Loading...
HomeMy WebLinkAbout19-4 Resolution No. 19-4 RESOLUTION AUTHORIZING EXECUTION OF AMENDMENT AREEMENT NO. 1 WITH ENGINEERING ENTERPRISES, INC. FOR PHASE II NGINEERING SERVICES IN CONNECTION WITH THE CHICAGO STREET SU ACE TRANSPORTATION PROGRAM (STP) PROJEC BE IT RESOLVED BY THE CITY COUNCIL OF TH CITY OF ELGIN,ILLINOIS,that pursuant to Elgin Municipal Code Section 5.02.020B(9) the ity Council hereby finds that an exception to the requirements of the procurement ordinance is ecessary and in the best interest of the city; and BE IT FURTHER RESOLVED BY THE CITY COU CIL OF THE CITY OF ELGIN, ILLINOIS, that Richard G. Kozal, City Manager, and Kimberl A. Dewis, City Clerk, be and are hereby authorized and directed to execute Amendment Agree ent No. 1 on behalf of the City of Elgin with Engineering Enterprises, Inc. for Phase II engineefng services in connection with the Chicago Street Surface Transportation Program(STP)Project,a opy of which is attached hereto and made a part hereof by reference. s/ David J. Kaptain David J. Kaptain, Mayor Presented: January 9, 2019 Adopted: January 9, 2019 Omnibus Vote: Yeas: 7 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk I AMENDMENT AGREEMENT No. 1 THIS AMENDMENT AGREEMENT No. 1 is hereby made and entered into this 9th day of January , 2019, by and between the City of Elg n, Illinois, a municipal corporation (hereinafter referred to as the "City"), and Engineering Ente rises, Inc., an Illinois corporation (hereinafter referred to as"Engineer"). WHEREAS, the City and Engineer hereto have previousl entered into an agreement dated February 25, 2015 (hereinafter referred to as "ORIGINAL GREEMENT"), wherein the City engaged the Engineer to furnish certain professional servic s in connection with the Chicago Street STP Project(hereinafter referred to as the"Project"); a d WHEREAS, the parties hereto have determined it to be in t eir best interest to amend Original Agreement; and WHEREAS, the City has determined that the proposed scope of the Project should be modified to include Supplemental Design Phase Professional Engine "ng Services for the Chicago Street STP Project(hereinafter referred to as"Supplemental Service "); and WHEREAS,the Original Agreement provides for a maximum payment of$548,253.00; and WHEREAS, the parties hereto have determined and agree that the total maximum payment for the Supplemental Services described in this Amendment Agreement No. 1 shall be in the amount of$78,913; and WHEREAS, the changes contemplated by this Amendment greement No. 1 are germane to the Original Agreement as signed; and this Amendment Agree ent No. 1 is in the best interests of City and is authorized by law. NOW, THEREFORE, for and in consideration of the mut promises and covenants provided for herein, and other good and valuable consideration, t e sufficiency of which is hereby acknowledged,the parties hereto agree as follows: 1. The above recitals are incorporated into and made a part of this agreement as if fully recited hereby. 2. That Section 1 of the Original Agreement is hereby amended by adding the following subparagraph D thereto to read as follows: "The Engineer shall also provide Supplemental Services for the Project which includes the Design Phase Professional Engineering for the Chicago Street STP Project in accordance with Attachment A-1 and Engineer shall Furnish such Supplemental Services for the Project as outlined and detailed in Attachment C-1," 3. That Section 2 of the Original Agreement is hereby amended by adding the following to the end of Subparagraph B: "B. Engineer shall provide the Supplemental Sery ces provided for in Amendment Agreement No. 1 in accordance with the schedul outlined herein and detailed in Attachment B-1." 