Loading...
HomeMy WebLinkAbout15-146 Resolution No. 15-146 RESOLUTION REPEALING RESOLUTION NO. 15-105 AUTHORIZING EXECUTION OF AN AGREEMENT WITH HAMPTON, LENZINI AND RENWICK, INC. FOR ENGINEERING SERVICES IN CONNECTION WITH THE McLEAN AND BIG TIMBER ROAD RAILROAD SIGNAL IMPROVEMENTS PROJECT WHEREAS, the City Council of the City of Elgin has previously adopted Resolution No. 15-105 authorizing execution of an agreement with Hampton, Lenzini and Renwick, Inc. for engineering services in connection with the McLean and Big Timber Railroad Signal Improvements Project; and WHEREAS, the form of the approved agreement was the city's standard engineering services agreement; and WHEREAS, it has since been determined that the Illinois Department of Transportation which is reimbursing certain costs for the project is requiring that the form of the engineering services agreement be the Illinois Department of Transportation form agreement; and WHEREAS, it is therefore necessary to repeal the previous Resolution No. 15-105 and to terminate the prior engineering services agreement for this project and to enter into a new agreement in the form provided for and required by the Illinois Department of Transportation for the project. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Resolution No. 15-105,previously adopted by the City Council on August 12, 2015, be and is hereby repealed and that the previous agreement between the City of Elgin and Hampton, Lenzini and Renwick, Inc., dated August 12, 2015, authorized by such a resolution be and is hereby terminated. s/David J. Kaptain David J. Kaptain, Mayor Presented: November 4, 2015 Adopted: November 4, 2015 Omnibus Vote: Yeas: 9 Nays: 0 Attest: s/Kimberly Dewis Kimberly Dewis, City Clerk Mayor David J. Kaptain ill ► i C ty Council Richard Dunne E LG I N Terry Gavin Rosamaria Martinez THE CITY IN THE SUBURBS Tish S. Powell John Prigge Carol Rauschenberger Toby Shaw F.John Steffen October 23, 2015 City Manager Mr. David H. Hinkston, President Sean R.Stegall Hampton Lenzini & Renwick 380 Shepard Drive Elgin, IL 60123 Re: IDOT Preliminary Engineering Services Agreement For McLean Blvd at Metra Railroad Dear Mr. Hinkston, The determination by the Illinois Department of Transportation (IDOT) requiring that their own engineering services agreement be executed for the McLean/Big Timber at Metra Railroad project has necessitated two resolutions to be brought forward and approved by the City Council. At the November 4, 2015 City Council Meeting, the original agreement in the form of the city's standard engineering services agreement which was executed on August 12, 2015 will be repealed through a resolution. At the same council meeting, a new resolution will be placed on the consent agenda for the second agreement in the form of the IDOT engineering services agreement in lieu of the city's standard engineering services agreement. Please sign below acknowledging that HLR agrees that the original engineering services agreement be terminated and the second agreement(IDOT engineering services agreement)will be entered in lieu thereof. Sincerely, Acknowledged and Approved Gregory J. Rokos, P.E. 7 , Public Services Director Hampton Lenzini & Renwick Date: S 150 Dexter Court,Elgin, IL 60120 847-931-6100 www.cityofelgin.org