HomeMy WebLinkAbout16-42 Resolution No. 16-42
RESOLUTION
AUTHORIZING EXECUTION OF AN AGREEMENT
WITH WBK ENGINEERING, LLC FOR DESIGN,ADMINISTRATION AND
PLANNING ENGINEERING SERVICES IN CONNECTION WITH
SITE RESTORATION FOR STREETS AND OTHER DAMAGED
INFRASTRUCTURE DUE TO UNDERGROUND UTILITY REPAIRS PROJECT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS,
that Sean R. Stegall, City Manager, and Kimberly A. Dewis, City Clerk, be and are hereby
authorized and directed to execute an Agreement on behalf of the City of Elgin with WBK
Engineering, LLC for design, administration and planning engineering services in connection
with the Site Restoration for Streets and Other Damaged Infrastructure Due to Underground
Utility Repairs Project, a copy of which is attached hereto and made a part hereof by reference.
s/David J. Kaptain
David J. Kaptain, Mayor
Presented: March 16, 2016
Adopted: March 16, 2016
Vote: Yeas: 9 Nays: 0
Attest:
s/Kimberly Dewis
Kimberly Dewis, City Clerk
AGREEMENT
THIS AGREEMENT is made and entered into this '7m'day of__ , 20 !6, , by
and between the CITY OF ELGIN, an Illinois municipal corporation (hereinafter referred to as
"CITY") and WBK Engineering LLC (hereinafter referred to as "ENGINEER").
WHEREAS, the CITY desires to engage the ENGINEER to furnish certain engineering
services for the development of plans and providing of construction inspection services for site
restoration for streets and other damaged infrastructure due to underground utility repairs
(hereinafter referred to as the PROJECT); and
WHEREAS, the ENGINEER represents that he is in compliance with Illinois Statutes
relating to professional registration of individuals and has the necessary expertise and experience
to furnish such services upon the terms and conditions set forth herein below.
NOW, THEREFORE, it is hereby agreed by and between the CITY and the ENGINEER
that the CITY does hereby retain the ENGINEER for and in consideration of the mutual promises
and covenants contained herein, the sufficiency of which is hereby acknowledged to act for and
represent it in the engineering matters involved in the PROJECT as described herein, subject to
the following terms and conditions and stipulations, to-wit:
1. SCOPE OF SERVICES
A. All work hereunder shall be performed under the direction of the Director of Public
Works of the CITY, herein after referred to as the "DIRECTOR".
B. The ENGINNER will provide contract preparation, bidding, and construction
services for the PROJECT.
C. A detailed Scope of Services is attached hereto as Attachment A.
2. PROGRESS REPORTS
A. An outline project milestone schedule is provided hereinunder.
B. A detailed project schedule for the Project is included as Attachment B, attached
hereto. Progress will be recorded on the project schedule and submitted monthly
as a component of the Status Report described in C below.
C. The ENGINEER will submit to the DIRECTOR monthly a status report keyed to
the project schedule. A brief narrative will be provided identifying progress,
findings and outstanding issues.
3. WORK PRODUCTS
All work product prepared by the ENGINEER pursuant hereto including, but not limited
to, reports, plans, designs, calculations, work drawings, studies, photographs, models and
recommendations shall be the property of the CITY and shall be delivered to the CITY
upon request of the DIRECTOR; provided, however, that the ENGINEER may retain
copies of such work product for its records. ENGINEER'S execution of this Agreement
shall constitute ENGINEER'S conveyance and assignment of all right, title and interest,
including but not limited to any copyright interest, by the ENGINEER to the CITY of all
such work product prepared by the ENGINEER pursuant to this Agreement. The CITY
shall have the right either on its own or through such other engineers as determined by the
CITY to utilize and/or amend such work product. Any such amendment to such work
product shall be at the sole risk of the CITY. Such work product is not intended or
represented to be suitable for reuse by the CITY on any extension to the PROJECT or on
any other project, and such reuse shall be at the sole risk of the CITY without liability or
legal exposure to the ENGINEER.
4. PAYMENTS TO THE ENGINEER(Not To Exceed Method)
A. For services provided the ENGINEER shall be paid at the rate of one times the
direct hourly rate of personnel employed on this PROJECT, with the total fee not
to exceed$56,853 regardless of the actual costs incurred by the ENGINEER unless
substantial modifications to the scope of the work are authorized in writing by the
DIRECTOR.
