HomeMy WebLinkAboutG40-19 Ordinance No. G40-19
AN ORDINANCE
AMENDING PORI PLANNED OFFICE RESEARCH INDUSTRIAL DISTRICT
ORDINANCE NO. G36-16
(2701-2801 Galvin Drive)
WHEREAS, the territory herein described has been classified in the PORI Planned Office
Research Industrial District and is subject to the requirements of Ordinance No. G36-16;and
WHEREAS, written application has been made to amend PORI Planned Office Research
Industrial District Ordinance G36-16 to grant a variation from the stormwater ordinance
requirements regarding the maximum side slope of stormwater detention facilities; and
WHEREAS, the zoning lot containing the property commonly referred to as 2701-2801
Galvin Drive is legally described within Ordinance No. G36-16 (and hereinafter referred to as the
"Subject Property");and
WHEREAS, the Planning and Zoning Commission conducted a public hearing concerning
said application on July 1, 2019, following due notice including by publication; and
WHEREAS, the Community Development Department and the Planning and Zoning
Commission have submitted their Findings of Fact concerning said application; and
WHEREAS, the Community Development Department and the Planning and Zoning
Commission recommend approval of said application, subject to the conditions articulated below:
and
WHEREAS, the City Council of the City of Elgin, Illinois, has reviewed the findings and
recommendations of the Community Development Department and the Planning and Zoning
Commission;and
WHEREAS, the City of Elgin is a home rule unit and as a home rule unit may exercise any
power and perform any function pertaining to its government and affairs; and
WHEREAS, zoning, including, but not limited to, this ordinance granting an amendment to
the PORI Planned Office Research Industrial District pertains to the government and affairs of the
city.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF I HE CITY OF
ELGIN,ILLINOIS:
Section 1. That the City Council of the City of Elgin hereby adopts the Findings of Fact,
dated July 1, 2019, and the recommendations made by the Community Development Department
and the Planning and Zoning Commission, a copy of which is attached hereto and made a part
hereof by reference as Exhibit A.
Section 2. That Section 3. G. k. g. Tree Preservation of Ordinance No. G36-16. is
hereby deleted in its entirety.
Section 3. That Section 3. G. k. Additional Site Design Requirements of Ordinance
No. G36-16, is hereby amended to include the following additional requirement:
g. A variation from the stormwater ordinance is hereby granted to allow the
installation of stormwater detention facilities with 3:1 side slopes.
Section 4. That except as amended herein, the use and development of the subject
property shall be controlled pursuant to the provisions of Ordinance No. G36-16. In the event of
any conflict between this ordinance and Ordinance No. G36-16, this ordinance and associated
documents shall control and prevail.
Section 5. That this ordinance shall be in full force and effect immediately after its
passage in the manner provided by law.
David J. Kap�'n, "<or
Presented: August 14, 2019
Passed: August 14, 2019
Omnibus Vote: Yeas: 9 Nays: 0
Recorded: August 14, 2019 X
Published: August 16, 2019 Fuji,vs
Attest:
•
fair 4111
Kimberly Dewis, Cit erk
2
FINDINGS OF FACT
PETITION 19-19
2701-2801 Galvin Drive
EXHIBIT A
July 1, 2019
RECOMMENDATION & FINDINGS OF FACT
OF THE COMMUNITY DEVELOPMENT DEPARTMENT AND
THE PLANNING & ZONING COMMISSION
CITY OF ELGIN, IL
OVERVIEW
Provided herein are the written findings and recommendation of the Community Development
Department and the Planning & Zoning Commission regarding Petition 19-19, an application by
McShane Construction Company, L.L.C., as applicant, and Conor Globe Elgin III, as property
owner,are requesting a stormwater variation to increase the side slopes of the proposed stormwater
detention facilities from 4:1 to 3:1, and other departures as may be necessary or desirable to
construct two office and warehouse buildings with accessory parking lots and truck loading
facilities at the property commonly referred to as 2701-2801 Galvin Drive.
GENERAL INFORMATION
Petition Number: 19-19
Property Location: 2701-2801 Galvin Drive
Requested Action: Stormwater Variation
Current Zoning: PORI Planned Office Research Industrial
Proposed Zoning: No Change(PORI Planned Office Research Industrial)
Existing Use: Vacant
Proposed Use: Office, warehouse, and/or industrial
Applicant: McShane Construction Company LLC
Owner Conor Globe Elgin III
Staff Coordinator: Denise Momodu, Associate Planner
Exhibits Attached: A. Aerial/Location Map
B. Zoning Map
Recommendation & Findings of Fact
Petition 19-19
July 1, 2019
C. Parcel Map
D. Site Location
E. Stormwater Variation Application and Findings of Fact
F. Draft Ordinance
BACKGROUND
McShane Construction Company L.L.C., as applicant, and Conor Globe Elgin III, as property
owner,are requesting a stormwater variation to increase the side slopes of the proposed stormwater
detention facilities from 4:1 to 3:1, and other departures as may be necessary or desirable to
construct two office and warehouse buildings with accessory parking lots and truck loading
facilities at the property commonly referred to as 2701-2801 Galvin Drive.
