HomeMy WebLinkAbout08-183 Resolution No. 08-183
RESOLUTION
AUTHORIZING EXECUTION OF A FACADE IMPROVEMENT
PROGRAM AGREEMENT WITH MAD MAGGIE'S
(51 South Grove Avenue)
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that
Olufemi Folarin,City Manager,and Diane Robertson,City Clerk,be and are hereby authorized and
directed to execute a facade improvement program agreement on behalf of the City of Elgin with
Mad Maggie's for the property commonly known as 51 South Grove Avenue, a copy of which is
attached hereto and made a part hereof by reference.
s/Robert Gilliam
Robert Gilliam, Mayor Pro Tem
Presented: August 13, 2008
Adopted: August 13, 2008
Omnibus Vote: Yeas: 5 Nays: 0
Attest:
s/Diane Robertson
Diane Robertson, City Clerk
CITY OF ELGIN
FACADE IMPROVEMENT PROGRAM AGREEMENT
51 S Grove Street
THIS AGREEMENT is made and entered into this cif day of r LY , 2008,by
and between the City of Elgin, Illinois, a municipal corporation (hereinafter referred to as "City"),
monly known as 51 S Grove Street, Elgin, Illinois,
and Sean Davis, the tenant of the property com
(hereinafter referred to as "Owner").
WHEREAS, City has established a facade improvement program(hereinafter referred to as
"Program") for application within certain areas of the corporate limits of City designated by City as
appropriate for such application (hereinafter referred to as "Rehabilitation Areas"); and
WHEREAS,Program is administered and funded solely by City for purposes of the control
and prevention of blight, dilapidation and deterioration of Rehabilitation Areas; and
WHEREAS, pursuant to Program, City has undertaken to share the cost of facade
improvements to certain structures within Rehabilitation Area, pursuant to the criteria set forth
herein; and
WHEREAS,Owner owns at least 50%of subject commercial building(s), or is the tenant of
commercial building(s)located within Rehabilitation Area,with owner having provided the owner's
consent and authority to participate in Program pursuant to the terms and provisions of this
Agreement.
NOW, THEREFORE, in consideration of the mutual promises and covenants contained
herein,the sufficiency of which is hereby acknowledged,the parties hereto hereby agree as follows:
Section 1. The total approved project costs of the facade improvements for the structure
referred to at Section 16 herein shall be $105,820.00, as set forth in Attachment A attached hereto
(such total approved project costs for facade improvements are hereinafter referred to as "Eligible
Costs"and such structure is hereinafter referred to as the"Structure"). The City shall pay the Owner
a sum not to exceed$37,037.00,being 35%of the total Eligible Costs, for facade improvements to
the structure approved pursuant to the provisions of this Agreement. The project shall be confined to
approved improvements made to that part of the Structure visible from any public right-of-way. All
parties hereto agree that all payments from the City provided for herein shall be made to Sean Davis,
who shall provide the City with a full release upon receipt.
Section 2. Eligible costs shall include labor, material and equipment costs, and such other
costs as may be reasonably necessary for the execution and completion of the facade improvement
hereby provided for(hereinafter referred to as the"Work"), as designated from the design drawings
and/or specifications approved by the Proi ect Review Team pursuant to the provisions of Section 3
herein and prepared by Consultant (hereinafter referred to as "Plans").
1
Section 3. No Work shall be undertaken or shall be considered to constitute the basis for an
Eligible Cost until the design for such Work has been submitted to and approved in writing by the
City's Project Review Team (hereinafter referred to as "Project Review Team") consisting of the
City's Historic Preservation Specialist and City's Principal Planner, and any other member
designated on the Project Review Team. Such design shall include, but not be limited to, a date
certain by which the Work shall be completed. In no event shall such Work be completed more than
one hundred eighty(180) days from the date of this Agreement, without the written consent of the
Project Review Team.
Section 4. The Project Review Team shall be pennitted access to Structure to periodically
review the progress of the Work. Such review shall not be in lieu of any other inspections which
may otherwise be required bylaw or by City. Any and all portions of the Work which do not,in the
sole discretion of the Project Review Team, conform to the Plans or other applicable terms of this
Agreement, shall be made to conform to the Plans and other applicable Terms of this Agreement
upon written notice of the existence of such non-conforming portions.
Section 5. Upon completion of the Work, and upon final inspection and written approval by
the Project Review Team and such other final inspections and approvals as maybe required bylaw,
Owner shall submit to City: (1) an executed,notarized itemized contractor statement reflecting the
total cost of the Work and each portion thereof, including, but not limited to, the cost of labor
(whether provided by any contractor or subcontractor), materials and equipment; (Z) copies of all
bids, contracts and invoices submitted, executed or incurred pursuant to the Work; and (3)
reasonable proof of payment of all costs incurred pursuant to the Work.
