HomeMy WebLinkAbout08-195 Resolution No. 08-195 RESOLUTION APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH DINATALE CONSTRUCTION, INC. FOR THE 2008 NEIGHBORHOOD RESURFACING MILLER/EDISON PROJECT WHEREAS, the City of Elgin has heretofore entered into a contract with DiNatale Construction, Inc. for the 2008 Neighborhood Resurfacing-Miller/Edison Project; and WHEREAS,it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Olufemi Folarin,City Manager,be and is hereby authorized and directed to execute Change Order No. 1, a copy of which is attached hereto and made a part hereof by reference. s/Ed Schock Ed Schock, Mayor Presented: August 27, 2008 Adopted: August 27, 2008 Omnibus Vote: Yeas: 4 Nays: 0 Attest: s/Diane Robertson Diane Robertson, City Clerk s ELGIN, ILLINOIS PROJECT 59910D CHANGE ORDER No. 1 CONTRACT: 2008 Neighborhood Resurfacing—Miller/Edison Project SCOPE: This Change Order No. 1 will provide additional quantities to existing contract items in order to complete additional water main replacement in conjunction with the 2008 Neighborhood Resurfacing—Miller/Edison Project. This change order affects a contract entered into between the City of Elgin and DiNatale Construction, Inc. of Addison, IL, dated March 12, 2008 for the 2008 Neighborhood Resurfacing —Miller/Edison Project. REASONS FOR CHANGE: This Change Order No. 1 is in the best interests of the City and is authorized by law. The necessity for the changes was unforeseen at the time of the original agreement, and the changes contemplated hereby are germane to the original agreement. SUMMARY OF CHANGES IN CONTRACT AMOUNT: The amount the contract will be revised is as follows: Attachment A is incorporated herein and describes the additional work to be performed by the Contractor and additional contract amounts to be paid by the City in this Change Order No. 1. The original contract with DiNatale Construction, Inc. is $1,477,909.25. By reason of Change Order No. 1, the contract for the 2008 Neighborhood Resurfacing—Miller/Edison Project will be increased in the amount of two hundred two thousand five hundred sixty nine and 50/100 dollars ($202,569.50). This Change Order No. 1 will result in an increase from the original contract amount of 7.29%. The new contract amount,inclusive of Change Order No. 1 is one million six hundred eighty thousand four hundred seventy eight and 75/100 dollars ($1,680,478.75). • F. CHANGE ORDER No.1 July 25, 2008 Page 2 OTHER CONTRACT PROVISIONS: All other contract provisions of the original agreement shall remain the same. Agreed to this 27th day of August , 2008. Recommended by: ENGINEERING DIVISION By: Title: Date: el, -/p g Accepted by: DiNatale CONSTRUCTION,INC. Party of the S-cond Part(Contractor) 41111111■%/ � di By: Title: v Date: /;;%#04 Approved by: CITY OF ELGIN Party of the First Part (Owner) By: Oluf_tii Folari' Title: City .na Date: August 27, 2008 t. Edison Water Main from Erie to South St Total Est Cost= $202,569.50 Item Qty Unit cost Tot Cost 1 6" DIP w/main 50 $52.00 $2,600.00 2 8" DIP w/main 1035 $57.50 $59,512.50 3 5' Dia W 2 $1,700.00 $3,400.00 4 8"Gate Valve 2 $900.00 $1,800.00 5 Cut-In connection 2 $5,000.00 $10,000.00 6 Fire Hyd 3 $2,850.00 $8,550.00 7 Hyd to be removed 1 $250.00 $250.00 8 Near Side Service 14 $1,000.00 $14,000.00 9 Far Side Service 14 $1,500.00 $21,000.00 10 Fittings 1000 $5.00 $5,000.00 11 Neenah R-1713 2 $210.00 $420.00 12 C&G 1300 $19.00 $24,700.00 13 Dr Appr 225 $45.00 $10,125.00 14 Class D Patch 700 $22.00 $15,400.00 15 Bit Surf Course 112 $54.75 $6,132.00 16 2" Bit Surf Rem 3900 $4.45 $17,355.00 17 Sodding 300 $7.75 $2,325.00 r giff vim.. August 7, 2008 , r TO: Mayor and Members of the City Council Y Y FROM: Olufemi Folarin, City Manager David Lawry, P.E., General Services Group Director SUBJECT: Change Order No. 1 for the 2008 Neighborhood Resurfacing — Miller/Edison Project PURPOSE The purpose of this memorandum is to provide the Mayor and members of the City Council with information to consider authorization of Change Order No. 1 for the subject project. RECOMMENDATION It is recommended that the City Council authorize the City Manager to execute Change Order No. 1 to the contract with DiNatale Construction, Inc. for the 2008 Neighborhood Resurfacing— Miller/Edison Project in the amount of$202,569.50. BACKGROUND On March 12, 2008, the City Council awarded the subject project to DiNatale Construction, Inc. The project includes, where necessary, the removal and replacement of curb & gutter, sidewalk, drive approaches and pavement lane repair. The existing pavement will be ground out and overlayed with 5 inches of new bituminous concrete. The project also includes the replacement of approximately 1,100 L.F. of 8 inch diameter water main. Change Order No. 1 ($202,569.50) will add additional quantities to existing pay items to replace the water main on Edison Street from South Street to Erie Street. A copy of Change Order No. 1 is attached as Exhibit A. In the last few years, the existing water main on Edison Street from South Street to Erie Street has experienced frequent breaks and is in need of replacement. With the recent completion of the new sludge transfer main and the water main breaks, Edison Street is in need of resurfacing. It is being recommended that the water main be replaced before the street is resurfaced. The contractor completing the Miller/Edison Resurfacing Project has agreed to honor his existing unit prices for the additional work. The change order includes all costs associated with replacement of the water main and restoration of the street. r Change Order No. 1 for Miller/Edison Resurfacing August 7, 2008 Page 2 COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED None FINANCIAL IMPACT The cost of Change Order No. 1 totals $202,569.50. Funds for the water main replacement are available in the water portion of the 2005 General Obligation Bond Fund, account number 365- 4000-795.93-41, "Distribution Systems", project number 409665, "Lime Residue Disposal Main" with $1,141,500 budgeted and $554,719 available. The revised contract amount with DiNatale Construction will be $1,680,478.75. LEGAL IMPACT None ALTERNATIVES 1. The City Council may choose to approve Change Order No. 1 with DiNatale Construction, Inc. in the amount of$202,569.50. 2. The City Council may choose not to approve Change Order No. 1 with DiNatale Construction Inc. Respectfully submitted for Council consideration. do Attachment