Loading...
HomeMy WebLinkAbout05-91 Resolution No. 05-91 RESOLUTION AUTHORIZING EXECUTION OF A FACADE IMPROVEMENT PROGRAM AGREEMENT WITH HILLTOP REAL ESTATE (55 National Street/301 Hendee Street) BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Olufemi Folarin,City Manager,and Dolonna Mecum,City Clerk,be and are hereby authorized and directed to execute a facade improvement program agreement on behalf of the City of Elgin with Hilltop Real Estate for the property commonly known as 55 National Street/301 Hendee Street, a copy of which is attached hereto and made a part hereof by reference. s/Ed Schock Ed Schock,Mayor Presented: March 23, 2005 Adopted: March 23, 2005 Omnibus Vote: Yeas: 6 Nays: 0 Attest: s/Dolonna Mecum Dolonna Mecum, City Clerk CITY OF ELGIN FACADE IMPROVEMENT PROGRAM AGREEMENT 55 National Street/301 Hendee Street THIS AGREEMENT is made and entered into this VIU day of ,e C& ,2005,by and between the City of Elgin, Illinois, a municipal corporation(hereinafter referred to as "City"), and Hilltop Real Estate, a Sub S Corporation, the property owner, (hereinafter referred to as "Owner"). WHEREAS, City has established a facade improvement program(hereinafter referred to as "Program")for application within certain areas of the corporate limits of City designated by City as appropriate for such application (hereinafter referred to as "Rehabilitation Areas"); and WHEREAS,Program is administered and funded solely by City for purposes of the control and prevention of blight, dilapidation and deterioration of Rehabilitation Areas; and WHEREAS, pursuant to Program, City has undertaken to share the cost of facade improvements to certain structures within the Rehabilitation Area,pursuant to the criteria set forth herein; and WHEREAS,Owner owns at least 50%of subject commercial building(s),or is the tenant of commercial building(s) located within Rehabilitation Area, with Owner having provided the Owner's consent and authority to participate in Program pursuant to the terms and provisions of this Agreement; and WHEREAS,Owner intends to complete facade improvements to the property in two phases, with facade improvements in Phase I already completed,and improvements in Phase H proposed to be completed. NOW, THEREFORE, in consideration of the mutual promises and covenants contained herein,the sufficiency of which is hereby mutually acknowledged,the parties hereto hereby agree as follows: Section 1. The total approved project costs for the facade improvements for the structure referred to at Section 15 herein are set forth in Attachment A attached hereto (such total approved project costs for facade improvements are hereinafter referred to as "Eligible Costs" and such structure is hereinafter referred to as the"Structure"). The City shall retroactively pay the Owner a sum of $1,170.00, being 20% of the total Eligible Costs for facade improvements on-going or already completed on the Structure,and$70,809.00,being 50%of the total Eligible Costs for facade improvements proposed to be completed, for a total not to exceed $71,979.00, and approved pursuant to the provisions of this Agreement. The project shall be confined to approved improvements made to that part of the Structure visible from any public right-of-way. All parties hereto agree that all payments from the City provided for herein shall be made to Hilltop Real Estate, 1 who shall provide the City with a full release upon receipt. Section 2. Eligible Costs shall include labor,material and equipment costs, and such other costs as may be reasonably necessary for the execution and completion of the facade improvement hereby provided for(hereinafter referred to as the"Work"),as designated from the design drawings and specifications approved by the City's Project Review Team. Section 3. The Project Review Team shall be permitted access to Structure to periodically review the progress of the Work. Such review shall not be in lieu of any other inspections which may otherwise be required by law or by City. Any and all