B. Reimbursement for field vehicle and CAD services, survey consumables and
printing services are included in the not to exceed amount as set forth in
subparagraph A above.
C. The CITY shall make periodic payments to the ENGINEER based upon actual
progress within 30 days after receipt and approval of invoice. Said periodic
payments to the ENGINEER shall not exceed the amounts shown in Attachment A,
and full payments for each task shall not be made until the task is completed and
accepted by the DIRECTOR.
D. A summary of expected tasks, labor efforts, fees and direct costs is attached as
Attachment C.
5. INVOICES
A. The ENGINEER shall submit invoices in a format approved by the CITY. Progress
reports (2C above)will be included with all payment requests.
B. The ENGINEER shall maintain records showing actual time devoted and cost
incurred. The ENGINEER shall permit the authorized representative of the CITY
to inspect and audit all data and records of the ENGINEER for work done under
this Agreement. The ENGINEER shall make these records available at reasonable
times during the Agreement period, and for a year after termination of this
Agreement.
6. TERMINATION OF AGREEMENT
Notwithstanding any other provision hereof, the CITY may terminate this Agreement at
any time upon fifteen (15) days prior written notice to the ENGINEER. In the event that
this Agreement is so terminated, the ENGINEER shall be paid for services actually
performed and reimbursable expenses actually incurred prior to termination, except that
reimbursement shall not exceed the task amounts set forth under Paragraph 4 above.
7. TERM
This Agreement shall become effective as of the date the ENGINEER is given a notice to
proceed and, unless terminated for cause or pursuant to Article 5, shall be deemed
concluded on the date the CITY determines that all of the ENGINEER's work under this
Agreement is completed. A determination of completion shall not constitute a waiver of
any rights or claims which the CITY may have or thereafter acquire with respect to any
term or provision of the Agreement.
8. NOTICE OF CLAIM
If the ENGINEER wishes to make a claim for additional compensation as a result of action
taken by the CITY, the ENGINEER shall give written notice of his claim within 15 days
after occurrence of such action. No claim for additional compensation shall be valid unless
so made. Any changes in the ENGINEER's fee shall be valid only to the extent that such
changes are included in writing signed by the CITY and the ENGINEER. Regardless of
the decision of the DIRECTOR relative to a claim submitted by the ENGINEER, all work
required under this Agreement as determined by the DIRECTOR shall proceed without
interruption.
9. BREACH OF CONTRACT
If either party violates or breaches any term of this Agreement, such violation or breach
shall be deemed to constitute a default, and the other party has the right to seek such
administrative, contractual or legal remedies as may be suitable to the violation or breach;
and, in addition, if either party, by reason of any default, fails within fifteen (15)days after
notice thereof by the other party to comply with the conditions of the Agreement,the other
party may terminate this Agreement. Notwithstanding the foregoing, or anything else to
the contrary in this Agreement, with the sole exception of an action to recover the monies
the CITY has agreed to pay to the ENGINEER pursuant to Paragraph 4 hereof, no action
shall be commenced by the ENGINEER against the CITY for monetary damages.
ENGINEER hereby further waives any and all claims or rights to interest on money
claimed to be due pursuant to this Agreement,and waives any and all such rights to interest
which it claims it may otherwise be entitled pursuant to law, including, but not limited to,
the Local Government Prompt Payment Act (50 ILCS 501/1, et seq.), as amended, or the
Illinois Interest Act(815 ILCS 205/1,et seq.),as amended. The parties hereto further agree
that any action by the ENGINEER arising out of this Agreement must be filed within one
year of the date the alleged cause of action arose or the same will be time-barred. The
provisions of this paragraph shall survive any expiration, completion and/or termination of
this Agreement.
10. INDEMNIFICATION
To the fullest extent permitted by law, ENGINEER agrees to and shall indemnify, defend
and hold harmless the CITY, its officers,employees,agents,boards and commissions from
and against any and all claims, suits,judgments, costs, attorneys fees, damages or other
relief, including but not limited to workers compensation claims, in any way resulting from
or arising out of negligent actions or omissions of the ENGINEER in connection herewith,
including negligence or omissions of employees or agents of the ENGINEER arising out
of the performance of this Agreement. In the event of any action against the CITY, its
officers, employees, agents, boards or commissions, covered by the foregoing duty to
indemnify,defend and hold harmless such action shall be defended by legal counsel of the
CITY's choosing. The provisions of this paragraph shall survive any expiration and/or
termination of this Agreement.
