HomeMy WebLinkAbout2015 HLR south street extension amendment 1AMENDMENT AGREEMENT No. 1
THIS AMENDMENT AGREEMENT is hereby made and entered into this day of
2015, by and between the City of Elgin, Illinois, a municipal corporation
(hereinafter referred to as the "City"), and Hampton Lenzini and Renwick, Inc., a Delaware
corporation and an Illinois Licensed Professional corporation (hereinafter referred to as
"Engineer").
WHEREAS, the City and Engineer hereto have previously entered into an agreement dated May
24, 2006 wherein the City engaged the Engineer to furnish certain professional services in
connection with the South Street Extension (hereinafter referred to as "Subject Agreement" and
the "Project'); and
WHEREAS, the parties hereto have determined it to be in their best interest to amend Original
Agreement; and
WHEREAS, the City has determined that the proposed scope of the PROJECT should be
modified to include additional design services.
NOW, THEREFORE, for and in consideration of the mutual undertakings as set forth in the
Subject Agreement, and other good and valuable consideration, the receipt and sufficiency of
which is hereby acknowledged, the parties hereto agree as follows:
1. Section IB of the Subject Agreement is hereby amended by adding the following to the end
thereof:
3. Additional design services for the following items:
a. Waterford Londonderry Drive Extension
b. Waterford Unit 2 portion of South Street
c. Waterford Utility locating
d. Additional wetland evaluation
Additional explanation of each item included in Attachment A-1.
2. Section IVA of the Subject Agreement is hereby amended by adding the following to the
end thereof, "For supplemental services provided under this amendment, the ENGINEER
shall be paid at the hourly rate for the classifications of the personnel employed on this
PROJECT, with the total fee not to exceed $16,710 regardless of the actual costs incurred
by the ENGINEER unless substantial modifications to the scope of work are authorized
in writing by the DIRECTOR
3. The changes provided to the Subject Agreement as provided in this Amendment
Agreement are germane to the original contract as signed and this Amendment
Agreement is in the best interests of the City of Elgin and is authorized by law.
4. That except as amended in this Amendment Agreement the Subject Agreement shall
remain in full force and effect.
5. That in the event of any conflict between the terms of the Subject Agreement, and the
provisions in this Amendment Agreement, the provisions of this Amendment Agreement
shall control.
IN WITNESS WHEREOF, the undersigned have entered into and executed this Amendment
Agreement as of the date and year first written above.
• r /
Atte t:
City Clerk
CONSULTANT
By:�' p J".
Its President
Attest:
Its Secretary
Attachment A-1
Amendment Number 1
With
Hampton Lenzini and Renwick
For
South Street Extension Design
SUMMARY
*Roadway Design —Temporary Londonderry Connector $4,086
*Roadway Design — South Half of South St $6,605
*Utility Survey — Waterford Utilities adjacent to South St $2,051
*Additional Wetland Evaluation —Threatened and Endangered Species Survey (T&E)
for the portion of wetland on the city section $3,964
Various scope of work items added to the 2006 agreement total $16,710
ROADWAY DESIGN
Temporary Londonderry Connector
In early summer of 2009, it became apparent that the detailed design of Londonderry Drive from the
end of the pavement constructed north of Wexford Drive to the proposed intersection with South Street
would not be furnished to the City. In order to provide a logical terminus for South Street and In
consideration of emergency services and overall traffic circulation, HLR was asked by the City to design a
roadway connection from the South Street Extension to existing Londonderry Drive.
This work was done between September 2009 and January 2010, and included the man-hours and costs
summarized on the attached spreadsheet.
CITY OF ELGIN
South Street Extension
Design Temporary Londonderry Connector
8129109 to 1130110
HLR TASKS, HOURS, FEES
CLASSIFICATION E9 E4 T5 C2
TASK 145.29 99.99 84.32 71.21 HOURS COST
1
Set up base sheet (develop existing topography for bullt
portion of Londonde
1
4
s
$437
2.
Incoporate existing utility information (from development plans
and field survey)
2
4
6
$537
3.
Typical section
1
1
2
$184
4.
Set pmpowd profile
2
2
5200
5.
Set ditch gradesantl providefor draina
4
1 4
5w9
7.
Proposed planIs profile sheet
2
8
10
5875
e.
Research delineators (MUTCD) for curve from South St. lo
Londonderry
2
sem
e.
