HomeMy WebLinkAbout05-60 Resolution No. 05-60
RESOLUTION
AUTHORIZING EXECUTION OF A HIGHWAY AUTHORITY AGREEMENT WITH
SPEEDWAY SUPERAMERICA LLC
(1570 Big Timber Road)
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that
Ed Schock, Mayor, and Dolonna Mecum, City Clerk, be and are hereby authorized and directed to
execute a Highway Authority Agreement on behalf of the City of Elgin with Speedway
SuperAmerica LLC to limit access to potentially contaminated soil or groundwater in the public
right-of-way adjacent to 1570 Big Timber Road, Elgin, Illinois, a copy of which is attached hereto
and made a part hereof by reference. •
s/Ed Schock
Ed Schock, Mayor
Presented: March 9, 2005
Adopted: March 9, 2005
Omnibus Vote: Yeas: 6 Nays: 0
Attest:
s/Dolonna Mecum
Dolonna Mecum, City Clerk
' ' 'lb `(
CITY OF ELGIN- SPEEDWAY SUPERAMERICA LLC
HIGHWAY AUTHORITY AGREEMENT
INITIAL INFORMATION FORM
OVERVIEW
The purpose of this document is to notify the City of Elgin, an
Illinois municipal corporation, of the extent of hydrocarbon im-
pact within soil and/or groundwater and to provide the necessary
initial information needed to enter into a highway authority
agreement, pursuant to 35 IAC 742 . 1020.
APPLICANT INFORMATION
Property Owner: SPEEDWAY SUPERAMERICA LLC Operator (if different) :
Address: P.O. Box 1500 Address:
Springfield, OH 45501
Telephone No: 937 .864.3000
Fax No: 937 .864 .6078
Name and Title of Person Authorized to Sign for Owner:
R. Scott Hiser, Corporate Environmental Manager
Name and Title of Person Authorized to Sign for Operator (if
different) :
APPLICANT'S ATTORNEY ENVIRONMENTAL CONSULTANT
Name: Jose Luis Gonzalez, Jr. Name: David Klatt, CHMM
Address: P.O. Box 1500 Address: 919 North Plum Grove Road
Springfield, OH 45501 Suite E
Schaumburg, IL 60173
Telephone No: 937 .864.3000 Telephone No: 847.517.1977, ext. 433
PROPERTY ADJACENT TO THE RIGHT-OF-WAY
Address : 1570 Big Timber Road, Elgin, IL 60123
RIGHT-OF-WAY(S) REQUIRING HIGHWAY AGREEMENT
Highway Number (s) : (Check one or both)
0 Soil Impact in Right-of-Way
0 Groundwater Impact in Right-of-Way
Street Name (if any) : Big Timber Road & McLean Boulevard
REGULATORY INFORMATION
IEMA Incident Number: 990227 , 910495, 910004, and 890646
IEPA Project Manager: Ms . Melinda Friedel
IEPA Status : (Check one)
❑ Conditional Approval
❑ Approval Pending
O Other
CAP approved with modifications on
9/1/2000 .
SAMPLING IN THE RIGHT-OF-WAY
(Check one)
0 Right-of-Way Sampled ❑ Right-of-Way Impractical to Sample
(Sampling was done adjacent
to right-of-way)
PERSON(S) TO BE NOTIFIED IN AGREEMENT
Name: R. Scott Hiser, Corporate Environmental Manager
Address : Speedway SuperAmerica LLC
P.O. Box 1500
Springfield, OH 45501
937 . 864 . 3000, ext . 6515
2
NATURE AND EXTENT OF HYDROCARBON IMPACT INFORMATION -
FOR EXHIBIT A
The Closure Report/Closure Response Letter will document the na-
ture and extent of hydrocarbon impact in the right-of-way.
Soil : Refer to Figure 1 - Estimated Soil Impact in the
Right-of-Way Map Using Tier One Residential Cor-
rective Action Objectives
Groundwater: Refer to Figure 2 - Estimated Groundwater Impact
in the Right-of-Way Map Using Tier One Corrective
Action Objectives
Tables showing soil and groundwater sampling results in the
right-of-way (if sampled) and/or adjacent to it need to be sub-
mitted and keyed to Figures 1 and 2 . Samples above Tier 1 One
Residential Corrective Action Objectives need to be highlighted.
AREA COVERED BY HIGHWAY AUTHORITY AGREEMENT - FOR EXHIBIT B
(Check one)
Q Refer to Figure 3 - Proposed Highway Authority Agreement Loca-
tion Map
❑ Location not proposed (The Department will draw map based on
Figures 1 and 2 . )
Attachments :
Q Figure 1 Estimated Soil Impact Map
Q Figure 2 Estimated Groundwater Impact Map
Q Figure 3 Proposed Highway Agreement Location Map
Q Tables Showing Sampling Results
❑ Closure Report
❑ Other
3
MASTER AGREEMENT
TIERED APPROACH TO CORRECTIVE-ACTION OBJECTIVES AGREEMENT
This Agreement is entered into this day of , 2004
pursuant to 35 Illinois Administrative Code Section 742 . 1020 by
and between Speedway SuperAmerica LLC ("Owner") and Speedway
SuperAmerica LLC ("Operator") , referred to herein as
"Owner/Operator, " and the City of Elgin, an Illinois municipal
corporation ("City") , as follows :
1 . This Agreement shall not be binding upon the City until it is
executed by the undersigned representative of the City and prior
to execution, this Agreement constitutes an offer by
Owner/Operator. The duly authorized representatives of
Owner/Operator have signed this Agreement and this Agreement is
binding upon them, their successors and assigns .
2 .a. Owner/Operator is pursuing a corrective action of a Site
and of the right-of-way adjacent to the boundary of the Site
located at 1570 Big Timber Road, Elgin, IL 60123 (the "Site") .
2 .b. Attached as Exhibit A are site maps prepared by
Owner/Operator which show the area of estimated contaminant
impacted soil and/or groundwater at the time of this Agreement
in the right-of-way above Tier 1 residential levels under 35
Illinois Administrative Code Part 742 . Also shown in Exhibit A
are tables prepared by Owner/Operator showing the concentration
of contaminants of concern, hereafter "Contaminants, " in soil
and/or groundwater within the Site and which shows the
applicable Tier 1 soil remediation objectives for residential
property and Tier 1 objectives for groundwater of the Illinois
Pollution Control Board ("IPCB") which are exceeded along the
boundary of the Site adjacent to the Right of-Way. The right-of-
way, and only the right-of-way, as described in Exhibit B,
hereinafter the "Right-of-Way, " adjacent to the site is subject
to this Agreement . As the drawings in the Exhibits are not
surveyed plats, the boundary of the Right-of-Way in the Exhibits
may be an approximation of the actual right-of-way lines . The
Right-of-Way is impractical to sample for Contaminants; however,
the parties believe that the area of the Right-of-Way is
adequate to encompass soil and/or groundwater within the Right-
of-Way possibly impacted with Contaminants from a release at the
Site .
2 . c . The Illinois Emergency Management Agency has assigned
incident number 990227, 910495, 910004, and 890646 to this
release at the Site .
