Loading...
HomeMy WebLinkAbout05-60 Resolution No. 05-60 RESOLUTION AUTHORIZING EXECUTION OF A HIGHWAY AUTHORITY AGREEMENT WITH SPEEDWAY SUPERAMERICA LLC (1570 Big Timber Road) BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Ed Schock, Mayor, and Dolonna Mecum, City Clerk, be and are hereby authorized and directed to execute a Highway Authority Agreement on behalf of the City of Elgin with Speedway SuperAmerica LLC to limit access to potentially contaminated soil or groundwater in the public right-of-way adjacent to 1570 Big Timber Road, Elgin, Illinois, a copy of which is attached hereto and made a part hereof by reference. • s/Ed Schock Ed Schock, Mayor Presented: March 9, 2005 Adopted: March 9, 2005 Omnibus Vote: Yeas: 6 Nays: 0 Attest: s/Dolonna Mecum Dolonna Mecum, City Clerk ' ' 'lb `( CITY OF ELGIN- SPEEDWAY SUPERAMERICA LLC HIGHWAY AUTHORITY AGREEMENT INITIAL INFORMATION FORM OVERVIEW The purpose of this document is to notify the City of Elgin, an Illinois municipal corporation, of the extent of hydrocarbon im- pact within soil and/or groundwater and to provide the necessary initial information needed to enter into a highway authority agreement, pursuant to 35 IAC 742 . 1020. APPLICANT INFORMATION Property Owner: SPEEDWAY SUPERAMERICA LLC Operator (if different) : Address: P.O. Box 1500 Address: Springfield, OH 45501 Telephone No: 937 .864.3000 Fax No: 937 .864 .6078 Name and Title of Person Authorized to Sign for Owner: R. Scott Hiser, Corporate Environmental Manager Name and Title of Person Authorized to Sign for Operator (if different) : APPLICANT'S ATTORNEY ENVIRONMENTAL CONSULTANT Name: Jose Luis Gonzalez, Jr. Name: David Klatt, CHMM Address: P.O. Box 1500 Address: 919 North Plum Grove Road Springfield, OH 45501 Suite E Schaumburg, IL 60173 Telephone No: 937 .864.3000 Telephone No: 847.517.1977, ext. 433 PROPERTY ADJACENT TO THE RIGHT-OF-WAY Address : 1570 Big Timber Road, Elgin, IL 60123 RIGHT-OF-WAY(S) REQUIRING HIGHWAY AGREEMENT Highway Number (s) : (Check one or both) 0 Soil Impact in Right-of-Way 0 Groundwater Impact in Right-of-Way Street Name (if any) : Big Timber Road & McLean Boulevard REGULATORY INFORMATION IEMA Incident Number: 990227 , 910495, 910004, and 890646 IEPA Project Manager: Ms . Melinda Friedel IEPA Status : (Check one) ❑ Conditional Approval ❑ Approval Pending O Other CAP approved with modifications on 9/1/2000 . SAMPLING IN THE RIGHT-OF-WAY (Check one) 0 Right-of-Way Sampled ❑ Right-of-Way Impractical to Sample (Sampling was done adjacent to right-of-way) PERSON(S) TO BE NOTIFIED IN AGREEMENT Name: R. Scott Hiser, Corporate Environmental Manager Address : Speedway SuperAmerica LLC P.O. Box 1500 Springfield, OH 45501 937 . 864 . 3000, ext . 6515 2 NATURE AND EXTENT OF HYDROCARBON IMPACT INFORMATION - FOR EXHIBIT A The Closure Report/Closure Response Letter will document the na- ture and extent of hydrocarbon impact in the right-of-way. Soil : Refer to Figure 1 - Estimated Soil Impact in the Right-of-Way Map Using Tier One Residential Cor- rective Action Objectives Groundwater: Refer to Figure 2 - Estimated Groundwater Impact in the Right-of-Way Map Using Tier One Corrective Action Objectives Tables showing soil and groundwater sampling results in the right-of-way (if sampled) and/or adjacent to it need to be sub- mitted and keyed to Figures 1 and 2 . Samples above Tier 1 One Residential Corrective Action Objectives need to be highlighted. AREA COVERED BY HIGHWAY AUTHORITY AGREEMENT - FOR EXHIBIT B (Check one) Q Refer to Figure 3 - Proposed Highway Authority Agreement Loca- tion Map ❑ Location not proposed (The Department will draw map based on Figures 1 and 2 . ) Attachments : Q Figure 1 Estimated Soil Impact Map Q Figure 2 Estimated Groundwater Impact Map Q Figure 3 Proposed Highway Agreement Location Map Q Tables Showing Sampling Results ❑ Closure Report ❑ Other 3 MASTER AGREEMENT TIERED APPROACH TO CORRECTIVE-ACTION OBJECTIVES AGREEMENT This Agreement is entered into this day of , 2004 pursuant to 35 Illinois Administrative Code Section 742 . 