� PIN / I_ AV a¢ 4 JEFFE 9 T�FRA Q1S< c _ , OAS �a /� c ENTERPRISE d I ¢ <.. Dan.. A§aN X .._PLU - -h S'. = :k:MANOR -AV �i o Ct —IF _ F �_= � � ":� ST p alto=— SUMMIT S r FD¢ ATH�ETIC S C. S.0 .g-eat,Hunt- l J/Of '� f CHURCH OF .■ ; NAZARE_ RDLi -I d�FREMONT__: U g --- AMERCAN GOLF- IFIELD OUR REDEE wl -„_HICKORY Pa' a t_ GRAW AV WAY -I ---• ---�Q ______ ST I! HER/DA ATH �_ BLL �CARL I 9 •LYMP _ FRANKLI�1 — >I - FIELD */ .O . i r� PEGWOODT C Blvd ¢ CT OU LORDS! i E - ,L-- --I , S_T Franklin f FAQ/MUSEUM `t' PARK - �% e — d Lo ma G/N I H� HUt� 0 LE T. ' � ,,Mi orka— -� L__ BLV--- 0I \ LORDS PAft -- '� �L9 OP HECKER 09 b QC�� EY<02 I Y A -_ u um PARK _ ¢ �Fi A- J SER' NOR _ ST} rn-� I PAVILLION a R,-• Ppil�\- _ e-- 9Q`I A.LER • 33 W 11 O LILLI 6 d ST t OOO / O¢ n oG' VILLAGE\ SE CF DR.vim °`•RDEN_ o w /C,ry e9 u O Ilowre .� °- FOR T. AV :i d CT e9/� o Win IVISI 1/ iN'S m "--� St Tr ',FO T r r l'� �r J'S/ G . SE RING Carl- Z Sr ' Mery Rom-+�� G j' Gy s p Ct QLINDEN AV u� U Y-# (tR �-q E CAGQ . P1 1'' L.::, n a �;+ ; URY ;CPT sib cy �cTCt v I! R 1- / ILTO■w _. 3¢ Hg i ST'` ma EASTVI CT. , CT rt ;: \ 31 W-11 N #�.. ST • 3 ¢ cc- ST PARK 32W- CHANNING W I BLUFF ROLLING PRAIRI• = a !Ir..- ST RYS PARK" ® I >- CIR Shales Parkway over ,f, 1 KNOLLS T- • 17 ¢ • GOLF CA Polar Creek * a 90 m �i 1 REL O ST ' • • 1 • _ Il) CLUB W# oI _.•_ cr \Z<R,A7 ✓ :G� ..`v •I.I�lIIIII� - IDOLE'> , EL Q ��'e C. . I*� ( a; GI W' ,cT ,/ii,.- it •�g� V)/`Q� S.N. 016-0222 MACKEY L 'Fi 9 \ I SCE L_N V Yek gLrTea e(� 4,��Cimma I. m U •I L CJ I NLN @ .: rt- t 4, ' '/ Villa Street over , -I§Iz j N2•NCY` <d' .Ysi, _ --, f p_ \ , O <� C1 - * LSU� NE LN 0.92 xC)m 2` Troe eo • Z '' k . P LOC- Willow Creek =IdARIE E f, �j :O CAMPUS T RO ING �' Sr TO .�y �_ r�� _ i.'err,. I Shy Cante.u _ a �iaJ Lincoln- �" .,. - �'F .+m SHERMA �` St •'tsorIP: �Ip rre�� i 0 tl tlor. ME yRIA tt��tNPLAZA n `I A\_ o Lf� T- Z� NS.C"ge\ o• 'L i Av raoC i ynnhCt S DIUM• ZEgSTCto O ••t 1fi G - ELLq Pa G�. 1 M 9YLa PA•. WOUD a NICqt� m e.- wFy I NLNo. \�o o Ctl�f < mmQ- goon k_ • .ESS �I S �: ST� L"�N o. v Qasssh,: !� Fa s W o } ro��BEN � HN �WI ' r-4 , IF..• h !�NEYLtS.N. 016-2523J I U y l-. - sr, , „.t"A : LAH LR Y Y -�° I EsaNDR, Villa Street over -'DALE CL CoDING : SE�N E � :^.:Van I o y� � N �,9 I •AR LD . Nost. d P� wr/ �� * NDRCEU��''RI`E �i•.IM i S MA S ��\ �' ` PO•Iar Creek I rN '.w�C �OP;� �•� Q::_ MAROON �� %NVER.I( 31W-1ON .U 77T'_ •••• /i HA�y1PT N ' •o m � vR•�o W �c ._L., •� I 13 JAY .m x . n •�e' .i' E-�ST:�, �� `MC Z 2 NS �J ST • •� IL�I ST_OF lNrightPk. /�9 �N�R'049't 70'' O^ ��=N 20 4 ROUGH HAS INGS I. i�i p ST > •., C O v .r• AL On , pR� o - DWI e-' I El DRAKE m I HUF "__ `"- I� l FIELD H UST•- Mt. s�;CONC61�.y (A �O. I w,rR �.