2 .d. Owner/Operator intends to request risk-based, site specific
soil and/or groundwater remediation objectives from the Illinois
Environmental Protection Agency ( "IEPA" ) under 35 Illinois Ad-
ministrative Code Part 742 .
2 .e. Under these rules, use of risk-based, site specific reme-
diation objectives in the Right-of-Way may require the use of a
Highway Authority Agreement as defined in 35 Illinois Adminis-
trative Code Section 742 . 1020 .
3 . The City holds a fee simple interest or a dedication for
highway purposes in the Right-of-Way, or the Right-of-Way is a
platted street, and has jurisdiction of the Right-of-Way. For
purposes of this Agreement, "jurisdiction" means that the City
exercises access control over the use of groundwater beneath the
Right-of-Way and over access to the soil beneath the Right-of-
Way because it requires a permit for that access .
4 .a. Under 35 Illinois Administrative Code Section 742 . 1020,
this Agreement is intended to be an acceptable "Highway Author-
ity Agreement" to IEPA, as the City is willing to agree that it
will not allow the use of groundwater under the highway Right-
of-Way as a potable or other domestic supply of water and that
it will limit access as described herein to soil under the high-
way Right-of-Way that is contaminated from the release at levels
above residential Tier 1 remediation objectives .
4 .b. The IEPA must review and approve this Agreement, and this
Agreement shall be referenced in the IEPA' s "No Further Remedia-
tion" determination in the chain of title for the Site in the
county where the Site is located.
4 .c. This Agreement shall be null and void as a Highway Author-
ity Agreement should the IEPA not approve it or should it not be
referenced in the "No Further Remediation" determination. This
Agreement shall not be effective between the Owner/Operator and
the City unless and until the IEPA approves this Agreement and
the IEPA accordingly references the Agreement in the IEPA's "No
Further Remediation" determination in the chain of title for the
Site in the county where the Site is located.
5 . The City promises IEPA and the Owner/Operator that it will
prohibit the use of groundwater that is contaminated from the
release at the Site at levels above Tier 1 remediation objec-
tives beneath its Right-of-Way as a potable or other domestic
supply of water and will limit access to soil as described
5
herein under the Right-of-Way that is contaminated from the re-
lease at the Site at levels above Tier 1 remediation objectives .
As the pavement in the Right-of-Way may be considered an engi-
neered barrier, the Owner/Operator agrees to reimburse the City
for maintenance activities requested by Owner/Operator in writ-
ing in order to maintain it as a barrier. The City does not oth-
erwise agree to perform maintenance of the Right-of-Way, nor
does it agree that the highway Right-of-Way will always remain a
highway or that it will maintain the Right-of-Way as an engi-
neered barrier.
6 . The Owner/Operator agrees to indemnify and hold harmless the
City, and other highway authorities, if any, maintaining the
highway Right-of-Way by an agreement with the City, and the
City' s agents, contractors, officers or employees for all obli-
gations asserted against or costs incurred by them, including
attorney' s fees and court costs, associated with the release of
Contaminants from the Site, regardless whether said obligations
or costs were caused by the negligence, but not the gross negli-
gence, of them.
7 . As an additional consideration, Owner/Operator agrees to re-
imburse the City for the reasonable costs it has incurred in
protecting human health and the environment, including, but not
limited to, identifying, investigating, handling, storing and
disposing of contaminated soil and groundwater in the Right-of-
Way as a result of the release of contaminants at this Site, and
the review and processing of this Agreement. The City has deter-
mined those costs for Owner and such costs amount to two thou-
sand five hundred dollars ($2500 . 00) . A cashier' s check made
payable to "City of Elgin, Illinois" shall be tendered to the
City at the time Owner/Operator furnishes a signed Agreement to
the City for its signature. That check will be deposited when
all necessary parties sign this Agreement.
8 . This Agreement shall be binding upon all successors in inter-
est to the Owner/ Operator or highway Right-of-Way. A successor
in interest of the City would include a highway authority to
which the City would transfer jurisdiction of the highway.
9 . Violation of the terms of this Agreement by Owner/Operator,
or their successors in interest, may be grounds for voidance of
this Agreement as a Highway Authority Agreement. Violation of
the terms of this Agreement by the City will not void this
Agreement, unless the IEPA has determined that the violation is
grounds for voiding this Agreement as a Highway Authority Agree-
6
ment and the City has not cured the violation within such time
as IEPA has granted to cure the violation.
10 . This Agreement shall continue in effect from the date of
this Agreement until the Right-of-Way is demonstrated to be
suitable for unrestricted use and there is no longer a need for
this Agreement as a Highway Authority Agreement, and the IEPA
has, upon written request to the IEPA by the Owner/Operator and
notice to the City, amended the notice in the chain of title of
the Site to reflect unencumbered future use of that highway
Right-of-Way.
11 . This Agreement is in settlement of claims the City may have
arising from the release of Contaminants into the Right-of-Way
associated with incident number 990227 , 910495, 910004, and
890646 .
12 . This Agreement does not limit the City' s ability to con-
struct, reconstruct, improve, repair, maintain and operate a
highway upon its property or to allow others to use the highway
Right-of-Way by permit. To that extent, the City reserves the
right and the right of those using its property under permit to
remove contaminated soil or groundwater above Tier 1 residential
remediation objectives from its Right-of-Way and to dispose of
them as they deem appropriate not inconsistent with applicable
environmental regulations so as to avoid causing a further re-
lease of the Contaminants and to protect human health and the
environment.
Prior to taking any such action, the City will first give
Owner/Operator written notice, unless there is an immediate
threat to the health or safety to any individual or to the pub-
lic, that it intends to perform a site investigation in the
Right-of-Way and remove or dispose of contaminated soil or
groundwater to the extent necessary for its work. Failure to
give notice shall not constitute a violation of this Agreement.
The removal or disposal shall be based upon the site investiga-
tion (which may be modified by field conditions during excava-
tion) , which Owner/Operator may review or may perform, if re-
quested to do so by the City. If practicable, as determined by
the City, the City may request Owner/Operator to remove and dis-
pose of the contaminated soil and/or groundwater necessary for
the City's work in advance of that work. The Owner/Operator
shall reimburse the reasonable costs incurred by the City to
perform the site investigation and to dispose of any contami-
nated soil or groundwater, provided, however, that if notice to
Owner/Operator has not been given and there was no immediate
7
threat to health or safety, reimbursement for those costs shall
be limited to twenty thousand dollars ($20, 000 . 00) . There is a
rebuttable presumption that the Contaminants found in the high-
way Right-of-Way arose from the release of Contaminants from the
Site. Should Owner/Operator not reimburse the reasonable costs
under the conditions set forth herein, this Agreement shall be
null and void, at the City' s option, upon written notice to
Owner/Operator by the City that those costs have not been reim-
bursed. Owner/Operator may cure that problem within twenty work-
ing days by making payment, or may seek to enjoin that result.
