HomeMy WebLinkAboutG40-21 Ordinance No. G40-21
AN ORDINANCE
AMENDING PGI PLANNED GENERAL INDUSTRIAL
DISTRICT ORDINANCE NO. G57-03
(1325 Bluff City Boulevard)
WHEREAS, the territory herein described has been classified in the PGI Planned General
Industrial District, and is subject to the requirements of Ordinance No. G57-03; and
WHEREAS, written application has been made to amend certain provisions of Ordinance
No. G57-03, to allow for the construction of the trucking service facility at 1325 Bluff City
Boulevard; and
WHEREAS,the zoning lot containing the premises at 1325 Bluff City Boulevard is part of
the property legally described in the PGI Planned General Industrial District Ordinance No. G57-
03 (the"Subject Property"); and
WHEREAS,the Planning and Zoning Commission conducted a public hearing concerning
said application on August 2, 2021 following due notice including by publication; and
WHEREAS, the Community Development Department and the Planning and Zoning
Commission have submitted their Findings of Fact concerning said application; and
WHEREAS, the Community Development Department and the Planning and Zoning
Commission recommend approval of said application, subject to the conditions articulated below;
and
WHEREAS, the City Council of the City of Elgin, Illinois, has reviewed the findings and
recommendations of the Community Development Department and the Planning and Zoning
Commission; and
WHEREAS,the City of Elgin is a home rule unit and as a home rule unit may exercise any
power and perform any function pertaining to its government and affairs; and
WHEREAS, zoning, including, but not limited to, this ordinance granting an amendment
to the PGI Planned General Industrial District established by Ordinance No. G57-03, pertains to
the government and affairs of the city.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
ELGIN, ILLINOIS:
Section 1. That the City Council of the City of Elgin hereby adopts the Findings of
Fact, dated August 2, 2021, and the recommendations made by the Community Development
Department and the Planning and Zoning Commission, a copy of which is attached hereto and
made a part hereof by reference as Exhibit A.
Section 2. That Section 3.G.of Ordinance No. G57-03,which regulates"Site Design",
in the POI Planned General Industrial District of the Subject Property, is hereby amended to
include the following additional conditions:
In this PGI Planned General Industrial District, except as otherwise provided for herein,
the use and development of the Subject Property shall be subject to the following additional
conditions:
9. Substantial conformance to the Development Application submitted by Abbott Land
and Investment Corporation, as applicant, and Gifford 300, LLC, as a property owner,
received February 8, 2021, and supporting documents including:
a. A letter RE: Copart/Vantage Trucking Development Application, dated February
4, 2021, prepared by Abbott Land and Investment Corp;
b. Undated Map Amendment for a Planned Development Statement of Purpose and
Conformance, dated received July 28, 2021;
c. Plat of Survey, prepared by Mackie Consultants, LLC, dated February 24, 2021,
last revised July 21, 2021;
d. Revised Exterior Elevations, Sheet A2,prepared by Architectural Resources,dated
November 14, 2019, last revised December 5, 2019, with such further revisions as
required by the Community Development Director;
e. Plat of Easement/Vacation Vantage Truck Site Elgin, Illinois,prepared by Mackie
Consultants,LLC,dated April 16,2021,last revised May 7,2021,with such further
revisions as required by the City Engineer;
f. Sky Drive - Station 10+00 to 24+85 Gifford 300 Industrial Development Elgin,
Illinois Sheet 9 of 18, prepared by Mackie Consultants, LLC, dated January 30,
2015, last revised March 19, 2021, with such further revisions as required by the
City Engineer;
g. Final Engineering Plans Vantage Truck 1325 Bluff City Blvd Elgin, Illinois,
prepared by Mackie Consultants, LLC, dated January 29, 2021, last revised July
21,2021, with such further revisions as required by the City Engineer; and
h. Storm Water Master Plan Gifford 300 Mine Site Reclamation Elgin, Illinois, Sheet
1 of 1,prepared by Mackie Consultants, LLC, dated January 14, 2021, last revised
April 12, 2021, with such further revisions as required by the City Engineer.
In the event of any conflict between such documents and the terms of this ordinance or
other applicable city ordinances, the terms of this ordinance or other applicable city
ordinances shall supersede and control.
10. A departure is hereby granted to allow the construction of the vehicle use area with the
minimum one-foot setback from the west and south property lines.
11. A departure is hereby granted to allow the construction of an eight-foot high, solid,
fence, of neutral color within the interior yard along the west and south property lines.
-2 -
12. A departure is hereby granted to allow the construction of an eight-foot high, solid,
fence of neutral color in the street yards along Sky Drive and Future Rubble Road.
13. A departure is hereby granted to allow the construction of the proposed truck parking
facility with the vehicle use area landscape yard consisting of 123 shade trees and 233
shrubs.
14. A departure is hereby granted to allow the construction of the proposed truck parking
facility with no vehicle use area interior landscape yard.
15. A departure is hereby granted to allow the installation of one or more refuse collection
areas within the truck parking facility. Such refuse collection area must be located with
the truck parking facility enclosed with the eight-foot-high solid fence, and is not
required to provide any additional screening in the form of a fence or a wall, provided
that such refuse collection area consists of a garbage can,garbage dumpster,or a similar
enclosure as approved by the Community Development Director. Such refuse
collection area may be located anywhere within the truck parking facility enclosed by
the eight-foot-high solid fence, including the required building setbacks from street lot
lines along Sky Drive and Future Rubble Road and the interior lot lines.
16.No portion of the truck parking facility shall be used as a commercial operations yard,
specifically the outdoor storage of any goods, materials, or equipment is not permitted
within the truck parking facility. More so, the truck parking facility shall not be used
for the loading and unloading of goods, materials, and/or equipment onto and off
trucks.