�.�- ¢I . p Hope Housto r:\ •n IO ILLINOIS�'''''" .n� YI ♦ Cem. a --� sa.• p H WCRETARY �..�, , _ - - ya OF STATEMitilUrarf ® � ' • Oi, OFFICE , I v, o tit I 1E' >I JOAN i • INENTAL DI b N a AV IMMI. •••A a ' pGIN Q ELC LzLJI II \ BCemluff lty 01 SQO �9i ¢if LI J 3 a I fi oQ j S. N. 016-6940 AV CREE _II1 �- _ ° ) Bluff City Boulevard over 1911.4R 1 BLj Poplar Creek * tt 27-----A-v, 2 l/�•F IW 99 Itmy Go 1 -9N aI 02°� 25 I� 32W-9N o J31W-9N oT m CO .l Li, 30 O 29 Ella U. Iz a 4- ..........as.IL i vvr. 14zN TsER RELGIN TWP. T41N.7---"---D , DECAD ''Y S(iFtIV,,,4k---,------ ,,,, ..1:: " T ' CT . r.. I _Wf.:_____ilTE ,... .. .......____, '-‘•-9-45' -s, l', v -T-s a MILLENIUM DR ,- - 4;:t MURCER kfr-- . R-P (..1 CENTURY OAKS 4 z a- , !I---- ---- „.--FE- c) Ct\ ''' A. . 6 OAKS li -a 37W-13N 36W-1c N v , 0.. vr-c-R Ct 4.,Dr A, ':.wo ,.: pe, 0%--'lf zg6 5 N eco eP.6, .-, ).• -o.,,. 04 7 -'• -.,t9k• ,, . , _ TODD 0,,,/c., + ,,,,,,g, • ell)x, INDSOR'S p-- )° 4% M t_y__Ay...-<'1,4,6, ..1 tr,,,,,., ... ..'EONNATNIEERR C,,... .J -kW. 40CE-: 0 C'1, % s,l, • :imruay 0,,,:s <<'R. TYLER --' - -r PAuL 41 A,. sQu a riE . - CREEK FAO c a. METRA 'f .„ C 44:3111-g., C7n3lIrLD peroicirr.,.,EsT c—N—CiLIC41 *-6\4 NOATHwe ''• STATION i 4.4 PLAZA US.15 01 485 IH ril R.R. SC cil x, '1 BIG TIN Z TEA-J it ,. '-r'..r.-...„Pa"..--,',., gm. ---- iiii 7-7-TBABER— ••-•-— DR :ENIZ .1 GGLEIELAND MP. :, , Etta 3741.V.ar._ -..,,..,_1111;Mr CREE• 2 ST*NEHAVEN -. -------_,.. .*TOF- ,O S. N. 045-6306 7:: .-- Nc_C:i,,REES 07 ILL! • I-..--..&313071- 0. ',-- --_ Royal Boulevard over .-ED , G --"------,,_OR r----' \ . 1 _- .:V ...,/ \O 1 - ./ / T ler Creek , ._____ELTz.eupfAN DR7Th / .. 0 1---f--------,-,...-' N.9 - ./('71 , / SC t f-.5_, : .0.' 4 -45, 4, -------' -; ' : ,, L at La . ; -, 1 • ' -—=-41: .z. 0). -\ 4 ..' I-Iti; :I 1 4 , 9 --,.._a_ -...... "-- NTROSE I ‘ (..)\ -- , 4 c,,.,s;..._0 - --tr-1 1 ulLEBIE -• pL ; .:c --,.-1( ,‘04 \ it Bolo___3-_,-----, ",r------------------ --__.4 a i____L-A------4 ' 0 WING ED. .." ".4.-.••01.-.„,WEST ELMER ) 136 -. -2- .,'„,fs9pLima---91^/zotv7 . /. 35-V - 2N YOSPI-9-mrtyp- - uoP 'v PARK HIGHLAND c-ri • 'IGHL AND 9'1407 . SPRINGS Aucg ,,v.,-. 4,- r", 'i . q Si i . - -• 0)/P ' a 4. GOLF ACRES <-1- :1-7 WEST -- •Z` ' A.-- t gr , I • CREEKSID t. fa! •-q, fi . iliNOis C '42- i 0 0,, (3-,•---!