13 . Written notice required by this Agreement shall be mailed to
the following:
To Owner/Operator:
R. Scott Hiser, Corporate Environmental Manager
Speedway SuperAmerica LLC
P.O. Box 1500
Springfield, OH 45501
To City:
Mr. John Loete
Public Works Director
150 Dexter Court
Elgin, IL 60120-5555
14 . The City' s sole responsibility under this Agreement with re-
spect to others using the highway Right-of-Way under permit from
the City is to include the following, or similar language, in
the future standard permit provisions and to make an effort to
notify its current permit holders of the following:
As a condition of this permit, the permittee shall re-
quest the City' s Public Works Department to identify
sites in the Right-of-Way where access to contaminated
soil or groundwater is governed by Tiered Approach to
Corrective-Action Objectives ( "TACO" ) Agreements . The
permittee shall take measures before, during and after
any access to these sites to protect worker safety and
human health and the environment . Excavated, contami-
nated soil should be managed off-site in accordance
with all environmental laws .
Owner/Operator hereby releases the City from liability for
breach of this Agreement by others under permit and indemnifies
the City against claims that may arise from others under permit
causing a breach of this Agreement. Owner/ Operator agrees that
8
its personnel, if any, at the Site who are aware of this Agree-
ment will notify anyone they know is excavating in the Right-of-
Way about this Agreement.
15 . Should the City breach Paragraph 5 of this Agreement,
Owner/Operator' s sole remedy is for an action for damages in the
Circuit Count for the Sixteenth Judicial Circuit, Kane County,
Illinois . Any and all claims for damages against the City, its
agents, contractors, officers, employees or its successors in
interest arising at any time for a breach of paragraph 5 of this
Agreement are limited to an aggregate maximum of two thousand
five hundred dollars ($2500 . 00) . No breach by the City, its
agents, contractors, officers, employees and its successors in
interest of a provision of this Agreement other than Paragraph 5
is actionable in either law or equity by Owner/Operator against
the City or its agents, contractors, officers, employees and its
successors in interest and Owner/Operator hereby releases the
City, its agents, contractors, officers, employees and its suc-
cessors in interest for any cause of action it may have against
them, other than as allowed in this paragraph, arising under
this Agreement or environmental laws, regulations or common law
governing the contaminated soil or groundwater in the highway
Right-of-Way. Should the City convey, vacate or transfer juris-
diction of that highway Right of-Way, Owner/Operator may pursue
an action under this Agreement against the successors in inter-
est, other than a State agency, in a court of law.
16 . This Agreement is entered into by the City in recognition of
laws passed by the General Assembly and regulations adopted by
the Pollution Control Board that encourage a tiered-approach to
remediating environmental contamination. This Agreement is en-
tered into by the City in the spirit of those laws and under its
right and obligations as a municipality. Should any provisions
of this Agreement be struck down as beyond the authority of the
City, however, this Agreement shall be null and void.
17 . The Owner and Operator shall be jointly and severally liable
for their obligations under this Agreement and all references to
"Owner/Operator" shall effect the Owner and Operator both
jointly and individually.
9
IN WITNESS WHEREOF, Owner/Operator, Speedway SuperAmerica LLC,
has caused this
Agreement to be signed by its duly authorized representative.
BY: / DATE: '73/aq
R. SCOTT HISER, CORPORATE ENVIRONMENTAL MANAGER i01}
IN WITNESS WHEREOF, the City has caused this Agreement to be
signed by its Mayor.
CITY OF ELGIN
BY: DATE: 31/6////t6-
ED SCHOCK, MAYOR
ATTEST:
@4,4h/1-„6 .0_■Cii.r--
DOLONNA MECUM, CI Y CLERK
10
Table 1
SOIL SAMPLE ANALYTICAL RESULTS FOR BTEX(mg/kg)
SPEEDWAY STATION#7514
ELGIN,ILLINOIS
Sample Date Sample Depth Benzene Toluene . Ethylbenzene Xylenes MTBE •
Location
MW-1 4/30/1990 - "1:2,,,Z.441 <0.500 <0.500 <1.0 NS
MW-2 5/1/1990 8.5-10 =yf _ <0.500 <0.500 2.4 NS
MW-3 5/1/1990 3.5-5 'F. <0.500 0.55 1.7 NS
B1 5/1/1990 4-6 --,, . <0.500 <0.500 <1.0 NS
B2 5/1/1990 3.5-5 .<1 sa <0.500 <0.500 <1.0 NS
MW-4 3/5/1991 3.5-5 0.022 0.17 0.17 2.2 NS
MW-5 3/5/1991 3.5-5 0.018 0.04 <0.005 0.017 NS
MW-6 3/5/1991 6-7.5 0.029 0.035 0.018 0.055 NS
MW-7 2/6/1992 5-7 -qt . <0.006 <0.006 0.009 NS
MW-7 2/6/1992 9-11 <0.006 <0.006 <0.006 <0.006 NS
MW-8 2/6/1992 7-9 0.006 <0.006 <0.006 <0.006 NS
MW-8 2/6/1992 11 -13 <0.006 <0.006 <0.006 <0.006 NS
MW-9 2/6/1992 9-11 a , 0.032 0.39 0.6 NS
MW-9 2/6/1992 11 -13 <0.006 <0.006 <0.006 <0.006 NS
MW-10 2/6/1992 5-7 0.007 0.008 0.031 0.014 NS
MW-10 2/6/1992 7-9 <0.006 <0.006 <0.006 <0.006 NS
SB-1 6/8/1992 8-10 ND 0.008 ND 0.008 NS
SB-1 6/8/1992 10-12 ND ND ND ND NS
SB-2 6/8/1992 8-10 ND ND ND ND NS
SB-2 6/8/1992 10-12 ND ND ND ND NS
SB-3 6/8/1992 8-10 0.013 0.006 0.026 0.014 NS
SB-3 6/8/1992 10-12 ;. ' 0.052 0.76 2.8 NS
SB-3 6/8/1992 12-14 0.019 ND 0.024 0.1 NS
SW-1 6/8/1992 8-10 ND ND ND 0.005 NS
SW-2 6/8/1992 10-12 ND ND ND ND NS
SW-1 8/11/1992 - : s 0.028 0.23 0.8 NS
SW-2 8/14/1992 - K,;. 7 _ 0.11 0.32 3.2 NS
SW-3 8/14/1992 - ND ND ND ND NS
SW-4 8/14/1992 - :::: . 10 100 NS
SW-5 8/14/1992 - 1r€ 0.29 0.098 17 NS
SW-6 8/14/1992 - ND 0.013 0.006 0.034 NS
SW-7 8/14/1992 - 0.011 0.006 0.023 0.044 NS
SW-8 8/14/1992 - ' 's° 0.047 0.26 0.48 NS
TL-1 8/19/1992 - 0.02 0.008 ND ND NS
NW 2/2/1999 3-5 ND 0.002 ND 0.002 NS
SW 2/2/1999 3-5 ND ND ND ND NS
WW 2/2/1999 3-5 ND ND ND ND NS
EW 2/2/1999 3-5 ND ND ND ND NS
T 2/2/1999 5-7 ND ND ND ND NS
MP-1 10/20/1999 3-5 0.002 ND ND ND NS
MP-2 10/20/1999 3-5 f':..'''; §1, ? 0.002 0.008 0.021 NS
MP-3 10/20/1999 3-5 ND ND ND ND NS
MP-4 10/20/1999 3-5 ND 0.002 ND ND NS
MW-13 10/19/2000 3.5-5 ND ND ND ND NS
MW-14 10/19/2000 _ 3-5 ND ND ND ND NS
I I 1
Tier 1 Soil Remediation Objectives 0.03 12 13 150 0.32
Table 1
SOIL SAMPLE ANALYTICAL RESULTS FOR BTEX(mg/kg)
SPEEDWAY STATION#7514
ELGIN,ILLINOIS
Sample Date Sample Depth Benzene Toluene Ethylbenzene Xylenes MTBE
Location
GP-1 6/22/2004 8-12 <0.002 <0.002 <0.002 <0.002 NS
GP-2 6/22/2004 8-12 <0.002 <0.002 <0.002 <0.002 NS
GP-3 6/22/2004 8-12 <0.002 <0.002 <0.002 <0.002 NS
GP-4 6/22/2004 4-8 r , o <0.130 <0.130 <0.130 NS
GP-5 6/22/2004 4-8 <0.002 <0.002 <0.002 <0.002 NS
GP-6 6/22/2004 0-4 �t�+ 1a <0.120 0.94 <0.120 NS
GP-7 6/22/2004 8-12 <0.002 <0.002 <0.002 NS
GP-8 6/22/2004 4-8 <0.032 <0,032 <0.032 0.096
GP-9 6/22/2004 0-4 0.006 <0.002 <0.002 <0.002 NS
GP-10 6/22/2004 8-12 <0.002 <0.002 <0.002 <0.002 NS
GP-11 6/22/2004 8-12 <0.002 <0.002 <0.002 <0.002 NS
Tier 1 Soil Remediation Objectives 0.03 12 13 150 0.32
-=Not Available
ND=Not Detected
NOTE:A shaded cell indicates that this value exceeds Tier 1 soil remediation objectives.