The 20.5-acre property is located at the southeast corner of Galvin Drive and Route72/Higgins
Road and is currently vacant. The properties to the south and west are zoned PORI Planned Office
Research Industrial District and are improved with several one-story office,warehousing,and light
industrial buildings and uses. The property located immediately to the east of the subject property
is zoned AB Area Business District and is home to a landscape contractor business.
The property located to the north of the subject property, across Illinois Route 72/Higgins Road,
contains the Dundee Middle School, and it is located within the Village of West Dundee. The
property immediately east of the school is vacant and is located within unincorporated Kane
County zoned F Farming District.
In 2016, the City approved a planned development on the subject property establishing a PORI
Planned Office Research and Industrial District by Ordinance No. G36-16. The approval however
did not include a specific site layout. Future development on the property needed to meet all
requirements of Ordinance G36-16 and the Municipal Code.
Stormwater Variation
In January 2019,the applicant submitted an application and plans for a building permit to construct
two spec office and warehousing buildings to be known as Northwest Pointe III. The overall site
layout for the two one-story 163,800- and 186,000-sqaure foot buildings with 394 parking spaces
and accessory truck loading areas meets all requirements of the PORI Ordinance.
However,during the final design,it was determined that the proposed stormwater detention facility
and several areas on the fringes of the site require a steeper side slope to accommodate all required
- 2 -
Recommendation & Findings of Fact
Petition 19-19
July 1, 2019
-r:i .t- , _ — '.z•= -.° .7 + �'N , parking and loading areas.
''` =--- -- a I :.--ad.' f,-- ' ��`�>� Three of the four sides of
, " *^ 4.` w the proposed stormwater
p . At-- , detention facility, and
.1,I I l rt f f / l.' 2, several areas along the
A. "' k 1 I X11--._--,_ .,,
�.I
.: 1 ` south and east sides of the
--air
,� IV It'= — — } -I.— "' property include 3:1 side
ii ":47* � I Liiiri 1, 1.2r.i L � � -
., ,
��' � � �, slopes to meet the grades
i."' of adjacent properties.
! 2_ 4."'.4.."'- '''''h?
, i�ili�riii�r tail 1j Per the stormwater
>,i *' 7 ' sr , „4,'. ordinance, the maximum
1 .. .-•• . :::.;�wt l3,' • �s.0 AIWA-11 ..,/y:,,11 int....1; side slope of a
I i -. '_ ; ..i__ - _ x � stormwater detention
-. ----_—= =— - - -__ - - %Art facility is 4:1. As such, the
applicant is requesting
Figure 1.Proposed stormwater detention areas with 3:1 side slopes approval of a variation
from the stormwater
ordinance requirements.
With the proposed variation, the stormwater detention would provide the required volume for
stormwater management.Additionally,the variation is requested due to the significant topographic
change on the property. The topography of the site rises approximately 12 feet from the west to
the east.
The requested variation would not increase the probability of flood damages or create an additional
threat to public health, safety and welfare; but it will maximize the volume for stormwater runoff
and allow for the topography of the site to meet the existing grades of the adjacent roadways. The
requested variation is summarized in the table below.
Table 1. Detail of Required Variation
Site Design Regulation Standard Proposed
Stormwater Detention Side Slope Max. side slope 4:1 Max. side slope 3:1
The Community Development Department offers the following additional information:
A. Property History. The subject property was annexed to the city in 1997, and was zoned
AB Area Business District by ordinances S1-97 and G4-97,respectively. In 2016,the City
approved the PORI Planned Office Research Industrial District planned development on
- 3 -
Recommendation & Findings of Fact
Petition 19-19
July 1, 2019
the property by Ordinance G36-16;however,a specific site layout was not approved at that
time. The property is vacant and has never been developed.
B. Surrounding Land Use and Zoning.The properties to the south and west are zoned PORI
Planned Office Research Industrial District and are improved with several one-story office,
warehousing, and light industrial buildings and uses. The property located immediately to
the east of the subject property is zoned AB Area Business District and is home to a
landscape contractor business.
