Loading...
HomeMy WebLinkAbout15-157 Resolution No. 15-157 RESOLUTION APPROVING CHANGE ORDER NO. 1 FOR THE CONTRACT WITH COPENHAVER CONSTRUCTION, INC. FOR 2015 CENTRAL BUSINESS DISTRICT STREETSCAPE IMPROVEMENTS WHEREAS, the City of Elgin has heretofore entered into a contract with Copenhaver Construction, Inc. for 2015 Central Business District Streetscape Improvements; and WHEREAS,it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Sean R, Stegall, City Manager,be and is hereby authorized and directed to execute Change Order No. 1,a copy of which is attached hereto and made a part hereof by reference. s/David J. Kaptain David J. Kaptain, Mayor Presented: December 2, 2015 Adopted: December 2, 2015 Omnibus Vote: Yeas: 9 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk OF Cr, Change Order . �--- City of Elgin ELGIN,ILLINOIS PROJECT: 2015 Central Business District Streetscape Improvements CHANGE ORDER No. 1 CONTRACT: 2015 Central Business District Streetscape Improvements with Copenhaver Construction, Inc. (the "Contractor") (Bid Number 15-032) CHANGES TO CONTRACT: I. Alternate Bid C. The scope of alternate Bid C relating to curb removal and concrete planter curb repairs for planter beds is expanded to provide for curb removal and concrete planter curb repairs to all of the existing 132 planter beds in the Central Business District. The Contractor shall provide pursuant to alternate Bid C the following labor and materials for all of the existing 132 planter beds in the Central Business District: (I) remove existing fencing; (2) remove and replace the curb at each fence post installation (buff color); (3) cut existing fence posts to 18" in height and modify the fence to attach a bracket to each post for surface mounting: and (4) reinstall existing fencing at all planter beds with new brackets for surface mounting in the same manner as the planter and fence details for new fencing to he provided for the project per sheet number L-09 and per SPECIAL PROVISIONS for ORNAMENTAL METAL FENCE. 18" LIT. 2. Alternate Bid B. Alternate Bid B relating to repaint fence (various locations) is eliminated from the scope of work. There will he no painting of the fencing on the repaired planter beds required (this does not apply to the new planter beds included in the contract). 3. Completion Dates. Extend Substantial Completion date to OC LADei 3O . 2016. Extend Final Completion date to ACJA;Y'^ _ 3,3 —, 2016. REASONS FOR CHANGES: • The changes are germane to the original contract as signed • The change order is in the best interests of the City of Elgin and authorized by law SUMMARY OF CHANGES IN CONTRACT AMOUNT: The amount of alternate Bid C is increased from $21,576 to $32,736. The amount of alternate Bid B is being reduced from $12,700 to zero. The net total amount of Change Order No. I is a reduction in the total contract price in the amount of'$I.540. ORIGINAL CONTRACT AMOUNT: $3.613.126.30 CHANGE ORDER No. I Increase alternate Bid C from $21.576 to $32.736 $11.160.00 Decrease alternate Bid B from 512.700 to zero -12.700.00 TOTAL FOR CHANGE. ORDER NO. I: DEDUCT $1,540 LO'IAL REVISED CONTRACT T AMOI,'N I.: $3.611.586.30 he original amount of the contract w ith Copenhayer Construction. Inc. is $3.613.126.30. Change Order No. I will decrease the original contract amount h■ a total of$1.540. The new contract amount. inclusive of Change Order No. I. is $3.611.586.30. OTHER CONTRACT PROVISIONS: Except as amended herein. the contract provisions shall remain the same. CHANGE ORDER No. I Agreed to this/3'`day of November. 2015. Recommended by CITY OF ELGIN Engineering Department By: Joseph Evers "Title: City Engineer Date: /! Signature Accepted by: COPENHAVER CONSTRUCTION, INC. Party of the Second Part (Contractor) By: 1j�ti l A.'/),: L,c;-'_ Title: Date: _ / Signature: 1-4 < Approved by: CITY OF ELGIN Party of the First Part (Owner) 13v: Sean R. Steuall____---_-------__ _-- Title: Cit) Manager Date: Decemb 2 15 Signature: I I real I)cpt,\grccrn,nt l hang,(lyder-1 op,nhm,r In•-3015 l cntral Horror,.I)i,t'r chc tpc Joe■