17. No"recreational vehicles" [SR] shall be parked,kept,or stored upon any portion of the
truck parking facility. This provision is not intended to prohibit the parking or storage
of semi-trailers detached from their truck.
18. All"motor vehicles" [SR]parked,kept,or stored at the truck parking facility shall have
up-to-date license plates and registration and be fully operational at all times.
19.No "motor vehicle" [SR] or semi-trailer shall at any time be in a state of major
disassembly, disrepair, or in the process of being stripped or dismantled. All wheels of
any"motor vehicle" [SR] or semi-trailer shall be fully inflated at all times. The repair,
rebuilding, reconditioning, or painting of "motor vehicles" [SR] or semi-trailers is
prohibited.
20. The selling of"motor vehicles" [SR] or semi-trailers from the truck parking facility is
prohibited.
21. Compliance with all applicable codes and ordinances.
Section 3. That Section 3. K. of Ordinance No. G57-03, which regulates "Off Street
Parking" is hereby amended to include the following conditions:
- 3 -
In this PGI Planned General Industrial District, except as otherwise provided for herein,
the use and development of the Subject Property shall be subject to the following additional
conditions:
1. A departure is hereby granted to allow the construction of the proposed vehicle use area
for the truck parking facility with reclaimed asphalt grindings course over gravel sub-
base course surfacing.
Section 4. That except as amended herein,the use and development of the Subject Property
shall be controlled pursuant to the provisions of Ordinance No. G57-03. In the event of any conflict
between this ordinance, Ordinance No. G57-03, this ordinance and associated documents shall
control and prevail.
Section 5. That this ordinance shall be in full force and effect immediately after its passage
in the manner provided by law.
David J. ptai , Mayor
Presented: August 25, 2021
Passed: August 25, 2021
Vote: Yeas: 9 Nays: 0 �`
Recorded: August 25, 2021
Published: August 27, 2021
Attest:
F '�a74• �f�7yv
Kimberly Dewis, Cit erk
- 4 -
EXHIBIT A
August 2, 2021
RECOMMENDATION & FINDINGS OF FACT
OF THE COMMUNITY DEVELOPMENT DEPARTMENT AND
THE PLANNING & ZONING COMMISSION
CITY OF ELGIN, IL
OVERVIEW
Provided herein are the written findings and recommendation of the Community Development
Department and the Planning & Zoning Commission regarding Petition 06-21 an application by
Abbott Land and Investment Corporation, as applicant, and Gifford 300, LLC, as property owner,
requesting a map amendment to PGI Planned General Industrial District Ordinance No. G57-03
with departures from the Elgin Municipal Code requirements for parking lot surface construction,
vehicle use area interior landscape yard, vehicle use area landscape yard, vehicle use area interior
yard setback,permitted fence height, exterior building materials, and any other departures as may
be necessary or desirable to construct a new trucking service facility at the property commonly
known as 1325 Bluff City Boulevard. The properties classified in the PGI Planned General
Industrial District established by Ordinance No. G57-03 are commonly known as 1325 Bluff City
Boulevard, 1225 Gifford Road, 1235 Gifford Road, 1245 Gifford Road, 1255 Gifford Road, and
1325 Gifford Road.
GENERAL INFORMATION
Petition Number: 06-21
Property Location: 1325 Bluff City Boulevard
Requested Action: Map Amendment to PGI Planned General Industrial District
Ordinance No. G57-03
Current Zoning: PGI Planned General Industrial District Ordinance No. G57-03
Proposed Zoning: No change. PGI Planned General Industrial District
Existing Use: Surface mining
Proposed Use: Trucking service
Applicant: Abbott Land and Investment Comoration
Recommendation & Findings of Fact
Petition 06-21
August 2, 2021
Owner Gifford 300, LLC
Staff Coordinators: Damir Latinovic, AICP, Senior Planner
Exhibits Attached: A. Aerial/Location Map
B. Zoning Map
C. Parcel Map
D. Site Location
E. Development Application and Attachments
F. Draft Ordinance
BACKGROUND
Abbott Land and Investment Corporation, as applicant, and Gifford 300, LLC, as property owner,
are requesting a map amendment to PGI Planned General Industrial District Ordinance No. G57-
03 with departures from the Elgin Municipal Code requirements for parking lot surface
construction, vehicle use area interior landscape yard,vehicle use area landscape yard,vehicle use
area interior yard setback, permitted fence height, exterior building materials, and any other
departures as may be necessary or desirable to construct a new trucking service facility at the
property commonly known as 1325 Bluff City Boulevard. The properties classified in the PGI
Planned General Industrial District established by Ordinance No. G57-03 are commonly known
as 1325 Bluff City Boulevard, 1225 Gifford Road, 1235 Gifford Road, 1245 Gifford Road, 1255
Gifford Road, and 1325 Gifford Road.
The 60-acre subject property is located on the south side of Bluff City Boulevard immediately
west of the Copart's wholesale automobile sales facility,both of which are located just west of the
intersection of US Route 20 and Bluff City Boulevard. The site is currently part of a larger 127-
acre quarry used for active surface mining of sand, gravel, and other materials.
The subject property is adjacent to other properties part of the same PGI Planned General Industrial
District established by Ordinance No. G57-03 on the west and south sides. The property adjacent
to the west would continue to be used for surface mining of sand,gravel and other materials,while
the properties to the south are improved with heavy industrial uses, including a metal recycling
use(Redline Metals)and waste transfer station(Waste Management).The property adjacent to the
east is a approximately 210-foot wide Commonwealth Edison right-of-way with Copart's
wholesale automobile sales facility further to the east zoned PGI Planned General Industrial
District established by Ordinance G55-03. The properties to the north across Bluff City Boulevard
- 2 -
Recommendation& Findings of Fact
Petition 06-21
August 2, 2021
are zoned PCF Planned Community Facility District, CF Community Facility District, and Cl
Commercial Industrial District and include the Institute of Islamic Education and a landscape
contractor shop.