11. NO PERSONAL LIABILITY
No official, director, officer, agent or employee of the CITY shall be charged personally
or held contractually liable under any term or provision of this Agreement or because of
their execution, approval or attempted execution of this Agreement.
12. INSURANCE
A. Comprehensive Liability. The ENGINEER shall provide, pay for and maintain
in effect, during the term of this Agreement, a policy of comprehensive general
liability insurance with limits of at least$1,000,000 aggregate for bodily injury and
$1,000,000 aggregate for property damage.
The ENGINEER shall deliver to the DIRECTOR a Certification of Insurance
naming the CITY as additional insured. The policy shall not be modified or
terminated without thirty(30) days prior written notice to the DIRECTOR.
The Certificate of Insurance which shall include Contractual obligation assumed by
the ENGINEER under Article 10 entitled"Indemnification" shall be provided.
This insurance shall apply as primary insurance with respect to any other insurance
or self-insurance programs afforded to the CITY. There shall be no endorsement
or modification of this insurance to make it excess over other available insurance,
alternatively, if the insurance states that it is excess or prorated, it shall be endorsed
to be primary with respect to the CITY.
B. Comprehensive Automobile Liability. Comprehensive Automobile Liability
Insurance covering all owned, non-owned and hired motor vehicles with limits of
not less than $500,000 per occurrence for damage to property.
C. Combined Single Limit Policy. The requirements for insurance coverage for the
general liability and auto exposures may be met with a combined single limit of
$1,000,000 per occurrence subject to a$1,000,000 aggregate.
D. Professional Liability. The ENGINEER shall carry Engineers Professional
Liability Insurance Covering claims resulting from error, omissions or negligent
acts with a combined single limit of not less than $1,000,000 per occurrence. A
Certificate of Insurance shall be submitted to the DIRECTOR as evidence of
insurance protection. The policy shall not be modified or terminated without thirty
(30)days prior written notice to the DIRECTOR.
13. CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES,
PROCEDURES AND SAFETY
The ENGINEER shall not have control over or charge of and shall not be responsible for
construction means, methods, techniques, sequences or procedures, or for safety
precautions and programs in connection with the construction, unless specifically
identified in the Scope of Services.
14. NONDISCRIMINATION
In all hiring or employment made possible or resulting from this Agreement,there shall be
no discrimination against any employee or applicant for employment because of sex, age,
race, color, creed, national origin, marital status, of the presence of any sensory, mental or
physical handicap, unless based upon a bona fide occupational qualification, and this
requirement shall apply to, but not be limited to, the following: employment advertising,
layoff or termination, rates of pay or other forms of compensation and selection for
training, including apprenticeship.
No person shall be denied or subjected to discrimination in receipt of the benefit of any
services or activities made possible by or resulting from this Agreement on the grounds of
sex,race, color, creed, national origin, age except minimum age and retirement provisions,
marital status or the presence of any sensory, mental or physical handicap. Any violation
of this provision shall be considered a violation of a material provision of this Agreement
and shall be grounds for cancellation,termination or suspension, in whole or in part,of the
Agreement by the CITY.
15. ASSIGNMENT AND SUCCESSORS
This Agreement and each and every portion thereof shall be binding upon the successors
and the assigns of the parties hereto; provided, however, that no assignment shall be made
without the prior written consent of the CITY.
16. DELEGATIONS AND SUBCONTRACTORS
Any assignment, delegation or subcontracting shall be subject to all the terms, conditions
and other provisions of this Agreement and the ENGINEER shall remain liable to the CITY
with respect to each and every item,condition and other provision hereof to the same extent
that the ENGINEER would have been obligated if it had done the work itself and no
assignment, delegation or subcontract had been made. Any proposed subcontractor shall
require the CITY's advanced written approval.
17. NO CO-PARTNERSHIP OR AGENCY
This Agreement shall not be construed so as to create a partnership, joint venture,
employment or other agency relationship between the parties hereto.
