Loading...
HomeMy WebLinkAbout01-175 Resolution No . 01-175 RESOLUTION AUTHORIZING EXECUTION OF A TRAFFIC SIGNAL INTERCONNECTS AGREEMENT WITH THE ILLINOIS DEPARTMENT OF TRANSPORTATION (McLean Boulevard and Big Timber Road) BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Ed Schock, Mayor, be and is hereby authorized and directed to execute a Traffic Signal Interconnects Agreement on behalf of the City of Elgin with the Illinois Department of Transportation for an upgrade of the traffic signal controller at McLean Boulevard and Big Timber Road, a copy of which is attached hereto and made a part hereof by reference . s/ Ed Schock Ed Schock, Mayor Presented: June 27, 2001 Adopted: June 27, 2001 Omnibus Vote: Yeas : 7 Nays : 0 Recorded: Attest : s/ Dolonna Mecum Dolonna Mecum, City Clerk ' C' ' Towr L a e_te t < iv Illinois Department of Transportation 2300 South Dirksen Parkway/ Springfield, Illinois /62764 -N ECE1IVE J rJUL 312001 July 24, 2001 City of Elgin Kane County Section 00-00169-00-TL Job No. P-91-400-00 & C-91-400-00 Ed Schock, Mayor City of Elgin 150 Dexter Ct. Elgin, IL 60120 Dear Mr. Schock: The joint agreement for the subject section was executed by the department on July 24, 2001. Your copy of the executed agreement is attached. Sincerely, Darrell W. McMurray, P. E. Engineer of Local Roads and Streets da/t40,Ahe.t. --- By: Larry D. Houser Local Project Implementation Engineer RECEIVED CC- A it G 01 2001 John P. Kos Attn: Nancy Magnus CITY OF ELGIN David G. Campbell Attn: Clarence Crowder PUBLIC WORKS Christine Reed Attn: Chuck Schmitt Gary Gould Attn: Nancy Finn City of Elgin Kane County • Section 00-00169-00-TL Job No. P-91-400-00 & C-91-400-00 • AGREEMENT TRAFFIC SIGNAL INTERCONNECTS THIS AGREEMENT made and entered into between the STATE OF ILLINOIS, Acting by an• through its Department of Transportation, hereinafter referred to as the "STATE", and the City of Elgin, State of Illinois, hereinafter called the LA. WITNESSETH: WHEREAS, in the interest of public safety, the parties desire to upgrade the traffic signals interconnected with METRA tracks at McLean Boulevard @ Big Timber Road, said improvement- to be identified as Section 00-00169-00-TL and STATE Job No. P-91-400-00 for Preliminary Engineering and C-91-400-00 for Construction and Construction Engineering, hereinafter referre• to as the PROJECT; and, WHEREAS, the parties hereto are desirous of utilizing STATE funds which have been mad: available for the PROJECT; and THEREFORE, in consideration of the mutual covenants contained herein, the parties hereto agree as follows: • I. THE LA AGREES: 1. To perform or cause to be performed, all required installation work as prescribed i Exhibit A. 2. To prepare the plans, specifications and detailed estimates of cost. These plans, specifications and estimates shall be submitted to the STATE and the Illinois Commerce Commission for their approval within 90 days of the execution of the agreement. 3. To begin work upon written authorization from the STATE to proceed. Upon receipt of authorization, the LA shall promptly begin the work set forth in the agreement and shall notify in writing the AGENCIES listed on EXHIBIT A before commencing work. writing the AGENCIES listed on EXHIBIT A before commencing work. • 4. To maintain, for a minimum of 3ears after the completion of the contract, ade u to Y Pq books, records, and supporting documents to verify the amounts, recipients, and uses of all disbursements of funds passing in conjunction with the contract; the contract and all books, records, and supporting documents related to the contract shall be available for review and audit by the AUDITOR GENERAL and the department; and the LA agrees to cooperate fully with an audit conducted by the AUDITOR GENERAL and to provide full access to all relevant materials Failure to maintain the books, records, and supporting documents required by this section shall establish a presumption in favor of the STATE for the recovery of any funds paid by the STATE under the contract for which adequate books, records, and supporting documentation are not available to support their purported disbursement. 