HomeMy WebLinkAboutCCDATE=SEPTEMBER 05, 2001 (5) • NIT I'ihen moved to approve the Findings ofpaet for Petition 49 01 as submined. Mr Krebsbach
seconded the nation, which was adopmd by a vote of rix yes and zuo no.
Oath Adminislered: Thu conn reporter administered the Cath to all pc a sons desiring in testify.
PE -ITION '1'0 BE HEARD:
COV lb DfRATION OF PETITION St-01 REOUFSTING A VAR ATION OF THE FI.GhN
Z NNGORDINANCF.. SECTION194Q!KCE I C.1TRA�'SITIO\ BUILDINGSEfRACK
TDLNIITANEDIJCTIONOFTIIEM ,lMtIM,REOUIRFO UILDING SIlTU C—KFUL
A_I'RA1 ION LME IN THE CI GEN RAI, INDUSTRIAL DISTRICT' PFOPzR'1'Y
LOCATED ATI460SHFLDONDRL%'FBY.SCHOOI.DISTRICTU-efi AS @fPITC.AN9AN�
OWNER.
MOI,I NAD UPfFD -6YESONO_
Testimony is contained within a verbatim Transcript recorded at the public hearing and within a
Vanation Review prepared bythe Cotrununiry Development Group. The applicant presented the
petition. No ohjeaorswerepresavt. Mr.Langluismovedto ncoumtend approval ofPetibon 53-01,
subject to the conditions for approval as outlined in the Variation Review_ Mi, Ehenrwondedlhc
notion, which m as adopted by a vote of six yes and zero no.
• SUNINIARV OF PENDING APPLICATIONS: Mr_ Sundland give a summary of ponding
applications.
0'1'HRRBUSINRSS: None.
ADJOURNMENT: Tlecre being no l'wilter business, Chairman Natalia adjoumod the meutiug at
z» PL
Respectfully submitted,
Lauren Kieck, Secretary
DATE APPROVED BY THE ZONING AND SUBDIVISION HEARING BOARD
•