1020 by and between Speedway SuperAmerica LLC ("Owner") and Speedway SuperAmerica LLC ("Operator") , referred to herein as "Owner/Operator, " and the City of Elgin, an Illinois municipal corporation ("City") , as follows : 1 . This Agreement shall not be binding upon the City until it is executed by the undersigned representative of the City and prior to execution, this Agreement constitutes an offer by Owner/Operator. The duly authorized representatives of Owner/Operator have signed this Agreement and this Agreement is binding upon them, their successors and assigns . 2 .a. Owner/Operator is pursuing a corrective action of a Site and of the right-of-way adjacent to the boundary of the Site located at 1570 Big Timber Road, Elgin, IL 60123 (the "Site") . 2 .b. Attached as Exhibit A are site maps prepared by Owner/Operator which show the area of estimated contaminant impacted soil and/or groundwater at the time of this Agreement in the right-of-way above Tier 1 residential levels under 35 Illinois Administrative Code Part 742 . Also shown in Exhibit A are tables prepared by Owner/Operator showing the concentration of contaminants of concern, hereafter "Contaminants, " in soil and/or groundwater within the Site and which shows the applicable Tier 1 soil remediation objectives for residential property and Tier 1 objectives for groundwater of the Illinois Pollution Control Board ("IPCB") which are exceeded along the boundary of the Site adjacent to the Right of-Way. The right-of- way, and only the right-of-way, as described in Exhibit B, hereinafter the "Right-of-Way, " adjacent to the site is subject to this Agreement . As the drawings in the Exhibits are not surveyed plats, the boundary of the Right-of-Way in the Exhibits may be an approximation of the actual right-of-way lines . The Right-of-Way is impractical to sample for Contaminants; however, the parties believe that the area of the Right-of-Way is adequate to encompass soil and/or groundwater within the Right- of-Way possibly impacted with Contaminants from a release at the Site . 2 . c . The Illinois Emergency Management Agency has assigned incident number 990227, 910495, 910004, and 890646 to this release at the Site . 2 .d. Owner/Operator intends to request risk-based, site specific soil and/or groundwater remediation objectives from the Illinois Environmental Protection Agency ( "IEPA" ) under 35 Illinois Ad- ministrative Code Part 742 . 2 .e. Under these rules, use of risk-based, site specific reme- diation objectives in the Right-of-Way may require the use of a Highway Authority Agreement as defined in 35 Illinois Adminis- trative Code Section 742 . 1020 . 3 . The City holds a fee simple interest or a dedication for highway purposes in the Right-of-Way, or the Right-of-Way is a platted street, and has jurisdiction of the Right-of-Way. For purposes of this Agreement, "jurisdiction" means that the City exercises access control over the use of groundwater beneath the Right-of-Way and over access to the soil beneath the Right-of- Way because it requires a permit for that access . 4 .a. Under 35 Illinois Administrative Code Section 742 . 1020, this Agreement is intended to be an acceptable "Highway Author- ity Agreement" to IEPA, as the City is willing to agree that it will not allow the use of groundwater under the highway Right- of-Way as a potable or other domestic supply of water and that it will limit access as described herein to soil under the high- way Right-of-Way that is contaminated from the release at levels above residential Tier 1 remediation objectives . 4 .b. The IEPA must review and approve this Agreement, and this Agreement shall be referenced in the IEPA' s "No Further Remedia- tion" determination in the chain of title for the Site in the county where the Site is located. 4 .c. This Agreement shall be null and void as a Highway Author- ity Agreement should the IEPA not approve it or should it not be referenced in the "No Further Remediation" determination. This Agreement shall not be effective between the Owner/Operator and the City unless and until the IEPA approves this Agreement and the IEPA accordingly references the Agreement in the IEPA's "No Further Remediation" determination in the chain of title for the Site in the county where the Site is located. 