The property located to the north of the subject property, across lllinois Route 72/Higgins
Road,contains Dundee Middle School,and it is located within the Village of West Dundee.
The property immediately east of the school is vacant and is located within unincorporated
Kane County zoned F Farming District.
C. Comprehensive Plan.The subject property is designated as Light Industrial by the City's
2018 Comprehensive Plan. This land use includes light-industrial uses and business parks
consisting of a range of uses such as research and development, light distribution and
warehousing, light manufacturing, and service and consumer-oriented businesses. The
scale and intensity of these uses should vary based on context and respect the scale and
character of nearby housing when located near a residential area. When adjacent to a
commercial district or residential neighborhoods, buffering and screening should be in
place to appropriately mitigate potential negative impacts and nuisances. Generally
speaking, light-industrial uses and activities are conducted entirely indoors and are
relatively low in intensity with limited impact on adjacent properties.
D. Zoning District. The purpose of the PORI Planned Office Research Industrial District
established by Ordinance No. G36-16 is to provide a planned industrial environment that
fosters a sense of place and destination within a coordinated campus or park setting,subject
to the provisions of Chapter 19.60 "Planned Developments"of the Elgin Municipal Code,
as amended, a PORI zoning district is most similar to, but departs from the standard
requirements of the ORI zoning district.
E. Trend of Development. The subject property is located at the southeast corner of Galvin
Drive and Illinois Route 72/Higgins Road, within the area that is generally referred to as
the northwest industrial park. Illinois Route 72/Higgins Road is a state-controlled arterial
street which provides connection to the northwest suburbs to the east and rural area to the
west. Galvin Drive functions as the main collector street serving most industrial properties
within Northwest Corporate Park and Northwest Business Park
With the exception of several properties, including the subject property, the northwest
industrial park is largely built out. The properties along N. Randall Road will continue to
develop with primarily commercial uses relying on the heavily traveled Randall Road
corridor, while other properties within the industrial park will continue to develop with
-4 -
Recommendation & Findings of Fact
Petition 19-19
July 1, 2019
office, warehousing, and light industrial uses due to the area's close proximity to the N.
Randall Road and I-90 Tollway interchange.
FINDINGS
After due notice as required by law, the Planning & Zoning Commission conducted a public
hearing in consideration of Petition 19-19 on July 1, 2019. Testimony was presented at the public
hearing in support of the application. The Community Development Department submitted a
Development Application Review and Written Findings & Recommendation to the Planning &
Zoning Commission dated July 1, 2019.
The Community Development Department and the Planning & Zoning Commission have made
the following findings regarding the application against the standards for variations from the
requirements of the stormwater ordinance outlined within § 904 of the Kane County Stormwater
Ordinance:
STANDARDS FOR STORMWATER ORDINANCE VARIATIONS
Applications for variations from the stormwater ordinance requirements must meet the standards
outlined in § 904 of the Kane County Stormwater Ordinance. The applicant has provided the
application for stormwater variations including the findings of fact attached as Exhibit E. Staff
concurs with applicants findings of fact against the standards for variations from the stormwater
ordinance requirements.
RECOMMENDATION
The Community Development Department and the Planning & Zoning Commission recommend
approval of Petition 19-19, subject to the following conditions:
1. Substantial conformance to the Development Application submitted by McShane
Construction Company L.L.C.,as applicant,and Conor Globe Elgin III,as property owner,
received May 13, 2019, and supporting documents including:
a. Undated Conor Globe III Annexation Legal Description, dated received May 13,
2019;
b. Undated Letter of Consent to McShane Constructions Company for the
development application from Conor Commercial Real Estate,dated received May
15, 2019;
c. Letter from Manhard Consulting LTD to Mr. Damir Latinovic, dated April 23,
2019, dated received May 13, 2019;
d. Topographic Survey (Sheets 1 of 2 and 2 of 2), prepared by Manhard Consulting
- 5 -
Recommendation & Findings of Fact
Petition 19-19
July 1, 2019
LTD, dated March 27, 2019;
e. Final Engineering Plans - Northwest Point III, prepared by Manhard Consulting
LTD, dated March 5, 2019; last revised May 6,2019;
f. Permit Landscape Plan - Northwest Point III , prepared by Gary R. Weber
Associates, Inc., dated April 17, 2019;
g. Two building elevation sheets all titled A4.1, prepared by Ware Malcomb, dated
January 16, 2019.
In the event of any conflict between such documents and the terms of this ordinance or
other applicable city ordinances, the terms of this ordinance or other applicable city
ordinances shall supersede and control.
