HomeMy WebLinkAbout06-17 Resolution No. 06-17
RESOLUTION
ACCEPTING AND AUTHORIZING EXECUTION OF THE 2006
MOTOR FUEL TAX MUNICIPAL ESTIMATE OF MAINTENANCE COSTS
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that it
hereby accepts and authorizes Olufemi Folarin, City Manager,to execute the 2006 Motor Fuel Tax
Municipal Estimate of Maintenance Costs,a copy of which is attached hereto and made a part hereof
by reference.
s/Ed Schock
Ed Schock, Mayor
Presented: January 25, 2006
Adopted: January 25, 2006
Vote: Yeas: 7 Nays: 0
Attest:
s/Dolonna Mecum
Dolonna Mecum, City Clerk
Resolution No. 06-17
Illinois Department Resolution for Maintenance of
p Streets and Highways by Municipality
of Transportation Under the Illinois Highway Code
BE IT RESOLVED, by the City Council of the
(Council or President and Board of Trustees)
City of Elgin , , Illinois, that there is hereby
(City,Town or Village) (Name)
appropriated the sum of $4,224,606.00 of Motor Fuel Tax funds for the purpose of maintaining
streets and highways under the applicable provisions of the Illinois Highway Code from January 1, 2006
(Date)
to December 31, 2006
(Date)
BE IT FURTHER RESOLVED, that only those streets, highways, and operations as listed and described on the approved
Municipal Estimate of Maintenance Costs, including supplemental or revised estimates approved in connection with this
resolution,are eligible for maintenance with Motor Fuel Tax funds during the period as specified above.
BE IT FURTHER RESOLVED, that the Clerk shall, as soon a practicable after the close of the period as given above,
submit to the Department of Transportation,on forms furnished by said Department , a certified statement showing
expenditures from and balances remaining in the account(s)for this period; and
BE IT FURTHER RESOLVED, that the Clerk shall immediately transmit two certified copies of this
resolution to the district office of the Department of Transportation, at Schaumburg. , Illinois.
I, Delonna Mecum Clerk in and for the City
(City,Town or Village)
of Elgin , County of Kane/Cook
hereby certify the foregoing to be a true, perfect and complete copy of a resolution adopted by
the Council at a meeting on January 25, 2006
(Council or President and Board of Trustees) Date
IN TESTIMONY WHEREOF, 1 have hereunto set my hand and seal this 25th day of January 2006 •
(SEAL) Elgin City Clerk
(City,Town or Village)
Authorized MFT Expenditure
Date
Department of Transportation
Regional Engineer •
Page 1 of 1 BLR 14230(Rev.9/05)
Illinois Department Municipal Estimate of
of Transportation Maintenance Costs
i
Section Number
Period from 1/1/2006 to 12/31/2006 Municipality City of Elgin
Estimated Cost of Maintenance Operations
Maintenance For Group I, II, or III (Material, Equipment or Labor) Operation
Operation Group Unit Cost
(No.-Description) (l,ll,lli,ly) Item Unit Quantity Price Cost
Catch Basin Cleaning II Equipment(see details) $ 67,200.00
II Labor(see details) _ $ 74,400.00 $ 141,600.00
Bituminous Patching II Equipment(see details) $ 60,000.00
II Labor(see details) $ 90,000.00
III Bit. Mix Group 1 Ton 1360 $ 28.00 $ 38,080.00
III Bit. Mix Group 2 Ton 200 $ 80.00 $ 16,000.00 $ 204,080.00
Bituminous Paving II Equipment(see details) $ 21,000.00
II Labor(see details) $ 24,800.00
III Bit. Mix Group 1 Ton 4000 $ 28.00 $ 112,000.00 $ 157,800,00
Snow& Ice Control I I Equipment(see details) $ 171,292.00
II _Labor(see details) $ 235,300.00
I Salt(state contract) Ton 9000 $ 37.00 $ 333,000.00
I Deicing Chemicals Gal 30,000 $ 0.50 $ 15,000.00 $ 754,592.00
Storm Sewer Cleaning II Equipment(see details) $ 24,192.00