5 . The City promises IEPA and the Owner/Operator that it will prohibit the use of groundwater that is contaminated from the release at the Site at levels above Tier 1 remediation objec- tives beneath its Right-of-Way as a potable or other domestic supply of water and will limit access to soil as described 5 herein under the Right-of-Way that is contaminated from the re- lease at the Site at levels above Tier 1 remediation objectives . As the pavement in the Right-of-Way may be considered an engi- neered barrier, the Owner/Operator agrees to reimburse the City for maintenance activities requested by Owner/Operator in writ- ing in order to maintain it as a barrier. The City does not oth- erwise agree to perform maintenance of the Right-of-Way, nor does it agree that the highway Right-of-Way will always remain a highway or that it will maintain the Right-of-Way as an engi- neered barrier. 6 . The Owner/Operator agrees to indemnify and hold harmless the City, and other highway authorities, if any, maintaining the highway Right-of-Way by an agreement with the City, and the City' s agents, contractors, officers or employees for all obli- gations asserted against or costs incurred by them, including attorney' s fees and court costs, associated with the release of Contaminants from the Site, regardless whether said obligations or costs were caused by the negligence, but not the gross negli- gence, of them. 7 . As an additional consideration, Owner/Operator agrees to re- imburse the City for the reasonable costs it has incurred in protecting human health and the environment, including, but not limited to, identifying, investigating, handling, storing and disposing of contaminated soil and groundwater in the Right-of- Way as a result of the release of contaminants at this Site, and the review and processing of this Agreement. The City has deter- mined those costs for Owner and such costs amount to two thou- sand five hundred dollars ($2500 . 00) . A cashier' s check made payable to "City of Elgin, Illinois" shall be tendered to the City at the time Owner/Operator furnishes a signed Agreement to the City for its signature. That check will be deposited when all necessary parties sign this Agreement. 8 . This Agreement shall be binding upon all successors in inter- est to the Owner/ Operator or highway Right-of-Way. A successor in interest of the City would include a highway authority to which the City would transfer jurisdiction of the highway. 9 . Violation of the terms of this Agreement by Owner/Operator, or their successors in interest, may be grounds for voidance of this Agreement as a Highway Authority Agreement. Violation of the terms of this Agreement by the City will not void this Agreement, unless the IEPA has determined that the violation is grounds for voiding this Agreement as a Highway Authority Agree- 6 ment and the City has not cured the violation within such time as IEPA has granted to cure the violation. 10 . This Agreement shall continue in effect from the date of this Agreement until the Right-of-Way is demonstrated to be suitable for unrestricted use and there is no longer a need for this Agreement as a Highway Authority Agreement, and the IEPA has, upon written request to the IEPA by the Owner/Operator and notice to the City, amended the notice in the chain of title of the Site to reflect unencumbered future use of that highway Right-of-Way. 11 . This Agreement is in settlement of claims the City may have arising from the release of Contaminants into the Right-of-Way associated with incident number 990227 , 910495, 910004, and 890646 . 12 . This Agreement does not limit the City' s ability to con- struct, reconstruct, improve, repair, maintain and operate a highway upon its property or to allow others to use the highway Right-of-Way by permit. To that extent, the City reserves the right and the right of those using its property under permit to remove contaminated soil or groundwater above Tier 1 residential remediation objectives from its Right-of-Way and to dispose of them as they deem appropriate not inconsistent with applicable environmental regulations so as to avoid causing a further re- lease of the Contaminants and to protect human health and the environment. Prior to taking any such action, the City will first give Owner/Operator written notice, unless there is an immediate threat to the health or safety to any individual or to the pub- lic, that it intends to perform a site investigation in the Right-of-Way and remove or dispose of contaminated soil or groundwater to the extent necessary for its work. Failure to give notice shall not constitute a violation of this