18. SEVERABILITY
The parties intend and agreed that, if any paragraph, sub-paragraph, phrase, clause or other
provision of this Agreement, or any portion thereof, shall be held to be void or otherwise
unenforceable, all other portions of this Agreement shall remain in full force and effect.
19. HEADINGS
The headings of the several paragraphs of this Agreement are inserted only as a matter of
convenience and for reference and in no way are they intended to define, limit or describe
the scope of intent of any provision of this Agreement,nor shall they be construed to affect
in any manner the terms and provisions hereof or the interpretation or construction thereof.
20. MODIFICATION OR AMENDMENT
This Agreement and its attachments constitutes the entire Agreement of the parties on the
subject matter hereof and may not be changed,modified,discharged or extended except by
written amendment duly executed by the parties. Each party agrees that no representations
or warranties shall be binding upon the other party unless expressed in writing herein or in
a duly executed amendment hereof, or change order as herein provided.
21. APPLICABLE LAW
This Agreement shall be deemed to have been made in, and shall be construed in
accordance with the laws of the State of Illinois. Venue for the resolution of any disputes
or the enforcement of any rights pursuant to this Agreement shall be in the Circuit Court
of Kane County, Illinois.
22. NEWS RELEASES
The ENGINEER may not issue any news releases without prior approval from the
DIRECTOR, nor will the ENGINEER make public proposals developed under this
Agreement without prior written approval from the DIRECTOR prior to said
documentation becoming matters of public record.
23. COOPERATION WITH OTHER CONSULTANTS
The ENGINEER shall cooperate with any other consultants in the CITY's employ or any
work associated with the PROJECT.
24. INTERFERENCE WITH PUBLIC CONTRACTING
The ENGINEER certifies hereby that it is not barred from bidding on this contract as a
result of a violation of 720 ILCS 5/33E et seq. or any similar state or federal statute
regarding bid rigging.
25. SEXUAL HARASSMENT
As a condition of this contract, the ENGINEER shall have written sexual harassment
policies that include, at a minimum, the following information:
A. the illegality of sexual harassment;
B. the definition of sexual harassment under state law;
C. a description of sexual harassment, utilizing examples;
D. the vendor's internal complaint process including penalties;
E. the legal recourse, investigative and complaint process available through the
Illinois Department of Human Rights, and the Illinois Human Rights Commission;
F. directions on how to contact the department and commission;
G. protection against retaliation as provided by Section 6-101 of the Human Rights
Act.
A copy of the policies shall be provided by ENGINEER to the Department of Human
Rights upon request 775 ILCS 5/2-105.
26. SUBSTANCE ABUSE PROGRAM.
As a condition of this agreement, ENGINEER shall have in place a written substance abuse
prevention program which meets or exceeds the program requirements in the Substance
Abuse Prevention Public Works Project Act at 820 ILCS 265/1 et seq. A copy of such
policy shall be provided to the City's Assistant City Manager prior to the entry into and
execution of this agreement.
27. WRITTEN COMMUNICATIONS
All recommendations and other communications by the ENGINEER to the DIRECTOR
and to other participants which may affect cost or time of completion, shall be made or
confirmed in writing. The DIRECTOR may also require other recommendations and
communications by the ENGINEER be made or confirmed in writing.
28. NOTICES
All notices, reports and documents required under this Agreement shall be in writing and
shall be mailed by First Class Mail, postage prepaid, addressed as follows:
A. As to CITY:
Chris Tiedt
Senior Engineer
City of Elgin
150 Dexter Court
Elgin, Illinois 60120-5555
B. As to ENGINEER:
Greg Chismark P.E.
WBK Engineering, LLC
116 W Main Street Suite 201
St. Charles, IL 60174
29. COMPLIANCE WITH LAWS
Notwithstanding any other provision of this Agreement it is expressly agreed and
understood that in connection with the performance of this Agreement that the ENGINEER shall
comply with all applicable Federal, State, City and other requirements of law, including, but not
limited to, any applicable requirements regarding prevailing wages, minimum wage, workplace
safety and legal status of employees. Without limiting the foregoing, ENGINEER hereby certifies,
represents and warrants to the CITY that all ENGINEER'S employees and/or agents who will be
providing products and/or services with respect to this Agreement shall be legal residents of the
United States. ENGINEER shall also at its expense secure all permits and licenses,pay all charges
and fees and give all notices necessary and incident to the due and lawful prosecution of the work,
and/or the products and/or services to be provided for in this Agreement. The CITY shall have the
right to audit any records in the possession or control of the ENGINEER to determine
ENGINEER'S compliance with the provisions of this section. In the event the CITY proceeds
with such an audit the ENGINEER shall make available to the CITY the ENGINEER'S relevant
records at no cost to the CITY. ENGINEER shall pay any and all costs associated with any such
audit.
