HomeMy WebLinkAbout05-62 Resolution No. 05-62
RESOLUTION
AUTHORIZING EXECUTION OF A HIGHWAY AUTHORITY AGREEMENT WITH
SPEEDWAY SUPERAMERICA LLC
(851 St. Charles Street)
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that
Ed Schock, Mayor, and Dolonna Mecum, City Clerk, be and are hereby authorized and directed to
execute a Highway Authority Agreement on behalf of the City of Elgin with Speedway
SuperAmerica LLC to limit access to potentially contaminated soil or groundwater in the public
right-of-way adjacent to 851 St.Charles Street,Elgin,Illinois,a copy of which is attached hereto and
made a part hereof by reference.
s/Ed Schock
Ed Schock, Mayor
Presented: March 9, 2005
Adopted: March 9, 2005
Omnibus Vote: Yeas: 6 Nays: 0
Attest:
s/Dolonna Mecum
Dolonna Mecum, City Clerk
1
CITY OF ELGIN- SPEEDWAY SUPERAMERICA LLC
HIGHWAY AUTHORITY AGREEMENT
INITIAL INFORMATION FORM
OVERVIEW
The purpose of this document is to notify the City of Elgin, an
Illinois municipal corporation, of the extent of hydrocarbon im-
pact within soil and/or groundwater and to provide the necessary
initial information needed to enter into a highway authority
agreement, pursuant to 35 IAC 742 . 1020 .
APPLICANT INFORMATION
Property Owner: SPEEDWAY SUPERAMERICA LLC Operator (if different) :
Address: P.O. Box 1500 Address:
Springfield, OH 45501
Telephone No: 937.864.3000
Fax No: 937 .864.6078
Name and Title of Person Authorized to Sign for Owner:
R. Scott Hiser, Corporate Environmental Manager
Name and Title of Person Authorized to Sign for Operator (if
different) :
APPLICANT'S ATTORNEY ENVIRONMENTAL CONSULTANT
Name: Jose Luis Gonzalez, Jr. Name: David Klatt, CHMM
Address: P.O. Box 1500 Address: 919 North Plum Grove Road
Springfield, OH 45501 Suite E
Schaumburg, IL 60173
Telephone No: 937.864.3000 Telephone No: 847.517.1977, ext. 433
PROPERTY ADJACENT TO THE RIGHT-OF-WAY
Address : 851 St. Charles Street, Elgin, IL 60123
RIGHT-OF-WAY(S) REQUIRING HIGHWAY AGREEMENT
Highway Number(s) : (Check one or both)
❑ Soil Impact in Right-of-Way
0 Groundwater Impact in Right-of-Way
Street Name (if any) : Bluff City Boulevard
REGULATORY INFORMATION
IEMA Incident Number: 860218A
IEPA Project Manager: Mr. Steve Putrich
IEPA Status : (Check one)
❑ Conditional Approval
❑ Approval Pending
D Other
CAP approved with modifications on
2/3/2003 . One of the IEPA's modi-
fications was to request that a
Highway Authority Agreement be
executed for Bluff City Boulevard
adjacent to 455 and 473 Bluff City
Boulevard.
SAMPLING IN THE RIGHT-OF-WAY
(Check one)
D Right-of-Way Sampled ❑ Right-of-Way Impractical to Sample
(Sampling was done adjacent
to right-of-way)
PERSON(S) TO BE NOTIFIED IN AGREEMENT
Name: R. Scott Hiser, Corporate Environmental Manager
Address : Speedway SuperAmerica LLC
P.O. Box 1500
Springfield, OH 45501
937 . 864 .3000, ext. 6515
2
- t
NATURE AND EXTENT OF HYDROCARBON IMPACT INFORMATION -
FOR EXHIBIT A
The Closure Report/Closure Response Letter will document the na-
ture and extent of hydrocarbon impact in the right-of-way.
Soil: Refer to Figure 1 - Estimated Soil Impact in the
Right-of-Way Map Using Tier One Residential Cor-
rective Action Objectives
Groundwater: Refer to Figure 2 - Estimated Groundwater Impact
in the Right-of-Way Map Using Tier One Corrective
Action Objectives
Tables showing soil and groundwater sampling results in the
right-of-way (if sampled) and/or adjacent to it need to be sub-
mitted and keyed to Figures 1 and 2 . Samples above Tier 1 One
Residential Corrective Action Objectives need to be highlighted.