Agreement. The removal or disposal shall be based upon the site investiga- tion (which may be modified by field conditions during excava- tion) , which Owner/Operator may review or may perform, if re- quested to do so by the City. If practicable, as determined by the City, the City may request Owner/Operator to remove and dis- pose of the contaminated soil and/or groundwater necessary for the City's work in advance of that work. The Owner/Operator shall reimburse the reasonable costs incurred by the City to perform the site investigation and to dispose of any contami- nated soil or groundwater, provided, however, that if notice to Owner/Operator has not been given and there was no immediate 7 threat to health or safety, reimbursement for those costs shall be limited to twenty thousand dollars ($20, 000 . 00) . There is a rebuttable presumption that the Contaminants found in the high- way Right-of-Way arose from the release of Contaminants from the Site. Should Owner/Operator not reimburse the reasonable costs under the conditions set forth herein, this Agreement shall be null and void, at the City' s option, upon written notice to Owner/Operator by the City that those costs have not been reim- bursed. Owner/Operator may cure that problem within twenty work- ing days by making payment, or may seek to enjoin that result. 13 . Written notice required by this Agreement shall be mailed to the following: To Owner/Operator: R. Scott Hiser, Corporate Environmental Manager Speedway SuperAmerica LLC P.O. Box 1500 Springfield, OH 45501 To City: Mr. John Loete Public Works Director 150 Dexter Court Elgin, IL 60120-5555 14 . The City' s sole responsibility under this Agreement with re- spect to others using the highway Right-of-Way under permit from the City is to include the following, or similar language, in the future standard permit provisions and to make an effort to notify its current permit holders of the following: As a condition of this permit, the permittee shall re- quest the City' s Public Works Department to identify sites in the Right-of-Way where access to contaminated soil or groundwater is governed by Tiered Approach to Corrective-Action Objectives ( "TACO" ) Agreements . The permittee shall take measures before, during and after any access to these sites to protect worker safety and human health and the environment . Excavated, contami- nated soil should be managed off-site in accordance with all environmental laws . Owner/Operator hereby releases the City from liability for breach of this Agreement by others under permit and indemnifies the City against claims that may arise from others under permit causing a breach of this Agreement. Owner/ Operator agrees that 8 its personnel, if any, at the Site who are aware of this Agree- ment will notify anyone they know is excavating in the Right-of- Way about this Agreement. 15 . Should the City breach Paragraph 5 of this Agreement, Owner/Operator' s sole remedy is for an action for damages in the Circuit Count for the Sixteenth Judicial Circuit, Kane County, Illinois . Any and all claims for damages against the City, its agents, contractors, officers, employees or its successors in interest arising at any time for a breach of paragraph 5 of this Agreement are limited to an aggregate maximum of two thousand five hundred dollars ($2500 . 00) . No breach by the City, its agents, contractors, officers, employees and its successors in interest of a provision of this Agreement other than Paragraph 5 is actionable in either law or equity by Owner/Operator against the City or its agents, contractors, officers, employees and its successors in interest and Owner/Operator hereby releases the City, its agents, contractors, officers, employees and its suc- cessors in interest for any cause of action it may have against them, other than as allowed in this paragraph, arising under this Agreement or environmental laws, regulations or common law governing the contaminated soil or groundwater in the highway Right-of-Way. Should the City convey, vacate or transfer juris- diction of that highway Right of-Way, Owner/Operator may pursue an action under this Agreement against the successors in inter- est, other than a State agency, in a court of law. 16 . This Agreement is entered into by the City in recognition of laws passed by the General Assembly and regulations adopted by the Pollution Control Board that encourage a tiered-approach to remediating environmental contamination. This Agreement is en- tered into by the City in the spirit of those laws and under its right and obligations as a municipality. Should any provisions of this Agreement be struck down as beyond the authority of the City, however, this Agreement shall be null and void. 17 . The Owner and Operator shall be jointly and severally liable for their obligations under this Agreement and all references to "Owner/Operator" shall effect the Owner and Operator both jointly and individually. 