portions of the Work which do not,in the sole discretion of the Project Review Team, conform to the Plans or other applicable terms of this Agreement, shall be made to conform to the Plans and other applicable Terms of this Agreement upon written notice of the existence of such non-conforming portions. Section 4. Upon completion of the Work,and upon final inspection and written approval by the Project Review Team and such other final inspections and approvals as maybe required by law, Owner shall submit to City: (1)an executed,notarized itemized contractor statement reflecting the total cost of the Work and each portion thereof, including, but not limited to, the cost of labor (whether provided by any contractor or subcontractor), materials and equipment; (2) copies of all bids, contracts and invoices submitted, executed or incurred pursuant to the Work; and (3) reasonable proof of payment of all costs incurred pursuant to the Work. Section 5. City shall pay to Owner the sum provided for at Section 1 herein within thirty(30) days of Owner's compliance to City's satisfaction with the provisions of Section 4 herein. In no event shall the amount paid to Owner exceed the lesser of the amount specified in this agreement or in the contractor's statement. Section 6. In the event Owner fails to complete the Work in accordance with the terms of this Agreement, or otherwise breaches the terms of this Agreement, City may terminate this Agreement upon written notice of breach and termination to Owner, and any and all financial or other obligations on the part of City shall cease and become null and void.Additionally,Owner shall refund to City all money paid to Owner by City pursuant to this agreement upon thirty (30) days written demand. This provision shall not constitute a restriction on City to pursue any and all other rights to which it may be entitled by law. Section 7. Upon completion of the Work,and for a period of five(5)years thereafter,Owner shall properly maintain the Work in its finished form,without alteration or change thereto,and shall not enter into any agreement, or take any other steps to alter, change or remove such Work, or to create or undertake any other Work which may constitute a deviation from the Plans,without prior written approval from the Project Review Team in its sole discretion. Section 8. Nothing herein is intended to limit, restrict or prohibit the Owner from undertaking any other Work in or about the subject premises which is unrelated to the facade improvement provided for in this Agreement. 2 Section 9. This Agreement shall be binding upon City and its successors,and upon Owner, Owner's successors and assigns for a period of five(5)years from and after the date of completion and approval of the Work. Owner shall provide subsequent Owner(s)of Structure with a copy of this Agreement. This Agreement shall run with the land underlying Structure. Notwithstanding the aforementioned five (5) year period, the provisions of Sections 6 and 11 herein shall survive the termination of this agreement. Section 10. If Owner does not own the underlying property for which Work is being done, Owner warrants and represents to City that Owner has a lease at the location for which the Work is proposed for a term of at least six (6) years. Owner further warrants and represents that he has received authorization from all Owners of the property for which Work is to be done to accept funds under this program and to undertake the Work. Further, such Owner(s) of the property for which Work is to be done hereby acknowledges that he is aware of this Agreement and authorized the Work which is to be made to the Structure. Said Owner(s)of the property for which improvements are to be made further acknowledge that, as owner of the property,he is a party to this Agreement and is bound by the provisions of this Agreement specifically,but not limited to,the provisions of Section 5 of this Agreement. Each"Owner"signature hereto hereby warrants and represents that there are no other