AREA COVERED BY HIGHWAY AUTHORITY AGREEMENT - FOR EXHIBIT B
(Check one)
Cif Refer to Figure 3 - Proposed Highway Authority Agreement Loca-
tion Map
❑ Location not proposed (The Department will draw map based on
Figures 1 and 2 . )
Attachments :
Q Figure 1 Estimated Soil Impact Map
D Figure 2 Estimated Groundwater Impact Map
Q Figure 3 Proposed Highway Agreement Location Map
Q Tables Showing Sampling Results
❑ Closure Report
❑ Other
3
MASTER AGREEMENT
TIERED APPROACH TO CORRECTIVE-ACTION OBJECTIVES AGREEMENT
This Agreement is entered into this day of , 2004
pursuant to 35 Illinois Administrative Code Section 742 . 1020 by
and between Speedway SuperAmerica LLC ("Owner") and Speedway
SuperAmerica LLC ("Operator") , referred to herein as
"Owner/Operator, " and the City of Elgin, an Illinois municipal
corporation ("City") , as follows :
1 . This Agreement shall not be binding upon the City until it is
executed by the undersigned representative of the City and prior
to execution, this Agreement constitutes an offer by
Owner/Operator. The duly authorized representatives of
Owner/Operator have signed this Agreement and this Agreement is
binding upon them, their successors and assigns .
2 .a. Owner/Operator is pursuing a corrective action of a Site
and of the right-of-way adjacent to the boundary of the Site
located at 851 St . Charles Street, Elgin, IL 60123 (the "Site") .
2 .b. Attached as Exhibit A are site maps prepared by
Owner/Operator which show the area of estimated contaminant
impacted soil and/or groundwater at the time of this Agreement
in the right-of-way above Tier 1 residential levels under 35
Illinois Administrative Code Part 742 . Also shown in Exhibit A
are tables prepared by Owner/Operator showing the concentration
of contaminants of concern, hereafter "Contaminants, " in soil
and/or groundwater within the Site and which shows the
applicable Tier 1 soil remediation objectives for residential
property and Tier 1 objectives for groundwater of the Illinois
Pollution Control Board ("IPCB") which are exceeded along the
boundary of the Site adjacent to the Right of-Way. The right-of-
way, and only the right-of-way, as described in Exhibit B,
hereinafter the "Right-of-Way, " adjacent to the site is subject
to this Agreement . As the drawings in the Exhibits are not
surveyed plats, the boundary of the Right-of-Way in the Exhibits
may be an approximation of the actual right-of-way lines . The
Right-of-Way is impractical to sample for Contaminants; however,
the parties believe that the area of the Right-of-Way is
adequate to encompass soil and/or groundwater within the Right-
of-Way possibly impacted with Contaminants from a release at the
Site.
2 .c . The Illinois Emergency Management Agency has assigned
incident number 860218A to this release at the Site .
2 .d. Owner/Operator intends to request risk-based, site specific
soil and/or groundwater remediation objectives from the Illinois
Environmental Protection Agency ("IEPA" ) under 35 Illinois Ad-
ministrative Code Part 742 .
2 .e. Under these rules, use of risk-based, site specific reme-
diation objectives in the Right-of-Way may require the use of a
Highway Authority Agreement as defined in 35 Illinois Adminis-
trative Code Section 742 . 1020 .
3 . The City holds a fee simple interest or a dedication for
highway purposes in the Right-of-Way, or the Right-of-Way is a
platted street, and has jurisdiction of the Right-of-Way. For
purposes of this Agreement, "jurisdiction" means that the City
exercises access control over the use of groundwater beneath the
Right-of-Way and over access to the soil beneath the Right-of-
Way because it requires a permit for that access .
4.a. Under 35 Illinois Administrative Code Section 742 . 1020,
this Agreement is intended to be an acceptable "Highway Author-
ity Agreement" to IEPA, as the City is willing to agree that it
will not allow the use of groundwater under the highway Right-
of-Way as a potable or other domestic supply of water and that
it will limit access as described herein to soil under the high-
way Right-of-Way that is contaminated from the release at levels
above residential Tier 1 remediation objectives .
4 .b. The IEPA must review and approve this Agreement, and this
Agreement shall be referenced in the IEPA' s "No Further Remedia-
tion" determination in the chain of title for the Site in the
county where the Site is located.
