HomeMy WebLinkAbout01-316 Resolution No. 01-316
RESOLUTION
APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH
LANDMARK CONTRACTORS, INC. FOR THE NORTH McLEAN BOULEVARD
AND BIG TIMBER ROAD INTERSECTION IMPROVEMENTS
WHEREAS, the City of Elgin has heretofore entered into
contract with Landmark Contractors, Inc . for the North McLea
Boulevard and Big Timber Road intersection improvements; and
WHEREAS, it is necessary and desirable to modify the terms of
the contract as is described in Change Order No. 1, attache.
hereto.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CIT
OF ELGIN, ILLINOIS, that Joyce A. Parker, City Manager, be and T-
hereby authorized and directed to execute Change Order No. 1,
copy of which is attached hereto and made a part hereof b
reference .
s/ Ed Schock
Ed Schock, Mayor
Presented: November 28, 2001
Adopted: November 28, 2001
Vote : Yeas : 7 Nays : 0
Attest :
s/ Dolonna Mecum
Dolonna Mecum, City Clerk
ELGIN, ILLINOIS
PROJECT 339754
CHANGE ORDER No. 1
SCOPE: This Change Order No. 1 and final will decrease the quantities of some
items and increase the quantities of other items.
The general contractor for this project is Landmark Contractors of Huntley,
Illinois.
REASON FOR CHANGE: This Change Order No. 1 is in the best interest of the City
and is authorized by law.
SUMMARY OF CHANGES IN CONTRACT AMOUNT:
ITEM TOTAL
Adjusted Quantities(see Attch. A) $2055.28
TOTAL CHANGE ORDER NO. 1 $2055.28
The original contract with Landmark Contractors, Inc. is $47,944.50. By reason of
Change Order No. 1, the contract for the 2000 N. McLean/Big Timber Intersection will
be increased in the amount of two thousand fifty five and 50/100 dollars ($2,055.50).
The new contract amount, inclusive of Change Order No. 1 is forty nine thousand nine
hundred ninety nine and 78/100 ($49,999.78).
.09;21/01 FRI 10:37 FAX 8479315983 Public Works Dept [ j0u3
CHANGE ORDER NO.1
September 21,2001
PAGE 2 OF 2
OTHER CONTRACT PROVISIONS: All other contract provisions shall remain the
same.
Agreed to this day of 2001.
Recommended:
ENGINEERI G DIVISION
By: -1f
-iI IlLi. -J
Title;OccAio&S 5VpeCl„ Il.►
Date: //..- /5— of
Accepted:
Landmark Contractors, Inc.
Party of the Second P2 rt (Contractor)
By: .. �r
Title:
Date: jU-/,r/9/
Approved:
CITY OF ELGIN
Party o e First Part (Ow er) -
By:
,';
Title: C.(4
ida„,42.1e:„
Date: 1 ,V3,0%
•
Engineer's Payment Estimate 2000 - N. MCLEAN / BIG TIMBER INTERSECTION
2000 N.McLean/Big Timber Intersection
Final Payment PAYMENT ESTIMATE
Item Awarded Added beducted Completed
No. Items Quantity Unit Values Quantity Quantity Quantity Unit Price Values
20200100 Earth Excavation 135 CY $5,737.50 23 112 $42.50 1 $4,760.00
31101000 Subbase Granular Material,Type B 66 TON $1,821.60 2.1 68.1 $27.60 $1,879.56
35500600 Bituminous Base Course,9" 220 SY $8,943.00 46 174 $40.65 $7,073.10
40600100 Bituminous Materials(Prime Coat) 22 GAL $214.50 7 15 $9.75 $146.25
40600300 Aggregate(Prime Coat) 1 TON $50.00 1 0 $50.00 $0.00
40600760 Bituminous Concrete Binder Course,
Mixture B,Type 2 34 TON $1,992.40 16.59 17.41 $58.60 $1,020.23
40600850 Bituminous Concrete Surface Course,
Mixture D,Class 1,Type 2 20 TON $1,647.00 18.14 38.14 $82.35 $3,140.83
42400200 PCC Sidewalk 5" 420 SF $1,491.00 108 312 $3.55 $1,107.60
44000500 Combination Curb and Gutter Removal 255 LF $2,550.00 19 236 $10.00 $2,360.00
60259100 Manholes to be Reconstructed with New
Type 11 Frame and Grate 1 EACH $2,350.00 1 $2,350.00 $2,350.00
60260300 Inlets to be Adjusted with New Type 1
Frame and Open Lid 2 EACH $1,000.00 2 $500.00 $1,000.00
60603800 Conmbination Concrete Curb and Gutter
Type B-6.12 220 LF $6,732.00 8 212 $30.60 $6,487.20