Proposal
The applicant is proposing to establish a 60-acre site from the larger 127-acre former quarry to
construct a trucking service parking facility. The front of the property would include a small 256-
square foot office building with a 13-stall parking lot for employees and visitors. The remainder
of the site would include the parking lot for semi-trucks and trailers. The truck parking lot would
include 1,229 12-foot wide by 75-foot-long parking stalls.
The facility operator (Vantage Trucking) would lease individual truck parking spaces to third-
party trucking service transportation companies. While large transportation companies have their
own distribution facilities where they also park their semi-trucks and trailers,most trucking service
transportation companies are small business owners whose truck fleets can include as little as one
or two trucks. Such trucking service transportation companies are expected to lease the semi-truck
and trailer parking spaces at the proposed facility.
The existing access driveway for the mine operations would be reconstructed and improved to
serve as the access driveway for the truck parking facility.The property would include a temporary
access driveway to the remainder of the quarry adjacent to the west, where surface mining
operations would continue. The applicant would construct a new public sidewalk along the
property's frontage along Bluff City Boulevard with a connection to the front office building. The
256-square foot, one-story office building would include stone masonry and fiber cement siding
on the exterior.
- 3 -
Recommendation& Findings of Fact
Petition 06-21
August 2, 2021
ALU
�-
Pr
-77
70fK gWffTTlff-/FL CALCLL�TIOM ZAI[ET_- � ti""•
*�r t
k': YY1TT'
71
WASTE MANAGEMENT
Figure 1. Proposed Landscape Plan
- 4 -
Recommendation & Findings of Fact
Petition 06-21
August 2, 2021
The proposed truck parking lot would be located 174 feet from the north property line along Bluff
City Boulevard at its closest point, 60 feet from the east property line along ComEd right-of-way,
one foot from the west property line adjacent to the remainder of the quarry, one foot from the
south property line adjacent to the Waste Management transfer station, and 15 feet from the future
Rubble Road and Sky Drive in the southwest portion of the site. The proposed truck parking lot
would be enclosed with an 8-foot-high steel fence of neutral color to match the steel fence
surrounding the Copart site. The proposed parking lot includes nine 28-foot-high parking lot light
fixtures which would comply with all outdoor lighting requirements of the zoning ordinance.
While the front parking lot and access driveway would be constructed with normal asphalt
surfacing, the 49.1-acre truck parking lot would be constructed of reclaimed asphalt grindings.
This parking lot surface, which is one of several requested departures from the zoning ordinance
requirements, would be compacted to resemble a typical hard surface asphalt parking lot.
While the applicant would not install any landscaping within the interior of the 49.1-acre truck
parking lot,extensive landscaping would be installed along the perimeter of the 8-foot fence visible
from public view. A total of 224 trees (172 shade trees, 36 evergreen trees, and 16 ornamental
trees)would be installed on the site. Of that, 112 trees would be installed north of the truck parking
lot to screen it from Bluff City Boulevard. One shade tree every 40 feet would be installed along
the east side of the parking lot fence adjacent to the ComEd right-of-way and along the future
Rubble Road and Sky Drive southwest of the site. Landscape screening is not required along the
west property line adjacent to the remainder of the surface mining property, and along the south
property line. All shade trees would be four inches in diameter at the time of installation, which
exceeds the typical requirement for three-inch caliper trees.
It is worth noting that the topography of the site is such that the truck parking lot is located
approximately 12-18 feet higher than Bluff City Boulevard. The combination of topography
change, the 8-foot fence, and extensive landscaping north of the fence will screen most if not all
semi-trucks and trailers parked within the truck parking lot.
Traffic analysis
The applicant has submitted a traffic study for the proposed facility which provides the analysis of
the existing and future traffic conditions in the area. The traffic study includes estimates for
anticipated number of trips to be generated by the proposed facility that is based on actual trip
counts at another similar Vantage trucking facility in Lemont, Illinois. The proposed facility is
expected to generate approximately 856 trips(both trucks and passenger vehicles)on a typical day.
The actual trip counts at Lemont facility indicate that the number of trips generated by the facility
are evenly distributed during the day. The actual peak time for the facility is expected to occur
during the mid-day hours between 11 a.m. and 3 p.m. During its peak hour from 11 a.m. to 12
p.m., the facility is expected to generate approximately 61 trips (30 inbound vehicles and 31
outbound vehicles). That represents one additional trip per minute during the mid-day hour for
area roadways.
- 5 -
Recommendation & Findings of Fact
Petition 06-21
August 2, 2021
Per IDOT's 2020 traffic counts, US Route 20 carries approximately 42,000 vehicles daily at the
intersection with Shales Parkway, Shales Parkway carries approximately 19,000 vehicles north of
US Route 20,and Bluff City Boulevard carries approximately 3,000 vehicles west of Gifford Road.
The morning peak hour occurs between 7 a.m. and 8 a.m., while the evening peak hour occurs
between 4 p.m. and 5 p.m.,neither of which overlaps with the expected peak hour of the proposed
facility, which will occur from 11 a.m. to 12 p.m.
The traffic study concludes that the US Route 20 and Bluff City Boulevard/Shales Parkway
intersection has adequate reserve capacity and is projected to continue to operate at the same level
of service regardless if the proposed facility is constructed or not. If the proposed facility is
constructed, all turning movements at this intersection would continue to operate with the same
general delays, except the northbound left turning movements, which would experience an
additional 5-7 second delay during the morning and evening peak hours.However,this is primarily
because US Route 20 receives the majority of the green time due to the amount of traffic on US
Route 20. The proposed facility would represent only approximately one percent of the total peak
hour traffic volume at this intersection.