4. That Section 4 of the Original Agreement is hereby amended by adding the following paragraph E and Payment Schedule to read as follows: "E. For services described in Attachments A-1, C-1', Engineer shall be paid at an hourly rate for the classifications of personnel who perform work on this Project; provided, however, that Engineer shall be paid a total maximfee of$78,913 for the services to be provided pursuant to this Amendment AgreemenlNo. 1, regardless of the actual time or actual costs incurred by the Engineer unless substantial modifications and scope of work are authorized in writing by the City and ap roved pursuant to a further written amendment to this Agreement. The total fees to be paid to the Engineer pursuant to the Original Agreement and Amendment Agreement No. 1 now total $627,166.00. The detailed basis of the additional fee associatedwith Amendment A eement No. 1 is t l�' included in Attachment C-1 and is based on hourly rates of personnel utilized. Attachment D-1, Standard Schedule of Charges dated January 2018, will be utilized for this Project." Payment Schedule for Supplemental Services ESTIMATED ESTIMATED VALUE ESTIMATED INVOICE DATE %COMPLETE OF WORK COMPLETE VALUE 10/31/2018 20% $ 15,782.60 $ 15,782.60 11/30/2018 30% $ 39,456.50 $ 23,673.90 12/31/2018 30% $ 63,130.40 $ 23,673.90 1/31/2019 10% $ 71,021.70 $ 7,891.30 2/28/2019 10% $ 78,913.00 $ 7,891.30 Total 100% $ 78,913.00 6. That except as amended in this Amendment Agreement No. 1 the Original Agreement shall remain in full force and effect. 7. That in the event of any conflict between the terms 3f the Original Agreement, and the provisions in this Amendment Agreement No. 1, the provisions of this Amendment Agreement No. 1 shall control. IN WITNESS WHEREOF, the undersigned have entered into and executed this Amendment Agreement as of the date and year first written above. CITY OF _ CONSULTANT By: i - / By: 37- City Manager It Vice President Att st: Attest: ad/eh/1444 , M City Clerk Its Executive Assistan Attachment A-1 Scope of Services — Phase II Close-Out Supplement' Additional work completed and/or anticipated to be completed to Close-Out Phase Il for the January 19, 2019 IDOT Letting (assuming no additional delays) A. Meetings and Coordination with City of Elgin 1. Additional coordination was required with the City for letting delays because of land acquisition issues. 2. Additional coordination and meetings with the City will be required to coordinate and finalize Phase 2 of this project (assume 2 meetings x 3 people per meeting x 4 hours). 3. EEI will prepare necessary plans or exhibits for each meeting. 4. EEI will prepare and distribute meeting minutes after each meeting. 5. Internal staff meetings as required for completion of 6ontract (assume 3 meetings x 4 people per meeting x 0.5 hour). B. Detour Plan Coordination 1. EEI prepared information for and attended an additional Detour Committee Meeting on February 15, 2018. 2. Prepared and distributed meeting minutes. 3. Provide agenda and exhibit information for October 2018 IDOT Detour Committee Meeting. 4. Attend IDOT Detour Committee Meeting in October 2018 to request extension of the approved detour route for the construction season in 2020. It is currently approved for the 2018 and 2019 construction seasons. 5. Revise detour plan if needed per IDOT comments. 