Loading...
HomeMy WebLinkAbout15-7 Resolution No. 15-7 RESOLUTION APPROVING CHANGE ORDER NO. 1 AND FINAL FOR THE CONTRACT WITH EARTHWERKS LAND IMPROVEMENT& DEVELOPMENT CORP. FOR THE CONSTRUCTION OF JACK E. COOK PARK AND FOREST PRESERVE WHEREAS, the City of Elgin has heretofore entered into a contract with Earthwerks Land Improvement & Development Corp. for the construction of Jack E. Cook Park and Forest Preserve; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 and Final, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Sean R, Stegall, City Manager, be and is hereby authorized and directed to execute Change Order No. 1 and Final, a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: January 28, 2015 Adopted: January 28, 2015 Omnibus Vote: Yeas: 9 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk OF Et. y - City of Elgin Change Order rG �TaTFS)FF-� ELGIN, ILLINOIS PROJECT No. 44040.001 CHANGE ORDER No. 1 AND FINAL CONTRACT: General Construction Jack E. Cook Park Bid No. 13-031 SCOPE: Amendments to the Construction Document for permit required changes identified in Construction Bulletin #001, dated 07/25/2013, issued to Earth Werks Land/Development Corp. on 08/05/2013. Z , ,J� �� + w' REASONS FOR CHANGE: • The circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed. • The change is germane to the original contract as signed. • The change order is in the best interests of the City of Elgin and authorized by law. SUMMARY OF CHANGES IN CONTRACT AMOUNT: The Contract is being amended to increase the contract amount. The changes will not result in a change to the contract provisions or contract time for work to be completed. ORIGINAL CONTRACT AMOUNT: $889,000.00 BASIS FOR THIS CHANGE ORDER NO. 1 AND FINAL: The changes are required to install box culverts and construct drainage swales allow surface run- off from the parcel to the east to flow through the park site to the creek west of the park site; to provide additional survey work; and to provide additional topsoil and grading. TOTAL FOR CHANGE ORDER NO. 1 AND FINAL: $74,869.18 PREVIOUS CHANGE ORDER(S): TOTAL OF PREVIOUS CHANGE ORDERS: TOTAL REVISED CONTRACT AMOUNT: $963,869.18 rovt.MQ,,.f• 41- The original amount of the contract with Earth Werks Land Development Corp. is $889,000.00. Change Order No. 1 and Final will increase the original contract amount by a total of$74,869.18, that sum rep- resenting 8.42% of the original contract amount. The new contract amount, inclusive of all change or- ders is$963,869.18. OTHER CONTRACT PROVISIONS: All other contract provisions remain the same. CHANGE ORDER No. 1 Agreed to this 14 day of January , 2015 Recommended by: PARKS AND RECREATION DEPARTMENT By: _Randy Reopelle Title: Parks and Recreation Director Date: /— 1'0 / .4, orSignature: / • ;1' ----//' '1--1—4 IF Accepted by: EARTH WERKS LAND/DEVELOPMENT CORP., Contrac By: .t)A-0./ .3 A v/g3 ,r- 4—•••• AC.*- It v`, Title: Date: . 1 • 4111), '''' •. ...•..e),:le ,-- Signature: Approved by: CITY OF ELGIN By: Sean R. Stelzall Title: City Manacer Date: January 28,,2015 Signature: , F:\Legal Dept\Agreement'Chann Order-Earth Verks-Jack Cook Park No1-12-16-14 docx t APPROVED De rt7t of Natural Resources D vlsi n fGrait Administration _ _ elk ik'-' 11•44411/) Date: P- 1 4 If iiiiS frat0