9 IN WITNESS WHEREOF, Owner/Operator, Speedway SuperAmerica LLC, has caused this Agreement to be signed by its duly authorized representative. BY: / DATE: '73/aq R. SCOTT HISER, CORPORATE ENVIRONMENTAL MANAGER i01} IN WITNESS WHEREOF, the City has caused this Agreement to be signed by its Mayor. CITY OF ELGIN BY: DATE: 31/6////t6- ED SCHOCK, MAYOR ATTEST: @4,4h/1-„6 .0_■Cii.r-- DOLONNA MECUM, CI Y CLERK 10 Table 1 SOIL SAMPLE ANALYTICAL RESULTS FOR BTEX(mg/kg) SPEEDWAY STATION#7514 ELGIN,ILLINOIS Sample Date Sample Depth Benzene Toluene . Ethylbenzene Xylenes MTBE • Location MW-1 4/30/1990 - "1:2,,,Z.441 <0.500 <0.500 <1.0 NS MW-2 5/1/1990 8.5-10 =yf _ <0.500 <0.500 2.4 NS MW-3 5/1/1990 3.5-5 'F. <0.500 0.55 1.7 NS B1 5/1/1990 4-6 --,, . <0.500 <0.500 <1.0 NS B2 5/1/1990 3.5-5 .<1 sa <0.500 <0.500 <1.0 NS MW-4 3/5/1991 3.5-5 0.022 0.17 0.17 2.2 NS MW-5 3/5/1991 3.5-5 0.018 0.04 <0.005 0.017 NS MW-6 3/5/1991 6-7.5 0.029 0.035 0.018 0.055 NS MW-7 2/6/1992 5-7 -qt . <0.006 <0.006 0.009 NS MW-7 2/6/1992 9-11 <0.006 <0.006 <0.006 <0.006 NS MW-8 2/6/1992 7-9 0.006 <0.006 <0.006 <0.006 NS MW-8 2/6/1992 11 -13 <0.006 <0.006 <0.006 <0.006 NS MW-9 2/6/1992 9-11 a , 0.032 0.39 0.6 NS MW-9 2/6/1992 11 -13 <0.006 <0.006 <0.006 <0.006 NS MW-10 2/6/1992 5-7 0.007 0.008 0.031 0.014 NS MW-10 2/6/1992 7-9 <0.006 <0.006 <0.006 <0.006 NS SB-1 6/8/1992 8-10 ND 0.008 ND 0.008 NS SB-1 6/8/1992 10-12 ND ND ND ND NS SB-2 6/8/1992 8-10 ND ND ND ND NS SB-2 6/8/1992 10-12 ND ND ND ND NS SB-3 6/8/1992 8-10 0.013 0.006 0.026 0.014 NS SB-3 6/8/1992 10-12 ;. ' 0.052 0.76 2.8 NS SB-3 6/8/1992 12-14 0.019 ND 0.024 0.1 NS SW-1 6/8/1992 8-10 ND ND ND 0.005 NS SW-2 6/8/1992 10-12 ND ND ND ND NS SW-1 8/11/1992 - : s 0.028 0.23 0.8 NS SW-2 8/14/1992 - K,;. 7 _ 0.11 0.32 3.2 NS SW-3 8/14/1992 - ND ND ND ND NS SW-4 8/14/1992 - :::: . 10 100 NS SW-5 8/14/1992 - 1r€ 0.29 0.098 17 NS SW-6 8/14/1992 - ND 0.013 0.006 0.034 NS SW-7 8/14/1992 - 0.011 0.006 0.023 0.044 NS SW-8 8/14/1992 - ' 's° 0.047 0.26 0.48 NS TL-1 8/19/1992 - 0.02 0.008 ND ND NS NW 2/2/1999 3-5 ND 0.002 ND 0.002 NS SW 2/2/1999 3-5 ND ND ND ND NS WW 2/2/1999 3-5 ND ND ND ND NS EW 2/2/1999 3-5 ND ND ND ND NS T 2/2/1999 5-7 ND ND ND ND NS MP-1 10/20/1999 3-5 0.002 ND ND ND NS MP-2 10/20/1999 3-5 f':..'''; §1, ? 0.002 0.008 0.021 NS MP-3 10/20/1999 3-5 ND ND ND ND NS MP-4 10/20/1999 3-5 ND 0.002 ND ND NS MW-13 10/19/2000 3.5-5 ND ND ND ND NS MW-14 10/19/2000 _ 3-5 ND ND ND ND NS I I 1 Tier 1 Soil Remediation Objectives 0.03 12 13 150 0.32 Table 1 SOIL SAMPLE ANALYTICAL RESULTS FOR BTEX(mg/kg) SPEEDWAY STATION#7514 ELGIN,ILLINOIS Sample Date Sample Depth Benzene Toluene Ethylbenzene Xylenes MTBE Location GP-1 6/22/2004 8-12 <0.002 <0.002 <0.002 <0.002 NS GP-2 6/22/2004 8-12 <0.002 <0.002 <0.002 <0.002 NS GP-3 6/22/2004 8-12 <0.002 <0.002 <0.002 <0.002 NS GP-4 6/22/2004 4-8 r , o <0.130 <0.130 <0.130 NS GP-5 6/22/2004 4-8 <0.002 <0.002 <0.002 <0.002 NS GP-6 6/22/2004 0-4 �t�+ 1a <0.120 0.94 <0.120 NS GP-7 6/22/2004 8-12 <0.002 <0.002 <0.002 NS GP-8 6/22/2004 4-8 <0.032 <0,032 <0.032 0.096 GP-9 6/22/2004 0-4 0.006 <0.002 <0.002 <0.002 NS GP-10 6/22/2004 8-12 <0.002 <0.002 <0.002 <0.002 NS GP-11 6/22/2004 8-12 <0.002 <0.002 <0.002 <0.002 NS Tier 1 Soil Remediation Objectives 0.03 12 13 150 0.32 -=Not Available ND=Not Detected NOTE:A shaded cell indicates that this value exceeds Tier 1 soil remediation objectives. Table 2 SOIL SAMPLE ANALYTICAL RESULTS FOR PNAs (mg/kg) SPEEDWAY STATION #7514 ELGIN, ILLINOIS 3/25/1993 3/25/1993 3/25/1993 Tier 1 Soil Remediation Parameter Objectives for Industrial B-101 (7'-9') B-102 (5'-7') B-103 (3'-5') /Commercial Properties Naphthalene . . ND ND 1.8 Acenaphthylene 35 ND ND -- Acenaphthene 12 ND ND 570 Flourene 