6. Prepare and distribute meeting minutes. C. Coordination with IDOT and KKCOM for Letting Delays 1. Additional coordination was required with IDOT and KKCOM for letting delays because of land acquisition issues in late 2017 (moved from November 2017 IDOT Letting to January 2018 IDOT Letting and again to March 2018 IDOT Letting). 2. EEI will coordinate with !DOT for the letting delay (to the January 2019 Letting) and for submittal of revised plans for the new letting date. 3. EEI will coordinate with and send necessary documentation to KKCOM for the delay in letting (to the January 2019 Letting). 4. EEI will continue to submit quarterly STP Update Forms to KKCOM. D. Final Plan Preparation (Finalize Phase ll Plans for Letting) 1. EEI will revise plans as needed for the following: a. Traffic Control and Staging — revise. b. IDOT Coded Pay Items — check and update as needed. c. IDOT Checksheets — update for correct letting. d. Special Provisions — update as needed for contract. e. Estimate of Time — revise for new letting and construction schedule. f. Estimate of Cost — update with more recent unit costs. g. Provisions in plans, specs, and estimates for lead service line replacement coordination. 2. EEI will address IDOT and City of Elgin review comments. 3. EEI will finalize and submit Final Plans, Specifications, and Estimates for the January 2019 IDOT Letting. \\MILKYWAY\EEI_Storage\Docs\Public\Elgin\2011\EG1104 Chicago Street Rehabilitation\PSA\Supplement Review\Mid 2018 Letting Delay Supplement\Attachment A-1 Phase 2 Engineering Scope of Services.docx E. Utility Coordination and Permit Review 1. Additional review and coordination with various utilities. 2. Review ComEd Permit, permit revisions, and attend site coordination meeting with CorEd and City of Elgin. 3. Review MCI Permit. 4. EEI will continue to coordinate with utility companies and review relocation permits (assume 2 people x 7.5 hours + 1 person x 4 hours) 5. Assume 2 field review meetings will be required for this (2 people X 7.5 hours). F. Permit Updates 1. EEI will update the IEPA watermain permit as needed 2. EEI will update the biological clearance (it expires September 2018). G. Lead Service Line Coordination 1. Reviewed information regarding lead service line replacement requirements for this project. 2. Prepared information for presentation to City Staff and City Council to outline potential scope, schedule, and budget for lead service line replacement for this project. 3. Project research and planning for lead service line replacement. H. Quality Control/Quality Assurance 1. QC/QA of plans, specifications, and estimates. I. Project Administration 1. Additional project management and administration for delays in letting. J. Plan Revisions for Land Acquisition Delays 1. Plan and construction staging revisions to account for letting delays and change in construction schedule when moving from November 2017 IDOT Letting to January 2018 IDOT Letting and again to March 2018 IDOT Letting. 2. Specification and estimate revisions to account for letting delays. \\MILKYWAY\EEI_Storage\Docs\Public\Elgin\2011\EG1104 Chicago Street Rehabilitation\PSA\Supplement Review\Mid 2018 Letting Delay Supplement\Attachment A-1 Phase 2 Engineering Scope of Services.docx ATTACHMENT B-1 : Project Schedule ,*, Engineering Enterprises,Inc. Chicago Street Phase II - Center Street to Liberty Street City of Elgin Kane and Cook Counties MONTH 2018 2019 Task Description Jan Feb Mar Apr May Jun Jul Aug JSep Oct Nov Dec Jan Feb Mar Project Administration and Quality Control/Quality Assurance Meetings and Coordination