entities having an ownership interest in the Structure,which have not executed this Agreement. Section 11. Owner hereby holds harmless and indemnifies City from and against any and all causes of action,suits,claims for damages,and any and all other liability,which may arise out of or in connection with Owner's or Owner's agents, employees and assigns' negligent performance of any of the terms of this Agreement.In the event the indemnification provisions of this Agreement are invoked so as to require legal defense of City, counsel for such defense shall be of City's choosing. The provisions of this section shall survive any termination and/or expiration of this agreement. Section 12. This Agreement shall not be construed to create a partnership,joint venture or employment relationship between the parties hereto. Section 13. This Agreement shall be subject to and governed by the laws of the State of Illinois. The parties hereto hereby agree that venue for any and all actions which may be brought by each and either of them to enforce the provisions of this Agreement shall be in the Circuit Court of Kane County, Illinois. Section 14. The terms of this Agreement shall be severable. In the event that any of the terms or provisions of this Agreement are deemed to be void or otherwise unenforceable for any reason, the remainder of this Agreement shall remain in full force and effect. Section 15. Owner's Name: Hilltop Real Estate Address: 1045 North Spring Street 3 City: Elgin, IL 60120 Telephone Number: 847-741-0437 Property Location: 55 National Street/301 Hendee Street Ownership Interest: property owner Contact Person: Keith Farnham IN WITNESS WHEREOF,the parties hereto have executed this Agreement on the date first appearing above. As to CITY OF ELGIN As to OWNER: By: By: Olufemi Narin ' Keith Farnham City Man r Hilltop Real Estate ATTEST: k*" Dolonna Mecum City Clerk 4 Attachment A 301 Hendee Street State and National Facade Improvement Program Project Costs Phase I com leted Scope of Work Contractorl Cost Independent cost estimate Cost obtained by City of Elgin Misc.demolition of Completed by owner $1,000.00 Silva Architects $1,200.00 lights,electrical,signs Paint Stripping Completed by owner $2,400.00 Silva Architects $3,000.00 2° coat of paint Completed by owner $1,800.00 stripping Exterior painting Completed by owner $1,600.00 Silva Architects $3,450.00 Total $6,800.00 $7,650.00 Total eligible project costs: $6,800.00 Retroactive grant at 20%: $1,360.00 Fee to obtain independent estimate $190.00(to be deducted from retroactive grant) Phase I(City's retroactive participation) $1,170.00 Phase II(proposed 2005 Scope of Work Contractor 1 Cost Contractor 2 Cost Reframing for doors J.C.Harris&Sons $88,218.00 Hargrave Builders,Inc 92,000.00 and windows,new aluminum entryway framing and corner panels Storefront materials, J.C.Harris&Sons $50,000 Hargrave Builders,Inc $50,000.00 door and window hardware Painting and misc. J.C.Harris&Sons $3,400.00 Hargrave Builders,Inc 6,600.00 repairs totals Lowest bids $141,618.0 $148,600.0 0 0 Total eligible project costs: $141,618.00 City's participation at 50%: $70,809.00 City's participation Phase I-City's retroactive participation at 20%: $1,170.00 Phase 11-City's participation at 50%: $70,809.00 Total City Participation $71,979.00 5 City of Elgin Agenda Item No 4,.. o February 18, 2005 TO: Mayor and Members of the City Council FROM: Olufemi Folarin, Acting City Manage ALIVE DOWNTOWN r Sarosh Saher, Urban Design & Preser tion Specialist SUBJECT: Facade Project for 55 National Street/301 Hendee Street Owned by Keith Farnham PURPOSE The purpose of this memorandum is to provide the Mayor and members of the City Council with information to consider a Facade Improvement project for the property located at 55 National Street/301 Hendee Street. roll RECOMMENDATION It is recommended that the City Council approve Phases I and II of the Facade Improvement project proposed for 55 National Street/301 Hendee Street to be funded in an amount of $71,979.00. BACKGROUND The property at 55 National Street/301 Hendee Street is located within the State and National Street area on the corner of Hendee and National Street. The concrete masonry unit structure was built in the early 1960's as a automotive repair and parts storage facility. The current owner of the property, Mr. Keith Farnham, proposes to adapt the building for use as new office space. Since some utility removal and paint stripping is already completed on the exterior, the owner wishes to apply for funding in two phases. Phase I(already completed) Phase I, completed in 2004, involved removal of non-functioning electrical utilities, stripping the exterior painted surface and applying one coat of primer and paint to the masonry surfaces. The application for retroactive funding of Phase I was submitted in December 2004, and meets the eligibility requirements of the program. The total eligible project cost under Phase I was $6,800. Retroactive participation at 20% would amount to $1,360.00. Per the program guidelines, the City obtained a second cost estimate on the work in Phase I from an architect to independently verify that costs/estimates for work a Facade—55 National Street/301 Hendee Street February 18,2005 Page 2 already completed were valid and to further ensure that the project estimates/costs were well- founded and prudent. The second cost estimate came in at $7,650.. This was higher than the estimates provided by the applicant to complete the work at $6,800.. Retroactive funding of Phase I at 20% amounted to $1,360.0. Per the program requirements, the fee associated with obtaining the independent estimate of $190. was subtracted from the grant amount. The remaining funding available from the City for retroactive participation amounts to $1,170. Phase Il(proposed) Phase II of the project will involve work to rehabilitate the existing windows and storefronts of the building and install a new aluminum entryway and corner features. The rehabilitation is proposed in keeping with the property owners plan to adaptively re-use the building for office space. Since the 2'x2' glass block windows are not currently conducive to the proposed interior office space configuration, they will be replaced with new aluminum windows. The design of the new windows is based on an existing steel sash window thereby maintaining the industrial character of the building. The existing garage door to the building will be adaptively re-used as the entrance to the building. It is proposed to be modified with new aluminum entrance doors with sidelights and transoms, which are more in keeping with the commercial character of National Street. The entire building will then be painted. Phase II of the project is proposed to be undertaken in the 2005-2006 construction season. Even though the building is a more recent addition to Elgin's commercial district, the above work meets the following program criteria for eligibility: • the compatibility of the proposed improvements with the overall architectural design goals for the area; • the relationship between the proposed improvements and the general character of the streetscape and other buildings in the area; The Facade Improvement Program allows the completion of projects in phases if plans for the entire project are submitted for review prior to the commencement of the project. The property owner has provided the minimum required two estimates for all the work proposed to the building, and is requesting that funding be allocated for the entire project at this time. The estimated eligible project costs for Phase II of the proposed work will be based on the lowest submitted bids at $141,618. The City's participation at 50 percent would amount to $70,809.00. Total City participation on the project is as follows: Phase I (20%) $ 1,170 Phase II (50%) 70,809 Total participation for both phases $71,979 Facade—55 National Street/301 Hendee Street February 18, 2005 Page 3 COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED Downtown