Loading...
HomeMy WebLinkAbout08-234 Resolution No. 08-234 RESOLUTION APPROVING CHANGE ORDER NO. 8 IN THE CONTRACT WITH REIKE OFFICE INTERIORS FOR FIRE STATION NO. 7 WHEREAS, the City of Elgin has heretofore entered into a contract with Reike Office Interiors for flooring installation at Fire Station No. 7; and WHEREAS,it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 8, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Olufemi Folarin,City Manager,be and is hereby authorized and directed to execute Change Order No. 8,a copy of which is attached hereto and made a part hereof by reference. s/Ed Schock Ed Schock, Mayor Presented: October 8, 2008 Adopted: October 8, 2008 Omnibus Vote: Yeas: 5 Nays: 0 Attest: s/Diane Robertson Diane Robertson, City Clerk City of Elgin Change Order ELGIN,ILLINOIS PROJECT 289506 CHANGE ORDER No. 8 CONTRACT: Construction of Fire Station 7 (Bid No. 06-053) SCOPE: On June 13, 2007, the City Council awarded a contract to Reike Office Interiors for the ce- ramic and Carpet Flooring of Fire Station#7 totaling$59,456. After the bid packages were awarded, the flooring selections were changed to reflect the City Green Building" initiative for materials that had a higher post consumer content of recycled material. The changes in the flooring material costs represents a higher post consumer content of recycled material and the charge for work that was created by another contractor(Weaver Construction). REASONS FOR CHANGE: Change Order No. 8 is in the best interest of the city and is authorized by law. The necessity for the change was unforeseen at the time the contract was originally executed. The changes contemplated in Change Order No. 8 are germane to the original agreement. SUMMARY OF CHANGES IN CONTRACT AMOUNT: The original contract will be amended as to scope and costs to include the change in flooring materials and additional work completed. ORIGINAL CONTRACT AMOUNT: $59,456 CHANGE ORDER No. 8 Change in flooring materials $8,667 TOTAL FOR CHANGE ORDER NO. 8 ADD $8,667 PREVIOUS CHANGE ORDER(S): Change Order No. $0 TOTAL OF PREVIOUS CHANGE ORDERS: ADD $0 TOTAL REVISED CONTRACT AMOUNT: $68,123 The original amount of the contract with Reike Office Interiors is $59,456. Change Order No. 8 totaling $8,667 will increase the original contract amount by a total of$8,667,that sum representing fourteen and six tenths percent(14.6%) of the original contract amount. The new contract amount, inclusive of all change orders is $68,123. OTHER CONTRACT PROVISIONS: All other contract provisions remain the same. CHANGE ORDER No. 8 October 9,2008 Agreed to this 9th day of October, 2008. Recommended by: Fire Department By: Mike Baker Title: Assistant Fire Chief Date: T /(OlUy Signatur&- Accepted by: Reike Office Interiors Party of the Second Part(Contractor) By: (11#18/s 1024 ru c Title: e,6 C-S/ f)ic-/j 7— Date: O Signature: 62k, Approved by: CITY OF ELGIN Party of the First Part(Owner) By: Olufemi Folarin Title: Cily Manager Date: Signature: September 18, 2008 TO: Mayor and Members of the City Council FROM: Olufemi Folarin, City Manager SAFE connnn�,Ni ry John Henrici, Fire Chief SUBJECT: Change Order No. 8 for the Construction of Fire Station 7 PURPOSE The purpose of this memorandum is to provide the Mayor and members of the City Council with information to consider authorizing Change Order No. 8 to the contract with Reike Office Interiors for the ceramic and carpet flooring installation for Fire Station 7. RECOMMENDATION It is recommended that the City Council authorize the execution of Change Order No. 8 to the contract with Reike Office Interiors for the ceramic and carpet flooring installation for Fire Station 7 in the amount of$8,667. BACKGROUND On June 13, 2007, the City Council awarded a contract to Reike Office Interiors for the ceramic and carpet flooring installation for Fire Station 7 in the amount of$59,456. After the bid packages were awarded, the flooring selections were changed to reflect the City "Green Building" initiative for materials that had a higher post consumer content of recycled material. The changes in the flooring material costs represent a higher post consumer content of recycled material and the charge for work that was created by another contractor (Weaver Construction). The total cost of Change Order No. 8 with Reike Office Interiors is $8,667 for a total contract price of$68,123. COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED None FINANCIAL IMPACT The total cost of Change Order No. 8 with Reike Office Interiors is $8,667. The total budget for this project is $5,432,443 with $5,330,660 spent and/or encumbered to date. There are sufficient Change Order No. 8 for Ceramic and Carpet for Fire Station 7 September 18, 2008 Page 2 funds budgeted ($483,750) and available ($48,542) in the 2008 Riverboat Lease Fund, account number 276-0000-791.30-03, "Architectural and Engineering" project 289506, "Fire Station 7" for the change order. LEGAL IMPACT None ALTERNATIVES 1. The City Council may choose to approve Change Order No. 8 with Reike Office Interiors for the ceramic and carpet flooring installation for Fire Station 7 in the amount of$8,667. 2. The City Council may choose not to approve Change Order No. 8 with Reike Office Interiors for the ceramic and carpet flooring installation for Fire Station 7 in the amount of$8,667. Respectfully submitted for Council consideration. JH/wmb attachments