Calculate quantilles 1 1
2
1
s208
10
Quantifies&revise estimate
2
2
S20o
it
ISpecial provision i i
2
1
$271
12.
lPmjed administration; consultation & coordination' OCIOA 4
4
5581
TOTALS 4
20
17
1 35
$4.M
ROADWAY DESIGN
South Half of South Street Sta. 20+85 to 31+60
Under the original scope of the South Street Extension project, the City was to design and construct the
north half of the roadway from approximately Station 20+85 to Station 31+60, with the south half being
designed and constructed as part of Waterford Neighborhood 1. In December of 2007, HLR was
instructed by the City to complete the design of the south half of the roadway, which would be built as
part of the City's construction contract.
Survey. To this point, HLR had no survey data south of the proposed centerline of South Street other
than cross sections provided by the development engineer showing existing conditions. At several
locations, the existing cross sections did not extend to the proposed right-of-way line. in order to
complete the design of the south half of the roadway, including the required embankment and
proposed sidewalk, and to quantify the work to be included in the City's construction contract, an HLR
survey crew performed a topographic survey to supplement our information to the south of the
proposed centerline in this area. This survey work was performed on February 15 and 18, 2008.
Design, The supplemental survey data was then imported into the existing point data, a revised TIN
(triangular irregular network) was run, and new existing conditions cross sections were generated.
After updating existing conditions, HLR completed the design of the south half of the roadway. The
geometric requirements had previously been set, but the cross sections required extensive revisions to
Include the proposed sidewalk, embankment and excavation and undercut for unsuitable materials.
Revisions to the plan and profile sheets were also required, as well as recalculation of roadway and
earthwork quantities and updating of summary of quantities, schedules of quantities and engineer's
estimate. The design work was performed during March through June of 2008.
The man-hours and costs associated with the work described herein is detailed in the accompanying
spreadsheet.
CITY OF ELGIN
South Street Extension
Design of South Half of South Street
(section adjacent to Waterford Neighborhood 1
Sta. 20+85 to Sto. 31460 t)
2115108 to 6130106
HLR TASKS, HOURS, FEES
CLASSIFICATION E9 E5 Ts T3
TASK 47.03 31.13 25.63 18.45 HOURS COST
1. Field serve to extend x -sections to proposed ROW
7
7 14
$635
2, Existing conditions revisions (Import points, renin TIN,
Aerate new x -sections
16
18
51 243
3_ Revise proposed xsections (include right side roadway
lus sidewalk undercuts
12
6
to
$1.593
4. Revise n 8 rde sheets
4
4
Eesti
5. Revise earthwork entitles
6
6
4586
6. Revise roadwayquantities and estimate
6
2
s
1721
7.
Pro ct administration; consultaWn S coordination; QC/QA 6
e
$ecs
TOTALS 6
26
35
71 681
5616051
UTILITY SURVEY
In February 2009, HLR received available as -built information relative to storm sewer, water main and
electrical utilities in Waterford adjacent to the South Street Extension. Since this information was
sketchy at best and appeared to be incomplete, and since the design of the south side of South Street
had become the City's responsibility in this area, HLR performed the field work necessary to complete
the provided information and to update existing conditions.
This work was done in March of 2009 and included the man-hours and costs summarized on the
attached spreadsheet.
CITY OF ELGIN
South Street Exbnalon
VerM,adon or Waterford Utility Locations Adjacent to South Street
3123109, 312"9, 3125109
HLR TASKS, HOURS, FEES ,,, ���,e,rennu Fe E< T7 T5
T & E SURVEY
Eastern Prairie Fringed Orchid Screening
In August of 20DS, the US Fish and Wildlife Service required that the project site be screened for the i
endangered Eastern Prairie Fringed Orchid. This screening was outside the original scope of the project
and was performed by Huff and Huff between June 28 and July 11, 2009. The screening was negative.
The cost of the screening was $3,963.64. A copy of Huff and Huff's invoice is attached.
CITY OF ELGIN
South Street Extension
Threatened and Endangered Species Survey - Eastern Prairie Fringed Orchid
Between June 29, 2009 and July 11, 2009
Work performed by Subconsultent - Huff a Huff
HLR TASKS, HOURS, FEES
CLASSIFICATION E9 E4 T7 T5 DIRECT
TASK HOURS COST
1. Threatened 4 vev 67 33,963.64
TOTALS 0 0 0 0 67 53,963.64
NOW. This incudes SQOw suxants Cost. Ovettread, Feed Fee, and Mileage on are, sepa2te trips b the site dis'mg this timehame.