IN WITNESS WHEREOF, the parties hereto have entered into and executed this
Agreement effective as of the date and year first written above.
FOR THE CITY; FOR THE ENG ER:
By By:
Manager Name/Print: CAet per/(/,PJ,P/
Title: na '1t'i ;� - ,'"a -72l i&'1 lmc.
Attes .
41'4( AZ4)
City Clerk
F:\Legal Dept\Agreement\ENGINEERING AGREEMENT-FORM-01-23-12.doc
ATTACHMENT A
SCOPE OF SERVICES
1. DESIGN,ADMINISTRATION & PLANNING ENGINEERING ACTIVITIES
1.General:The Design Engineer will serve as the City of Elgin's representative for the entire
design and administration of the planning for the project as assigned by the City. As
such he will function as an extension of the City's staff and be responsible for overall
implementation and management of the project. The Design Engineer shall include
implementation of City policies, program administration, coordination and monitoring
of consultants and contractors providing overall management control and direction to
insure completion of the bidding and planning documents in accordance with the City's
objectives of cost, time and quality. The Design Engineer will work closely with and
report to the City Engineer or his designee. It shall be understood that the Design
Engineer will act as the City Engineer on this project and shall coordinate with other City
entities such as the Legal Department, City Clerk, Purchasing Director, Water Director,
and Public Services Director. The Design Engineer shall be responsible for acting as the
City Engineer on this project in regards to Federal, State and County issues as well.
2. Law: The Design Engineer is expected to understand all State, County and City Laws
governing the implementation of his bidding and planning documents.
2. DESIGN
1. a. Preliminary Design:
Project Kickoff: Establish lines of communication. Present a work plan for the project
including schedule milestones,design criteria (utilize existing standard City contract as a
base model), list of information needed to begin design.
Acquire existing information including previous reports plans of recent development
and relevant site information
Collect water, sanitary and storm atlases 10
Interview and document same, the Sewer, Water and Street departments for their
knowledge of issues within the project location. Collect and analyze public utility
records and notify utility of pending project.
c. Inspection of Project Location: The Design Engineer shall provide site inspection of the
entire area as well as immediately adjacent area.The following shall be included;
Physical inspection of all manholes, valve vaults, catchbasins, inlets, electrical vaults.
Video recording of existing improvements within and adjacent to the project location.
Also, private property as it abuts the project. Complete geotechnical investigations
where deem necessary by the Design Engineer.
Signage inventory. Pavement marking inventory.Trees I inventory. Lighting
inventory. Video Inspection of entire project.
d.Scope of Work Refinement: Based upon the collection of the above information, the Design
Engineer shall refine the scope of work, including an estimate of cost, and obtain
approval from the City. The Design Engineer shall include alternatives sufficient to insure
the base bid will be below the total budget(when considering testing, publications,
inspections and other typical costs found in construction projects).
e.Construction Documents: Design Engineer will complete plan sheets as necessary,
construction estimates, construction specifications, bid and contract documents utilizing
a City format.Any alterations or additions to the City format shall be highlighted and
fully explained to the City Engineer or his representative. Plan sheets shall be provided
for all underground work including water main, storm sewer and sanitary
improvements.
e.Scheduling: For this agreement,the Design Engineer shall develop a schedule for all steps
from execution of this agreement to contract award.The schedule shall be updated at a
minimum of every two weeks and submitted to the City Engineer or his designee.
f. Surveying: Base plan sheets will be developed from this survey at a scale of 1"=50'. 11
g. Construction Estimate: The Design Engineer shall prepare an estimate related to the
work the City desires to have completed under this project. In addition, the Design
Engineer shall set the project estimates up to allow for alternates to insure a project
may be bid and awarded as close to the budget as possible.
h. Agency coordination: At a minimum, the Design Engineer shall schedule meetings with
the City and any other interested agency, at about the midway point in their plan and
specification development to insure they are meeting the expectations of the City.