--cl-- co a g g i7r-% F W-12N 0 CCP .I... Nr'''-,,,7 ja !.:r .-0 '‘,1".,. . 4.,•0_1\\ 1„ r ,t ELEMENT/1=.1..." ci , 1 6, hi,A',,,,,..,__,4ARK ,,,,,,..,/ couRsE & / KASKA IA , 1 gil _ al. cod '. .",oe,- .....___,—4'4' -7 ••••• ''..Bluff 1,-,- ',co '0 ILINILDIS .: P Ma or _ • - Pa WI crt , ,c",14)rr -4...f „•,.,Dr* "`i - g 14>• , S r" 0 : . 000" '' 1: tlat''',,a, ,!'.6.9-17g,-=-:-..\ff...,-_-.- ..11-..---R..--D__ WI P•RK II cng•,ti >c'h'' >, wallo (7.!:'...7 l'' T •• or•Fs,--- ,,,,,,,-3,',-„, ...\ ,./151•-•- ---- - - ag MA oR 1.C.II II li -gh <2 >1 i 4--- 4,------1 is2 ..4)' ,, .*v. _.:_,FE,,,.. iCt csg:poWsler...,, ,,,. . .-"--'1'a) o:_w_m_kNoj.__ ,,--1 .- -• v ---- W1LDEMEt$E -4 T----14-ailiA • o '._., ..-- . , (ALMORA P,.__.:•:,. TALL HEIGHT ,., .D-......--.,, E •...:4 . ? ? KI . .i. a gr -,II i 0. -Jj' 0 T I --r-s,7:1- =-- a .•I• ' , . !,.--•t-,•-•-; --...9AKL. A , r. , . i EY .., i r- ..•fr „JC OR t , . --,..... : --., 0 '("- a _.._ 0.. AM ' ' , Z ;I . !, c w !. G1.11 OAKS CLOS g.4 Z 1;;' ..7--t:4:"3'I A COVE 4. 1_4 zi *I. '-- eSke' ••••,....',,',.Y0,_ SIDE ,z,ti% Lidi..7 . 4./N, • il. ‘9 . 1.11-1 -la'.-- ----c-x.- Ili . „ D. .. c,_ • I.A... „ -, . ' '''" .11,/.... HIDDEN ,•90 DR uu i_ .f./ :71 • ' THOM•AS • .: M ..,,,, ,-_---• 'cr -- - 40UNTRY >, Q,1 ' Highlan0 . ' (1 cc JAME'',,I,1----el,cc fx itc-,C2, RANDALL .A. M ' F.,cr 0 o. e \-1:- R/DGE 4 /.. cl) 4IGHLAN5 ,i • .. 1 • , ..,- 7 cl- m '3' L co -C_Ct. .. Fly__Aq_i_ La_ k, 1.,. ' * 041-1 1 -''' g.° 1 - ,,----N-.---'-e--g. ----,. • , ___._119.47: ...._pj 4L n• • • , c- - ,o-- ca. "I z 4.c _ •,cc E 0 4 I II:' WOVE ---- c't) I '. ; i ...,,- a o,'"-- ,.- - _----1-11-- --r---- 7• kt*GO°9 / -'---- DR Highland Avenue over ... - ., 1-15 ,. ...-1-4-6. oc :•• Ptoo ,c), 404.... z,.. it•• Cj _ _ 0%., ----... •-'''... ••-• i . , • HAVVTHOR A Sandy Creek * I t -11 N 1,',-•' --.,2,:---!-.• .A. Hals pl 4 .- g.,,,t • . ,i t 1 . r R • I. 2 4 :.--. ,<5.,.‘ ----..,-.,,,,,,,,,,,,,::-..,_.,_ „I g.,.: ,, • _ I] PK Gv01-29i1C1 . - - WI .. AIRLITEe'PC'2----- ''''•'' '' ‘.),' A '',:„--71,‘ 4;:<< 4i- 1771WATER4 RKI . 9.'i"- -, •-:LARK.IN - 0 '' HE HERp 1LS I ost; ,‘6,/fIk. •,,,k,.. .... Cul .' .. ; I___._____Y,r___,„ _,;__,_ — TT rt"- Y ' ' •-'''4,,, -...-.„,„-L..- ‘.-1----------- —-- "IA T i' t -- , . il i:___,-....- r '-'SFILEA I z 'Z \,,, \Ai--...,..- .11.0,!---<;,ms;---- ' • , -.--- ......-4---t— ..,,._,..__r_i_______, DLE 47,01.0 ATHLETIC :i ji ' i P I r I I' : .-4 /q- '11 :1 • ;:c.-c.- • kAFC_Lli 11 Coll__.., I ,i•-'..,, -.'