4 .c. This Agreement shall be null and void as a Highway Author-
ity Agreement should the IEPA not approve it or should it not be
referenced in the "No Further Remediation" determination. This
Agreement shall not be effective between the Owner/Operator and
the City unless and until the IEPA approves this Agreement and
the IEPA accordingly references the Agreement in the IEPA' s "No
Further Remediation" determination in the chain of title for the
Site in the county where the Site is located.
5. The City promises IEPA and the Owner/Operator that it will
prohibit the use of groundwater that is contaminated from the
release at the Site at levels above Tier 1 remediation objec-
tives beneath its Right-of-Way as a potable or other domestic
supply of water and will limit access to soil as described
herein under the Right-of-Way that is contaminated from the re-
5
lease at the Site at levels above Tier 1 remediation objectives .
As the pavement in the Right-of-Way may be considered an engi-
neered barrier, the Owner/Operator agrees to reimburse the City
for maintenance activities requested by Owner/Operator in writ-
ing in order to maintain it as a barrier. The City does not oth-
erwise agree to perform maintenance of the Right-of-Way, nor
does it agree that the highway Right-of-Way will always remain a
highway or that it will maintain the Right-of-Way as an engi-
neered barrier.
6 . The Owner/Operator agrees to indemnify and hold harmless the
City, and other highway authorities, if any, maintaining the
highway Right-of-Way by an agreement with the City, and the
City's agents, contractors, officers or employees for all obli-
gations asserted against or costs incurred by them, including
attorney's fees and court costs, associated with the release of
Contaminants from the Site, regardless whether said obligations
or costs were caused by the negligence, but not the gross negli-
gence, of them.
7 . As an additional consideration, Owner/Operator agrees to re-
imburse the City for the reasonable costs it has incurred in
protecting human health and the environment, including, but not
limited to, identifying, investigating, handling, storing and
disposing of contaminated soil and groundwater in the Right-of-
Way as a result of the release of contaminants at this Site, and
the review and processing of this Agreement. The City has deter-
mined those costs for Owner and such costs amount to two thou-
sand five hundred dollars ($2500 . 00) . A cashier's check made
payable to "City of Elgin, Illinois" shall be tendered to the
City at the time Owner/Operator furnishes a signed Agreement to
the City for its signature. That check will be deposited when
all necessary parties sign this Agreement.
8 . This Agreement shall be binding upon all successors in inter-
est to the Owner/ Operator or highway Right-of-Way. A successor
in interest of the City would include a highway authority to
which the City would transfer jurisdiction of the highway.
9 . Violation of the terms of this Agreement by Owner/Operator,
or their successors in interest, may be grounds for voidance of
this Agreement as a Highway Authority Agreement. Violation of
the terms of this Agreement by the City will not void this
Agreement, unless the IEPA has determined that the violation is
grounds for voiding this Agreement as a Highway Authority Agree-
ment and the City has not cured the violation within such time
as IEPA has granted to cure the violation.
6
10 . This Agreement shall continue in effect from the date of
this Agreement until the Right-of-Way is demonstrated to be
suitable for unrestricted use and there is no longer a need for
this Agreement as a Highway Authority Agreement, and the IEPA
has, upon written request to the IEPA by the Owner/Operator and
notice to the City, amended the notice in the chain of title of
the Site to reflect unencumbered future use of that highway
Right-of-Way.
11 . This Agreement is in settlement of claims the City may have
arising from the release of Contaminants into the Right-of-Way
associated with incident number 860218A.
12 . This Agreement does not limit the City's ability to con-
struct, reconstruct, improve, repair, maintain and operate a
highway upon its property or to allow others to use the highway
Right-of-Way by permit. To that extent, the City reserves the
right and the right of those using its property under permit to
remove contaminated soil or groundwater above Tier 1 residential
remediation objectives from its Right-of-Way and to dispose of
them as they deem appropriate not inconsistent with applicable
environmental regulations so as to avoid causing a further re-
lease of the Contaminants and to protect human health and the
environment.
Prior to taking any such action, the City will first give
Owner/Operator written notice, unless there is an immediate
threat to the health or safety to any individual or to the pub-
lic, that it intends to perform a site investigation in the
Right-of-Way and remove or dispose of contaminated soil or
groundwater to the extent necessary for its work. Failure to
give notice shall not constitute a violation of this Agreement.