II Labor(see details) $ 26,784.00 $ 50,976.00
Curb&Gutter II Equipment(see details) $ 20,230.00
II Labor(see details) $ 35,200.00 $ 55,430.00
Street Sweeping II Equipment(see details) $ 255,640.00
II Labor(see details) $ 159,400.00
I Dump Fees for Sweepings $ 75,000.00 $ 490,040.00
Traffic Markings/Signs II Equipment(see details) $ 10,008.00
II Labor(see details) $ 16,680.00
06-00000-02-GM IV Thermoplastic(Contract) $ 120,000.00
06-00000-01-GM IV Paint(Contract) $ 85,000.00 $ 231,688.00
Traffic Signals IV Painting(Contract) $ 50,000.00
IV Maint. (IL 19 and IL 58) $ 10,500.00
06-00000-07-GM IV .Maintenance(Contract) $ 90,000.00
06-00000-09-GM IV LED Conversion (Contract) $ 185,000.00 $ 335,500.00
Bridge Maintenance IV 06-00000-05-GM $ 250,000.00 $ 250,000.00
Total Day Labor Costs
Total Estimated Maintenance Operation Cost $2,671,706.00
Preliminary Engineering
Engineering Inspection
Material Testing
Total Estimated Engineering Cost
Total Estimated Maintenance Cost
Submitted: January 25, 2006 Approved:
I Date Date
B : \, '_ �s Cit Manager
•'•al Official Title Regional Engineer
Submit Four(4)Copies to Regional Engineer
Page 1 of 2 BLR 14231 (Rev.7/05)
Illinois Department Municipal Estimate of
of Transportation Maintenance Costs
Section Number
Period from 1/1/2006 to 12/31/2006 Municipality City of Elgin
Estimated Cost of Maintenance Operations
Maintenance For Group I, II, or III (Material, Equipment or Labor) Operation
Operation Group Unit Cost
(No.-Description) (I,II,III,1V) Item Unit Quantity Price Cost
Page 1 Total Carried Forward $2,671,706.00
Street Resurfacing
06-00000-03-GM IV Intermittent Resurfacing $ 700,000.00
06-00000-06-GM IV Unimproved Street Maint. $ 250,000.00
06-00000-08-GM IV Crack Sealing $ 75,000.00 $1,025,000.00
Street Lighting 11 ,Equipment(see details) $ 22,500.00
II Labor(see details) $ 68,000.00
11 Energy(power costs) $ 90,000.00
III Materials Bid $ 150,000.00 $ 330,500.00
Total Day Labor Costs $1,382,626.00
Total Estimated Maintenance Operation Cost $4,027,206.00
$1,000 +2%($300,000)_+5%($1,780,000)= Preliminary Engineering $ 96,000.00
6%($1,690,000)= Engineering Inspection $ 101,400.00
Material Testing_ _$ -
Total Estimated Engineering Cost
Total Estimated Maintenance Cost $4,224,606.00
Submitted: January 25, 2006 Approved:
Date Date
B : ` _ Cit Manaser
.al 0 icial Title Regional Engineer
Submit Four(4)Copies to Regional Engineer
Page 2 of 2 BLR 14231 (Rev.7/05)
Details Sheet
Illinois Department Municipal Estimate of
of Transportation Maintenance Costs
Section Number
Period from 1/1/2006 to 12/31/2006 Municipality City of Elgin
Estimated Cost of Maintenance Operations
Maintenance For Group I, II, or III (Material, Equipment or Labor) Operation
Operation Group Unit
(No.-Description) (I,ll,lli,IV) Item Unit Quantity Price Cost Cost
Catch Basing Cleaning , 2 sewer jet/vacuum trucks hours 1,200 $ 56.00 $ 67,200.00
2 equipment operators hours 1,200 $ 32.00 $ 38,400.00
2 utility workers hours 1,200 $ 30.00 $ 36,000.00
Bituminous Patching 4 four CY dump trucks hours 2,400 $ 25.00 $ 60,000.00
8 utility workers hours 3,000 $ 30.00 $ 90,000.00
Bituminous Paving _paver, 10,000 GVW hours 200 $ 55.00 $ 11,000.00
4 four CY dump trucks hours 400 $ 25.00 $ 10,000.00
2 equipment operators hours 400 $ 32.00 $ 12,800.00
4 utility workers hours 400 $ 30.00 $ 12,000.00
Snow&Ice Control 24 four CY dump trucks hours 4,488 _ $ 25.00 $ 112,200.00
4 eight CY dump trucks hours 748 $ 34.00 $ 25,432.00
7 dump trucks 15,000 GVW hours 1,309 $ 18.00 $ 23,562.00
6 pickup trucks w/plow hours 1,122 $ 9.00 $ 10,098.00