5. To bill the STATE monthly for performance of its work as herein specified, for the STATE'S 100% share of its expense as incurred. The LA, upon completion of its work, shall promptly render to the STATE a detailed final statement of its actual expenses as incurred. 6. To bill the state for preliminary engineering work previously performed by the LA ir its consultant to determine minimum warning times for METRA'S signal system. This work to be reimbursed 100% by the STATE. 7. To assure that the traffic signal work is coordinated with METRA and the Illinois Commerce Commission, and that the final cutover connection with METRA'S signal system is approved by the Illinois Commerce Commission. 8. To complete the work as shown in Exhibit A on or before July 1, 2001. 9. To certify to the best of its knowledge and belief its officials: (a) are not presently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from covered transactions by any Federal department or agency: (b) have not within a three-year period preceding this Agreement been convict:d of or had a civil judgement rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain or performing a public (Federal, State or local) transaction or contract under a public transaction; violation of Federal or state antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements receiving stolen property; (c) are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State, local) with commission of any of the offenses enumerated in item (b) of this certification; and (d) have not within"a three-year period preceding the Agreement had one or more public transactions (Federal, State, local) terminated for cause or default. 10. To include the certifications, listed in item 9 above and all other certifications required by State statutes, in every contract, including procurement of materials and leases of equipment. II. THE STATE AGREES: 1. To reimburse the LA for its share of the preliminary engineering, construction and construction engineering costs upon receipt of a bill from the LA requesting such payment. Th bills shall contain sufficient cost information and, if said services are performed by a contractor •r consultant, show evidence of payment by the LA. 2. After the installation is completed, a final inspection will be performed by representatives of the STATE, the LA and the ILLINOIS COMMERCE COMMISSION. III. ITIS MUTUALLY AGREED: 1. After the completion of the improvement, the LA will retain jurisdiction and maintenance responsibility of the completed improvement including perpetual remote acces . 2. The completed traffic signals shall conform to Part VIII of the "Manual on Uniform Traffic Control Devices for Streets and Highways." 3. That the project will be processed, let, and constructed in accordance with Motor Fuel Tax (MFT) standards, policies and procedures upon approval of plans and specifications b, the STATE. 4. Obligations of the STATE shall cease immediately without penalty or further pay ent being required if, in any fiscal year, the Illinois General Assembly or applicable federal funding source fails to appropriate or otherwise make available funds for the work contemplated herein. This agreement shall be binding upon and inure to the benefits of the parties, their successors and assigns. City of Elgin STATE OF ILLINOIS DEPARTMENT OF TRANSPORTATION Q �i This ,A.rQ day of , 20�f This 4V day of 3/,‘ iy , 20Q./ By: __ �'-Yereceie/ By C`( /v1 f�7G ) (Director of Highw ys s:\gen\wpdocs\barb\walt\122800-a.doc\ City of Elgin Kane County Section No. 00-00169-00-TL Job No. P-91-400-00 & C-91-400-00 EXHIBIT A Railroad: METRA Road Name: McLean Boulevard @ Big Timber Road SCOPE OF WORK: 1. Provide signal plans, cable plans and chart sequences. 2. Replace controller and cabinet complete with CRC security, reservice capabilities, and phone line for remote monitoring. 3. Replace existing blank-out signs with new fiber optic signs. 4. Install new three conductor railroad interconnect cable. 