78000400 Thermoplastic Pavement Marking Line-6" 30 LF $325.50 2.3 32.3 $10.85 $350.46
78000650 Thermoplastic Pavement Marking Line-24 25 LF $1,084.00 3.5 28.5 $43.36 $1,235.76
84700100 Detector Loop,Type 1 100 LF $3,880.00 131 231 $38.80 $8,962.80
Z0048665 Railroad Protective Liability Insurance 1 L SUM $5,076.00 1 $5,076.00 $5,076.00
Railroad Flagman 1 L SUM $2,800.00 1 $2,800.00 $2,800.00
Relocate Existing Sign 1 L SUM $250.00 1 $250.00 $250.00
Totals $47,944.50 $49,999.78
Miscellaneous Extras and Credits Values
Total Miscellaneous Extras and Credits $0.00
Total Value of Completed Work $49,999.78
Deduct Retainage (0% ) $49,999.78
Balance due on completed work $0.00
Miscellaneous Debits
Payment Estimate No. 1 $44,209.74
Payment Estimate No.2 $0.00
Total Debits $44,209.74
NET AMOUNT DUE: $5,790.04
Approved: Date: Title:
- +
,:c4 OF ECG>
aL
City of Elgin Agenda Item No.
' 7
tiN
',Irk D til'
G :::
November 9, 2001 a.1 ' 0 0
to ' 1 ,„
I ,,L1!!! , II oi
TO: Mayor and Members of the City Council
V 8
FROM: Joyce A. Parker, City Manager FINANCIALLY STABLE CITY GOVERNMENT
EFFICIENT SERVICES.
AND DUALITY INFRASTRUCTURE
SUBJECT: Change Order No. 1 and Final Payment
for 2000 North McLean Boulevard/Big
Timber Road Intersection Improvements
PURPOSE
The purpose of this memorandum is to provide the Mayor and members
of the City Council with information to consider Change Order No.
1 and Final Payment for North McLean Boulevard/Big Timber Road
Intersection Improvements .
BACKGROUND
eilk On September 13 , 2000 , the City Council awarded to Landmark
Contractors the contract for the 2000 - North McLean Boulevard/Big
Timber Road Intersection Improvement Project . This project widened
the curb radii on the south leg of the intersection and replaced a
temporary asphalt sidewalk across the Metra property, from Timber
Drive to Big Timber Road, with a permanent concrete sidewalk. The
project was substantially complete in November 2000 with warranty
repair completed in July of 2001 .
Change Order No. 1 ($2 , 055 . 28) will increase and decrease the
quantities of 13 existing contract items . The item of significant
cost/quantity change was the traffic signal detector loops . The
contract quantity accounted for replacing the detector loop in the
lane that was widened. During construction it was impossible to
remove the existing curb on the south side of the intersection
without breaking the connections to the detector loops in the left
driving lanes and left turn lanes . Therefore, four detector loops
not in the original award had to be installed to return the
intersection to its normal operating condition.
The additional detector loops cost $5, 082 . 80 . Other savings in the
contract were realized during construction such that the net amount
of Change Order No. 1 is $2 , 055 . 28 . Change Order No. 1 is shown ini
Exhibit A.
eill''
•
•
em. Change Order No. 1 North McLean/Big Timber Improvements
November 9, 2001
Page 2
COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED
None .
FINANCIAL IMPACT
Project number 339754 - North McLean Boulevard/Big Timber Road
Original Budget
275-0000-791 . 93-80 $ 50 , 000
Expenditures
Landmark Contractors $47, 945
Change Order 2 , 055
Suburban Newspapers 230
Total Expenditures $ (50 , 230)
Amount Over Budget $ ( 230)
rft. There are sufficient funds remaining from other street projects to
pay the overage .
WV01/GAL IMPACT
None .
ALTERNATIVES
None .
RECOMMENDATION
It is recommended that City Council authorize execution of Change
Order No. 1 in the amount of $2, 055 . 28 and direct staff to prepare
the necessary resolution.
Respectfully submitted,
—..._
elAc.91-__ • ,(t*-A"tka-4 9—
Joyce\. Parker
City Manager
tow cb
attachments