Loading...
HomeMy WebLinkAbout07-58 Resolution No. 07-58 RESOLUTION AUTHORIZING EXECUTION OF INTERGOVERNMENTAL AGREEMENT WITH THE COUNTY OF KANE REGARDING COST PARTICIPATION IN A FEASIBILITY STUDY FOR THE RANDALL ROAD AND U.S. ROUTE 20 INTERCHANGE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Ed Schock, Mayor, and Dolonna Mecum, City Clerk, be and are hereby authorized and directed to execute an Intergovernmental Agreement with the County of Kane regarding cost participation in a feasibility study for the Randall Road and U.S. Route 20 interchange, a copy of which is attached hereto and made a part hereof by reference. s/Ed Schock Ed Schock, Mayor Presented: February 28, 2007 Adopted: February 28, 2007 Omnibus Vote: Yeas: 7 Nays: 0 Attest: s/Dolonna Mecum Dolonna Mecum, City Clerk s/Jennifer Quinton Jennifer Quinton, Deputy City Clerk a f V INTERGOVERNMENTAL AGREEMENT BETWEEN THE CITY OF ELGIN AND THE COUNTY OF KANE REGARDING COST PARTICIPATION OF A FEASIBILITY STUDY FOR THE RANDALL ROAD AND U.S. ROUTE 20 INTERCHANGE This Agreement is entered into this 10th day of April,2007 by and between the City of Elgin, a municipal corporation of the County of Kane, State of Illinois, hereinafter referred to as "CITY", and the County of Kane,a body corporate and politic of the State of Illinois,hereinafter referred to as "COUNTY." WITNESSETH WHEREAS,the Illinois Constitution of 1970 Article VII,Section 10 and the Intergovernmental Cooperation Act of the Illinois Compiled Statues, (5 ILCS 220/1 et seq.) authorizes the CITY and the COUNTY to cooperate in the performance of their respective duties and responsibilities by contracts and other agreements; and WHEREAS, the CITY and the COUNTY, in order to facilitate the free flow of traffic and insure safety to the motoring public, are desirous of improving the interchange at Randall Road (County Highway # 34) and U.S. Route 20 (FAP Route 345), State Section: 2006-018I, hereinafter referred to as the "PROJECT", by conducting a Feasibility Study; and WHEREAS,the population of north central Kane County is expected to increase dramatically over the next twenty years, diminishing safety and increasing congestion at and in the surrounding area of the PROJECT; and WHEREAS, the CITY and the COUNTY find that the health, welfare and safety of their residents are best served by entering into this Agreement to participate in the cost of a Feasibility Study for the purpose of determining a conceptual interchange design necessary for future improvements to ensure they will function in a safe and efficient manner for the movement of vehicular traffic;and WHEREAS,the Feasibility Study shall consist of the preparation of a bound report detailing the feasibility of various interchange reconstruction alternatives, which shall include, but not be limited to the Review of Existing Conditions,Determination of Future Traffic Demands,Interchange Type Study, Preliminary Project Cost Estimates, and Meeting with Involved Agencies, Political Bodies and the Public; and NOW,THEREFORE,in consideration of the mutual covenants contain herein,the CITY and the COUNTY mutually covenant, agree and bind them as follows, to wit: 1. The CITY and the COUNTY acknowledge and agree that the preambles as stated herein above are incorporated into this Agreement. 2. The COUNTY agrees to obtain the services of a State of Illinois pre-qualified engineering firm to provide the necessary documentation for the Feasibility Study. 3. The COUNTY agrees to pay for all costs associated with the Feasibility Study in its entirety, subject to reimbursement by the CITY as hereinafter stipulated. 4. It is mutually agreed by both parties hereto that the estimated cost of the Feasibility Study is $100,000. 5. The CITY agrees that upon execution of this Agreement by both parties, the COUNTY's proof of acquiring a pre-qualified engineering firm, and receipt of an invoice from the COUNTY, the CITY will pay to the COUNTY in a lump sum an amount equal to 100%of its obligation incurred under this Agreement, an amount not to exceed $25,000. 6. The COUNTY shall provide the CITY with a copy of the Feasibility Study upon its completion by the State of Illinois pre-qualified engineering firm. This AGREEMENT and the covenants contained herein shall be null and void in the event the contract covering the Feasibility Study contemplated herein is not awarded within the three years subsequent to execution of the agreement. This Agreement shall be binding upon and to the benefit of the parties hereto, their successors and assigns. COUNTY OF KANE CITY OF ELGIN By iL ' By_ Karen cConnaughay / Ed Schock Chair, County Board Mayor Kane County, Illinois ATTEST: ATTEST: By: ILLMea.0( John A. Cunningham City Clerk Cllr,:County of Ka P • At C_Ace `•-' OF E4 c, ti City of Elgin Agenda Item No. L .. ',Y February 9, 2007 :y. TO Mayor and Members of the City Council FROM: Olufemi Folarin, City Manager turmoil),Stable John Loete, Public Works Dire or �""'' "'ll`''' " SUBJECT: Intergovernmental Agreement with Kane County for Participation in Funding a Feasibility Study for the Randall Road and U.S. Route 20 Interchange PURPOSE The purpose of this memorandum is to provide the Mayor and members of the City Council with information to consider executing an agreement with Kane County for cost participation in a feasibility study for roadway improvements at the Randall Road/U.S. Route 20 interchange. rk. RECOMMENDATION It is recommended that the City Council authorize execution of the Intergovernmental Agreement with Kane County for participation in funding of a feasibility study for improvements at the Randall Road and U.S. Route 20 interchange in the amount of$25,000. BACKGROUND Kane County has recently contracted with a consultant to complete a feasibility study for improvements to the Randall Road/U.S. Route 20 interchange. With the expected dramatic increase in population in Kane County over the next twenty years, it is recognized that diminishing safety and increasing congestion will become a major problem for this intersection. The feasibility study will look at various intersection alternatives, determine future traffic demands and provide preliminary project cost estimates. Kane County is requesting that the City participate in the cost of the feasibility study. The results of this study will have a major impact on the ability of traffic to move at an acceptable level of service through the subject intersection. The not-to-exceed cost of the study is $100,000. The City's share of the cost will be $25,000. A copy of the Intergovernmental Agreement is attached as Exhibit A. COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED rib'. None • Randall Rd & U.S. 20 Interchange February 9, 2007 Page 2 FINANCIAL IMPACT The City's share of the cost for the feasibility study is $25,000. A budget transfer of$25,000 will be necessary to fund this initiative. A transfer from account number 275-0000-791.47-00 "Special Events Expense" where sufficient funds have been budgeted ($225,000) and are available ($225,000) is recommended. This project will be established in the Riverboat Fund, account number 275-0000-791.30-99, project number 039695, "U.S 20/Randall Feasibility Study". GAL IMPACT None ALTERNATIVES 1. The City Council may choose to authorize execution of the Intergovernmental Agreement as recommended. r 2. The City Council may choose not to authorize execution of the Intergovernmental Agreement. Respectfully submitted for Council consideration. JL/do Attachment r .............. EXHIBIT A Intergovernmental Agreement