The traffic analysis also shows that the proposed one full access driveway can adequately serve
the proposed facility. The existing full access driveway to Bluff City Boulevard which serves the
quarry would be reconstructed to serve the proposed facility with one inbound lane and two
outbound lanes (one for left-turning vehicles and one for right turning vehicles). Bluff City
Boulevard already includes a designated left-turn lane for westbound vehicles coming from US
Route 20. The length of the designated left-turn lane can accommodate approximately five
passenger vehicles, or one to two semi-trucks with trailers. Based on the anticipated traffic
volumes at the proposed facility, the existing left-turn lane can adequately serve the proposed
facility, and the applicant is not proposing any changes to Bluff City Boulevard or the designated
left-turn lane.
Bluff City Boulevard is under Illinois Department of Transportation (IDOT)jurisdiction and the
proposed access driveway to Bluff City Boulevard will need to be approved by IDOT. The
applicant has provided documentation indicating IDOT does not object to the proposed access for
the proposed facility.
The proposed development requires several departures from the requirements of the PGI Planned
General Industrial District Ordinance No. G57-03 and the zoning ordinance. The requested
departures are summarized in Table 1 below,and are further described in the Planned Development
Departures and Exceptions section of the staff report further below.
- 6 -
Recommendation & Findings of Fact
Petition 06-21
August 2, 2021
Table 1. Detail of Required Departures 1325 Bluff City Boulevard
Site Design Regulation Requirement Proposed
Asphalt, concrete, or brick Reclaimed asphalt
Parking Lot Surfacing paver surface course over grindings course over
gravel sub-base course gravel sub-base course
Vehicle use area interior yard 17 ft 1 ft. along west property
setback line
Fence type and height within the Max. 4 feet high and open- g feet high and solid type
required street yard setback design type
Fence type and height within the Max. 6 feet high and solid g feet high and solid type
required interior yard setback type
Vehicle use area landscape yard 44 shade trees and 333 123 shade trees and 233
(perimeter of a parking lot) shrubs shrubs
Vehicle use area interior 107,121 sq. ft. of VUA No landscape yard (within the interior landscape yard with a lan VUA interior
parkinglot 428 trees and 428 shrubs landscape yard
In side and rear yards Within enclosed truck
Location and enclosure for a outside of required building parking facility with
refuse collection area setbacks, and enclosed with additional enclosure other
a six-foot high solid fence or than the 8-foot solid fence
wall surrounding the parking lot
The Community Development Department offers the following additional information:
A. Property History. The subject property was annexed in 1962. Upon annexation the
property was zoned M2 General Manufacturing District. In 1992, the property was zoned
GI General Industrial District as part of the comprehensive amendment to the zoning
ordinance.
In 2003, the City classified the property in the PGI Planned General Industrial District by
Ordinance G57-03. At the same time the City approved Copart's wholesale automobile
sales facility at 1475 Bluff City Boulevard by establishing the PGI Planned General
Industrial District by Ordinance G55-03 for that property. The property is part of the Bluff
City TIF District.
The property is home to a former quarry and has been used for surface mining operation of
sand, gravel and other materials since its annexation.
B. Surrounding Land Use and Zoning. The subject property is adjacent to other properties
part of the same PGI Planned General Industrial District established by Ordinance No.
- 7 -
Recommendation & Findings of Fact
Petition 06-21
August 2, 2021
G57-03 on the west and south sides. The property adjacent to the west would continue to
be used for surface mining of sand, gravel and other materials, while the properties to the
south are improved with heavy industrial uses, including a metal recycling use (Redline
Metals) and waste transfer station(Waste Management). The property adjacent to the east
is a approximately 210-foot wide Commonwealth Edison right-of-way with Copart's
wholesale automobile sales facility further to the east zoned PGI Planned General
Industrial District established by Ordinance G55-03. The properties to the north across
Bluff City Boulevard are zoned PCF Planned Community Facility District,CF Community
Facility District, and Cl Commercial Industrial District and include the Institute of Islamic
Education and a landscape contractor shop.
C. Comprehensive Plan. The subject property is designated as Industrial by the City's 2018
Comprehensive Plan. Industrial land uses include more intense industrial uses capable of
generating excessive noise, traffic, odor, and other nuisances. Example uses include
manufacturing, food processing, distribution, and businesses requiring significant areas
dedicated to the storage of materials or whose operations are performed in the open-air.
Give the potentially intense nature of businesses within industrial areas, they should be
well-buffered from residential and commercial areas to eliminate potential impacts on
property values and quality of life.
D. Zoning District. The purpose and intent of the PGI Planned General Industrial District
established by Ordinance G57-03 is to provide an alternate planned industrial environment
for those industrial uses that do not require the location or environment of an ORI Zoning
District. This PGI Zoning District is most similar to, but departs from the standard
requirements of the GI Zoning District. The PGI District is subject to the provisions of
Chapter 19.60, "Planned Development".
E. Trend of Development. The subject property is located within the southeast industrial
park. Uses that have historically located in the southeast industrial park include both light-
industrial and warehousing uses as well as heavy industrial uses such as a motor-vehicle
recycling facility and a waste-management transfer station. Over the last ten years the trend
of development in this and other industrial parks in the City has been towards establishment
of smaller light-industrial/warehousing buildings with large surface parking lots and
commercial operations yards for storage of semi-trucks and trailers.
FINDINGS
After due notice as required by law, the Planning & Zoning Commission conducted a public
hearing in consideration of Petitions 06-21 on August 2, 2021. Testimony was presented at the
public hearing in support of and against the application.The Community Development Department
submitted a Development Application Review and Written Findings & Recommendation to the
Planning &Zoning Commission dated August 2,2021.
- 8 -
Recommendation & Findings of Fact
Petition 06-21
August 2, 2021
The Community Development Department and the Planning & Zoning Commission have made
the following findings regarding this application against the standards for map amendments
outlined within § 19.55.030 and the standards for planned developments outlined within §
19.60.040:
STANDARDS FOR MAP AMENDMENTS AND PLANNED DEVELOPMENTS
A. Site Characteristics Standard. The suitability of the subject property for the planned
development with respect to its size, shape, significant natural features including
topography, watercourses and vegetation and existing improvements.