5. Install pedestrian warning signs at all pedestrian signal locations. 6. Install crosshatch striping for NB McLean at Big Timber Road. 7. Consultant will need to study accident data and count data to check signal phasing and insure that existing phasing can be maintained. 8. Incidental work necessary to complete the items hereinabove specified. ESTIMATED COST: 100% State Participation $15,000- Phase II (Preliminary Engineering) $15,000- Controller and Cabinet (include RR cable) $10,000- Striping & Signing $5,000 - Phase III (Construction Engineering) $45,000 -TOTAL AGENCIES TO BE NOTIFIED BEFORE COMMENCING WORK: Mr. Phil Marcyn, IDOT, Dist. 1, BLR&S, 201 West Center Court, Schaumburg, IL 60196 (847/705-4201) Mr. Stan Milewski (630-378-1171) or Mr. Dan Powers (847-516-0733), ICC, 527 East Capitol, Springfield, IL 62701 SUBMIT ALL BILLS FOR THE STATE'S 100% SHARE TO: Darrell W. McMurray, P. E. Engineer of Local Roads and Streets 2300 South Dirksen Parkway Springfield, Illinois 62764 s:\gen\wpdocs\barb\watt\122100.doc\ VL, : H INTERSECTION TRAFFIC SIGNALS WITH INTERSECTION TRAFFIC SIGNA_::S AT CROSS STREET IN ADVANCE OF GRADE CROSSING • 100 mm (4") . • • Greater 150 mm (6") ' 100 mm (4") • than White b): :-\-\------ -- , 25m 45° to (81,) Pavement 3 m See Note 3 1200 mm (4') i (10') i 0 ,. .,,,,...,...,.,,: ,,.:.:;:! See Note2 ,141j0.11CAUTION;>?€; on Typical1 i ... hT i Signing !s`> sETWEEN € :! Sheet • DO NOT Traffic Signals RR Stop��1 �......... STOP A Line "''" ON ,... ,... I TRACKS -- , Note: 1. Pavement markings to be Installed only on paved approaches to Intersections controlled by traffic signals which are Interconnected with the railroad warning signals. 2. Where near-side traffic signals are used the pavement Markings extend to the Intersection. 3. Where the angle between the diagonal stripes and the track (0) would be less than approximately 20°, the stripes should be sloped in the opposite direction from that shown. TYPICAL SUPPLEMENTAL PAVEMENT MARKING TREATMENT FOR RAILROAD C : • ► l . . • . e_A _ _ ar k - _ a . . _ I A ADJACENT RAILROAD WARNING SIGNALS •• — - 1 • - - - • • Illinois Dept . of Trans ; 23 .01 . 199e Springfield. • IL . • 10: 64 IC: DIST_1—N TRAIN no. 23.99 in 1— i7 .99 Scale is 4. 63 CC: WER XI 0 ii 00 Top— Yellow bb • • 18 . 0 • [4" . tCrl (Uj (3 -ki 0• I _ eg 0 i 0 1 shrour -g • YEIE AppRogcNEs • Black legend and border on yellow reflectorized background. Border 0.6" Margin 0.4" Corner radius 1.5" Legend 2" C Ali dimensions in inches. r , •J SA" • 10 tii*erk is GEg 12.13 + ,i sr vN *o� G ''', ler A ._......... #yr). . tat 2 1�1® �E ASA 0.101,-/iii? M{4 ;i.i' no Y _„ , ,„„, _ p0X0 y is i . .' `i•,'{ • t _.,..,‘.,,. '4,7;3:4';:r),.;';'; ...‘,''':;• 0 4...,_---4 0,,..,..,, uv..:‘,..-..,:” offr.;!..,. . _,.. . _..3 .,......;7,...... 1.........„....,:l.,.:,,,,.....,.. ..,.,?:. si-exoc\ . .:,...,::.,,..,..,...,....,..!-A;-..?:„.;,:f.11,..eik,-,,),t•, . .: :,1 ,. I • 1. . •,t.. y : '•;± -,4,.. V :r, 1• ;..Y: !i. �. . sl. #.• r� +'! ,, i- _7.et id py;t' i;5 4-':'----- ! F W' i e t `�` ' ytJ:/•(.) ,. " E.} ,•, ,� ��. p,�E ... ME t �:: Ct 'J o : r ....••••••' 71 I 2 ��•` it ''"— s rs 1 41. 44 a • t 'w ppN ..i.t 1e t T\, NWN sN . N ‘, - c..0 i .w tat. i ��F t / �� ,• ' 11 m Crco ln, co E �, t ! tom/ ® �n w o t 2\ / ` itiv_a� a ZO p 3 0 ` \ U` f \ MGA11 'ti i gvM�cQpe co t� -o 17 t \ \ , oA .. AwN " � �e G -C1 p f A i E pAraA�1N • } A; sio ��o` tt /���E'Er4}xfetx a tion'`��' •� 1C7 { f �o rt' O E },. 'pE , tEtoo . v-OAS;t a" ` W 1 `"6 00 .tP Q n, g% t tO ANAtUN t' . , ' o 1 .....•, CP 0 O(O 2 * o ' L- •y CO KN}, :.4....,0..tti:40p,sa; Cf►,p) \ 0 0 1. o/ • -.; rot :- Si , ../0". * 6 � � s , /' u, a$7:3 �.�y � 4,1 f ' EEa : , '�.mit' ��a ' Vy• `0' --" 1 miti�� l� % Y.p 2' (--/�` \vl,. ,/N011tll MlYr �y �r 1 �y� 1 '�,•rY �' "'''":1'r • ,,A •`r 1- ,,1110 i i, 0 t• " , •,rE . 't, X t2 tpX ct j1. 4�Ety/ •e ,, ,AE,ON �` n`•'?' •` iji 0 as 1I. i r (1/41 i 'i 3 'tiifti / _-----t►nw(t / S 4 \ t� ods \k p' t �• th 3'' t x MSE tt 1N 0 4. • N EM - .}'�,il.. 17 iie'S � � ��y W 1E_ �Ale t • Y • I t ® µ�.,wnYYI�V T.r G i"' �\ -' CONN yp,Nl, p .' .1' .p ` .111=1 • c+Kl..