••'• F-i i' ;: 14,s.'41 .0 , , , n q i :0 „mERIE '...,....,.11:.....,,,...z,zz.11 ovor:. ,,S:IT: 76,.: iii-nz_F__:_\ 4), COUNTRY 4/), /6) ir•F- di .,E La, 1.-,:,...„,,....„, •,.., ' c .'-' 6 _x ------1.6f44,, 2 _g,•• ,...Z., ..„,,C42 M YER ' . . EYOLR Z 4-1.2'.`"- • . '0 OTTER I 8 : -) 4 . CREEK '-' ! 0--5_-91±1 Er " NIULgFilly -1, ,... „A .., --,44 CLUB , :1 < < §f I-II 1 511,. .....se., ,:-----11-;;,' ' ..,""-• TOWN > 0 ...." -.' • ik" <10 CS CI-.. ...ct '''.•,,,-.,' , Eli() • ...<31,,Z ..J , 2.. , , Fs. ,OUTH -"; II tui co -,- -- ,„ :• 3;-1 LILPAN •\ --I ' . .. ......,;_--- ...i.2t._•7',•..-,...._..._-_ - -,-.‘,. 1,....7,,; COUNTRY . ------ .----0...,-- --..,•-•0 z-.. L4cA- \• q_ _./ ..: .., ,,,, . -7-.., H.RvABD ---.7 f -,-,-,,,--,,,.. ., . ,_ Ri 0-40,.... _ _, BENtoToN -':,..,..`4:litr.- PLAZA Pr. , t; ,,•- ,T-6-i .:. 2 dit' , Q.;\•,,_' I Z p-•Zt,ir 1 ORD 1 '... -,...- Wil < 0 ‘N.,:**c.,.. aii„.._.„.. •.71- '",9 ,I :' --,,,,,,,-,-,,::,, ----,,,-_,...„...,--,,,.. A Iv"n ie •'/--- , 37W-10N zr 0 s <"COLLEGE !S-,," '2- *,,20 21 c-, c ci DR SO BALL OTTE- PARK '7\ I•• Z t.S>.`_______12 cr• A___ FLEETwooDi III CREE, ,,,. • BAR. WOODBRIDGE I i 36W4ON Z -I LAI if w z co ,,, 1 -0 ,EYBALL ky 35W-1 ON Cz•URTS DP NORTH t_ky • ELGIN cr Fill''• \G'ik -< OMMUNT' \ BMX r,_ TOW, •,ES OF COV •En\C- ,• 0- ,3 ODBRIDGE .1 r- it, COLLIPE -• _____ ,.a SPARTAN ./ F. ...?../t 0 .ncaster Brighton , •c[ 'no ----e-,Ct PAR AN .,-..-...-- , T3 se 03 . wry yk. 0 SPARTAN ELG . I -0 . . Ct..c,e, -,_ • ,,c„.,° Chelsea IN SPORTS 0 1 o'---• ,,f-Ct „A-..et MEADOWS GOLF COURSE ,c; II EXHIBIT B-1 2004/2005 BRIDGE INSPECTION AVERAGE SCORE SHEET CONSULTANTS SELECTION TEAM HLR HNTB CMT Lochner Collins John Loete 3 4 1 5 2 Joe Evers 1 1 3 5 4 Steve Pertzborn 2 3 4 1 5 Chad Butzow 1 4 2 5 3 Omar Santos 3 4 1 2 5 TOTAL SCORE 10 16 11 18 19 AVERAGE SCORE 2 3.2 2.2 3.6 3.8 Note: Assigned scores based on the following formula: 5=highest, 1=lowest 2004/2005 BRIDGE INSPECTION EXHIBiT -2 QUALIFICATIONS RATING SHEET - SUMMARY CONSULTANTS • HLR HNTB CMT Lochner Coffins T EVALUATION FACTORS WEIGHT 1 2 ° 3 4 , 5 1 2 3 4 5 1 2 3 4 5 1 12 3 4 - 5 1 1 2 1 3 4 5 Project Manager Qualifications 0-20 14 14 14 15 10 11111 14 ® 16 EID® 15 -17 ' 1 151 15I i 15 1 13 14 17 14 17 : 17 15 f I! $ 1 'g.'Nli�r�tkMA�ec. Project Team Qualifications 0-20 17 13 16 15 ® 1 .' 13 ® 14 6 i 1 q ; 17 1 15 1 9 3 i g 16 16 1 '; 7j 1 i I 1 5 6 Hm � 1 • , 16 16 t* Firm Experience 0-15 15 12, 13 14 10 ®®in 14 12 15 14 13 14 11 Minn 13 15 14 15 A14 13 Scope of Services Proposed 0-15 13 11 11 13 12 13 13 13 13 ; 13 1 1` 12 12 13 9 114 13 12 14 10 10 121 11 12 11 ot�? .