Findings. The subject property is suitable for the intended planned development with
respect to its size, shape, significant features including topography, watercourses,
vegetation, and existing improvements. The 60-acre subject property is part of an active
quarry used for surface mining of sand, gravel and other materials. The property does not
include any significant water courses,vegetation or existing improvements that would have
a negative impact on the proposed development. The property does have a sloping
topography. The center of the site is approximately 12-18 feet higher than the established
grade at Bluff City Boulevard. The applicant is proposing to maintain the existing
topography, which will help screen the proposed truck parking lot behind an 8-foot-high
fence and extensive landscaping. The applicant would install a total of 224 shade,
evergreen, and ornamental trees primarily along the perimeter of the truck parking lot.
B. Sewer and Water Standard. The suitability of the subject property for the planned
development with respect to the availability of adequate Municipal water, wastewater
treatment and stormwater control facilities.
Findings. The subject property is suitable for the intended planned development with
respect to the availability of adequate water, sanitary treatment, and storm water control
facilities. All required municipal water, sanitary sewer, and stormwater utilities are located
in close proximity of the site. The front 256-square foot office building would connect to
the existing sanitary sewer and water main in Bluff City Boulevard. The existing facilities
can adequately service the proposed building.
The applicant is proposing to construct a new surface stormwater detention facility in the
northeast corner of the site that would serve to collect the stormwater from the front
driveway and front parking lot.The stormwater from the truck parking lot would discharge
onto the quarry property adjacent to the west. The proposed development will meet all
requirements of the stormwater ordinance.
C. Traffic and Parking Standard. The suitability of the subject property for the planned
development with respect to the provision of safe and efficient on-site and off-site vehicular
- 9 -
Recommendation& Findings of Fact
Petition 06-21
August 2, 2021
circulation designed to minimize traffic congestion.
1. Nonresidential land uses should be located central and accessible to the area or
population served without requiring traffic movements through or into a residential
neighborhood. Nonresidential land uses should not be located within residential
neighborhoods, but on their periphery as defined by the "arterial street"[SRI system.
2. The number of locations for vehicular access to or from a public right of way should be
limited to those which are necessary for the reasonable use of the property and
consistent with current traffic engineering standards. Property with two (2) street
frontages should not be permitted access to or from the street with the higher degree of
continuity within the overall street system or with the higher traffic volume. With the
exception of residential driveways, locations for vehicular access to or from a public
right of way should be aligned directly opposite existing or approved locations across
the street.
Findings. The subject property is suitable for the intended planned development with
respect to the provision of safe and efficient on-site and off-site vehicular circulation
designed to minimize traffic congestion. The applicant has submitted a traffic study to
analyze the traffic impact of the proposed facility. The proposed facility would generate
approximately 856 trips per day,which are evenly distributed throughout the day.The peak
hour occurs weekdays from 11 a.m. to 12 p.m. This peak time does not coincide with the
typical morning and evening rush hour peak times on surrounding roadways. During the
peak hour, the proposed facility is expected to generate approximately 61 trips, which is
approximately one trip per minute. The surrounding roadways have adequate capacity to
accommodate the anticipated additional traffic from the facility.
The proposed 256-square foot office building in the front is required to provide only one
parking space based on the requirement for one parking stall per 250 square feet of floor
area. The applicant is proposing to construct a 13-stall parking lot adjacent to the building
for employees and visitors.
The proposed facility would meet its parking requirement without any negative impact on
surrounding uses and properties.
D. Zoning History Standard. The suitability of the subject property for the planned
development with respect to the length of time the property has remained undeveloped or
unused in its current zoning district.
Findings. The property is suitable for the intended planned development with respect to
the length of time the property has remained undeveloped or unused in its current zoning
district. The subject property was annexed in 1962. Upon annexation the property was
zoned M2 General Manufacturing District. In 1992, the property was zoned GI General
Industrial District as part of the comprehensive amendment to the zoning ordinance.
In 2003, the City classified the property in the PGI Planned General Industrial District by
- 10 -
Recommendation & Findings of Fact
Petition 06-21
August 2, 2021
Ordinance G57-03. At the same time the City approved Copart's wholesale automobile
sales facility at 1475 Bluff City Boulevard by establishing the PGI Planned General
Industrial District by Ordinance G55-03 for that property. The property is part of the Bluff
City TIF District.
The property is home to a former quarry and has been used for surface mining operation of
sand, gravel and other materials since its annexation.
E. Surrounding Land Use and Zoning Standard. The suitability of the subject property for
the planned development with respect to consistency and compatibility with surrounding
land use and zoning.
Findings. The property is suitable for the intended planned development with respect to
consistency and compatibility with surrounding land uses and zoning. The subject property
is adjacent to other properties part of the same PGI Planned General Industrial District
established by Ordinance No. G57-03 on the west and south sides. The property adjacent
to the west would continue to be used for surface mining of sand, gravel and other
materials, while the properties to the south are improved with heavy industrial uses,
including a metal recycling use (Redline Metals) and waste transfer station (Waste
Management). The property adjacent to the east is a approximately 210-foot wide
Commonwealth Edison right-of-way with Copart's wholesale automobile sales facility
further to the east zoned PGI Planned General Industrial District established by Ordinance
G55-03. The properties to the north across Bluff City Boulevard are zoned PCF Planned
Community Facility District, CF Community Facility District, and Cl Commercial
Industrial District and include the Institute of Islamic Education and a landscape contractor
shop.
F. Trend of Development Standard. The suitability of the subject property for the planned
development with respect to consistency with an existing pattern of development or an
identifiable trend of development in the area.