Table 2
SOIL SAMPLE ANALYTICAL RESULTS FOR PNAs (mg/kg)
SPEEDWAY STATION #7514
ELGIN, ILLINOIS
3/25/1993 3/25/1993 3/25/1993 Tier 1 Soil Remediation
Parameter Objectives for Industrial
B-101 (7'-9') B-102 (5'-7') B-103 (3'-5') /Commercial Properties
Naphthalene . . ND ND 1.8
Acenaphthylene 35 ND ND --
Acenaphthene 12 ND ND 570
Flourene 1.3 ND ND 560
Phenanthrene ND ND ND --
Anthracene ND ND ND 12,000
Flouranthene ND ND ND 4,300
Pyrene ND ND ND 4,200
Chrysene ND ND ND 160
Benzo(a) anthracene ND ND ND 2
Benzo(b) flouranthene ND ND ND 5
Benzo(k) flouranthene ND ND ND 49
Benzo(a) pyrene ND ND ND 0.8
Dibenzo(a,h) anthracene ND ND ND 0.8
Benzo(g,h,i) perylene ND ND ND --
Indeno (1,2,3-cd)pyrene ND ND ND 8
ND = Not Detected
---= There is no governement regulated objective.
Table 2
SOIL SAMPLE ANALYTICAL RESULTS FOR PNAs (mg/kg)
SPEEDWAY STATION #7514
ELGIN, ILLINOIS
2/2/1 999 2/2/1 999 2/211999 2/2/1 999 2/2/1999 Tier 1 Soil Remediation
Parameter Objectives for Industrial
T (5'-7') NW(3'-5') SW(3'-5') WW(3'-5') EW (3'-5) /Commercial Properties
Naphthalene ND ND ND ND ND 1.8
Acenaphthylene ND ND ND ND ND --
Acenaphthene ND ND ND ND ND 570
Flourene ND ND ND ND ND 560
Phenanthrene ND ND ND ND ND --
Anthracene ND ND ND ND ND 12,000
Flouranthene ND ND ND ND ND 4,300
Pyrene ND ND ND ND ND 4,200
Chrysene ND ND ND ND 0.14 160
Benzo(a)anthracene ND ND ND ND 0.14 2
Benzo(b)flouranthene ND ND ND ND 0.15 5
Benzo(k)flouranthene ND ND ND ND 0.082 49
Benzo(a) pyrene ND ND ND ND 0.1 0.8
Dibenzo(a,h) anthracene ND ND ND ND ND 0.8
Benzo(g,h,i) perylene ND ND ND ND ND --
Indeno(1,2,3-cd)pyrene ND ND ND ND 0.096 8
Arsenic, total 1.55 NS NS NS NS 7.2*
Cadmium, total 0.14 NS NS NS NS 0.6*
Chromium, TCLP (mg/L) ND NS NS NS NS 0.1 mg/L
Mercury, total ND NS NS NS NS 0.06*
Barium, total 65.1 NS NS NS NS 110*
Lead, total 17.2 NS NS NS NS 36*
Selenium, total ND NS NS NS NS 0.48*
Silver, total ND NS NS NS NS 0.55*
ND -Not Detected
NS -Not Sampled
*= Statewide background value
---= There is no governement regulated objective.
Table 2
SOIL SAMPLE ANALYTICAL RESULTS FOR PNAs (mg/kg)
SPEEDWAY STATION #7514
ELGIN, ILLINOIS
10/20/1999 10/20/1999 10/20/1999 10/20/1999 10/19/2000 Tier 1 Soil Remediation
Parameter Objectives for Industrial
MP-1 (3'-5') MP-2 (3'-5') MP-3 (3'-5') MP-4(3'-5') MW-13 (3.5'-5') /Commercial Properties
Naphthalene ND ND ND ND ND 1.8
Acenaphthylene ND ND ND ND ND --
Acenaphthene ND ND ND ND ND 570
Flourene ND ND ND ND ND 560
Phenanthrene ND ND ND ND ND --
Anthracene ND ND ND ND ND 12,000
Flouranthene 0.13 0.14 ND ND ND 4,300
Pyrene 0.16 0.12 ND ND ND 4,200
Chrysene ND ND 0.099 ND 0.47 160
Benzo(a) anthracene 0.093 0.066 ND ND 0.47 2
Benzo(b) flouranthene 0.063 0.086 0.092 ND ND 5
Benzo(k) flouranthene 0.028 0.027 0.02 ND ND 49
Benzo(a) pyrene 0.11 0.083 0.086 ND 0.065 0.8
Dibenzo(a,h) anthracene 0.11 ND ND ND 0.29 0.8
Benzo(g,h,i) perylene 0.15 0.14 ND ND ND --
Indeno(1,2,3-cd)pyrene 0.033 0.015 ND ND ND 8
ND -Not Detected
NS -Not Sampled
*= Statewide background value
---= There is no governement regulated objective.