Neighborhood Association, DNA FINANCIAL IMPACT The City's participation for both phases would amount to $71,979.00. There are sufficient funds available in Riverboat Fund, State Street Facade Improvement Program, account number 275- 0000-791.78-99 project numbers 079834 and 079835. Balances of $37,275.00 and $50,000.00 respectively, are currently available to fund this project. LEGALIMPACT An agreement between the City of Elgin and property owner at 55 National Street/301 Hendee Street will be required. ALTERNATIVES 1. Approve Phases I and II of the Facade Improvement project proposed for 55 National Street/301 Hendee Street to be funded in an amount of$71,979.00. 2. Reject the Facade Improvement project proposed for 55 National Street/301 Hendee Street. Respectfully Submitted for Council consideration. SBS/sr Attachments Facade—55 National Street/301 Hendee Street February 18, 2005 Page 4 55 National Street/301 Hendee Street State and National Facade Improvement Program Project Costs Phase I(completed) Scope of Work Contractorl Cost Independent cost estimate Cost obtained b City of Elgin Misc.demolition of Completed by owner $1,000.00 Silva Architects $1,200.00 lights,electrical,signs Paint Stripping Completed b owner $2,400.00 Silva Architects $3,000.00 2" coat of paint Completed by owner $1,800.00 stripping Exterior paintin Completed by owner $1,600.00 Silva Architects $3,450.00 Total $6,800.00 $7,650.00 Total eligible project costs: $6,800.00 Retroactive grant at 20%: $1,360.00 Fee to obtain independent estimate $190.00(to be deducted from retroactive grant) Phase I(City's retroactive participation) $1,170.00 Phase II(proposed 2005 Scope of Work Contractor I Cost Contractor 2 Cost Reframing for doors J.C.Harris&Sons $88,218.00 Hargrave Builders, Inc 92,000.00 and windows,new aluminum entryway framing and corner panels Storefront materials, J.C.Harris&Sons $50,000 Hargrave Builders, Inc $50,000.00 door and window hardware Painting and misc. J.C.Harris&Sons $3,400.00 Hargrave Builders, Inc 6,600.00 repairs totals Lowest bids $141,618.00 $148,600.00 Total eligible project costs: $141,618.00 City's participation at 50%: $70,809.00 City's participation Phase I-City's retroactive participation at 20%: $1,170.00 Phase 11-City's participation at 50%: $70,809.00 Total City Participation $71,979.00 �x►�rrN� �N��ads ELEVATIONS,E W Q A E-1 m 3'Y T Et.F.VATION— .XIRTIN Ir/�r5(��- W �� M W ® ® nMSOxs i M IW�Y CHUMS DESICNGROUP K M t'FW� VSEVAnoNS T. WEST EAST �VeTTArr_�+YTCTr�i._,�� 0' ¢' 8' 16' w�rr L ow,►w�v SCALE: 1/4-1'-0* ......� + ws YLM � v �IST1�t � ��►e�Tt�1 S ' 2 ELEVA110NS,N S w H A M H w Z w . SOUTH ELEVATION—EXiSTINC- x f7 W ® ® CXRIS7'U �Q�CDt� MIQNCROUP A Mtn wr Ni MTY IfA 1�*_QRTFi LEVATION—EXISTING- VA!IIIIS SOUT}i 0' 4' 8' 16' �..� SCALE: 1/4-l'-O" w�.r■r. '�°r t I I A O D F A ce a 9 1 0 imp K & R CHRISTOPHER C 30 1 HENDEE DRIVE E �� b EXAr:L IL 6 0 1 23 m UZVATIONS,N S Mil N � p A0 W h�l W � Aa � w . SOUTH E EVATION—PROPOSED 7MM� � W x W IEV40M -NO! -71 - - - - - - - - - - CMUSTUS DESlGNGROUP Wl=- �ata n onto«n rn wr NORTH ELEVATION—PROPOSED 0' V 8' 1 ELEVATIONS N .ORTH, SOUTH ...moo SCALE: 1/16' -1'-0' nie�r.rw �r 301 Hendee Street Building Estimate 2004 Work Completed: N isc. demolition of lights,conduit,signs,etc. $1,000 Stripping of paint on face brick(Hendee St. side) 2,400 2°d coat of paint stripping 1,800 Painting 1,600 Total: $6,800 Feb 10 05 08:42a P.2 Silva Architects February 9,2005 City of Elgin Mr. Sarosh Saher 150 Dexter Court Elgin, l!60120 Re:330 Hendee Street, Exterior painting estimate Dear Sarosh, The following estimate is based on current union painter labor rate of$75.00 per hour. Miscellaneous Demolition—2 men,1 day $1,200.00 Clean and chemical strip paint(Hendee street elevation only) 2 men,2 days $Z400•00 Clean and power wash remaining building 4,000 SF at$0.15/SF $ 600.00 Paint exterior masonry with standard'block fill'paint. 4,750 SF at$0.601 SF $2,850.00 Miscellaneous materials,dean up and&Man lift 6S 00.00 Total $7,650.00 This estimate is prepared based upon my survey of the site and review of the PDF files you supplied to this office.