1.3 ND ND 560 Phenanthrene ND ND ND -- Anthracene ND ND ND 12,000 Flouranthene ND ND ND 4,300 Pyrene ND ND ND 4,200 Chrysene ND ND ND 160 Benzo(a) anthracene ND ND ND 2 Benzo(b) flouranthene ND ND ND 5 Benzo(k) flouranthene ND ND ND 49 Benzo(a) pyrene ND ND ND 0.8 Dibenzo(a,h) anthracene ND ND ND 0.8 Benzo(g,h,i) perylene ND ND ND -- Indeno (1,2,3-cd)pyrene ND ND ND 8 ND = Not Detected ---= There is no governement regulated objective. Table 2 SOIL SAMPLE ANALYTICAL RESULTS FOR PNAs (mg/kg) SPEEDWAY STATION #7514 ELGIN, ILLINOIS 2/2/1 999 2/2/1 999 2/211999 2/2/1 999 2/2/1999 Tier 1 Soil Remediation Parameter Objectives for Industrial T (5'-7') NW(3'-5') SW(3'-5') WW(3'-5') EW (3'-5) /Commercial Properties Naphthalene ND ND ND ND ND 1.8 Acenaphthylene ND ND ND ND ND -- Acenaphthene ND ND ND ND ND 570 Flourene ND ND ND ND ND 560 Phenanthrene ND ND ND ND ND -- Anthracene ND ND ND ND ND 12,000 Flouranthene ND ND ND ND ND 4,300 Pyrene ND ND ND ND ND 4,200 Chrysene ND ND ND ND 0.14 160 Benzo(a)anthracene ND ND ND ND 0.14 2 Benzo(b)flouranthene ND ND ND ND 0.15 5 Benzo(k)flouranthene ND ND ND ND 0.082 49 Benzo(a) pyrene ND ND ND ND 0.1 0.8 Dibenzo(a,h) anthracene ND ND ND ND ND 0.8 Benzo(g,h,i) perylene ND ND ND ND ND -- Indeno(1,2,3-cd)pyrene ND ND ND ND 0.096 8 Arsenic, total 1.55 NS NS NS NS 7.2* Cadmium, total 0.14 NS NS NS NS 0.6* Chromium, TCLP (mg/L) ND NS NS NS NS 0.1 mg/L Mercury, total ND NS NS NS NS 0.06* Barium, total 65.1 NS NS NS NS 110* Lead, total 17.2 NS NS NS NS 36* Selenium, total ND NS NS NS NS 0.48* Silver, total ND NS NS NS NS 0.55* ND -Not Detected NS -Not Sampled *= Statewide background value ---= There is no governement regulated objective. Table 2 SOIL SAMPLE ANALYTICAL RESULTS FOR PNAs (mg/kg) SPEEDWAY STATION #7514 ELGIN, ILLINOIS 10/20/1999 10/20/1999 10/20/1999 10/20/1999 10/19/2000 Tier 1 Soil Remediation Parameter Objectives for Industrial MP-1 (3'-5') MP-2 (3'-5') MP-3 (3'-5') MP-4(3'-5') MW-13 (3.5'-5') /Commercial Properties Naphthalene ND ND ND ND ND 1.8 Acenaphthylene ND ND ND ND ND -- Acenaphthene ND ND ND ND ND 570 Flourene ND ND ND ND ND 560 Phenanthrene ND ND ND ND ND -- Anthracene ND ND ND ND ND 12,000 Flouranthene 0.13 0.14 ND ND ND 4,300 Pyrene 0.16 0.12 ND ND ND 4,200 Chrysene ND ND 0.099 ND 0.47 160 Benzo(a) anthracene 0.093 0.066 ND ND 0.47 2 Benzo(b) flouranthene 0.063 0.086 0.092 ND ND 5 Benzo(k) flouranthene 0.028 0.027 0.02 ND ND 49 Benzo(a) pyrene 0.11 0.083 0.086 ND 0.065 0.8 Dibenzo(a,h) anthracene 0.11 ND ND ND 0.29 0.8 Benzo(g,h,i) perylene 0.15 0.14 ND ND ND -- Indeno(1,2,3-cd)pyrene 0.033 0.015 ND ND ND 8 ND -Not Detected NS -Not Sampled *= Statewide background value ---= There is no governement regulated objective. Table 2 SOIL SAMPLE ANALYTICAL RESULTS FOR PNAs(mg/kg) SPEEDWAY STATION #7514 ELGIN, ILLINOIS Parameter 6/22/2004 ' 6/22/2004 6/22/2004 6/22/2004 Tier 1 Soil Remediation GP-3 (8'-12') GP-4(4'-8') GP-5(4'-8') GP-6(0'-4') Objectives for Industrial Naphthalene ND ND ND 0.92 1.8 Acenaphthylene ND ND ND ND -- Acenaphthene ND ND ND ND 570 Flourene ND ND ND 0.16 560 Phenanthrene ND ND ND ND -- Anthracene ND ND ND ND 12,000 Flouranthene ND ND ND ND 4,300 Pyrene ND ND ND ND 4,200 Chrysene ND ND ND ND 160 Benzo(a)anthracene ND ND ND ND 2 Benzo(b)flouranthene ND ND ND ND 5 Benzo(k) flouranthene ND ND ND ND 49 Benzo(a) pyrene ND ND ND ND 0.8 Dibenzo(a,h)anthracene ND ND ND ND 0.8 Benzo(g,h,i)perylene ND ND ND ND -- Indeno(1,2,3-cd) pyrene ND ND ND ND 8 ND -Not Detected NS -Not Sampled *= Statewide background value ---= There is no governement regulated objective. Table 3 SUMMARY OF BTEX GROUNDWATER SAMPLE ANALYTICAL DATA (mg/L) SPEEDWAY STATION#7514 ELGIN, ILLINOIS Sample Sample Date Benzene Toluene Ethylbenzene Xylenes MTBE Location MW-1 5/11/19901 0.046 0.075 0.2 NS 1/20/1992 0.005 0.002 0.002 0.003 NS 5/11/1990 7� 0.44 0.32 5 NS MW-2 1/20/1992 0.16 0 55 4 6 NS 5/11/1990 �� a ..� � f; NS 1/20/1992 �,�� � 0.26 �'� NS 6/30/1993 0.14 ''" � 6 NS tea , 0.014 0.19 0.086 NS 2/7/1996 �a,� „„�.