Table 2
SOIL SAMPLE ANALYTICAL RESULTS FOR PNAs(mg/kg)
SPEEDWAY STATION #7514
ELGIN, ILLINOIS
Parameter 6/22/2004 ' 6/22/2004 6/22/2004 6/22/2004 Tier 1 Soil Remediation
GP-3 (8'-12') GP-4(4'-8') GP-5(4'-8') GP-6(0'-4') Objectives for Industrial
Naphthalene ND ND ND 0.92 1.8
Acenaphthylene ND ND ND ND --
Acenaphthene ND ND ND ND 570
Flourene ND ND ND 0.16 560
Phenanthrene ND ND ND ND --
Anthracene ND ND ND ND 12,000
Flouranthene ND ND ND ND 4,300
Pyrene ND ND ND ND 4,200
Chrysene ND ND ND ND 160
Benzo(a)anthracene ND ND ND ND 2
Benzo(b)flouranthene ND ND ND ND 5
Benzo(k) flouranthene ND ND ND ND 49
Benzo(a) pyrene ND ND ND ND 0.8
Dibenzo(a,h)anthracene ND ND ND ND 0.8
Benzo(g,h,i)perylene ND ND ND ND --
Indeno(1,2,3-cd) pyrene ND ND ND ND 8
ND -Not Detected
NS -Not Sampled
*= Statewide background value
---= There is no governement regulated objective.
Table 3
SUMMARY OF BTEX GROUNDWATER SAMPLE ANALYTICAL DATA (mg/L)
SPEEDWAY STATION#7514
ELGIN, ILLINOIS
Sample Sample Date Benzene Toluene Ethylbenzene Xylenes MTBE
Location
MW-1 5/11/19901 0.046 0.075 0.2 NS
1/20/1992 0.005 0.002 0.002 0.003 NS
5/11/1990 7� 0.44 0.32 5 NS
MW-2 1/20/1992 0.16 0 55 4 6 NS
5/11/1990 �� a ..� � f; NS
1/20/1992 �,�� � 0.26 �'� NS
6/30/1993 0.14 ''" � 6 NS
tea , 0.014 0.19 0.086 NS
2/7/1996 �a,� „„�.--
7/24/1996 " ' 0.012 0.2 0.23 NS
11/26/1996 0.006 0.19 0.3 NS
MW 3 2/25/1997 0.062 0.31 1.4 NS
5/20/1997 +7 0.004 0.33 0.59 NS
8/13/1997 0.01 0.25 0.43 NS
10/2/1998 09 ND 0.09 0.061 NS
2/11/1999 :,,,.,,,,.:11M-, ND 0.11 0.08 NS
10/19/1999 ' ` ND 0.051 0.03 NS
11/13/2001 L � r r 0.0042 0.013 0.012 NS
3/21/1991 0.0013 ND 0.0009 0.0024 NS
1/20/1992 OOO i ND ND 0.002 NS
7/14/1992 ' iT ND 0.011 0.002 NS
6/30/1993 0.003 ND ND ND NS
2/7/1996 nkA ND ND ND NS
7/24/1996 r�'
'� ` , 0.002 0.004 0.004 NS
MW-4 11/26/1996 '`L ND ND 0.002 NS
2/25/1997 0.003 0.003 0.002 0.007 NS
5/20/1997 0.1 ND 0.011 ND NS
8/13/1997 0.003 ND ND ND NS
10/2/1998 ND ND ND ND NS
ND ND ND NS
2/11/1999 0.0017
10/19/1999 ND ND ND ND NS
11/13/2001 ND 0.019 0.0011 0.0013 NS
3/21/1991 ND ND ND ND NS
1/20/1992 0.001 0.002 ND ND NS
6/30/1993 ND ND ND ND NS
2/7/1996 0.002 0.013 0.005 0.046 NS
MW-5 10/2/1998 ND ND ND ND NS
2/11/1999 ND ND ND ND NS
10/19/1999 ND ND ND ND NS
11/13/2001 ND ND ND ND NS
10/3/2003 ND ND ND ND NS
Tier 1 Groundwater 0.005 1 0.7 10 0.07
Remediation Objectives
Table 3
SUMMARY OF BTEX GROUNDWATER SAMPLE ANALYTICAL DATA (mg/L)
SPEEDWAY STATION#7514
ELGIN, ILLINOIS
Sample Sample Date Benzene Toluene Ethylbenzene Xylenes MTBE
Location
5/21/1991 0.02 0.1 0.056 NS
1/20/1992 .'`
�� 0.068 0.26 0.13 NS
7/1/1993 0.009 0.16 0.31 NS
2/7/1996 0.005 ND ND ND NS
MW-6 10/2/1998 ND ND 0.0024 NS
2/11/1999 ND ND ND NS
10/19/1999 ND ND ND ND NS
11/13/2001 ND ND ND 0.0016 NS
10/1/2003 ND ND ND ND NS
5/18/2004 <0.001 <0.001 <0.001 <0.001 0.021
1/20/1992 ND 0.002 ND ND NS
2/14/19921 � °
x,� ND ND 0.001 NS
7/14/1992 + °-- ND ND ND NS
6/30/1993 ,2:t ND ND ND NS
2/7/1996 '17 0.055 0.008 0.052 NS
7/24/1996 ; 0.062 0.16 1 NS
11/26/1996 m 0.041 0.22 0.96 NS
MW-7 2/25/1997 , ii 1 0.006 0.25 0.4 NS
5/20/1997 � '`, 0.029 0.27 1.2 NS
8/13/1997
: w,E ;� 0.045 0.68 2.5 NS
10/2/1998 :',2.&2:1__`p1, ND 0.039 0.019 NS
2/11/1999 ' _ ` ND 0.084 0.27 NS
10/19/1999 _ , mL., ND 0.02 0.0017 NS
11/13/2001 + = ND ND 0.0033 NS
10/3/2003 ND ND ND 0.001 NS
2/14/1992 +1 ND ND ND NS
7/14/1992 0.002 ND ND 0.001 NS
6/30/1993 ND ND ND ND NS
2/7/1996 ND ND ND ND NS
10/2/1998 ND ND ND ND NS
MW-8
2/11/1999 ND ND ND ND NS
10/19/1999 ND ND ND ND NS
11/13/2001 ND ND ND 0.0013 NS
10/1/2003 ND ND ND ND NS
5/18/2004 „ <0.001 <0.001 <0.001
2/14/1992 0.001 ND ND ND NS
7/14/1992 L ``-- : a ND 0.001 ND NS
6/30/1993 1 r.-s + e :m ND 0.002 0.001 NS
2/7/1996 ND ND ND ND NS
10/2/1998 ! f,. .:
MW-9 ,u ND 0.14 0.14 NS
2/11/1999 ND ND ND ND NS
10/19/1999 ND ND ND ND NS
11/13/2001 ND ND ND ND NS
10/1/2003 ND ND ND ND NS
5/18/2004 <0.001 <0.001 <0.001 <0.001 <0.003
Tier 1 Groundwater 0.005 1 0.7 10 0.07
Remediation Ob'ectives
Table 3
SUMMARY OF BTEX GROUNDWATER SAMPLE ANALYTICAL DATA (mg/L)
SPEEDWAY STATION #7514
ELGIN, ILLINOIS
Sample Sample Date Benzene Toluene Ethylbenzene Xylenes MTBE
Location
2/14/1992 ND ND ND ND NS
7/14/1992 ND ND ND ND NS
6/30/1993 ND ND ND ND NS
2/7/1996 0.004 ND ND ND NS
10/2/1998 ND ND ND ND NS
MW 10
2/11/1999 ND ND ND ND NS
10/19/1999 ND ND ND ND NS
11/13/2001 ND ND ND 0.0013 NS
10/3/2003 ND 0.0012 ND ND NS
5/18/2004 <0.001 <0.001 <0.001 <0.001 <0.003