Findings.The subject property is suited for the intended planned development with respect
to consistency with an existing pattern of development or an identifiable trend of
development in the area. The subject property is located within the southeast industrial
park. Uses that have historically located in the southeast industrial park include both light-
industrial and warehousing uses as well as heavy industrial uses such as a motor-vehicle
recycling facility and a waste-management transfer station. Over the last ten years, the
trend of development in this and other industrial parks in the City has been towards
establishment of smaller light-industrial/warehousing buildings with large surface parking
lots and commercial operations yards for storage of semi-trucks and trailers.
G. Planned Development District Standard: The suitability of the subject property for the
intended planned development district with respect to conformance to the provisions for
- 11 -
Recommendation& Findings of Fact
Petition 06-21
August 2, 2021
the purpose and intent, and the location and size of a zoning district.
Findings. The subject property is suitable for the intended planned development district
with respect to conformance to the provisions for the purpose and intent, and the location
and size of a zoning district. The purpose and intent of the PGI Planned General Industrial
District established by Ordinance G57-03 is to provide an alternate planned industrial
environment for those industrial uses that do not require the location or environment of an
ORI Zoning District. This PGI Zoning District is most similar to, but departs from the
standard requirements of the GI Zoning District. The PGI District is subject to the
provisions of Chapter 19.60, "Planned Development".
H. Comprehensive Plan Standard. The suitability of the subject property for the planned
development with respect to conformance to the goals, objectives, and policies of the
Official Comprehensive Plan
Findings. The subject property is suitable for the intended planned development with
respect to conformance to the goals,objectives, and policies of the Official Comprehensive
Plan. The subject property is designated as Industrial by the City's 2018 Comprehensive
Plan. Industrial land uses include more intense industrial uses capable of generating
excessive noise, traffic, odor, and other nuisances. Example uses include manufacturing,
food processing, distribution, and businesses requiring significant areas dedicated to the
storage of materials or whose operations are performed in the open-air. Give the potentially
intense nature of businesses within industrial areas, they should be well-buffered from
residential and commercial areas to eliminate potential impacts on property values and
quality of life.
ADDITIONAL STANDARDS FOR PLANNED DEVELOPMENTS
I. Conditional Use for a Planned Development: Where applicable, the suitability of the
subject property for the intended conditional use for a planned development with respect
to the provision for the purpose and intent of planned developments and with respect to the
provisions of section 19.65.010 of the zoning ordinance. No conditional use for a planned
development should be granted for the sole purpose of introducing a land use not otherwise
permitted on the subject property.
Findings. This standard is not applicable. The applicant is not seeking approval of a
planned development as a conditional use.
J. Natural Preservation Standard. The suitability of the subject property for the intended
planned development with respect to the preservation of all significant natural features
including topography, watercourses, wetlands, and vegetation.
- 12 -
Recommendation& Findings of Fact
Petition 06-21
August 2, 2021
Findings. The subject property is suitable for the intended planned development with
respect to the preservation of all significant natural features including topography,
watercourses, wetlands, and vegetation. There are no significant natural features,
watercourses, wetlands, and vegetation located on the property. The property does have a
sloping topography,which the applicant plans to maintain to help screen the proposed truck
parking lot behind an 8-foot-high fence and extensive landscaping. The applicant would
install a total of 224 shade, evergreen, and ornamental trees primarily along the perimeter
of the truck parking lot.
K. Internal Land Use. The suitability of the subject property for the intended planned
development with respect to the land uses permitted within the development being located,
designed, and operated so as to exercise no undue detrimental influence on each other or
on surrounding property.
Findings. The subject property is suitable for the intended planned development with
respect to the land uses permitted within the development being located, designed, and
operated so as to exercise no undue detrimental influence on each other or on surrounding
properties.The subject property is part of an active quarry used for surface mining of sand,
gravel, and other materials. The existing access driveway for the mine would be
reconstructed to serve as the access for proposed truck parking facility.A temporary access
driveway for the mine would be constructed branching off from the main driveway for the
truck parking facility. The applicant would screen the proposed parking lot with an 8-foot-
high steel fence with neutral color to match the existing fence at the adjacent Copart's
wholesale automobile sales facility. Extensive landscaping would be installed in
front/north of the truck parking lot to screen the facility from Bluff City Boulevard.
Additional landscaping would be installed along the east and west sides of the truck parking
lot for additional screening from adjacent properties. The proposal will not have any
negative effect on the surrounding properties.
PLANNED DEVELOPMENT DEPARTURES AND EXCEPTIONS
The applicant is requesting the following departure from the requirements of the zoning ordinance:
1. Section 19.45.170, "Surfacing". A vehicle use area is required to have a paved surface
consisting of bituminous concrete (asphalt), concrete, or brick paver course over
compacted gravel base course.The applicant is proposing to construct the truck parking lot
facility with a paved surface consisting of reclaimed asphalt grindings course over the
gravel base course.
2. Section 3. G. E. 2., "Vehicle Use Area Setbacks by Lot Line", of Ordinance No. G57-
03. The minimum required vehicle use area interior yard setback is 17 feet. The applicant
is proposing to construct the truck parking lot with a 1-foot setback from the west and south
property lines.
- 13 -
Recommendation & Findings of Fact
Petition 06-21
August 2, 2021
3. Section 19.90.015, "Definitions and Regulations". The maximum permitted height and
style of a fence within the required street yard setback is four feet high, and open-design
fence. The applicant is proposing to construct an 8-foot-high solid steel fence of neutral
color surrounding the truck parking lot that is located within the required 24-foot street
yard setback along Sky Drive and Future Ruble Road.
4. Section 19.90.015, "Definitions and Regulations". The maximum permitted height and
style of a fence within the required interior yard setback is six feet high, and solid,privacy
fence. The applicant is proposing to construct an 8-foot-high solid steel fence of neutral
color surrounding the truck parking lot that is located within the required 17-foot setback
along the west and south property lines.