A second meeting shall be held with the City at approximately 95%completion to
finalize the bid, specifications and planning documents.
The Design Engineer shall prepare any and all necessary permits and documents
required by the Illinois Environmental Protection Agency, Illinois Department of
Transportation, or any other governmental agency that has a regulatory interest in the
project.
The Design Engineer shall coordinate with all public utility companies including
verification of the soundness of their structures and any potential relocations/delays.
3. BIDDING
1.Prepare bid forms, notices and addendum as necessary for bidders.
2.Coordinate with the local newspaper to insure the notice is published 10 days in advance of
the bid opening.
3.Provide (10) sets of drawings and specifications to be issued by the City to prospective
bidders on memory sticks that are USB compatible.
4.Attend pre-bid meeting with prospective bidders to provide clarification for issues and
concerns from bidders if needed.The Engineer will also distribute minutes from pre-bid
meeting to the City and all meeting attendees with written answers to
concerns/questions from the meeting.
5.The selected Engineer will receive bidder questions and requests for clarification. Based on
these questions and requests, the selected Engineer will prepare addenda as necessary
to respond to the questions presented. Addenda will be issued to the City for
distribution to the bidders.
6.Attend the bid opening and evaluate the bids and bidders to determine if the bids were
submitted in accordance with the contract documents and if the bidders are qualified to
perform the work. Following this review, a recommendation will be presented to the
City for award of the construction contracts.
7. Prepare tabulation of bids for distribution to City agencies and interested bidders.
8. Assist the City in the preparation of six(6) copies of final contracts for execution by the
successful bidder and the City.
ATTACHMENT B
PROJECT SCHEDULE
April Bidding of the Construction Project
May City Council Approval of the Construction Contract
June Start Work of the Construction Project
October Completion of Construction Contract
ATTACHMENT C
FEE SCHEDULE
r s I i j; •$ —S
j i a_
f
1
- • tit 0€ fir + -�
■
lj I I
C __ =X^
v
: 4 ;
i i,
t
P
1 j 1 1 it
$ I � 1I j
I
-Y - _, , r-----.-T.-R■
— - T t. .i
s 3
, I i ;
■
I
I r1 ' i
i d
` t 1 Ir r
3 I f Pd 1 3
� v 4 k l!iiil ;I JJJJ
1 • ,s-11 ■' IS
3 E -
lit - sQ!a • • b.rg
a �+o
J==AI -' •-r.,:'
-
' I
I;f1∎7471, I I rgrod VI Ivetoes 4 Ff rroN'V Fromm''I i now*ri I yrra 1 nw."'ry in....so wt.+
1.•••■••n.ICI l.U.b
1 1 Rove..L IOb111Y bww P 0166s g f ..._.._..._.. ._.....f_.* i —
1_ .1>SA.'Awls r mra/iM Rrw moor.L Wl444 !0 JI
• 5}cr+caavr roof At'•.arom ♦Fron t d 1161...4•411 4 21 . _ __. ._.._..—....
.....,•
_. r .... _.._..41, —�... .. ■
'4 Op,..a d pal lttxrl 4 i1•I111►ra ... ! t! _ ,.. ,.._._. _....._...
' Nan 0 5/rcOrrlo„wawa.*booed u,Cr}IV•rw . _....._.... _,.. ......_...�__—... _.................� _. .. _ t
1 6 014 P'OtPfs AfsrfYYA ._._.. 4
1 7 Ihgrrta,d Bra 716.AW..1 > 4
_ eprlgn J anal.4nrx—iTtocvrw�a _ ..� .._._ .__F 1 _._
14*TOT0a 100.0 10.0 000 04 0 U 1 1p 00�
1'l10CtM 54 ++ 4?* 44rt 441
! Con11/1KIIOa Swag.,44.111 ill tar.•ya.Va.+icwroa 01 OwaOtMw I l
... _..._v_
2
7 Rave*14svv•t0 9imArow's t... .._ 4
..
d 3 Dr,r corWn�ril 1r1`R.I k sots* ,vb Bo. 144 Kota. (Ixrww i Ores
' X
14 0 raC,aMa u]m Mows,•t+werq• r ..._1 .__..:..._..�_ _....._.__._.,..♦ • _
2 s cor.ln.:w+JOw•alo+I Jua,s.r•awa.r '17 ''?