12 equipment operators hours 2,450 $ 32.00 $ 78,400.00
29 utility workers hours, 5,230 , $ 30.00 $ 156,900.00
Storm Sewer Cleaning 1 sewer jet/vacuum truck hours 432 $ 56.00 $ 24,192.00
1 equipment operator hours 432 $ 32.00 $ 13,824.00
1 utility worker hours, 432 $ 30.00 $ 12,960.00
Curb and Gutter 1 dump truck 12,000 GVW hours 550 $ 17.00 $ 9,350.00
1 eight CY dump truck hours 320 $ 34.00 $ 10,880.00
1 cement finisher hours 550 $ 34.00 $ 18,700.00
1 utility worker hours 550 $ 30.00 $ 16,500.00
Street Sweeping 3 street sweepers, mech. hours 3,800 $ 56.00 $212,800.00
1 eight CY dump truck hours 1,260 $ 34.00 $ 42,840.00
3 equipment operators hours 3,800 $ 32.00 $ 121,600.00
1 utility worker hours 1,260 $ 30.00 $ 37,800.00
Traffic Markings/Signs sign service truck hours 556 $ 18.00 $ 10,008.00
2 utility workers hours 556 $ 30.00 $ 16,680.00
Street Lighting _bucket truck 32 ft height hours 900 $ 25.00 $ 22,500.00
2 electrical workers hours 2,000 $ 34.00 $ 68,000.00
Total Day Labor Costs $1,382,626.00
Total Estimated Maintenance Operation Cost
Preliminary Engineering
Engineering Inspection
Material Testing_
Total Estimated Engineering Cost
Total Estimated Maintenance Cost
Submitted: January 25, 2006 Approved:
Date Date
B : 111V■11 —� -- �� ��� Manager
Municipal•,iciai Title Regional Engineer
Submit Four(4)Copies to Regional Engineer
BLR 14231 (Rev.7/05)
; ,? Agenda Item No.
City of Elgin
110' E ��
L 0!
January 20, 2006 I
0$
N
FINANCIALLY STABLE CITYGOVERNMENT
TO: Mayor and Members of the City Council EFFICIENT SERVICES,
AND QUALITY INFRASTRUCTURE
FROM: Olufemi Folarin, City Manager
John Loete, Public Works Dire or
SUBJECT: Approval of Resolution for 2006 Motor Fuel Tax Municipal Estimate of
Maintenance Costs
PURPOSE
The purpose of this memorandum is to provide the Mayor and members of the City Council with
information to consider the passage of the annual Motor Fuel Tax Resolution for General
Maintenance Funds for 2006.
RECOMMENDATION
It is recommended that the City Council approve the attached Motor Fuel Tax Resolution for
maintenance of Streets and Highways in the amount of$4,224,606.
BACKGROUND
Motor Fuel Tax (MFT) funds are tax monies collected by the State of Illinois at the time of fuel
purchase, including gasoline and diesel fuel. A portion of the funds collected by the State are
distributed to municipalities and townships for road, signal, and street light maintenance based
on the historical per capita allocation adjusted for inflation. Based on this criterion, the MFT
funds due to be provided to the City of Elgin in 2006 are $2,850,000. Combined with prior year
unencumbered funds ($1,531,640) and miscellaneous revenue ($31,000), the total budget
available for 2006 is $4,462,640. The amount being considered for use on eligible maintenance
activities in 2006 is $4,224,606, leaving a balance of$238,034 as a contingency reserve.
The action being requested at this time is the approval of the resolution designating the total
budget amount for 2006 and of the Municipal Estimate of Maintenance Costs outlining the
activities to be funded, with the proposed budget for each. Both documents are required by the
Illinois Department of Transportation (IDOT) and are attached. Only specific work related to the
maintenance of street pavements, drainage pipes, street lights, and traffic signals are eligible
under the MFT program. Work can be done by in-house crews with costs for labor, equipment,
and materials being identified and reimbursed. Contracting for the design/bidding and
P` performance/construction of the work is also allowed.