5. Section 19.12.720,"Landscape Yards".The applicant is required to install 44 shade trees
and 333 shrubs along the perimeter of the proposed truck parking lot. The applicant is
proposing to install 123 shade trees and 233 shrubs along the perimeter of the parking lot.
6. Section 19.12.720, "Landscape Yards". The applicant is required to provide 107,121
square feet of vehicle use area interior landscape yard within the proposed truck parking
lot with 428 trees and 428 shrubs. The applicant is not proposing any vehicle use area
interior landscape yard.
7. Section 19.90.015,"Definitions and Regulations".A refuse collection area is required to
be in side and rear yards only outside of the required building setback,and must be enclosed
with a six-foot high solid fence or wall. The applicant is proposing one or more refuse
collection areas within the truck parking facility(as may be needed), and is not proposing
an additional fence enclosure.
Staff finds the proposed departures are appropriate to achieve a desirable development on a hard-
to-develop property. The subject property is part of a former quarry where active surface mining
of sand, gravel and other materials is still taking place. A significant amount of fill is required to
make the property development ready. However, the soil of a property with a significant amount
of fill requires a long period of time to stabilize to be suitable for the construction of any type of
building. The property also collects stormwater runoff from the surrounding properties which
further complicates stabilization of the soil.
The significant amount of soil settling that is expected would also cause regular asphalt or concrete
parking lot to settle requiring more frequent maintenance. The applicant is therefore proposing to
construct the parking lot with reclaimed asphalt grindings which is more appropriate for soft soils
with significant settling issues.
The applicant is proposing to construct the truck parking lot with only one-foot setback from the
west and south property lines to maximize the site because of the heavy industrial uses on the
- 14 -
Recommendation & Findings of Fact
Petition 06-21
August 2, 2021
adjacent properties. The former quarry where active mining still takes place is located to the west,
while Waste Management's transfer station is located to the south. However, the applicant is
proposing to construct the parking lot 174 feet south of the front property line along Bluff City
Boulevard to allow for adequate landscape screening and reduce any visual impact of the proposed
use.
Furthermore, to provide the most effective screening of the truck parking lot, the applicant has
agreed, at the request of staff, to install an 8-foot-high steel fence of neutral color on all sides of
the truck parking lot. The fence will complement the same type of 8-foot-high fence surrounding
the Copart's wholesale automobile sales facility to the east.The combination of the proposed fence
and landscaping will provide an effective screening of the truck parking lot from the public view
and the surrounding properties.
The applicant is not proposing any vehicle use area interior yard landscaping to avoid any conflicts
for truck maneuvering within the parking lot. Instead, the applicant would install a total of 224
shade, evergreen, and ornamental trees on the exterior of the fence along the perimeter of the
parking lot. Of that, 112 trees and 173 shrubs would be installed north of the fence to screen the
front view of the truck parking lot from Bluff City Boulevard. Along the east and southwest sides,
the applicant is proposing to install primarily shade trees and native prairie grass mix, because
shade trees have the most beneficial impact to screen the parking lot. The applicant would also
upsize all new shade trees and install four-inch caliper trees instead of the 3-inch caliper trees
typically required.
Finally, the applicant may install one or more refuse collection areas within the truck parking
facility for its customers. More specifically, the applicant would install garbage cans or garbage
dumpsters as needed. The applicant is not proposing an addition screening method for such
garbage cans or garbage dumpsters because they would already be located within the 8-foot solid
fence surrounding the parking lot. Such refuse collection areas necessary and desirable to minimize
any litter throughout the site.
RECOMMENDATION
The Community Development Department and the Planning & Zoning Commission recommend
approval of Petition 06-21, subject to the following conditions:
1. Substantial conformance to the Development Application submitted by Abbott Land and
Investment Corporation,as applicant, and Gifford 300,LLC, as a property owner,received
February 8, 2021, and supporting documents including:
a. A letter RE: Copart/Vantage Trucking Development Application, dated February
4, 2021,prepared by Abbott Land and Investment Corp;
b. Undated Map Amendment for a Planned Development Statement of Purpose and
- 15 -
Recommendation & Findings of Fact
Petition 06-21
August 2, 2021
Conformance, dated received July 28, 2021;
c. Plat of Survey, prepared by Mackie Consultants, LLC, dated February 24, 2021,
last revised July 21, 2021;
d. Revised Exterior Elevations, Sheet A2,prepared by Architectural Resources,dated
November 14, 2019, last revised December 5, 2019, with such further revisions as
required by the Community Development Director;
e. Plat of Easement/Vacation Vantage Truck Site Elgin, Illinois, prepared by Mackie
Consultants,LLC,dated April 16,2021,last revised May 7,2021,with such further
revisions as required by the City Engineer;
f. Sky Drive — Station 10+00 to 24+85 Gifford 300 Industrial Development Elgin,
Illinois Sheet 9 of 18, prepared by Mackie Consultants, LLC, dated January 30,
2015, last revised March 19, 2021, with such further revisions as required by the
City Engineer;
g. Final Engineering Plans Vantage Truck 1325 Bluff City Blvd Elgin, Illinois,
prepared by Mackie Consultants, LLC, dated January 29, 2021, last revised July
21, 2021, with such further revisions as required by the City Engineer; and
h. Storm Water Master Plan Gifford 300 Mine Site Reclamation Elgin, Illinois, Sheet
1 of 1, prepared by Mackie Consultants, LLC, dated January 14, 2021, last revised
April 12, 2021, with such further revisions as required by the City Engineer.
In the event of any conflict between such documents and the terms of this ordinance or
other applicable city ordinances, the terms of this ordinance or other applicable city
ordinances shall supersede and control.
2. A departure is hereby granted to allow the construction of the proposed vehicle use area
for the truck parking facility with reclaimed asphalt grindings course over gravel sub-base
course surfacing.