`____.. . __ ___�..,___ 1 —,•
f 1 7jI nN O,awy t'Mw1'rvar r I+�Rtr.t aro 1_uwV B 0
ws Tdra 100 0 2 0 164 r 10!0' 1 000 10
Pt KENT 14, 46'S M's
iOTtitl ►y t!0 1 20A 0 27.0 10 6}t 1 041 10
/I IIGt MT >atl 1 _ 4's r..l� i.I •
•
. _ .
Consultant WSK Engines/Ong.LI.0 TASK 1 I ASK 2 I ASK 3
Construcuon Layout As
Design Fngineenrig
Built Surveys, Verification 0
Sennces
Ot Quantities
. I
, I T E M UNITS UNF I COST WANT TOTAL COST QUANT TOTAL COST QUANT _ TOTAL COST
. ...
'DIRECT COSTS
Postage&Shoppvig(UPS.I-ed-Es) UNI 1 $1 00 50 550(X) 50 55000 $000
Travel Mintage DAY S45 00 50 00 15 $ 7500 $0 00
T ravel Mileage MIL E 50 5.40 250 513500 250 513500 50 00
24 a 36 OW Bond Sheets SHE ET $0 60 50 00 50 00 $0 00
24 i 36 Color Rend Sheets SHUT T S21 00 50 00 50 00 $0 00
24 a 36 Mylar PTots SHEET 513 SO 10 00 50 00 50 00
24 a 36 Display Boards EACH $33.00 50 00 50 00 50 00
1 1 a 1/BYV PrioloccipieS SHEET 10 20 50 00 $0 00 $0 00
11 a 17 Coto,Pholocopaes SHEET $2 25 50 00 SO 00 SO 00
8'6i 11 RW Photocopies SIIIE 1 $0 15 SO 00 SO 00 SO 00
8 'A a 11 Color Photocopies SHEET $' 25 ,
$000 $0 00 $0 00
•
,
Small Report Binding EACH $40 00 $0 00 ' $0 00 $0 00
Medium Report Binding EACH 575 00 ,
, 50 00 $O 00 $0 00
Large Report Binding EACH $100 00 t $000 $0 00 $0 00
Pubsc Notice LNews Papal) UNIT $350 00 $0 00 SO 00 SO 00
Survey Equipment(Per Week) UNIT $700 00 $0 00 $0 00 SO 00
Specialty Equipment UNIT $1 00 50(X) 50 00 50 00
Permit Fees UNIT 51 00 50 00 50 00 50.00
PlarVInapection Review Fees UNIT 51 00 SO 00 $0 00 $0 00
Recording Fees UNIT $1 00 5000 $0 00 SO 00
T Me Commitments EACH $400 00 50 00 50 00 5000
Phase I Archectogical Survey UNIT $1 00 $0 00 $0 00 $000
Special Waste Radius Report UNIT ST 00 50 00 SO 00 $0 00
_
Sub-Togas 11115_00 1460.00 $0.00
WBK ENGINEERING, LLC
2016 Standard Charges for Professional Services
tl�t B�
Pnncipal $ 2'C
Engineer VI 5 185
Engineer V $ 165
Engineer rV $ 140
Erc sneer IIi S 117
Engineer II s 98
Enguseer I 5 84
Enginerrg Technician IV $ 138
Engineering Technicren III S 116
Engineenng Techrncian II S 97
Engineenng Technician I S 81
Senior Structurai Engineer S 170
Senor Scientist S 170
Ertwormer;al Resource Specaatst IV S '23
Environmer'tal Resource Spec ales li I S 94
Environmental Resource Spec.saAt li 5 85
Environmental Resource Specraust I 5 78
Urban Planner V S 18C
Urban Planner IV 3 144
Urban Planner III 3 120
Urban Planner u S 98
Urban Planner I S gr�
lardscape Arch tact 5 94
Professorial land Surveyor $ 130
Engineering Intern $ 45
Office Professional 1 62
Drect Costs Copies& Prints Messenger& Delivery
Services Wimp. etc. Cost+17'4
C►uirgt.t.s Include overhead and port?
WSK Fr►irrw rw ; CL C reserves the rrgir!to increase rates and
costs by 5%arnuaiTy