2006 MFT Municipal Estimate of Maint. Costs
January 20, 2006
t0" Page 2
The in-house activities and maintenance contracts being proposed , with one exception, have
been accomplished historically with MFT funds. Further details on the revised program and on
the maintenance contracts on which there are significant changes are as follows:
Traffic Signal Maintenance — This program, started in June 2004, is currently contracted to
Lyons Pinner Electric but will be re-bid this year for a new two year contract. The traffic signal
maintenance contract provides scheduled servicing of the signal equipment, including annual re-
lamping and addresses the key maintains under an agreement with IDOT.
Unimproved Street Maintenance — 2006 will be the second year of an overlay of plant mix
asphalt, rather than a chip seal surface. No drainage improvements will be included, so the
overlay must be installed in a manner that also does not cause more drainage problems in areas
that are already troubled with limited drainage. This year's program will include the unimproved
streets in the area east of Willard Ave., South of Villa St. and West of Poplar Creek.
Intermittent Street Resurfacing— An on-going program of base repairs and asphalt overlays that
this year will address:
1) Airport Rd., Tollgate to 1-90 (West)
2) Tollgate Rd., State to Airport
3) Corporate Dr., River Ridge to east end
4) River Ridge, Airport to Corporate
5) Fox Ln, Randall to Holmes
6) Grove Ave., Prairie to National
7) Prairie St.,Fox River to Villa
These streets were chosen by staff based on a condition survey and the timeliness of applying a
maintenance overlay in order to avoid a more expensive reconstruction at a later date. These
streets were submitted as part of the five year plan for each program in the.2006 budget.
LED Traffic Signal Conversion — This program began in 2004 with the replacement of standard
incandescent bulb signals with light emitting diode (LED) signals. The LED signals are brighter,
last 5-10 times as long and use only 10% of the electricity of the standard bulbs. The 2006
program will convert the final 14 intersections that are either not in the CBD Signal
Improvement Project area owned by the State (IDOT) or scheduled for replacement by a City
roadway project. As always with this program, available grants will be applied for to help offset
some of the project costs for completing this environmentally friendly project.
2006 MFT Municipal Estimate of Maint. Costs
January 20, 2006
l Page 3
COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED
None
y/i(.... .
FINANCIAL IMPACT
The anticipated revenues in 2006 for the Motor Fuel Tax Fund (Fund 290) from all sources total
$4,462,640. The proposed MFT appropriation resolution is in the amount of$4,224,606, leaving
a contingency balance of$238,034. Specific expenditure accounts detailed in the 2006 Budget
will be adjusted to agree with the approved MFT resolution.
vviv/LEGAL IMPACT
None
ALTERNATIVES
1. Approve the resolution as recommended.
2. Do not approve the resolution and expenditure statement and choose to spend the MFT
"" funds in another fashion.
Respectfully submitted for Council consideration.
(do)
Attachment
eilik
QT)Illinois Department Municipal tstimate or
of Transportation Maintenance Costs
Section Number
Period from 1/1/2006 to 12/31/2006 Municipality City of Elgin
�^ Estimated Cost of Maintenance Operations
Maintenance For Group I, II, or III (Material, Equipment or Labor) Operation
Operation Group Unit Cost
(No.-Description) (I,II,III,IV) Item Unit Quantity Price Cost
Catch Basin Cleaning II Equipment(see details) $ 67,200.00
I I Labor(see details) $ 74,400.00 $ 141,600.00