3. A departure is hereby granted to allow the construction of the vehicle use area with the
minimum one-foot setback from the west and south property lines.
4. A departure is hereby granted to allow the construction of an eight-foot high, solid, fence,
of neutral color within the interior yard along the west and south property lines.
5. A departure is hereby granted to allow the construction of an eight-foot high, solid, fence
of neutral color in the street yards along Sky Drive and Future Rubble Road.
6. A departure is hereby granted to allow the construction of the proposed truck parking
facility with the vehicle use area landscape yard consisting of 123 shade trees and 233
shrubs.
7. A departure is hereby granted to allow the construction of the proposed truck parking
facility with no vehicle use area interior landscape yard.
- 16 -
Recommendation & Findings of Fact
Petition 06-21
August 2, 2021
8. A departure is hereby granted to allow the installation of one or more refuse collection
areas within the truck parking facility. Such refuse collection area must be located with the
truck parking facility enclosed with the eight-foot-high solid fence, and is not required to
provide any additional screening in the form of a fence or a wall,provided that such refuse
collection area consists of a garbage can, garbage dumpster, or a similar enclosure as
approved by the Community Development Director. Such refuse collection area may be
located anywhere within the truck parking facility enclosed by the eight-foot-high solid
fence, including the required building setbacks from street lot lines along Sky Drive and
Future Rubble Road and the interior lot lines.
9. No portion of the truck parking facility shall be used as a commercial operations yard,
specifically the outdoor storage of any goods, materials, or equipment is not permitted
within the truck parking facility. More so, the truck parking facility shall not be used for
the loading and unloading of goods,materials, and/or equipment onto and off trucks.
10. No "recreational vehicles" [SR] shall be parked, kept, or stored upon any portion of the
truck parking facility. This provision is not intended to prohibit the parking or storage of
semi-trailers detached from their truck.
11. All "motor vehicles" [SR] parked, kept, or stored at the truck parking facility shall have
up-to-date license plates and registration and be fully operational at all times.
12. No"motor vehicle" [SR]or semi-trailer shall at any time be in a state of major disassembly,
disrepair, or in the process of being stripped or dismantled. All wheels of any "motor
vehicle" [SR] or semi-trailer shall be fully inflated at all times. The repair, rebuilding,
reconditioning, or painting of"motor vehicles" [SR] or semi-trailers is prohibited.
13. The selling of "motor vehicles" [SR] or semi-trailers from the truck parking facility is
prohibited.
14. Compliance with all applicable codes and ordinances.
The vote of the Planning&Zoning Commission on the motion to recommend approval of Petition
06-21 subject to the conditions outlined above, was four (4) yes, zero (0) no, and zero (0)
abstentions. Two members were absent.
Respectfully Submitted,
s/Jay Cox
Jay Cox, Chairman
- 17 -
Recommendation & Findings of Fact
Petition 06-21
August 2, 2021
Planning&Zoning Commission
s/Damir Latinovic
Damir Latinovic, AICP; Secretary
Planning&Zoning Commission
- 18 -
Rte 20 �,
A
20
V
d
Subject Property
s
Petition 06-21 a� R
�r
04t
; »rs
y
Y
jr
Ilk
r.
.vY % v <.
Of
r � � ram" r �'��• � `�'-_ IBC� 1�,"n""><� �� �y,,7,, ''�'��°u
' �^,,r..'
s` �\
k'
EXHIBITA Aerial/Location Map
Map prepared by City of Elgin o 100 200 aoo soo io
Department of Community Development
1
a pia °nco pr �a-4
s� PRC Crd o�14,
RC2 NO Name
CF
CI Rte 20 GI, .
___ Bluff City Blvd CI
PS
SubJ'ect Property
Petition 06-21
I
i
� I
CF
Legend (�
I
ORC1 Residence Conservation 1
ORC2 Residence Conservation 2
ORC3 Residence Conservation 3
OPRC Planned Residence Conservation PGI
O SFR1 Single Family Residence 1
O PSFR1 Planned Single Family Residence 1
O SFR2 Single Family Residence 2
O PSFR2 Planned Single Family Residence 2
OTRF Two Family Residence
PTRF Planned Two Family Residence
MFR Multiple Family Residence
PMFR Planned Multiple Family Residence
ORB Residence Business
QPRB Planned Residential Business
ONB Neighborhood Business
PNB Planned Neighborhood Business
-AB Area Business
-PAB Planned Area Business
-CC1 Center City 1
-CC2 Center City 2
-PCC Planned Center City
ORI Office Research Industrial
OPORI Planned Office Research Industrial
®GI General Industrial
OPGI Planned General Industrial
®Cl Commercial Industrial
CF Community Facility
PCF Planned Community Facility G I \
EXHIBIT B Zoning Map
W+E
SS
Map prepared by City of Elgin 0 162.5325 650 975 1,300
Department of Community Development Feet
11I St
e,U�C�ty e
Subject Property
1325 B I u f f City Blvd. Pt. 06203010190000
Petition 06-21
Pt. 06194040170000
Pt. 06302010080000
Pt. 06291000200000
0201o090p0
3
�•06
EXHIBIT C Parcel Map N
City of Elgin 0 85 170 340 510 680
Department of Community Development Feet
EXHIBIT D
SITE LOCATION
1325 Bluff City Boulevard
Petition 06-21
P
Aproximate
boundary of the ..
sub'ect property �«
�4
• Copart R
Wholesale
Automobile Sales
ActivE Mine a-
LCOURiLN-
Site area map with zoning overlay
z
View of the subject property from Bluff City Blvd
EXHIBIT D
SITE LOCATION
1325 Bluff City Boulevard
Petition 06-21
a / t
N...,
NIL
m ,,.-_'
t R
it
. 4
Bird's eye view of the north middle and south portions
Y �
of the 60-acre subject property