-- 7/24/1996 " ' 0.012 0.2 0.23 NS 11/26/1996 0.006 0.19 0.3 NS MW 3 2/25/1997 0.062 0.31 1.4 NS 5/20/1997 +7 0.004 0.33 0.59 NS 8/13/1997 0.01 0.25 0.43 NS 10/2/1998 09 ND 0.09 0.061 NS 2/11/1999 :,,,.,,,,.:11M-, ND 0.11 0.08 NS 10/19/1999 ' ` ND 0.051 0.03 NS 11/13/2001 L � r r 0.0042 0.013 0.012 NS 3/21/1991 0.0013 ND 0.0009 0.0024 NS 1/20/1992 OOO i ND ND 0.002 NS 7/14/1992 ' iT ND 0.011 0.002 NS 6/30/1993 0.003 ND ND ND NS 2/7/1996 nkA ND ND ND NS 7/24/1996 r�' '� ` , 0.002 0.004 0.004 NS MW-4 11/26/1996 '`L ND ND 0.002 NS 2/25/1997 0.003 0.003 0.002 0.007 NS 5/20/1997 0.1 ND 0.011 ND NS 8/13/1997 0.003 ND ND ND NS 10/2/1998 ND ND ND ND NS ND ND ND NS 2/11/1999 0.0017 10/19/1999 ND ND ND ND NS 11/13/2001 ND 0.019 0.0011 0.0013 NS 3/21/1991 ND ND ND ND NS 1/20/1992 0.001 0.002 ND ND NS 6/30/1993 ND ND ND ND NS 2/7/1996 0.002 0.013 0.005 0.046 NS MW-5 10/2/1998 ND ND ND ND NS 2/11/1999 ND ND ND ND NS 10/19/1999 ND ND ND ND NS 11/13/2001 ND ND ND ND NS 10/3/2003 ND ND ND ND NS Tier 1 Groundwater 0.005 1 0.7 10 0.07 Remediation Objectives Table 3 SUMMARY OF BTEX GROUNDWATER SAMPLE ANALYTICAL DATA (mg/L) SPEEDWAY STATION#7514 ELGIN, ILLINOIS Sample Sample Date Benzene Toluene Ethylbenzene Xylenes MTBE Location 5/21/1991 0.02 0.1 0.056 NS 1/20/1992 .'` �� 0.068 0.26 0.13 NS 7/1/1993 0.009 0.16 0.31 NS 2/7/1996 0.005 ND ND ND NS MW-6 10/2/1998 ND ND 0.0024 NS 2/11/1999 ND ND ND NS 10/19/1999 ND ND ND ND NS 11/13/2001 ND ND ND 0.0016 NS 10/1/2003 ND ND ND ND NS 5/18/2004 <0.001 <0.001 <0.001 <0.001 0.021 1/20/1992 ND 0.002 ND ND NS 2/14/19921 � ° x,� ND ND 0.001 NS 7/14/1992 + °-- ND ND ND NS 6/30/1993 ,2:t ND ND ND NS 2/7/1996 '17 0.055 0.008 0.052 NS 7/24/1996 ; 0.062 0.16 1 NS 11/26/1996 m 0.041 0.22 0.96 NS MW-7 2/25/1997 , ii 1 0.006 0.25 0.4 NS 5/20/1997 � '`, 0.029 0.27 1.2 NS 8/13/1997 : w,E ;� 0.045 0.68 2.5 NS 10/2/1998 :',2.&2:1__`p1, ND 0.039 0.019 NS 2/11/1999 ' _ ` ND 0.084 0.27 NS 10/19/1999 _ , mL., ND 0.02 0.0017 NS 11/13/2001 + = ND ND 0.0033 NS 10/3/2003 ND ND ND 0.001 NS 2/14/1992 +1 ND ND ND NS 7/14/1992 0.002 ND ND 0.001 NS 6/30/1993 ND ND ND ND NS 2/7/1996 ND ND ND ND NS 10/2/1998 ND ND ND ND NS MW-8 2/11/1999 ND ND ND ND NS 10/19/1999 ND ND ND ND NS 11/13/2001 ND ND ND 0.0013 NS 10/1/2003 ND ND ND ND NS 5/18/2004 „ <0.001 <0.001 <0.001 2/14/1992 0.001 ND ND ND NS 7/14/1992 L ``-- : a ND 0.001 ND NS 6/30/1993 1 r.-s + e :m ND 0.002 0.001 NS 2/7/1996 ND ND ND ND NS 10/2/1998 ! f,. .: MW-9 ,u ND 0.14 0.14 NS 2/11/1999 ND ND ND ND NS 10/19/1999 ND ND ND ND NS 11/13/2001 ND ND ND ND NS 10/1/2003 ND ND ND ND NS 5/18/2004 <0.001 <0.001 <0.001 <0.001 <0.003 Tier 1 Groundwater 0.005 1 0.7 10 0.07 Remediation Ob'ectives Table 3 SUMMARY OF BTEX GROUNDWATER SAMPLE ANALYTICAL DATA (mg/L) SPEEDWAY STATION #7514 ELGIN, ILLINOIS Sample Sample Date Benzene Toluene Ethylbenzene Xylenes MTBE Location 2/14/1992 ND ND ND ND NS 7/14/1992 ND ND ND ND NS 6/30/1993 ND ND ND ND NS 2/7/1996 0.004 ND ND ND NS 10/2/1998 ND ND ND ND NS MW 10 2/11/1999 ND ND ND ND NS 10/19/1999 ND ND ND ND NS 11/13/2001 ND ND ND 0.0013 NS 10/3/2003 ND 0.0012 ND ND NS 5/18/2004 <0.001 <0.001 <0.001 <0.001 <0.003 10/27/1999 ND ND ND ND NS 11/13/2001 ND ND ND ND NS MW 11 10/1/2003 ND ND ND ND NS 5/18/2004 <0.001 <0.001 <0.001 <0.001 NS 10/27/1999 ND ND ND ND NS 11/13/2001 ND ND ND ND NS MW 12 10/1/2003 ND ND ND ND NS 5/18/2004 <0.001 <0.001 <0.001 <0.001 NS 11/13/2001 ND ND ND ND NS MW-13 10/1/2003 ND ND ND ND NS 5/18/2004 <0.001 <0.001 <0.001 <0.001 NS 11/13/2001 ND ND ND ND NS MW-14 10/1/2003 ND ND ND ND NS 5/18/2004 <0.001 <0.001 <0.001 <0.001 NS 2/7/1996 . 0.015 0.014 0.26 NS 7/24/1996 il,::.:* 0.017 0.15 0.42 NS 11/26/1996 „, m: -;„ 0.05 0.19 0.5 NS RW 1 2/25/1997 0.17 0.072 0.34 NS 5/20/1997 ,, « w 0.025 0.062 0.19 NS 8/13/1997 ''*:".1 _,A 0.007 0.083 0.16 NS 10/2/1998 „ F L.! ND 0.01 ND NS 2/11/1999 0.0032 ND ND ND NS SVE-1 7/1/1993 0.1 Mn,:i7MME,1 1.1 NS SVE-2 7/1/1993 0.001 0.003 ND ND NS SVE-3 7/1/1993 ND ND ND ND NS SVE-4 7/1/1993 0.97 0.072 0.15 0.71 NS Tier 1 Groundwater 0.005 1 0.7 10 0.07 Remediation Objectives . ND=Not Detected. NS=Not Sampled. NOTES: 1. A shaded cell indicates that this value exceeds Tier 1 groundwater remediation objectives. 2. Monitoring well MW-1 was destroyed in August 1992. 2. Monitoring well MW-2 was destroyed in August 1992. Table 4 SUMMARY OF DETECTED PNAs IN GROUNDWATER SAMPLES(mg/L) SPEEDWAY STATION #7514 ELGIN, ILLINOIS MW-3 MW-6 SVE-1 SVE-4 MW-3 Tier 1 Soil Remediation Parameter Objectives for Industrial 6/30/1993 7/1/1993 7/1/1993 7/1/1993 2/7/1996 /Commercial Properties Naphthalene � ,i" ' ..t , " 0.016 1 7 ND 0.025 Acenaphthylene 0.15 0.024 0.042 0.052 x ND -- Benzo (a) anthracene ND ND ND ND ND 0.00013 Dibenzo (a,h) anthracene ND ND ND ND 2 d 0.0003 Benzo (g,h,i) perylene ND ND ND ND 0.00082 -- Indeno (1,2,3-cd) pyrene ND ND ND ND . 