`,_- y x= n,. . Familiarity With Conditions 0-25 . 21 20: 25 24 18 20 18 25 24 15 12 i 1 ;9 24 23 10 20 18 20 ' 23 ! 7 20 20 25 , 24 12 - Technology 0-5 5 3 4 5 3 . 5 1 2 4 1 4 5 5 5K 5 3 5 ' 41 ' ` 5 4 5 4 4 5 J 1 TOTALS 0-100 85 73 83 86 65 86 73 85 89 68 83 79 86 87 5418718 2 Le, (--90 j 59 34, 81 87 i 83 72 Resolution No. 02-100 RESOLUTION APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH ILLINOIS CONSTRUCTORS CORP. FOR THE 2001 BRIDGE MAINTENANCE PROGRAM WHEREAS, the City of Elgin has heretofore entered into a contract with Illinois Constructors Corp. for the 2001 Bridge Maintenance Program; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Olufemi Folarin, Interim City Manager, be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference . s/ Ed Schock Ed Schock, Mayor Presented: March 13 , 2002 Adopted: March 13 , 2002 Omnibus Vote : Yeas : 7 Nays : 0 Attest : s/ Dolonna Mecum Dolonna Mecum, City Clerk ELGIN, ILLINOIS PROJECT 339594 CHANGE ORDER No. 1 SCOPE: This Change Order No. 1 will increase the quantity for the Furnish and Erect Structural Steel. The general contractor for this project is Illinois Constructors of St. Charles, Illinois. REASON FOR CHANGE: This Change Order No. 1 is in the best interest of the City and is authorized by law. SUMMARY OF CHANGES IN CONTRACT AMOUNT: ITEM TOTAL Furnish and Erect Structural Steel $12,424.10 TOTAL CHANGE ORDER NO. 1 $12,424.10 The original contract with Illinois Constructors Corp. is $52,460. By reason of Change Order No. 1, the contract for the 2001 Bridge Maintenance Program - MFT will be increased in the amount of twelve thousand four hundred twenty four and 10/100 dollars ($12,424.10). The new contract amount, inclusive of Change Order No. 1 is sixty four thousand eight hundred eighty,four and 10/100 dollars ($64,884.10). CHANGE ORDER NO. 1 February 4,2001 PAGE 2 OF 2 OTHER CONTRACT PROVISIONS: All other contract provisions shall remain the same. Agreed to this day of , 2002. Recommended: Public Wor s D partment By: Oçoç Title: upe6, e. -+ Date: FP 6a /1/ 2002- Accepted: Illinois Constructors Corp. Part Second Part (Contractor) By: Title: 4Q-4A-C Date: r`-e ^]��.OGL Approved: CITY OF ELGIN Party of the First Part (Owner) By: • �.�. Title: Date: fri, , / ?� ,2.o Q ?