�,.' n pN Com ` a.. p (At yl S% a I 1 • �y' r „w.) o � „,.-.. -. V. rir ���,fff��f�` Y•.kt �1�, tt�qq:NO }0= T t,�.,( .0 ..01,2\ S,, <^ i AY�./'0 ���� �P�t{� E11NE0 �\ S, (N.�w+• ' l��i..1 `1 • \\\P `� C um lftt �` G.,;:,.... �S �r 1,. ��' (, .A",„.—,"^ 1 OY on g il Of'. �,Y'Y1 gt O �a 1 �a 1 1!'t Na �, ���` r,� �i (, g. ,,I \1;tv ` eau I.0 'O as i • l 4 \,lp ,`r 4( ON 1 "'�' ��.rN 1 y M A , �� „,,,,,.,,I.. �r i i-` NE'L l4 +" '��v 4Age0 .-ON ' SpA :,, \\ikt4\'',,,\ �,. k,:..?!...:C.....3,,, "�{ ��IV, •,� t- .. l)aL— �, s (` , EY„,,,, , \\. i, IL y► ;' � TA �: � ! willilikl'� gypby{ ��Tlilt 1WI'' 111 C6‘ . . ; t, / pA,��NN pt .► fi - t ' q 11 `Aa 3�r �1,\` !M .\A'4 / 010Ft4c., _ City of Elgin Agenda Item No. N. eI lm 1 NH L t y June 8, 2001 N TO: Mayor and Members of the City Council SAFE COMMUNITY' FROM: Joyce A. Parker, City Manager SUBJECT: Agreement With IDOT For The Upgrade Of The Traffic Signals at McLean Boulevard and Big Timber Road PURPOSE The purpose of this memorandum is to provide the Mayor and members of the City Council with information to consider the approval of an agreement with the Illinois Department of Transportation (IDOT) to upgrade the traffic signal controller at McLean Boulevard and Big Timber Road. BACKGROUND The Illinois Commerce Commission (ICC) has initiated a statewide program to upgrade all traffic signals that are interconnected with a railroad crossing. The upgrading increases the effectiveness of the safety systems that ensure the traffic signals never allow traffic flow to approach the crossing when a train is present or approaching. Implementation of the upgrade involves changing the traffic signal controller and the interconnect cable to the crossing gates and adding new signage and pavement markings in advance of the crossing. The estimated cost of improvements for this intersection is $45 , 000 . The ICC program requires the local agency to make the signal improvements and then be reimbursed by the ICC. However, trackage owned by a commuter rail line, namely METRA and CTA, is not eligible for funding under any ICC program. To ensure that crossings on commuter rail lines are upgraded as well, IDOT voluntarily partnered with the ICC to fund those reimbursements . The attached agreement with IDOT provides for the subject reimbursement . It should be noted that Section III , paragraph 4 of, the agreement relieves IDOT of the responsibility to reimburSe us if the Legislature cuts off the funding for the program in the next fiscal year. We requested that this language be removed but IDOT insists that they have no other option since this is not their program and their participation is voluntary. When pressed by staff 4 F 4 IDOT Agreement June 8, 2001 Page 2 as to the logic of entering in an agreement with such a release clause, the ICC representative indicated that any signalized crossings not upgraded by this program will at some date in the future be cited in violation of the safety requirements and the agency responsible for maintenance (the City) will be forced to make the upgrade at their expense . Faced with that alternative, staff recommends entering into the agreement with IDOT and proceeding quickly to complete the work. Design and installation of the upgrade should be complete by the end of the year and reimbursement by IDOT would be likely. COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED None. FINANCIAL IMPACT Funding for the controller upgrade can be taken from the traffic signal miscellaneous services account, account number 010-3321- 753 .45-99 . They will be replaced with the reimbursement funds from IDOT when they are received. \,W2('GAL IMPACT None . ALTERNATIVES Take no action at this time and wait to be cited by ICC for a safety violation at the signalized crossing. Under this scenario the City would be responsible for the full cost of the signal upgrade work. RECOMMENDATION It is recommended that the City Council approve the agreement and authorize the Mayor to sign. R- .ectfully submitted, a /4;14`-- - Jc rce . . Parker City Manager Attachment