Bituminous Patching II Equipment(see details) $ 60,000.00
II Labor(see details) $ 90,000.00
III Bit. Mix Group 1 Ton 1360 $ 28.00 $ 38,080.00
III Bit. Mix Group 2 Ton 200 $ 80.00 $ 16,000.00 $ 204,080.00
Bituminous Paving II Equipment(see details) $ 21,000.00
II Labor(see details) $ 24,800.00
III Bit. Mix Group 1 Ton 4000 $ 28.00 $ 112,000.00 , $ 157,800.00
Snow& Ice Control II Equipment(see details) , $ 171,292.00
II Labor(see details) , $ 235,300.00
I Salt(state contract) Ton 9000 $ 37.00 $ 333,000.00
I Deicing Chemicals Gal , 30,000 $ 0.50 $ 15,000.00 $ 754,592.00
Storm Sewer Cleaning II Equipment(see details) _ $ 24,192.00
II Labor(see details) $ 26,784.00 $ 50,976.00
Curb &Gutter II Equipment(see details) _ $ 20,230.00
II Labor(see details) $ 35,200.00 , $ 55,430.00
Street Sweeping II Equipment(see details) $ 255,640.00
II Labor(see details) $ 159,400.00
I Dump Fees for Sweepings $ 75,000.00 $ 490,040.00
fic Markings/Signs II Equipment(see details) $ 10,008.00
II Labor(see details) $ 16,680.00
06-00000-02-GM IV Thermoplastic(Contract) $ 120,000.00
06-00000-01-GM IV Paint (Contract) , $ 85,000.00 $ 231,688.00
Traffic Signals IV Painting (Contract) $ 50,000.00
IV Maint. (IL 19 and IL 58) $ 10,500.00
06-00000-07-GM IV Maintenance (Contract) $ 90,000.00
06-00000-09-GM IV LED Conversion (Contract) $ 185,000.00 $ 335,500.00
Bridge Maintenance IV 06-00000-05-GM $ 250,000.00 ' $ 250,000.00
Total Day Labor Costs
Total Estimated Maintenance Operation Cost $2,671,706.00
Preliminary Engineering
Engineering Inspection
Material Testing
Total Estimated Engineering Cost
Total Estimated Maintenance Cost
Submitted: _ Approved:
Date Date
e` City Manager
Municipal Official Title Regional Engineer
Submit Four(4)Copies to Regional Engineer
Page 1 of 2 BLR 14231 (Rev.7/05)
Illinois Department Municipal Estimate of .
1.)
of Transportation Maintenance Costs
Section Number
Plod from 1/1/2006 to 12/31/2006 Municipality City of Elgin
y
Estimated Cost of Maintenance Operations
Maintenance For Group I, II, or III (Material, Equipment or Labor)
Group Unit Operation
Operation P Cost
(No.-Description) (►,11,m,IV) Item Unit Quantity Price Cost
Page 1 Total Carried Forward _ $2,671,706.00
Street Resurfacing
06-00000-03-GM IV Intermittent Resurfacing _ $ 700,000.00
06-00000-06-GM IV _Unimproved Street Maint. $ 250,000.00
06-00000-08-GM IV Crack Sealing _ $ 75,000.00 $1,025,000.00
Street Lighting II Equipment(see details) $ 22,500.00
II Labor(see details) _ $ 68,000.00
II Energy(power costs) $ 90,000.00
III Materials Bid $ 150,000.00 $ 330,500.00
Total Day Labor Costs $1,382,626.00
Total Estimated Maintenance Operation Cost $4,027,206.00
$1,000 +2%($300,000) + 5%($1,780,000) = Preliminary Engineering. $ 96,000.00
6%($1,690,000) = Engineering Inspection $ 101,400.00
Material Testing_ $ -
Total Estimated Engineering Cost
Total Estimated Maintenance Cost $4,224,606.00
Submitted: Approved:
Date Date
City Manager
Municipal Official Title Regional Engineer
Submit Four(4) Copies to Regional Engineer
Page 2 of 2 BLR 14231 (Rev.7/05)
•
Illinois Department Municipal Estimate of
of Transportation Maintenance Costs
Section Number
d from 1/1/2006 to 12/31/2006 Municipality City of Elgin
Estimated Cost of Maintenance Operations
Maintenance For Group I, II, or III (Material, Equipment or Labor) Operation
Operation Group Unit
(No.-Description) (I,II,III,IV) Item Unit Quantity Price Cost Cost
Catch Basing Cleaning 2 sewer jet/vacuum trucks hours 1,200 $ 56.00 $ 67,200.00
2 equipment operators hours 1,200 $. 32.00` $ 38,400.00
2 utility workers hours 1,200 _$ 30.00 $ 36,000.00
Bituminous Patching 4 four CY dump trucks hours 2,400 $ 25.00 $ 60,000.00