10/27/1999 ND ND ND ND NS
11/13/2001 ND ND ND ND NS
MW 11
10/1/2003 ND ND ND ND NS
5/18/2004 <0.001 <0.001 <0.001 <0.001 NS
10/27/1999 ND ND ND ND NS
11/13/2001 ND ND ND ND NS
MW 12
10/1/2003 ND ND ND ND NS
5/18/2004 <0.001 <0.001 <0.001 <0.001 NS
11/13/2001 ND ND ND ND NS
MW-13 10/1/2003 ND ND ND ND NS
5/18/2004 <0.001 <0.001 <0.001 <0.001 NS
11/13/2001 ND ND ND ND NS
MW-14 10/1/2003 ND ND ND ND NS
5/18/2004 <0.001 <0.001 <0.001 <0.001 NS
2/7/1996 . 0.015 0.014 0.26 NS
7/24/1996 il,::.:* 0.017 0.15 0.42 NS
11/26/1996 „, m: -;„ 0.05 0.19 0.5 NS
RW 1 2/25/1997 0.17 0.072 0.34 NS
5/20/1997 ,, « w 0.025 0.062 0.19 NS
8/13/1997 ''*:".1 _,A 0.007 0.083 0.16 NS
10/2/1998 „ F L.! ND 0.01 ND NS
2/11/1999 0.0032 ND ND ND NS
SVE-1 7/1/1993 0.1 Mn,:i7MME,1 1.1 NS
SVE-2 7/1/1993 0.001 0.003 ND ND NS
SVE-3 7/1/1993 ND ND ND ND NS
SVE-4 7/1/1993 0.97 0.072 0.15 0.71 NS
Tier 1 Groundwater 0.005 1 0.7 10 0.07
Remediation Objectives .
ND=Not Detected.
NS=Not Sampled.
NOTES:
1. A shaded cell indicates that this value exceeds Tier 1 groundwater remediation objectives.
2. Monitoring well MW-1 was destroyed in August 1992.
2. Monitoring well MW-2 was destroyed in August 1992.
Table 4
SUMMARY OF DETECTED PNAs IN GROUNDWATER SAMPLES(mg/L)
SPEEDWAY STATION #7514
ELGIN, ILLINOIS
MW-3 MW-6 SVE-1 SVE-4 MW-3 Tier 1 Soil Remediation
Parameter Objectives for Industrial
6/30/1993 7/1/1993 7/1/1993 7/1/1993 2/7/1996 /Commercial Properties
Naphthalene � ,i" ' ..t , " 0.016 1 7 ND 0.025
Acenaphthylene 0.15 0.024 0.042 0.052 x ND --
Benzo (a) anthracene ND ND ND ND ND 0.00013
Dibenzo (a,h) anthracene ND ND ND ND 2 d 0.0003
Benzo (g,h,i) perylene ND ND ND ND 0.00082 --
Indeno (1,2,3-cd) pyrene ND ND ND ND . 1t 5 ; 0.00043
[‘ID -Not Detected
-= A Tier 1 soil remediation objective has not been established for this parameter.
A shaded cell indicates that this value exceeds Tier 1 groundwater remediation objectives.
Table 4
SUMMARY OF DETECTED PNAs IN GROUNDWATER SAMPLES(mg/L)
SPEEDWAY STATION #7514
ELGIN, ILLINOIS
RW-1 MW-3 MW-4 MW-7 MW-3 Tier 1 Soil Remediation
Parameter Objectives for Industrial
2/7/1996 7/24/1996 2/25/1997 2/25/1997 2/25/1997 /Commercial Properties
aphthalene ND + I :1 �' ND ; . i ';` ND 0.025
Acenaphthylene ND 0.028 0.01 0.031 0.16 --
Acenaphthene 0.023 ND ND ND ND 0.42
-Not Detected
[ID
= A Tier 1 soil remediation objective has not been established for this parameter.
shaded cell indicates that this value exceeds Tier 1 groundwater remediation objectives.
•
Table 4
SUMMARY OF DETECTED PNAs IN GROUNDWATER SAMPLES (mg/L)
SPEEDWAY STATION #7514
ELGIN, ILLINOIS
RW 1 MW-7 MW-3 MW-7 MW-3 Tier 1 Soil Remediation
Parameter Objectives for Industrial
2/25/1997 5/20/1997 5/20/1997 8/13/1997 8/13/1997 /Commercial Properties
aphthalene ND 0.011 + 41'; ; ' 0.025
Acenaphthylene 0.043 0.025 0.03 ND 0.051 --
ND -Not Detected
--= A Tier 1 soil remediation objective has not been established for this parameter.
A shaded cell indicates that this value exceeds Tier 1 groundwater remediation objectives.
Table 4
SUMMARY OF DETECTED PNAs IN GROUNDWATER SAMPLES(mg/L)
SPEEDWAY STATION #7514
ELGIN, ILLINOIS
RW-1 MW-3 MW-7 MW-10 Tier 1 Soil Remedialion Objectives
Parameter
8/13/1997 10/19/1999 10/19/1999 10/19/1999 for Industrial /Commercial Properties
aphthalene ND Otti- ND ND 0.025
Acenaphthylene 0.051 0.051 0.011 ND --
enzo (a) anthracene ND ND ND
� 0.00013
ND -Not Detected
--= A Tier 1 soil remediation objective has not been established for this parameter.
A shaded cell indicates that this value exceeds Tier 1 groundwater remediation objectives.
Table 4
SUMMARY OF DETECTED PNAs IN GROUNDWATER SAMPLES(mg/L)
SPEEDWAY STATION #7514
ELGIN, ILLINOIS
MW-3 MW-4 MW-10 MW-10 Tier 1 Soil Remediation Objectives
Parameter
11/13/2001 11/13/2001 11/13/2001 11/13/2001 for Industrial (Commercial Properties
Naphthalene ND ND ND 0.025
Fluoranthene ND ND 0.005 0.004 0.28
Pyrene ND ND 0.004 ND 0.21
Chrysene ND ND 0.003 0.003 --
Benzo (a) anthracene ND :::,1 :1,1I10* 0.001 -;! , ) 0 0.00013
Benzo(b) fluoranthene ND 0.001 :`tom 0.001 0.00018
Benzo (k) fluoranthene ND e ,i • 0.001 i'f ,4 0.00017
Benzo (a) pyrene ND `ka r � 00,,,
Benzo E * .° °� 0.0002
Dibenzo (a,h) anthracene ND 4.77.1z * W,°, 1.i 1 + • R =. pr' ;7 0.0003
Benzo (g,h,i) perylene ND ND 0.002 ND --
Indeno (1,2,3-cd)pyrene ND ,# ' '�°;' „ 4 ?'sE:! 1.;i'; 0.00043
ND -Not Detected
--= A Tier 1 soil remediation objective has not been established for this parameter.