with City of Elgin Detour Plan Coordination _ Coordination with IDOT and KKCOM -,,,,,e. Lead Service Line Coordination for Plans Plan Preparation/Revision , Initital Final Plan Submittal _ IDOT Initial Final Plan Review Final-Final Plan Submittal Utility Coordination and Permit Review C .fw ; , , - h TEPA Permit Uipdates Project Letting QualityControl/QualityAssurance Engineering Key Dates 9� 9 � -�� Agency Review Contracting ATTACHMENT C-1 ,SIL ESTIMATED OF LEVEL OF EFFORT AND ASSOCIATED COST-PROPOSED ADDITIONAL TASKS - PROFESSIONAL ENGINEERING SERVICES-PHASE II ENGINEERING CLOSE-OUT E LG IN CHICAGO STREET PHASE II-CENTER STREET TO LIBERTY STREET CITY OF ELGIN,ILLINOIS ENTITY: ENGINEERING SURVEYING DRAFTING ADMIN. WORK PRINCIPAL SENIOR SENIOR SENIOR SENIOR SENIOR ITEM COST WORK _ PROJECT ROLE: IN PROJECT PROJECT PROJECT PROJECT ENGINEERING PROJECT PROJECT PROJECT CAD PROJECT HOUR PER ITEM - CHARGE MANAGER ENGINEER II ENGINEER I ENGINEER INTERN MANAGER_ SURVEYOR II TECHNICIAN MANAGER TECHNICIAN ADMIN. SWAM, ITEM NO. WORK REM HOURLY RATE: $197 . $191 $160 $149 $137 - $84 $173 $160 $125 -$173 $137 $80 PHASE I A MEETINGS AND COORDINATION WITH CITY OF ELGIN 10 14 26 6 - - - - - - - - 55 $ 9.504 B DETOUR PLAN COORDINATION 2 20 - - - - - - - - 22 $ 3,822 C COORDINATE WITH IDOT AND KKCOM FOR LETTING DELAY 2 6 2 _ - _ _ _ _ - _ - 9 $ 1.685 D PLAN PREPARATION 6 14 42 71 - - - - - - 32.25 8 173 $ 26.213 E UTILITY COORDINATION AND PERMIT REVIEW - 4 44 23 - - - - - - 71 $ 11.197 F PERMIT UPDATES - 1 2 - - - - - - _ - - 3 S 511 G LEAD SERVICE LINE COORDINATION(FOR REPLACEMENT) 5 15 9 • - 4 - - - - - - 32 $ 5.432 H QUALITY CONTROUQUALITY ASSURANCE 2 8 2 - - - - - - - - - 12 $ 2.242 I PROJECT ADMINISTRATION 2 4 7 - - - - - - - - - 13 $ 2.278 J PLAN REVISIONS FOR LAND ACQUISITION DELAYS - - 33 26 - - - - - - - - 59 $ 9.154 SUB TOTAL 26 67 197 126 - 4 - - - - 32 8 449 $ 71,83725 DIRECT EXPENSES LABOR SUMMARY Printing $ 200 Engineering Expenses= $ 66.779 Hutt 8 Hutt CCM Update/Sampling $ 6.876 Surveying Expenses= $ - Drafinq Expenses= S 4.418 Administrative Expenses= $ 640 TOTAL LABOR EXPENSES= $ 71,937 DIRECT EXPENSES= S 7,076 -_��T1XT2GXPEN ES=_ f�28gA t.'C Attachment D-1 Standard Schedule of Charges 41kor 11111111111 January 1,2018 EMPLOYEE DESIGNATION CLASSIFICATION HOURLY RATE Senior Principal E-4 $202.00 Principal E-3 $197.00 Senior Project Manager E-2 $191.00 Project Manager E-1 $173.00 Senior Project Engineer/Planner/Surveyor II P-6 $160.00 Senior Project Engineer/Planner/Surveyor I P-5 $149.00 Project Engineer/Planner/Surveyor P-4 $137.00 Senior Engineer/Planner/Surveyor P-3 $125.00 Engineer/Planner/Surveyor P-2 $114.00 Associate Engineer/Planner/Surveyor P-1 $103.00 Senior Project Technician II T-6 $149.00 Senior Project Technician I T-5 $137.00 Project Technician T-4 $125.00 Senior Technician T-3 $114.00 Technician T-2 $103.00 Associate Technician T-1 $ 90.00 Engineering/Land Surveying Intern I-1 $ 84.00 GIS Technician G-1 $ 72.00 Administrative Assistant A-3 $ 70.00 CREW RATES,VEHICLES AND REPROGRAPHICS 1 Man Field Crew with Standard Survey Equipment $163.00 2 Man Field Crew with Standard Survey Equipment $254.00 1 Man Field Crew with RTS or GPS* $202.00 2 Man Field Crew with RTS or GPS* $293.00 Vehicle for Construction Observation $15.00 In-House Scanning and Reproduction $0.25/Sq.Ft. (Black&White) $1.00/Sq.Ft.(Color) Reimbursable Direct Costs&Services by Others Cost+ 10% *RTS=Robotic Total Station/GPS=Global Positioning System 52 Wheeler Road,Sugar Grove, IL 60554— (630) 466-6700 tel — (630)466-6701 fax —www.eeiweb.com