Loading...
HomeMy WebLinkAbout00-54 Resolution No. 00-54 RESOLUTION APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH UNITED VISUAL OF ITASCA FOR A PROJECTION SYSTEM FOR THE CITY COUNCIL CHAMBERS WHEREAS, the City of Elgin has heretofore entered into a contract with United Visual of Itasca for a projection system for the City Council chambers; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Joyce A. Parker, City Manager, be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference . s/ Ed Schock Ed Schock, Mayor Presented: February 23 , 2000 Adopted: February 23 , 2000 Omnibus Vote : Yeas 6 Nays 0 Attest : s/ Dolonna Mecum Dolonna Mecum, City Clerk I 11. CHANGE ORDER NO. 1 This Change Order made and entered into this 2 day of February, 2000, by and between the City of Elgin, an Illinois municipal corporation, an United Visual, inc. ORIGINAL CONTRACT: PROJECTION SYSTEM FOR THE CITY COUNCIL CHAMBERS Invitation to Bid No. 99-120 Contract Date December 10, 1999 PROJECT NO. 379520 SCOPE: Add additional small lectern, Increase the size of the original lectern, add lighting control to the lectern, and add additional video input. REASONS FOR CHANGE: The original lectern was not sized to hold a computer monitor. It was determined that a larger lectern would be needed. It was also determined that the existing small lectern should be replaced with a matching unit. It was also determined that lighting control and additional video inputs should be added that could allow TV cameras to feed a signal into the projection system. The circumstances said to necessitate the change of performance were not reasonably foreseeable at the time the contract was signed, the change is germane to the original contract as signed, and the change order as herein provided is in the best interests of the city and authorized by law. SUMMARY OF CHANGES IN CONTRACT AMOUNT: The amount of the contract will be revised as follows: ITEM DEDUCT ADD Increase lectern size Delete original lectern and equipment ($2,850) Add 1 Marshall MLP-50 prairie style lectern $2,595 Add 1 Marshall m-rm equipment rack $ 160 Add 1 Marshall MDR-9 document camera drawer $ 385 Add 1 Marshall EEF external electrical feed $ 85 Add 1 Marshall M POCKET locking pocket door $ 335 Add 1 Shure A400SMXLR microphone shock mount $ 30 Add 1 Marshall M-RAP rear access panel $ 210 Add 1 Marshall locking slide projector drawer $ 180 Add 1 Marshall M-KS keyboard shelf $ 175 Add 1 Marshall M-MON-FLG monitor mount $ 405 Total of lectern change $1,710 Additional Lectern Add 1 Marshall M1P-25 prairie style lectern $1,495 Add 1 Shure A400SMXLR microphone shock mount $ 30 Total of Small Lectern $1,525 Add 2 Marshall MLL laser burned logos 12" $ 790 Lighting Control Package Add f AMX PRO-DP8 prolink wall panel $ 185 Add 1 AMX RDD-DM4/120 4 channel module $ 640 Add 1 AMX 2SWM dual switch module $ 80 Add 1 AMX RDA-ENC4 enclosure for RDD module $ 245 Add AMX programming $ 250 Total of Lighting Control Package $1,400 CHANGE ORDER NO.1 Page 2 Additional Video Feed Input Add 1 Extron 5CR 5 input switcher $1,615 Add 1 Extron 60-190-01 rack shelf $ 81.50 Delete 1 Extron SW4 AR 4 input switcher 560$ Delete 1 Extron 60-032-01 2u rack shelf ($ 77� Total for Video Feed Input $1,059.50 TOTAL AMOUNT OF CHANGE ORDER# 1 $6484.50 Original Contract Price Including Alternates $26,212.00 New Contract Amount $32,696.50 OTHER CONTRACT PROVISIONS: All other contract provisions shall remain the same. Agreed to this day of February, 2000. Recommended: BUILD G MAINTENANCE DEPARTMENT By: Date: 2////zo ote Accepted: Party of the Second Part (Contractor) By: Title: ��,'• /r Date: -2-AA) Approved: CITY OF ELGIN Party of the First Part (Owner) Title: Date: 2`a-7/O 5.jOFEl.0 K. # City of Elgin Agenda Item No. � III 'R4 Ito FE,v February 9, 2000 To : Mayor and Members of the City Council From: Joyce A. Parker, City Manager Subject : Video Presentation System for the Council Chambers Change Order #1 PURPOSE The purpose of this memorandum is to provide the Mayor and members of the City Council with information to consider a change order to the contract to furnish and install a video projection system for the City Council Chambers . BACKGROUND Specifications were prepared and bids were sent out to furnish and install a video presentation system for the City Council Chambers . Bids were opened on November 17, 1999, two bids were received with the contract being awarded to United Visual at the December 8, 1999 City Council meeting. After the bid award, it was determined that a computer and monitor should be permanently mounted into the new presentation lectern (podium) . The computer will allow greater use of computer generated presentations by City staff and others whose software is compatible with the City' s. To mount the computer into the lectern, the size needed to be increased. The proposed lectern will be 50 inches e . wide . It was also determined that the existing small lectern should be replaced with a matching unit in a smaller size . Also proposed for the larger lectern are controls for the room lighting and inputs that would allow for a camera input to the projection system. The camera input could be used to link the AT&T Cable camera to the system allowing the signal to be projected onto the screen or to monitors within the room to provide better viewing from different areas of the room. The change order also includes City Seals to be mounted on the front of the two lecterns . Total cost for all changes is $6 , 484 . 50 . A copy of the change order is attached for your information. Additional equipment has been considered to expand the system' s viewing capabilities . Additional TV monitors could be placed strategically to resolve areas of the Council Chambers where viewing may be obscured. It has been decided to wait to install this additional equipment until the large screen is in use, and where the real difficult viewing areas can be identified. _ �. ' Video Presentation System February 9, 2000 Page 2 If it is decided later to install the additional monitors, this work could be accomplished by Building Maintenance staff . COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED None . �INANCIAL IMPACT The cost of the original video projection system totaled $26 , 212 . The change order amount of $6 , 484 . 50 would bring the revised contract amount to $32, 696 . 50 . Funding for this change order is available in the 2000 General Fund account number 010-3701-742 . 92- 44 , project number 379520 . \on/ LEGAL IMPACT None . ALTERNATIVES None . RECOMMENDATION It is recommended that the Mayor and City Council approve the change order to the contract with United Visual of Itasca for a total amount of $6 , 484 . 50 . Respectfully submitted, yce . Parker City Manager attachment