8 utility workers hours 3,000 $ 30.00 $ 90,000.00
Bituminous Paving _ paver, 10,000 GVW hours 200 $ 55.00 $ 11,000.00
4 four CY dump trucks hours 400 $ 25.00 $ 10,000.00
2 equipment operators hours 400 $ 32.00 $ 12,800.00
4 utility workers hours 400 $ 30.00 $ 12,000.00
Snow& Ice Control 24 four CY dump trucks hours 4,488 $ 25.00 $ 112,200.00
4 eight CY dump trucks hours 748 $ 34.00 $ 25,432.00
7 dump trucks 15,000 GVW hours 1,309 $ 18.00 $ 23,562.00
6 pickup trucks w/plow hours 1,122 $ 9.00 $ 10,098.00
12 equipment operators hours 2,450 $ 32.00 $ 78,400.00
29 utility workers hours 5,230 $ 30.00 $ 156,900.00
Storm Sewer Cleaning 1 sewer jet/vacuum truck hours 432 $ 56.00 $ 24,192.00
1 equipment operator hours 432 $ 32.00 $ 13,824.00
1 utility worker hours 432 $ 30.00_ $ 12,960.00
rkj and Gutter 1 dump truck 12,000 GVW hours 550 $ 17.00 $ 9,350.00
1 eight CY dump truck hours 320 $ 34.00 $ 10,880.00
1 cement finisher hours 550 $ 34.00 $ 18,700.00
1 utility worker hours 550 $ 30.00 $ 16,500.00
Street Sweeping 13 street sweepers, mech. hours 3,800 $ 56.00 $212,800.00
1 eight CY dump truck hours 1,260 $ 34.00_$ 42,840.00
3 equipment operators hours 3,800 $ 32.00 $ 121,600.00
1 utility worker hours 1,260 $ 30.00 $ 37,800.00
Traffic Markings/Signs sign service truck hours 556 $ 18.00 $ 10,008.00
2 utility workers hours 556 $ 30.00 $ 16,680.00
Street Lighting bucket truck 32 ft height hours 900 $ 25.00 $ 22,500.00
2 electrical workers hours 2,000 $ 34.00 $ 68,000.00
Total Day Labor Costs $1,382,626.00
Total Estimated Maintenance Operation Cost
Preliminary Engineering
Engineering Inspection
Material Testin
Total Estimated Engineering Cost
Total Estimated Maintenance Cost
Submitted: Approved:
Date Date
yam. City Manager
Municipal Official Title Regional Engineer
Submit Four(4)Copies to Regional Engineer
BLR 14231 (Rev.7/05)
Resolution for Maintenance of
Illinois Department Streets and Highways by Municipality
of Transportation Under the Illinois Highway Code
BE IT RESOLVED,by the City Council of the
(Council or President and Board of Trustees)
City of Elgin , , Illinois,that there is hereby
(City,Town or Village) (Name)
appropriated the sum of $4,224,606.00 of Motor Fuel Tax funds for the purpose of maintaining
streets and highways under the applicable provisions of the Illinois Highway Code from January 1, 2006
(Date)
to December 31,2006
(Date)
BE IT FURTHER RESOLVED,that only those streets, highways, and operations as listed and described on the approved
Municipal Estimate of Maintenance Costs, including supplemental or revised estimates approved in connection with this
resolution, are eligible for maintenance with Motor Fuel Tax funds during the period as specified above.
BE IT FURTHER RESOLVED, that the Clerk shall, as soon a practicable after the close of the period as given above,
submit to the Department of Transportation, on forms furnished by said Department , a certified statement showing
expenditures from and balances remaining in the account(s)for this period; and
BE IT FURTHER RESOLVED,that the Clerk shall immediately transmit two certified copies of this
resolution to the district office of the Department of Transportation, at Schaumburg. , Illinois.
I, Delonna Mecum Clerk in and for the City
(City,Town or Village)
of Elgin , County of Kane/Cook
hereby certify the foregoing to be a true, perfect and complete copy of a resolution adopted by
the Council at a meeting on January 25, 2006
(Council or President and Board of Trustees) Date
IN TESTIMONY WHEREOF, I have hereunto set my hand and seal this day of .
(SEAL) City Clerk
. (City,Town or Village)
Authorized MFT Expenditure
• Date
Department of Transportation
Regional Engineer