-if I can be of further assistance please don't hesitate t call. Sincenrly,�, /S(e F.Silva 168 East Highland Avenue Suite 102 Elgin,Illinois 60120 p:(847)841-1500 f:(847)841-1050 Feb 10 05 09:34a p-2 Silva Architects Februwy 10,2005 City ofE jn Mr.Satosh Saher 150 Dader0ourt Elgin,IL 60120 Re: 330 Hendee Street E)dw or Pwft Estirrr9 In dw No.015-05 Per our agreement to provide architectural services we hereby charge for professional services rendered. Estimation calculations for the demolition,cleaning,and painting of 330 Hendee Street,Elgin,IL 2 Hours Q$95.00 per tour=$190.00 Total Due This Invoice $190.00 Thank you for the opportunity to work with the City of Elgin. 168 East Highland Avenue Suite 102 Elgin,Illinois 60120 p:(847)841-1500 f:(847)841-1050 t i UR/CHRISTOPHER, INC. 216 Prairie Street • Elgin, Illinois 60120 • 847-741-0437 • Fax 847-741-9695 January 26, 2005 ATTN: Sarosh Saber City of Elgin 150 Dexter Court Elgin,IL 60120 Dear Sarosh: This letter is the additional information you had requested for my recent application for the Facade Improvement Project at 301 Hendee Street at National Street.I am enclosing bids from local general contractors with backup estimates as needed for the missing items. I will complete each estimate with other proposals from other subcontractors. J C Harris and Sons Inc.Proposal: Base bid: $88,218. Storefront materials,doors, Windows,hardware 50,000. Painting- 2 coats-see the Previous estimate- 3,400. Total: $141,618. Hargrave Builders Inc.Proposal: Base Bid: $92,000. Painting 3,400. Alum Windows,Doors 50,000. Alum Roof Coping 2,000 Roofing above canopies 1,200 Total $148,600 We trust these numbers are sufficient for you to make a favorable decision on my application for our Facade Improvement Program. Sincerely, Keith F am, - President, K&.R/Christopher,Inc. •01:24.'2005 15:31 F.0 847 888 4141 JC HARRIS �IUD1 J . C. Harris and Sons, Inc. 820 Tollgate Road-Elgin,Illinois 60123 General Contractors Since 1923 Telephone(847)888-4141 Fax(847)888-8444 January 26, 2005 K&-R Cluistoper Elgin, Illinois Attn: Keith RE; BUILDING MODIFICATIONS 301 HENDEE STREET ELGIN,ILLINOIS Dear Kei the The budgetary costs for modifications on the above referenced project,per your scope of work would be-___-----_------- ---------------------------------- $88,218.OU. Exclusions: Storefront materials, doors, hardware,windows,painting. If you bave any questions,please feel free to contact me. Sincerely, J .HARRIS AND SONS,INC. C.J � Dan Ziller Vice President DZ.-kd JAN-26-2H 5 WED 15:13 TEL:2147 7 419695 NAPE:K+.R CWISTUFHER F. 1 •01/26/2005 WFID I 1 :157 FAX 8477427889 HARGRAVE IN I I LDERS Q 00 l , HARGRAVE BUILDERS INC. 503 SUNDOWN ROAD TELEPHONE: 647-742-7828 SOUTH ELGIN,ILLINOIS 60977 FAX: 847-742-7889 CONTRACT PROPOSAL Date: January 26, 2005 ��t1•D To: K & R /Christopher, Inc 11 Attn: Keith Project: 301 Hendee Si, Elgin, IL We propose to provide the carpentry as per the sketches and dimensions provided and the following: Furnish& Install all of the following: All masonry/steel to provide 16 window&door openings per drawings($44,000.00) Alf framing/sheathing @ facade and canopies, All metal siding per drawings ($4$,000.00) This Bid does NOT include any of the following: Painting Aluminum windows or doors Roofing or roof coping We do supply all fasteners as needed to perform our work,and will clean up debris created by our work and dispose of it in a container on the job provided by others. TOTAL BID :$92,000.00 We do not include the cost of any city licenses or license and payment bonds in our bid.If either would be necessary there will be an additional charge of$50.00 for the license and payment bond and the cost of the license,which is generally$50.00.if a waiver of subrogation is required the additional cost to our bid will be$5100 per named insured on the waiver. Our offer is subject to acceptance within 30 days from the above date. Payment is to be made each month as the work progresses to the value of ninety (90) percent of all work completed.The entire amount of the contract is to be paid within 30 days after completion. .TA4-2G,-c't1r35 I=lED 12-16 TF1 :R47741.9695 I WMF:K:1:R CHRT gTF1PHFR P- 1 . 