2. A variation from the stormwater ordinance is hereby granted to allow the installation of
stormwater detention facilities with a 3:1 side slopes.
3. Compliance with all applicable codes and ordinances.
The vote of the Planning&Zoning Commission on the motion to recommend approval, subject to
the conditions outlined by the Community Development Department,was five(5)yes,zero(0)no,
and zero(0) abstentions. Two members were absent.
Respectfully Submitted,
s/Jay Cox
Jay Cox, Chairman
Planning&Zoning Commission
s/Damir Latinovic
Damir Latinovic, AICP; Secretary
Planning&Zoning Commission
- 6 -
'ti: ...„...._111rIll • •1" : j . 1
iiiii : ,...,
Recreation Dr----+•
• 1
4011161CI . .,.......T....."c
Subject Property
1. ---3 — ` ', Petition 19-19
• j -- Hiily,En0 :1°
- 1
Hi• •ins"Rd
:+.1,111 •nig - _ _illiji . —
l' �Spectium Dr y _
1
fr 1111111 ,I I J 111111x'iMO'
1 _ I
Ii
' •.11il11nwR wow..
NPR .
IX
• 11 III III II L.
. .0i7k "C)
'CO
4 I i moo 413 A. k
i ®,
%...': .e�►� 1 1`' Pinnacle Dr «t
e to
•
I
+i lF T CO r01 i .. Ct
• - _...„......____ . _ _
...Northwest Pkwy ]. -.Y ��
iii
_ _ , -lb
..;.it
.1 . f . •
it a- I _ -• old=
EXHIBIT A Aerial/Location Map Ni
W Ij,- F
S
Map prepared by City of Elgin 0 140 280 560 840 x,120
Feet
Department of Community Development
•
Ic
lco
E
Ie
3
Subject Property
Petition 19-19
ft
I a,
Higgins Rd
Legend //���/�
ORC1 Residence Conservation 1 Spectrum
RC2 Residence Conservation 2
ORC3 Residence Conservation 3
PRC Planned Residence Conservation
O SFR1 Single Family Residence 1
OPSFR1 Planned Single Family Residence 1
O SFR2 Single Family Residence 2
PSFR2 Planned Single Family Residence 2 PORI
TRF Two Family Residence
OPTRF Planned Two Family Residence
O MFR Multiple Family Residence
PMFR Planned Multiple Family Residence
RB Residence Business
OPRB Planned Residential Business AB
MNNB Neighborhood Business
PNB Planned Neighborhood Business
-AB Area Business
-PAB Planned Area Business
-CC1 Center City 1 ®RI
CC2 Center City 2
-PCC Planned Center City
ORI Office Research Industrial
-PORI Planned Office Research Industrial
-GI General Industrial
-PGI Planned General hdustrial
-CI Commercial Industrial
CF Community Facility
PCF Planned Community Facility
EXHIBIT Zoning Map
W+F.
Map prepared by City of Elgin 0 100 200 400 600 800
Department of Community Development ► Feet
Subject Property
2701 Galvin Dr.
Petition 19-19
Higgins Rd
0319400026
Spectrum Dr
L
Busse Pkwy I
EXHIBITC Parcel Map N
City of Elgin o 40 80 160 240 320
Department of Community Development Feet
EXHIBIT D
SITE LOCATION
2701 Galvin Drive
Petition 19-19
elk
11.
r. , ; 1 _,, Subject
. , i s.'
-..• t.
t�► � . :�� *, .,. Property
rt
S ,. . .. p y
141/4:.meg,
i iMrV4�- ..
rililij P 1 , . . ,41LAr
cilill
Ir
Bird's Eye View Looking North
111111.
cr
l ;.
i M_
w 11
Bird's Eye View Looking West
EXHIBIT D
SITE LOCATION
2701 Galvin Drive
Petition 19-19
.
•
•
Looking North from adjacent property
•
•
Looking East from Galvin Drive
EXHIBIT D
SITE LOCATION
2701 Galvin Drive
Petition 19-19
•
a. - - .;. .' .. ;'- �'A Vis,., ,,• ,
z•etfle
t M -- 'r,-
,LGN ,f••0"
A, lit-
y., . 'fi;'•'# t*irxRZO ANG
� ��
{
..1
- . • . =- 06:/' I:4 / 20 19
Looking Southwest from Route 72/Higgins Road
FM" IIP
-4201111111ThEalowtzt 'aim. — f-...t'.t e2.,
• /
Looking South from Route 72/Higgins Road