Loading...
HomeMy WebLinkAbout01-111 Resolution No. 01-111 RESOLUTION APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH MARTAM CONSTRUCTION, INC. FOR SIDEWALK REPAIRS AT CITY HALL WHEREAS, the City Elgin El in has heretofore entered into a contract with Martam Construction, Inc . for sidewalk repairs at city hall ; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 , attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN ILLINOIS, that Joyce A. Parker, City Manager, be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference . s/ Ed Schock Ed Schock, Mayor Presented: April 25, 2001 Adopted: April 25, 2001 Omnibus Vote : Yeas 5 Nays : 0 Attest : s/ Dolonna Mecum Dolonna Mecum, City Clerk d CHANGE ORDER NO. 1 and Final This Change Order made and entered into this 25th day of April, 2001, by and between the City of Elgin, an Illinois municipal corporation, and Madam Construction, Inc. ORIGINAL CONTRACT: Sidewalk Repairs at City Hall Invitation to Bid No. 00-080A Contract Date September 19, 2000 PROJECT NO. 379513 SCOPE: Replace damaged drains, repair damaged stairs, and pour additional section of concrete sidewalk. REASONS FOR CHANGE: After removal of the old concrete and gravel it was discovered that the drains were in very poor condition and needed to be replaced. The stairs to the plaza from the west entrance of City Hall deteriorated with the freeze thaw cycles over the winter and have become a severe safety hazard. This work would be for repairs only not replacement. The additional sidewalk work is to provide a slower elevation change needed due to the change in scope from the original design. SUMMARY OF CHANGES IN CONTRACT AMOUNT: The amount of the contract will be revised as follows: ITEM DEDUCT ADD Furnish and install 8 drains @ $800.00 each $ 6,400.00 Repair concrete stairs $ 850.00 Replace 300 sq. ft. of concrete sidewalk $ 1,800.00 TOTAL AMOUNT OF CHANGE ORDER # 1 $ 9050.00 Original Contract Price Including Alternates $ 116,040.00 New Contract Amount $ 125,090.00 OTHER CONTRACT PROVISIONS: All other contract provisions shall remain the same. Agreed to this 25th day of April, 2001 . Recommended: BUILDING MAINTENANCE DEPARTMENT Date: %/..?/e7/ Accepted: Party of the Second Part (Contractor) By: /," G Title: r -s. Date: 4/-/7 v/ Approved: CITY OF ELGIN Party of the First Part (Owner) B 11- Date: /e/o / . OF Ez City of Elgin Agenda Item No. n,RgTCDfFO^� E ir4 . r L a . April 2 , 2001 G , TO: Mayor and Members of the City Council N ' .21 FROM: Joyce A. Parker, City Manager NEIGHBORHOOD VITALITY SUBJECT: Change Order No. 1 - City Hall Sidewalk Replacement PURPOSE The purpose of this memorandum is to provide the Mayor and the members of the City Council with information to approve a change order to the City Hall Sidewalk Replacement Project . BACKGROUND The sidewalk at the main entrance to City Hall was badly deteriorating and scheduled for replacement . A bid was awarded to Martam Construction of Elgin at the September 13 , 2000 City Council meeting. After removal of the existing concrete and gravel it was discovered that the drains were in very poor condition and would need to be replaced. Also due to a reduction in the scope from the original design it was determined that the transition from the new sidewalk to the old sidewalk would be too steep of a slope and an additional section of concrete would need to be replaced to correct this problem. The stairs to the west of the building that lead down to the plaza have deteriorated severely during the freeze/thaw cycles of the last winter and have become a severe trip hazard. The work on the stairs would be a repair only, not a replacement . A copy of the change order is attached for your review. GROUPS/INTERESTED PERSONS CONTACTED None. FINANCIAL IMPACT The total budget for this project equals $150, 000 . Martam Construction' s original contract totals $116, 040 . Change order No. 1 calls for an additional $9, 050, bringing the revised contract total to $125, 090 . Additional miscellaneous expenses of $1, 810 bring the total project cost to $126, 900 . Change Order No . 1 - City Hall Sidewalk April 2 , 2001 Page 2 \NJAL GAL IMPACT None . ALTERNATIVES None . RECOMMENDATIONS It is recommended that the City Council approve a change order to the contract with Martam Construction for a total amount of $9, 050 . 00 . Re •ectfully submitted, O '2 /2 _ J•gce A. Parker City Manager Attachment