01/26/2005 W1iU 11:57 KAN 8477427889 IIAR(:RAVI-7 1311II.DI:It5 e �()(12 Any alteration or deviation from the above specifications Involving extra cost of the material or labor will be billed as an extra to the general contractor. All extras will be billed at$7 1.00 per hour. Hargrave Builders, Inc.agrees to carry Worker's Compensation and Public Liability Insurance, to pay all sales taxes, FICA and Medicare Benefits,and Unemployment Compensation taxes upon the material and labor furnished under this contract. Respectfully Submitted, Dale Hargrave, Presid nt HARGRAVE BUILDERS, INC. ACCEPTANCE: Hargrave Builders, Inc is hereby authorized to furnish all materials and/or labor required to complete the work referred to in this proposal for which the undersigned agrees to pay the amount mentioned in said proposal,and accordin.9 to the terms thereof. SIGNED DATE Please sign, date, and return a copy of this contract for our files.We cannot start job until we receive a signed contract. JAN-26-2005 WED 12:17 TEL:5477419695 NAME:k*R GHRISTCINHER P. 2 rl11 iH!41J U:1 1'.'.J 4 64 f On!O7 J4.7 tr-iI':L'11Yf-yL !7L.f+ti� tLl'il l'{ Yfi'7t_ U1!Ul t PLATE GLASS,WINDOW GLASS•PLASTICS, MIRRORS ALUMINUM ENTRANCES&.STOREFRO1418-AU'r0 GLASS INSTALLED Cardinal Mirror & Glass t--"/ompany DIAL(047)695-8600 939 Davis Road•Elgin, Illinois 60123 kept- Tol Free (800)458-8944 FAX 1847)69.5-8543 Jan. 24,2005 K 8c R Christopher Project: 341 Hendee Street 216 Prairie Street Elgin,It. 601.23 Elgin, ll,. 64120 Attention: Keith FarNiam We propose to furnish and install.aluminum framing,aluminum doors,door kardware., glass,project-in windows and glazing related items. Frames: Kawneer 451 insulated fxaming. Profile 2 x.4 1/2". Doers:Ka A neer 190 narrow stile door. with 10"bottom rays,Roton.binges.l?,awneer 1.790 panic bar with concealed rods,Suriace moun ted closer,pull handles and threshold. Glass: one inch insulated brOMe tint glass.Tempered where required. Vent Windows: Project-in vent window with Cann hai7dle,screens and one inch insulated bronze glass. Panels:Kick--plate Iu;sidlite door locations to match framing. Finish:Bronze anodized. Total Price: $49,925.00 Tax is b.i4uded. Exclusions: Cleaning,of glass aztd protection of fravwes. If you bave any questions please contact me. ThL*you, �. 0_4av David Cbipalla BRAND 5 CARDINAL 61.ASS(N)WIANY OF Dp(/L8.O[KALJ3-'LL*JW MPX)JNAI AUTO%Aa GWP--11•-HFNAY.N1INOIC. GA"JAL AUTO OLM fk*"NY CRY&JAL IAISE.-141DIS JAN-24-2005 11Ctld 16:0 TEL:8t177919695 tJHtlE:IO,R CFipI5TC1F'1-EF: F• 1 WU421 1L`,j Mass - t!4'/tfliMUb`J`J P. 1 ` JOE' S WUALL I TY GLASS Stag S t I-mo t ' Elgin , xl E•� 1:=,.:� f~•M e 8.4.7—,Ba&-0 +4.7 F:--AX= 84.7—a4BB--171!:5.p9 26014. State Street, Elgin, li 60123 888-0447 FAX:888-0559 0 u c),t { :7s) 65 14 36-323454 K R/C 2J6 F'RAIRE STREET KEITH CELL 847-574-9263 ELGIN, IL 0.0120 41k:847-741-0437 Hm:8A7-741-9695 FAX KEITH/JOHN MAG Convents LOCATION: -301 HENDEE ST. DUOTE 1-25-05 STREFRONT: KAWNEER ST' D BRONZE 4SIT ALUMINUM FRAMING FOR 1" BRONZE TEMPERED GLAZING. DOORS: NARROW STILE. HRDb1: ROTON HINGE, PL.ISH / PULL, SWEEP'S, MS LOCKS, THUMSTURNS, CLOSER W/ HOLD OPEN DOOR "A" LATCH LOCI; AND PADDEL, ONLY. 1 FRAM: 72" X 86" DOOR W/ SIDELITE W/ 1 HORIZ. 1 FRAM- X 12011 PAIR DOORS. CUSTOM TRANSOM, 'TWO EQUAL SIDELITES W/ 2 HbRIZ. 1 FRAM: 192" X 120" PAIR DOORS CUSTOM TRANSOM, FOUR EPUAL SIDLITES W/ 2 HOkIZ. WINDOWS: KAWNIEER 8225T FIXED OVER MANUALLY OPERATED HOPPER WINDOWS. STID BRONZE' FRAMING FOR 1 ' BRONZE GLAZING ANNEALED A14D SCREENS. 1 ' op, GS-. 144" X 72" - 3 BAYS EACH ;� OPI GS: 120" X 6k-v, 3 BAYS EACH 1 C!F';G: _48" X-72" _-1 UNIT__-_-____°_--_-___ �+! =TOTAL MATERIALS, -TAX & LABOR } $ 51, 500- 00 Cash R. JAN-25-2005 TUE 14:03 TEL:8477419695 NAPIE:KWR CHRISTOPHER P. 1 :'.�� i� r 1