Section 6. City shall pay to Owner the sum provided for at Section 1 herein within thirty(30)
days of owner's compliance with the provisions of Section 5 herein. In no event shall the amount
paid to Owner exceed the amount specified in this Agreement or in the contractor statement.
Section 7. In the event Owner fails to complete the Work in accordance with the terms of
this Agreement, or otherwise breaches the terms of this Agreement, City may terminate this
Agreement upon written notice of breach and termination to Owner, and any and all financial or
other obligations on the part of City shall cease and become null and void.Additionally,Owner shall
refund to City, all money paid to Owner by City pursuant to this agreement upon thirty (30) days
written demand. This provision shall not constitute a restriction on City to pursue any and all other
rights to which it may be entitled by law.
Section 8. Upon completion of the Work, and for a period of five(5)years thereafter,Owner
shall properly maintain the Work in its finished form,without alteration or change thereto, and shall
not enter into any agreement, or take any other steps to alter, change or remove such Work, or to
create or undertake any other Work which may constitute a deviation from the Plans,without prior
written approval from the Project Review Team in its sole discretion.
Section 9. Nothing herein is intended to limit, restrict or prohibit the Owner from
2
undertaking any other Work in or about the subject premises which is unrelated to the facade
improvement provided for in this Agreement.
Section 10. This Agreement shall be binding upon City and its successors,and upon Owner,
Owner's successors and assigns for a period of five (5) years from and after the date of completion
and approval of the Work. Owner shall provide subsequent Owner(s)of Structure with a copy of this
Agreement. This Agreement shall run with the land underlying Structure. Notwithstanding the
aforementioned five (5) year period, the provisions of Sections 7 and 12 herein shall survive the
termination of this agreement.
Section 11. If Owner does not own the underlying property for which Work is being done,
Owner warrants and represents to City that Owner has a lease at the location for which the Work is
proposed for a term of at least six (6) years. Owner further warrants and represents that he has
received authorization from all owners of the property for which Work is to be done to accept funds
under this program and to undertake the Work. Further, such owner(s) of the property for which
Work is to be done hereby acknowledges that he is aware of this Agreement and authorized the Work
which is to be made to the Structure. Said owner(s) of the property for which improvements are to
be made further acknowledge that, as owner of the property,he is a party to this Agreement and is
bound by the provisions of this Agreement specifically,but not limited to,the provisions of Section
6 of this Agreement. Each"Owner"signature hereto hereby warrants and represents that there are no
other entities having an ownership interest in the Structure,which have not executed this Agreement.
Section 12. Owner hereby holds harmless and indemnifies City from and against any and all
causes of action, suits, claims for damages, and any and all other liability,which may arise out of or
in connection with Owner's or Owner's agents', employees' and assigns' negligent performance of
any of the terms of this Agreement.In the event the indemnification provisions of this Agreement are
invoked so as to require legal defense of City, counsel for such defense shall be of City's choosing.
The provisions of this section shall survive any termination and/or expiration of this agreement.
Section 13. This Agreement shall not be construed to create a partnership,joint venture or
employment relationship between the parties hereto.
Section 14. This Agreement shall be subject to and governed by the laws of the State of
Illinois. The parties hereto hereby agree that venue for any and all actions which may be brought by
each and either of them to enforce the provisions of this Agreement shall be in the Circuit Court of
Kane County, Illinois.
Section 15. The terms of this Agreement shall be severable. In the event that any of the
terms or provisions of this Agreement are deemed to be void or otherwise unenforceable for any
reason, the remainder of this Agreement shall remain in full force and effect.
Section 16.
Owner's Name: Sean Davis
3
Address: 7102 Dove Way
City: Cary, IL 60013
Telephone Number: 847-533-3040
Property Location: 51 S Grove Street
Ownership Interest: Tenant
Contact Person: Sean Davis
7102 Dove Way
Cary, IL 60013
847-533-3040
IN WITNESS WHEREOF,the parties hereto have executed this Agreement on the date first
appearing above.
As to CITY OF ELGIN As to OWNER:
By: a"`..^ By
Olufe F'olarin an i
Ci na Tenant
ATTEST:
Diane Robertson
City Clerk
4
Attachment A
Facade Improvement Program
51 S Grove Street
Sean Davis
August 1, 2008
Proposed scope of work for facade improvements
Demolition
1. Remove existing glass storefront, awnings, and mosaic the bulkhead on first floor
elevations.
New Work
1. Install new storefront and storefront doors with clear insulated glass with bronze anodized
aluminum frames. If existing bulkheads are too deteriorated to repair, new bulkheads
may be constructed to match the original along base of storefront windows.
2. Masonry repairs including:
a. Power-washing the whole building
b. Replacing mosaic tile on bulkhead
C. Removing loose/damaged brick lintels, repairing and replacing.
d. Repair o,cracked/spalled limestones.
e. Repoirt brick wall as required.