The removal or disposal shall be based upon the site investiga-
tion (which may be modified by field conditions during excava-
tion) , which Owner/Operator may review or may perform, if re-
quested to do so by the City. If practicable, as determined by
the City, the City may request Owner/Operator to remove and dis-
pose of the contaminated soil and/or groundwater necessary for
the City's work in advance of that work. The Owner/Operator
shall reimburse the reasonable costs incurred by the City to
perform the site investigation and to dispose of any contami-
nated soil or groundwater, provided, however, that if notice to
Owner/Operator has not been given and there was no immediate
threat to health or safety, reimbursement for those costs shall
be limited to twenty thousand dollars ($20, 000 . 00) . There is a
rebuttable presumption that the Contaminants found in the high-
7
way Right-of-Way arose from the release of Contaminants from the
Site. Should Owner/Operator not reimburse the reasonable costs
under the conditions set forth herein, this Agreement shall be
null and void, at the City's option, upon written notice to
Owner/Operator by the City that those costs have not been reim-
bursed. Owner/Operator may cure that problem within twenty work-
ing days by making payment, or may seek to enjoin that result.
13 . Written notice required by this Agreement shall be mailed to
the following:
To Owner/Operator:
R. Scott Hiser, Corporate Environmental Manager
Speedway SuperAmerica LLC
P.O. Box 1500
Springfield, OH 45501
To City:
Mr. John Loete
Public Works Director
150 Dexter Court
Elgin, IL 60120-5555
14 . The City's sole responsibility under this Agreement with re-
spect to others using the highway Right-of-Way under permit from
the City is to include the following, or similar language, in
the future standard permit provisions and to make an effort to
notify its current permit holders of the following:
As a condition of this permit, the permittee shall re-
quest the City' s Public Works Department to identify
sites in the Right-of-Way where access to contaminated
soil or groundwater is governed by Tiered Approach to
Corrective-Action Objectives ( "TACO" ) Agreements . The
permittee shall take measures before, during and after
any access to these sites to protect worker safety and
human health and the environment . Excavated, contami-
nated soil should be managed off-site in accordance
with all environmental laws .
Owner/Operator hereby releases the City from liability for
breach of this Agreement by others under permit and indemnifies
the City against claims that may arise from others under permit
causing a breach of this Agreement. Owner/ Operator agrees that
its personnel, if any, at the Site who are aware of this Agree-
ment will notify anyone they know is excavating in the Right-of-
Way about this Agreement.
8
15 . Should the City breach Paragraph 5 of this Agreement,
Owner/Operator' s sole remedy is for an action for damages in the
Circuit Count for the Sixteenth Judicial Circuit, Kane County,
Illinois . Any and all claims for damages against the City, its
agents, contractors, officers, employees or its successors in
interest arising at any time for a breach of paragraph 5 of this
Agreement are limited to an aggregate maximum of two thousand
five hundred dollars ($2500 . 00) . No breach by the City, its
agents, contractors, officers, employees and its successors in
interest of a provision of this Agreement other than Paragraph 5
is actionable in either law or equity by Owner/Operator against
the City or its agents, contractors, officers, employees and its
successors in interest and Owner/Operator hereby releases the
City, its agents, contractors, officers, employees and its suc-
cessors in interest for any cause of action it may have against
them, other than as allowed in this paragraph, arising under
this Agreement or environmental laws, regulations or common law
governing the contaminated soil or groundwater in the highway
Right-of-Way. Should the City convey, vacate or transfer juris-
diction of that highway Right of-Way, Owner/Operator may pursue
an action under this Agreement against the successors in inter-
est, other than a State agency, in a court of law.
16 . This Agreement is entered into by the City in recognition of
laws passed by the General Assembly and regulations adopted by
the Pollution Control Board that encourage a tiered-approach to
remediating environmental contamination. This Agreement is en-
tered into by the City in the spirit of those laws and under its
right and obligations as a municipality. Should any provisions
of this Agreement be struck down as beyond the authority of the
City, however, this Agreement shall be null and void.
17 . The Owner and Operator shall be jointly and severally liable
for their obligations under this Agreement and all references to
"Owner/Operator" shall effect the Owner and Operator both
jointly and individually.
9
IN WITNESS WHEREOF, Owner/Operator, Speedway SuperAmerica LLC,
has caused this
Agreement to be signed by its duly authorized representative.
BY: 0.r DATE: 7/0;34,691
R. SCOTT HISER, CORPORATE ENVIRONMENTAL MANAGER
(Y/j/
.
IN WITNESS WHEREOF, the City has caused this Agreement to be
signed by its Mayor.
CITY OF ELGIN
BY: DATE: ,3//1/0.
ED SC OCK, MAYOR
ATTEST:
X‘P4-1"-1,-e /1/(e-Ctz
DOLONNA MECUM, CITY CLERK
10
Table 1
SOIL SAMPLE BTEX ANALYTICAL DATA(mg/kg)
SPEEDWAY STATION#7095
851 ST.CHARLES STREET
ELGIN,ILLINOIS
Sample Date Depth Benzene Toluene Ethylbenzene Xylenes
Number (feet)
&1 12/13/95 9-11 1-'u >.,, a, ;„ 0.370 3.7 62 11
B-2 12/13/95 9-11 0.007 ND 0.079 0.140
MW-1A 7/5/00 3.5-5 0.003 ND ND ND
MW-1A 7/5/00 8.5-10 0.015 0.006 0.002 0.011
MW-2A 7/5/00 3.5-5 ND ND ND ND
MW-2A 7/5/00 8.5-10 0.004 0.005 ND 0.004
MW-3A 7/5/00 3.5-5 ND ND ND ND
MW-3A 7/5/00 8.5-10 ND ND 0.080 0.730
MW-4A I 5/10/01 I 9-11 I ND ND I ND ND
MW-5A I 5/16/02 I 3.5-5 0.006 0.012 I ND 0.010
MW-6A 5/16/02 I 3.5-5 0.006 0.012 0.006 0.009
Tier 1 Soil Remediation Objectives for 0.030 12 13 150
Class I Groundwater
ND=Not Detected
Note: Shaded cells represent concentrations that exceed Tier 1 soil remediation objectives.
1
Table 2
GROUNDWATER SAMPLE BTEX ANALYTICAL DATA (mg/L)
SPEEDWAY STATION#7095
851 ST. CHARLES STREET
ELGIN, ILLINOIS
Sample Date Benzene Toluene Ethylbenzene Xylenes
Number
SUMP 1 5/18/89 0.0007 ND ND 0.0023
SUMP 2 I 5/18/89 ` (1,41Xii; 'I 0.130 I 0.052 I 0.380
SUMP 3 5/18/89 ', 041'0 I 0.011 0.011 I' 0.110
RW-1 I 12/28/99 I ND I ND I ND I ND
MW-1 5/17/89 ND I ND ND I ND
MW-2 5/17/89 .1 1 I ? ; q.. .,. . .,.
MW-3 5/17/89 r.,.:' 0.6 i; 6.8
MW-3 6/6/94 (0-101 0.018 0.280 0.180
MW-3 9/8/94 ; (1,14 I NA NA NA
F r14.-%
MW-3 3/21/95
t, �.�.�_41 0.012 0.390 0.450
MW-4 5/17/89 0.0007 0.0006 0.0001 0.00016
MW-4 6/6/94 ND ND ND ND
MW-4 9/8/94 ND ND ND ND
MW-5 I .4, .. � «. I 0.610 I 1.8
MW-6 5/17/89 0.0022 0.0025 0.001 0.0046
MW-6 6/6/94 ND ND ND ND
MW-6 9/8/94 ND ND ND ND
Tier 1 Groundwater 0.005 1 0.700 10
Remediation Objectives
for Class I Groundwater
2
Table 2 (continued)
GROUNDWATER SAMPLE BTEX ANALYTICAL DATA (mg/L)
SPEEDWAY STATION#7095
851 ST. CHARLES STREET
ELGIN, ILLINOIS
Sample Date Benzene Toluene Ethylbenzene Xylenes
Number
MW-9 I 5/19/89 I 0.0003 I 0.0008 I ND I ND
MW-11 5/19/89 ND ND ND ND
MW-12 I 5/17/89 „ tll Sl I 0.0005 I ND I ND
MW-13 5/17/89 0.005 0.0008 0.0015 0.0037
MW-13 6/6/94 ND ND ND ND
MW-13 3/24/95 ND ND ND ND
MW-14 5/17/89 1,i4ii l ND ND ND
MW-14 6/6/94 ND ND ND ND
MW-14 9/8/94 ND ND ND ND
MW-15 5/17/89 ND ND ND ND
MW-15 6/6/94 ND ND ND ND
MW-15 9/8/94 ND ND ND ND
MW-15 3/24/95 ND ND ND ND
MW-15 12/28/99 ND ND ND ND
MW-15 8/8/00 ND ND ND ND
MW-16 I 6/6/94 I ND I ND I ND I ND J
MW-19 6/6/94 I 41,. a(I_ 0.096 0.590 2.2
MW-19 3/24/95 04i,:' 0.140 0.140 0.580
Tier 1 Groundwater 0.005 1 0.700 10
Remediation Objectives
for Class I Groundwater
3
Table 2 (continued)
GROUNDWATER SAMPLE BTEX ANALYTICAL DATA (mg/L)
SPEEDWAY STATION#7095
851 ST. CHARLES STREET
ELGIN, ILLINOIS
Sample Date Benzene Toluene Ethylbenzene Xylenes
Number
MW-20 12/28/99 ND ND ND ND
MW-20 8/8/00 ND ND ND ND
MW-20 8/30/01 0.0032 ND ND ND
MW-20 7/17/03 ND ND ND ND
MW-22 6/6/94 0.004 ND ND ND
MW-22 3/24/95 0.003 ND ND ND
MW-22 12/28/99 ND ND ND ND
MW-23 5/17/89 ( Ill: 0.0011 0.0082 0.0009
MW-23 6/6/94 ND ND ND ND
MW-23 9/8/94 ND ND ND ND
MW-23 3/22/95 ND ND ND ND
MW-24 6/6/94 ND ND ND ND
MW-24 3/27/95 ND ND ND ND
MW-24 12/28/99 ND ND ND ND
MW-24 8/8/00 ND ND ND ND
MW-25 5/17/89 31,1 tail 0.0034 0.007 0.003
MW-25 6/6/94 ND ND ND ND
MW-25 9/8/94 ND ND ND ND
MW-25 3/24/95 ND ND ND ND
Tier 1 Groundwater 0.005 1 0.700 10
Remediation Objectives
for Class I Groundwater - -
4
Table 2 (continued)
GROUNDWATER SAMPLE BTEX ANALYTICAL DATA(mg/L)
SPEEDWAY STATION#7095
851 ST. CHARLES STREET
ELGIN,ILLINOIS
Sample Date Benzene Toluene Ethylbenzene Xylenes
Number
MW-26 5/17/89 ;,Irk Ii7`i1 s 0.0018 0.0028 0.0026
MW-26 6/6/94 ND ND ND ND
MW-26 3/24/95 ND ND ND ND
MW-26 12/28/99 ND ND ND ND
MW-26 8/8/00 ND ND ND ND
MW-27 5/17/89 (Hit:? 0.110 0.200 0.880
MW-27 6/6/94 ai_;t.:{i • 0.038 19 1 , 1.6
MW-27 9/8/94 t;;Eiis� NA NA NA
' ,::i
MW-27 3/24/95 ,,f,, 1,1i i$ 0.025 0.340 0.180
MW-27 12/28/99 ND ND ND ND
MW-27 8/8/00 71$1771 ND 0.007 0.001
MW-28 5/18/89 iTdi, , i!'�' `I 0.0067 I 0.016 0.042
MW-30 5/18/89 ND ND ND ND
MW-30 6/6/94 ND ND ND ND
MW-30 9/8/94 ND ND ND ND
MW-30 3/22/95 ND ND ND ND
Tier 1 Groundwater 0.005 1 0.700 10
Remediation Objectives
for Class I Groundwater
5
Table 2 (continued)
GROUNDWATER SAMPLE BTEX ANALYTICAL DATA (mg/L)
SPEEDWAY STATION#7095
851 ST. CHARLES STREET
ELGIN,ILLINOIS
Sample Date Benzene Toluene Ethylbenzene Xylenes
Number
MW-31 5/18/89 ND ND ND ND
MW-31 6/6/94 ND ND ND ND
MW-31 9/8/94 ND ND ND ND
MW-31 3/22/95 ND ND ND ND
MW-32 5/18/89 ND ND ND ND
MW-32 9/8/94 ND ND ND ND
MW-34 5/18/89 �. .._ '4 ,,._ �.' {�...�. ...r._ 5.6
MW-34 6/6/94 (1, 1111 :I 0.017 0.100 0.290
MW-34 9/8/94 0.004 NA NA NA
MW-34 3/22/95 .^,(IA ND 0.021 0.007
MW-35 6/6/94 ND ND ND ND
MW-35 3/22/95 ND ND ND ND
MW-37 5/18/89 0.0013 0.004 ND ND
MW-37 6/6/94 ND ND ND ND
MW-37 9/8/94 ND ND ND ND
MW-37 3/22/95 ND ND ND ND
Tier 1 Groundwater 0.005 1 0.700 10
Remediation Objectives
for Class I Groundwater
6
Table 2 (continued)
GROUNDWATER SAMPLE BTEX ANALYTICAL DATA(mg/L)
SPEEDWAY STATION# 7095
851 ST. CHARLES STREET
ELGIN,ILLINOIS
Sample Date Benzene Toluene Ethylbenzene Xylenes
Number
MW-1A 8/8/00 i` iii 4L 0.026 0.150 0.310
MW-1A 5/10/01 ND ND ND ND
MW-1A 1/10/02a NI)t 0.001 0.001 ND
MW-1A 7/17/03 ,y /111(,4 ND ND ND
MW-2A 10/25/00 ND ND ND ND
MW-2A 5/10/01 iI.WW1: ND ND ND
MW-2A 1/10/02 4141;q: : ND ND ND
MW-2A 7/17/03 0.0015 ND ND ND
MW-3A 8/8/00 , 41 t°4lt ND 0.650 2.1
MW-3A 5/10/01 41ef11 f r" ND ,w, ,, 3.9
MW-3A 1/10/02 ; '4('� �° y ND 0.400 0.180
f
MW-3A 7/17/03 i! i` i A 0.0029 0.570 0.300
MW-4A 8/30/01 ND ND ND ND
MW-4A 4/29/02 ND ND ND ND
MW-4A 7/17/03 ND ND ND ND
MW-5A 5/20/02 ND ND ND ND
MW-5A 7/17/03 ND ND ND ND
MW-6A 5/20/02 ND ND ND ND
MW-6A 7/17/03 ND ND ND ND
Tier 1 Groundwater 0.005 1 0.700 10
Remediation Objectives
for Class I Groundwater
ND=Not Detected
NA=Not Available
Note: Shaded cells represent concentrations that exceed Tier 1 groundwater remediation objectives.
7
A.
BLUFF CITY BOULEVARD _1
_ —
srrsuY- �— - - srrsuv• - - srrsw- �} sirsur — `srrsov ---
MW-8 r \.
MW-11 MW-10
NF -0 FORMER iDIL ��
NF ANA MAy-9 VAPOR EXTRACTION`1ti TRAFFIC LIGHT
NF # -7 \'g' MW-24 • MW-Z5
I�.r.l—— —— —
MW-29 T 6,1
MW-14 :--2232.16
-26 I T 1 - 0 5 4 tA¢ - tli
NF ¢ 4- MR. ROBERT JUUENe1 - 1 4� -0 NF
NF 1 I ROCKFORD I. NA-121 APARTMENT B . I i i AN11-2 -c}-144 B-RAGE TA&& N+11::.-'.: 11
STOP-N-GO INC.
I I I MR. ROBERT JUUEN j BLUFF 'KW , 1 Cs o C) MW-3A +^'
455 BLUFF CITY BLVD.
MW-30 I MW-28 I CITY BLVD -t� MW-16 I it , 6`S- ,-t,r a MW-3 NA II
NA NF MW-20 Nq _tA'�' i.•- 1-1•-
NF I i} A4 IG-—/.1-13 - -- --IC- - - y BMW-tl' -!-_._
MW-15 I A, 0
NW-31 I BMW- - FL DRIVEWAY �: NF
I
MR. & MRS. HERNANDEZ I L I MR. & MRS. GUZMAN
MW-21 865 ELIZABETH Sr. j a 857 ST. CHARLES ST.
Mw- M-34 _at F-- -- -- -- -- -- -- -- -
.0- A - I 858 ST. CHARLES ST. I F I DRIVEWAY
I MW-37 MW 36 I I 1 -
•--•-- -•--•-- -.--.-_. I 0 MR. ANGEL I'ERQ
I 859 ST. CHARLES ST.
FORMER SOIL ' I
VAPOR EXTRACTION t I
SYSTEM #2
LEGEND ESTIMATED AREA OF _.76
MW-2 MONITORING WELL LOCATION IMPACTED SOIL o
S-1 Q AF3ANDONED SUMP LOCATION
MN ��
8-1 ® SOIL BORING LOCATION 0 40'
6 FORMER LOCATION OF FUEL DISPENSER DRILLING DEEMED NOT FEASIBLE
—sr r MN-- 15" STORM & SANITARY SEWER LINE
WITHIN ST. CHARLES STREET ROW Practical Environmental Consultants, Inc.
aDUE TO UTILITIES 919 Nora Plum crow Rood,Sidle E Wane (847 517-1177
-- seN - - 8" SANITARY SEWER LINE NOTES Sehoumbwg, Mole 10173 FaaYnNs 0$4 517-1916
3 v WATER UNE NF-NOT FOUND
N.-NOT AICESSIBLE ESTIMATED SPEEDWAY STATION #7095
GAS LINE Ft.-FORMER SOIL IMPACT • 851 ST. CHARLES STREET
chi ---Fa TELEPHONE LINE ELGIN, ILLINOIS
OATS SCALE APPROVED OWN.6Y FIOUAE
8121/2003 AS SHOWN SR AJR 1
ESTIMATED AREA OF
IMPACTED GROUNDWATER i.
BLUFF CITY BOULEVARD -I
srrse— — — Tr4 six- — — — -STtSAN— — Q SrtSIN — bTt SIN----•MW-8
-,0 FORMER IL �`� TRAFFIC MW-10 VAPOR CTION
•>NF ANA MW-9¢ SYSTEM#1 i
PROPOSED HIGHWAY AUTHORITY
AGREEMENT LOCATION 6.
BLUFF CITY BO V`^Axn �♦����• V*47 ,t-sr t se, _. �4P -.v#. 440 ; — s7'.SIN — sr.SIN----
MW-11 t -10 ;:♦NF- o�♦:♦:.:♦:.:♦ V q t' IL Cti TRAFFIC
�4 NF ����.4 r #' ( j
-- --�— --
. ∎.;�i l 1 1.►P A P.���A.i��o l 2�∎1 1 I N �� — `--It -- I g
!NF MIW 19 .0. -24 MW-25 0 '
,, r
MW^29 T I NF-14 o mw-23!4 R. ROBERT JULIEN T I I i t INAFW-5 MW-4® MW-4A
NF I APARTMENT BLDG, o ' i 4 B-t FORAGER TANK I
I STOP_N GO INC. I NNAA-1214 477,479, & 481 I MNYFV_2 0B-2 STORAGE AREA
-0' a I 455 BLUFF CITY BLVD. I MR. ROBERT JUIJEN j BLUFF CITY BLVD. i "^'1 -'s-3 C; MW-3A
MW-30 I MW-28 MW-20 I 473 BLUFF I _ 4NF_g'� -t 4 4
CITY BLVD.NA "1. MW-14 I r tA' My MW-3 NA I I -
RW-1 I -,p- Ji ` NF ' — -- — -- l--•—
NF IG- -- 4- -- -- --_ -- --MW-15 MW-1 I DPoVEWAY
^NA 4MW- f$I DRNEWAY -0-MW-33 DRVEWAY —I NF i
I MR. & MRS. HERNANDEZ I ( ' MR. & MRS. GUZMAN
MW-21 865 ELIZABETH ST. 1 1 857 ST. CHARLES ST.
MW - I l' 4MW-i I--•--•--•—-It--•--•--•--•-
¢-0 858 Si. CHARLES ST. I NF i DanEwY
MW-37 MW-36 I I
�a I
'I--.—6—_ M-'5%r1 --1—- -- -- -- 1_- -- -- -
—
I . I I MR. ANGEL PEREZ
I FORMER SOIL
i I r i 859 ST. CHARLES ST.
i I
VAPOR EXTRACTION I
SYSTEM f2
LEGEND
MW-2 4 MONITORING WELL LOCATION c
S-1 `' ABANDONED SUMP LOCATION tcALc IN rat
mom
° B-1 0 SOIL BORING LOCATION o 40' x
3 mo FORMER LOCATION OF FUEL DISPENSER DRILLING DEEMED NOT FEASIBLE
—s}t six-- 15" STORM & SANITARt SEWER LINE WITHIN ST. CHARLES STREET ROW Practical Environmental Consultants, Inc.
Ei ----sex-- DUE TO UTILITIES III Plum e noon,Sulk E aaa& (47) 517-1177
8�SANITARY SEWER LINE NOTES t(
i • WATER LINE NF-NOT Farm
-NOT ACCESSIBLE PROPOSED HIGHWAY SPEEDWAY STATION #7095
GAS LINE 'FORMER=ATM AUTHORITY AGREEMENT 6 851 ST. CHARLES STREET
7 TELEPHONE LINE LOCATION ELGIN, IWNOIS
8/21/2003 AS SHN APPI
AJR F13t£
OW