A shaded cell indicates that this value exceeds Tier 1 groundwater remediation objectives.
Table 4
SUMMARY OF DETECTED PNAs IN GROUNDWATER SAMPLES (mg/L)
SPEEDWAY STATION #7514
ELGIN, ILLINOIS
MW-6 MW-8 MW-9 MW-10 Tier 1 Soil Remediation
Parameter Objectives for Industrial
5/18/2004 5/18/2004 5/18/2004 5/18/2004 /Commercial Properties
Naphthalene ND ND ND 0.14
Acenaphylene ND ND ND ND ---
Acenaphthene ND ND ND ND 0.42
Fluorene ND ND ND ND 0.28
Phenanthrene ND ND ND ND ---
Anthracene ND ND ND ND 2.1
Fluoranthene ND ND ND ND 0.28
Pyrene ND ND ND ND 0.21
Chrysene ND ND ND ND 0.0015
Benzo (a) anthracene ND ND ND ND 0.00013
Benzo (b) fluoranthene ND ND ND ND 0.00018
Benzo (k) fluoranthene ND ND ND ND 0.00017
Benzo (a) pyrene ND _ ND ND ND 0.0002
Dibenzo (a,h) anthracene ND ND ND ND 0.0003
Benzo (g,h,i) perylene ND ND ND ND ---
Indeno (1,2,3-cd) pyrene ND ND ND ND 0.00043
ND - Not Detected
-- = A Tier 1 soil remediation objective has not been established for this parameter.
A shaded cell indicates that this value exceeds Tier 1 groundwater remediation objectives.
•
Table 4
SUMMARY OF DETECTED PNAs IN GROUNDWATER SAMPLES (mg/L)
SPEEDWAY STATION #7514
ELGIN, ILLINOIS
MW-11 MW-12 MW-13 MW-14 Tier 1 Soil Remediation
Parameter Objectives for Industrial
5/18/2004 5/18/2004 5/18/2004 5/18/2004 /Commercial Properties
Naphthalene ND ND ND ND 0.14
Acenaphylene ND ND ND ND ---
Acenaphthene ND ND ND ND 0.42
Fluorene ND ND ND ND 0.28
Phenanthrene ND ND ND ND ---
Anthracene ND ND ND ND 2.1
Fluoranthene ND ND ND ND 0.28
Pyrene ND ND ND ND 0.21
Chrysene ND ND ND ND 0.0015
Benzo (a) anthracene ND ND ND ND 0.00013
Benzo (b) fluoranthene ND ND ND ND 0.00018
Benzo (k) fluoranthene ND ND ND ND 0.00017
Benzo (a) pyrene ND ND ND ND 0.0002
Dibenzo (a,h) anthracene ND ND ND ND 0.0003
Benzo (g,h,i) perylene ND ND ND ND ---
Indeno (1,2,3-cd) pyrene ND ND ND ND 0.00043
ND - Not Detected
-- = A Tier 1 soil remediation objective has not been established for this parameter.
A shaded cell indicates that this value exceeds Tier 1 groundwater remediation objectives.
ESTIMATED AREA OF LEGEND
IMPACTED SOIL
-1 MOATTORNG WELL LOCATION s4sou D BY
G1 AND DESTROYED IN AUGUST 1992.
LIMITS OF EXCAVATION
- - - - -;- - - I- — — -4'— — —° — — '- - - - - --s - - II ( I I GTI BETWEEN APRIL O AND FEBRUARY 1992
w�s1E a usT I'
• — — • — — ,w-,s Wilt* I t,w-„ MO/STORM w4J LOCATION NSMLLED BY
IlliNia- -_� „ -iii
PEC IN OCTOBER 1999 AND OCTOBER 2000.
m- y��-IA �,, !' �� r,, I lI I I ems' sal WRING LOCATION COLLECTED BY
BUILDING 5;;, sw-1 _APR- T�' `1. I �, Gn N APRIL,990
1 ' ,' dL o o w-w fl I I . 8 suw BORING LOCATION COLLECTED BY
ICj i I I G 1 N JUNE 1992
I I 441//s-5 4 T i`40 �' I I tut Sal BO NNG LOCATION COUECWFD BY
ovtovr I 'As =..A. . 90-4 I i ' W I GII N MARCH ,993
PUMP SUNOS�I MIGRATNNd PATHWAY SAMPLE LOCATION
I 1 • 1 t �Str-� �J � �I , II COLLECTED BY PEC N OCTOBER 1999
7
,w-3 B-2 • • a-,o, L-ib°_•• - SITE CLASSIFICATION sal BORING
'jI �� �, COLLECTED BY PEC N OCTOBER 1999
I i
1 R llN(WAJER « 1 I Awl TANK(PULL SOIL SAMPLE LOCATION
Fi 0,,-ii-a-rer� I un-, I 1
M-3 '121'0 1 ;�y COLLECTED BY GT IN AUGUST 1992
II ,a „ _�.. lS2J e O 2 I 1 !so-� I wi(s a7 T�OiLEC D BYY PEC FEBR NR1•1999
-1 SA-2 SYE�3 s 1 SOIL VAPOR EXTRACTION LOCATIONS
a'L �J � �' I INSTALLED BY GR IN AUGUST 1992
1
L I- ` TIP-2f J , , mR,-, 12'RECOVERY WELL LOCATION
+ .11 STORM SEWER
®sa-z 91-I --s -JI
® I CAS
r i w WATER
BIG TIMBER ROAD I N__ ____. SA MY SEWER
%---- - 11 I 7 - TELEPHONE
II I l ELECTRIC
1011-14 1 1 II
111:
- --r- - - - — __ __. e -- r — — __ — __r__ - -0 TELEPHONE >N OiMri€Y
Imo
— — r — - — — r — r — —ti -..-,._ MANHOLE' o 13' 30'
1 _ -I NOTE ALL WELL AND UTILITY LOCATIONS ARE APPROMIATE.
Practical Environmental Consultants, Inc.
-69 -—--- --- 413— — 4- --s w -- -- f 919 Nor h Plum Qew Road Phone (847)517 1977
Sults 1 SahamEburp, R Wi73 o Fao>dmp, (847)517 1988
11111 11 11 N III II INN I III -L 111 IL L I� -L II 1I -U -1 111 II I IL Ill 1 .1- N 111 1 a L 10 I It! Ill - I1 � EstruteD AREA SPEEDWAY STATION #7514
OF IMPACTED 1370 1110 T MBER R0A0
SOIL ELGIN, ILLINOIS
DATE SCALE APPROVED OWN.BY - FIGURE
7/14/2004 AS SHOWN WES AJR 1
I
LEGEND
/—ESTIMATED AREA OF
IMPACTED GROUNDWATER w" c,, °rim msTiteE2D. BY
LIMITS OF EXCAVATION
I i I I wa BY
MONITORING WELL LOCATION INSTALLED
— -; — -.4— — — E- — — —+— — — — E- — — — — -' — — I GR BETWEEN ORE 1990 NO FEBRLMY
1992
-12 wE Us>
r — __—_--__—_-- �--,r --- — — — — I - mo.,. N w u.LOCN NSA n or
II4 L -u
FEC N OCTOBER 1999 AND OCTOBER 2000.