3. Awnings:
a. Install 10 new awnings over each window on the second floor, 14' wide x 4' high
x 3' projection, 12"box, color burgundy. Per approved plans, permit#93347,
dated 7.29.08.
b. Install 1 new awning over the three sides of the storefront, 148' wide x 7' high x
4' projection, 12" box, color burgundy. Per approved plans, permit#93347, dated
7.29.08.
4. Signage:
a. One internally illuminated horizontal sign over entrance on Dupage Ct above first
floor awning. Per approved plans, permit#92507, dated 7.22.08.
b. One internally illuminated horizontal sign over entrance on Grove Street above
first floor awning. Per approved plans,permit#92507, dated 7.22.08.
C. One internally illuminated vertical sign on northwest corner of building above
first floor awning. Per approved plans, pen-nit #92507, dated 7.22.08.
5. Lighting:
a. Install (8) accent sconces for down lighting above second floor windows but
centered between each one per drawings dated April 10, 2008.
5
Mad Maggie's 51 S Grove Street
Facade Improvement Pro ram - eligible costs
Contractor Cost Contractor Cost
1 Estimate 2 Estimate
Scope of work Olympic
Awnin Thatcher $29,900.00 Si ns $34,158.68
Olympic
New si n Si nX $13,280.00 Si ns $36,288.13
Cardinal
Mirror and Star-Tech
Windows/Doors Glass $37,000.00 Glass $39,569.18
Greg's Masonry
Brick Clean in /Tuck ointin Masonr $25,640.00 Works LLC $40,780.00
Total
low bid $105,820.00 $150.,795.99
Total eligible costs: $105,820 (based on
lower bids
City's participation: 35%
Total Facade Improvement Grant $37,037.00
allocation:
6
July 17, 2008
TO: Mayor and Members of the City Council
FROM: Olufemi Folarin, City Manager
Jennifer Fritz-Williams: Historic Preservation Specialist
SUBJECT: Mad Maggie's Facade Improvement Grant Application, 51 South Grove Street
PURPOSE
The purpose of this memorandum is to provide the Mayor and members of the City Council with
information to consider a facade improvement project for Mad Maggie's located at 51 South
Grove Street.
RECOMMENDATION
It is recommended that the City Council approve the facade improvement project proposed for
Mad Maggie's located at 51 South Grove Street to be funded in the amount of$37,037.
BACKGROUND
The property at 51 South Grove Street is located in downtown Elgin and was built in the 1940s
as part of the commercial development of Elgin's center city. The building occupies a corner
location facing South Grove Street and DuPage Court. The business owner, Mr. Sean Davis, is
requesting funding from the Facade Improvement Program to complete exterior improvements
on the building's storefront. The business owner proposes to clean, repoint, and replace the
masonry and ceramic tiles as required, replace storefront windows and doors, and install awnings
and new signage.
The total eligible cost of the project amounts to $105,820. At 35%, the City's participation on
the project would be $37,037.
COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED
Downtown Neighborhood Association
Mad Maggie's Facade Improvement Grant Application
July 17, 2008
Page 2
FINANCIAL IMPACT
The proposed facade improvement grant to Mad Maggie's would total $37,037. There are no
longer sufficient funds available in the 2008 Downtown Business Facade Improvement Program,
Riverboat Fund account number 275-0000-791.78-99 and it is being suggested that Central Area
Tax Increment Financing (TIF) Fund be utilized to fund this TIF eligible expense. Therefore, it
is recommended that a budget transfer be made in the amount of$37,500 from the Central Area
TIF Fund account number 262-0000-791.92-32, project 262005 "CBD Right of Way
Improvements" to project number 80001A, "Mad Maggies Facade Improvement" in account
262-0000-791.78-99 "Rehab Loans/Grants".
LEGALIMPACT
If funding is approved, an agreement between the City of Elgin and the business owner of Mad
Maggie's at 51 South Grove Street would be required.
ALTERNATIVES
1. The City Council may choose to approve the facade improvement project proposed for 51
South Grove Street to be funded in an amount of$37,037.
2. The City Council may choose to reject the request to fund the facade improvement
project.
Respectfully Submitted for Council consideration.
JFW
Attachments
Mad Maggie's Facade Improvement Grant Application
July 17, 2008
Page 3
Mad Ma ie's 51 S Grove Street
Facade Improvement Program -eligible costs
Contractor Cost Contractor Cost
1 Estimate 2 Estimate
Scope of work Olympic
Awnin Thatcher $29,900.00 Si ns $34,158.68
Olympic
New si n Si nX $13,280.00 Si ns $36,288.13
Cardinal
Mirror and Star-Tech
Windows/Doors Glass $37,000.00 Glass $39,569.18
Greg's Masonry
Brick Clean in /Tuckpointin Masonr $25,640.00 Works LLC $40,780.00
Total low bid $105,820.00 $150,795.99
Total eligible costs: $105,820(based on
lower bids
City's participation: 35%
Total Facade Improvement Grant $37,037.00
allocation: