HomeMy WebLinkAboutCCDATE=JULY 17, 1997 _ EMERGENCY TELEPHONE; SYSTEMS BOARD OF ELGLN
., MINUTES
.JULY 17, 1997
Present: Donna Scott
Rill Diamond
JoAnn Foley
Jim Bums, Ciampa r
Luti Moses, Detector
Rov Hcndenon
Absent: Stan Splint
SAI L—Tfl_-Q-11Dl
The nme5np vms called to order at 3'43 PAI , by Chairmen Burns.
AEFROVAT.$))f_PRREV1011fa MONI '. \ll\IJ't5
Fir. Deno and nide a nation to introit the minutes ofthe April P, 1997 meetin_ Ms. Scott
seconded and the motion carried.
AljL1DRIZF'. Pel_\IE\T (1)_t��Lf]
NULmancesAmeriech is .itill i nthe trews of carrecti rip the monthly invoice si ace w e entered into
tiro new 5year contract
SLTURCWRTS:
SAKI List
Phase I of the CAD Project will be rescheduled for the fall of 1999 pending cmnpleamIL of the PIIS
Departments Gmiservices Project for the City Geogruphicd Information Sysam. The genorvme,
pro,i n will provide the scotle for the CAD system to fran on. The CAD stem can nut be
implemented until the geofile is complete We will have CAI) functionality for dispatch enter
operations only at time. Phase H ofthe Project (AVL, mapping, NICT'a) will be ucgemd for [lie
2nd yuareer of 1993.
The Fre DoPanment is reacuchirm CDPD(Cellular Data Packet Distribution) at an option m nm her
laptops on i stood of MA RTS due to their need for more functional m Vum admit Engineering may
mud to be contracted to do w evaltan on of tris option. The CAD Committee wirier usludim members
of the Fire Department, will continue to research and keep the board posted. I he board world be
willing in consider contracting with Vegemoat Engimal to evmltmte tris option if nemisary