� F:\General Services\Public_Works\pw\MFT info\2001 Bridge Maint.change order#1.wpd J 4y OF FCC or Agenda Item No. City of Elgin E L :N February 22 , 2002 G tr1 N TO: Mayor and Members of the City Council SAFE COMMUNITY FROM: Olufemi Folarin, Interim City Manager SUBJECT: Change Order No. 1 for 2001 MFT Bridge Maintenance Contract PURPOSE The purpose of this memorandum is to provide the Mayor and the members of the City Council with information to consider Change Order No. 1 for the 2001 MFT Bridge Maintenance Contract . BACKGROUND On September 26, 2001, the City Council awarded to Illinois Constructors the contract for 2001 MFT Bridge Maintenance for the replacement of the roller bearings on the National Street bridge . The contract was awarded in the amount of $52 , 460 . 00 . When the contractor was placing the order with the steel manufacturer, an error in the bid quantity for the steel needed for the bearings was discovered. The cost of the steel was based on a unit price bid of $13 . 00/pound. This erroneous quantity in the original bid documents was established by Hampton, Lenzini and Renwick, Inc . (HLR) , the City' s consultant for engineering services related to the Motor Fuel Tax contracts . The awarded contract incorrectly lists the steel quantity at 1, 320 pounds while the corrected quantity is 2 , 275 . 7 pounds . The increased cost to the contract is $12 , 424 . 10 and the revised awarded contract amount is $64 , 884 . 10 . HLR has agreed to charge their construction inspection services against the original awarded amount of $52 , 460 . 00 . Their fee for inspection is 6% of the actual awarded contract amount . This is a realized savings of $745 .45 for the construction inspection cost for the project . Final payment is not being processed at this time due to the fact that painting of the new steel could not be complete due to temperature requirements of the paint . A second payment will be made to the contractor after this change order is approved with a retainage held until the painting is complete in the spring. The project will be finaled out at that time. L � 1911111 Change Order No. 1 for 2001 MFT Bridge Maintenance Contract February 22 , 2002 Page 2 COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED (�JNone . i1 `v FINANCIAL IMPACT The subject project has budgeted funds of $100, 000 . 00 in account number 290-0000-791 .41-08, project number 339648 . The total amount of Change Order No. 1 (Attachment A) is $12 , 424 . 10 . The revised contract amount with Illinois Constructors is $64 , 884 . 10 . Original Award Amount $52 , 460 . 00 Change Order No. 1 $12 , 424 . 10 Revised Award Amount $64, 884 .10 EGAL IMPACT None . ALTERNATIVES None . RECOMMENDATION It is recommended that the City Council authorize the execution of Change Order No. 1 in the amount of $12, 424 . 