I-- I, •8-1 SOIL BORING LOCATION COLLECTED Br
r 'A __•, —__ =7 "n II I � GD N APRIL 1990
BUILDING ;I _� I. I 59-1
_= SOB.BORING LOCATION COLLECTED BY
' i �` ° ) M►-10 i I ® GR N 1992•
o o �° • �, I 1 '� 9-101 SON.BORING LOCATION COLLECTED BY•I �w-s + FI Vii- y" W Gn N MARCH 1993
- I cMtow I �t f__ _, I I. I ,
RAP MIGRATION PATHWAY SAMPLE LOCATION
COLLECTED BY PEG IN OCTOBER 1999
11 �s�e°���' �-o-0 i I I ± 1 COLLECTED ECTED IC TIONEC L BANG 1999
twa 9-21 C—J• •C-7 I 8-101 �`°_ 43j e-1w 1I "'
+ ,® I II II . , I
NoAe1, • I A TANK Put SOIL SAMPLE LOCATION
S,RO,, *Rt n:-,N I'-t _� COLLECTED BY Gil IN AUGUST 1992
I i,'w n, I ��ill i
= J 8--io2 wa s9 O 1,0(3-91 T( ECTED SS PE FEBRUARY 1999
_,,- I I ii , I j 1 e
C--] = ] I 0 O o srE t SOL VAPOR EXIRACT10N LOCATIONS
_ - I 1 5 rE-2 srEa I INSTALLED BY GR N AUGUST 1992
L. haw t 12'RECOVERY WELL=ANON
ss v — ...AMR_ -/ I-ss ss STORM SEWER
5B-I 1---Y s-- GAS
®s9-2
r 14 WATER
BIG TIMBER ROAD 1 " ._---- SANITARY SEVER
— — — —�— — ....,i_I _ TE1J PILONE
_1 1_
t ELECHRI
i I I
M
L 09-14 APPROXIMATE
— —r-- — — — — r —_ — —_ � — r r —0TELEPHONE SCALE
—
�- - • - - • - - • - - • - - • - - • - - • - - • - -_— s, MANHOLE 0 15' 30'
— — — — --r— -- — — —r — — — — r— --
NOTE:ALL WELL AND MIRY LOCATIONS ARE APPROBATE.
1 — ,— — —I
Practical Environmental Consultants, Inc.
+ — ------- -- - -t24"-- -- -- I 919 North Plum Grove Rood Phone (847)517 1977
ri FaotdmRo (847)517 1988
I[ 11 L III LI �I Il Ill 111 1. 111 _ lU II III - �I I11 Ill III 111 111 lU I III 11 II II I� I I� Schaumburg. TED AREA SPEEDWAY STATION f 7514
of IMPACTED 1570 BIG TRIER ROAD
GROUNDWATER ELGIN. ILi1NOIS
DATE - SCALE APPROVED Dw11.BY FIGURE
7/14/2004 AS SHOWN WES AJR 2
HIGHWAY LEGEND
AUTHORITY AGREEMENT
LOCATION - -1...i '
LIMITS OF EXCAVATION
MN-3
I S- — — -J — —� I BY
1♦I ,,�♦♦�♦♦,
MOMTORING
INSTALLED
! N APRIL 1990 AND FEBRUARY
Y
1992
92
r - � -_. — - - - — IM-,2—P kMSTE UST. 17-
w-11 MONITORING YEL LOCATION INSTALLED BY
ILYA 1414-13 i ,.._�.. PEC N OCTOBER 1999 AND OCTOBER 2000.
I t ' � A BUILDING `
' ♦ >- I L.'I ♦ r■ID I,. � ♦ '1 MIL BORING LOCATION COLLECTED BY
CFI IN APRL 1990•
+ • ) MW- {I .0—' - ` ®N-101 G MLOCATION COLECTED BY
JUNE
I ( u-s r - L ,° o
-y— I ♦I 4 • o , I I. N 4 o SOIL BORING LOCATION COLLECTED BY
Gil N MARCH 1993
HI
MAP IL - - r 1 MGPA10N PATHWAY SAMPLE LOCATION
I 4. o *
♦ . COLLECTED BY PEC N OCTOBER 1999
C"] •C'i7 I is-To' `o d , s�Ct�ISSffIY PECI sag.TOBER
�► ♦, COLLECTED BY PEC N E LOCATION
,999
NI-167
Hpw�`t?_-" _=-- �sM-,
TANK PULL SOIL SAMPLE LOCATION
- CpRIr;TI)N I _1 MP-1,t1.1
I �.� COLLECTED BY GM N AUGUST 1992
w,a
,,,_, �JJ ; 8-102 ♦ i,w(3-57 TALK PILL SOIL SAMPLE LOCATION
- y- I X11 e �ii� I ,\ I rr.
♦ . COLLECTED BY PEC N FEBRUARY 1999
I 1""-'t ___-- I I 0, S1E�3 SYE�I I I I ♦ ♦♦. t INSTALLED BY LOCATIONS 992
T7
_+ - L,v- � ♦,, — -f 5Y-, 12'RECOVERY WELL LDGTION
as s t'� STORM SEWER
I 41Ill' *VT. 10'V-Ak Ifie GAS
=BIG TIMBER ROAD lo'4.∎a A=�1��;,I _._____ sANTTAn SEWER
.♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦�'♦;, i -- TaCTRIC
)�♦N♦�♦�♦�♦N♦N♦N_,LNNNN♦�♦�'�� . 1 H
r — — — — �AL����;L.∎����A`���. AL A. TELEPHONE
SCALE
._-.. .._. —— — .�T`—_ ^ —_. _ — -q___. MANHOLE 0 15 30'
-I NOTE:ALL WELL AND UTILITY LOCATIONS ARE APPROXIMATE
3— + rs' Practical Environmental Consultants, Inc.
- ;5-------------—as--——----------4's___._-_._.--—,�.------- ---—-- f H NoYlh Plum Grow Rood Phone (847)517 1977
Smile E • fomdmfo (847)517 1988
1 I I II I 1 11 HI I H II H 1 1 I II 11 11 1 II 11 1 I II 1 11 H I 1 H H I Schaumburg, 1.60173
HIGHWAY SPEEDWAY STATION /7514
G AUTHORITY AGREEMENT 1570 BIG TUNER ROAD
LOCATION ELGIN, ILLINOIS
DATE SCALE APPTROIED OWl&BY FIGURE
7/14/2004 AS SHAWN WES AJR 3