10 and direct staff to prepare the necessary resolution. Respectfully submitted, Olufemi Tari Interi C' ty Ma ager JML:cab Attachment SEPTEMBER 26, 2001 VOLUME LXVI BID 01-127 AWARDED FOR 2001 BRIDGE MAINTENANCE CONTRACT Councilmember Gilliam made a motion, seconded by Councilmember Figueroa, to award a contract to Illinois Constructors Corporation, the low responsible bidder, at the price of $52 , 460 . Upon a roll call vote : Yeas : Councilmembers Figueroa, Gilliam, Munson, Walters, Wasilowski, Yearman and Mayor Schock. Nays : None . BID 01-114 AWARDED FOR RECREATION CENTER CONSTRUCTION Councilmember Walters made a motion, seconded by Councilmember Wasilowski, to authorize Gilbane to execute contracts with Midwest Masonry in the amount of $2 , 527, 200, to Edwin Anderson Construction in the amount of $1, 533 , 000, to Elgin Roofing Company in the amount of $723 , 520, and to CAD Contract Glazing in the amount of $1, 540, 500 for masonry, general trades, roofing and glass/glazing associated with the Recreation Center construction. Upon a roll call vote : Yeas : Councilmembers Figueroa, Gilliam, Munson, Walters, Wasilowski and Mayor Schock. Nays : Councilmember Yearman. BID 01-120 AWARDED FOR VEHICLE LIFT FOR THE FIRE DEPARTMENT Councilmember Munson made a motion, seconded by Councilmember Wasilowski, to award a contract to Standard Equipment and Automotive Equipment in the amount of $55, 100 . Upon a roll call vote : Yeas : Councilmembers Figueroa, Gilliam, Munson, Walters, Wasilowski, Yearman and Mayor Schock. Nays : None . BID 01-122 AWARDED FOR PLOW BLADES Councilmember Yearman made a motion, seconded by Councilmember Munson, to award a contract to the overall low bidder, Central Parts Warehouse, in the amount of $6, 552 . 90 . Upon a roll call vote : Yeas : Councilmembers Figueroa, Gilliam, Munson, Walters, Wasilowski, Yearman and Mayor Schock. Nays : None . BID 01-123 AWARDED FOR MULTI FIELD LIGHTING PROJECT Councilmember Walters made a motion, seconded by Councilmember Figueroa, to award contracts for the base bid to light Wing and Lords Park tennis courts, the youth sports associations and the Sports Complex Soccer Field lighting alternate to the lowest responsive bidders, Lauderdale Electric in the amount of $96, 175 and Musco Lighting in the amount of $211, 735 . Upon a roll call vote : Yeas : Councilmembers Figueroa, Gilliam, Munson, Walters, Wasilowski, Yearman and Mayor Schock. Nays : None . 661