1t 5 ; 0.00043 [‘ID -Not Detected -= A Tier 1 soil remediation objective has not been established for this parameter. A shaded cell indicates that this value exceeds Tier 1 groundwater remediation objectives. Table 4 SUMMARY OF DETECTED PNAs IN GROUNDWATER SAMPLES(mg/L) SPEEDWAY STATION #7514 ELGIN, ILLINOIS RW-1 MW-3 MW-4 MW-7 MW-3 Tier 1 Soil Remediation Parameter Objectives for Industrial 2/7/1996 7/24/1996 2/25/1997 2/25/1997 2/25/1997 /Commercial Properties aphthalene ND + I :1 �' ND ; . i ';` ND 0.025 Acenaphthylene ND 0.028 0.01 0.031 0.16 -- Acenaphthene 0.023 ND ND ND ND 0.42 -Not Detected [ID = A Tier 1 soil remediation objective has not been established for this parameter. shaded cell indicates that this value exceeds Tier 1 groundwater remediation objectives. • Table 4 SUMMARY OF DETECTED PNAs IN GROUNDWATER SAMPLES (mg/L) SPEEDWAY STATION #7514 ELGIN, ILLINOIS RW 1 MW-7 MW-3 MW-7 MW-3 Tier 1 Soil Remediation Parameter Objectives for Industrial 2/25/1997 5/20/1997 5/20/1997 8/13/1997 8/13/1997 /Commercial Properties aphthalene ND 0.011 + 41'; ; ' 0.025 Acenaphthylene 0.043 0.025 0.03 ND 0.051 -- ND -Not Detected --= A Tier 1 soil remediation objective has not been established for this parameter. A shaded cell indicates that this value exceeds Tier 1 groundwater remediation objectives. Table 4 SUMMARY OF DETECTED PNAs IN GROUNDWATER SAMPLES(mg/L) SPEEDWAY STATION #7514 ELGIN, ILLINOIS RW-1 MW-3 MW-7 MW-10 Tier 1 Soil Remedialion Objectives Parameter 8/13/1997 10/19/1999 10/19/1999 10/19/1999 for Industrial /Commercial Properties aphthalene ND Otti- ND ND 0.025 Acenaphthylene 0.051 0.051 0.011 ND -- enzo (a) anthracene ND ND ND � 0.00013 ND -Not Detected --= A Tier 1 soil remediation objective has not been established for this parameter. A shaded cell indicates that this value exceeds Tier 1 groundwater remediation objectives. Table 4 SUMMARY OF DETECTED PNAs IN GROUNDWATER SAMPLES(mg/L) SPEEDWAY STATION #7514 ELGIN, ILLINOIS MW-3 MW-4 MW-10 MW-10 Tier 1 Soil Remediation Objectives Parameter 11/13/2001 11/13/2001 11/13/2001 11/13/2001 for Industrial (Commercial Properties Naphthalene ND ND ND 0.025 Fluoranthene ND ND 0.005 0.004 0.28 Pyrene ND ND 0.004 ND 0.21 Chrysene ND ND 0.003 0.003 -- Benzo (a) anthracene ND :::,1 :1,1I10* 0.001 -;! , ) 0 0.00013 Benzo(b) fluoranthene ND 0.001 :`tom 0.001 0.00018 Benzo (k) fluoranthene ND e ,i • 0.001 i'f ,4 0.00017 Benzo (a) pyrene ND `ka r � 00,,, Benzo E * .° °� 0.0002 Dibenzo (a,h) anthracene ND 4.77.1z * W,°, 1.i 1 + • R =. pr' ;7 0.0003 Benzo (g,h,i) perylene ND ND 0.002 ND -- Indeno (1,2,3-cd)pyrene ND ,# ' '�°;' „ 4 ?'sE:! 1.;i'; 0.00043 ND -Not Detected --= A Tier 1 soil remediation objective has not been established for this parameter. A shaded cell indicates that this value exceeds Tier 1 groundwater remediation objectives. Table 4 SUMMARY OF DETECTED PNAs IN GROUNDWATER SAMPLES (mg/L) SPEEDWAY STATION #7514 ELGIN, ILLINOIS MW-6 MW-8 MW-9 MW-10 Tier 1 Soil Remediation Parameter Objectives for Industrial 5/18/2004 5/18/2004 5/18/2004 5/18/2004 /Commercial Properties Naphthalene ND ND ND 0.14 Acenaphylene ND ND ND ND --- Acenaphthene ND ND ND ND 0.42 Fluorene ND ND ND ND 0.28 Phenanthrene ND ND ND ND --- Anthracene ND ND ND ND 2.1 Fluoranthene ND ND ND ND 0.28 Pyrene ND ND ND ND 0.21 Chrysene ND ND ND ND 0.0015 Benzo (a) anthracene ND ND ND ND 0.00013 Benzo (b) fluoranthene ND ND ND ND 0.00018 Benzo (k) fluoranthene ND ND ND ND 0.00017 Benzo (a) pyrene ND _ ND ND ND 0.0002 Dibenzo (a,h) anthracene ND ND ND ND 0.0003 Benzo (g,h,i) perylene ND ND ND ND --- Indeno (1,2,3-cd) pyrene ND ND ND ND 0.00043 ND - Not Detected -- = A Tier 1 soil remediation objective has not been established for this parameter. A shaded cell indicates that this value exceeds Tier 1 groundwater remediation objectives. • Table 4 SUMMARY OF DETECTED PNAs IN GROUNDWATER SAMPLES (mg/L) SPEEDWAY STATION #7514 ELGIN, ILLINOIS MW-11 MW-12 MW-13 MW-14 Tier 1 Soil Remediation Parameter Objectives for Industrial 5/18/2004 5/18/2004 5/18/2004 5/18/2004 /Commercial Properties Naphthalene ND ND ND ND 0.14 Acenaphylene ND ND ND ND --- Acenaphthene ND ND ND ND 0.42 Fluorene ND ND ND ND 0.28 Phenanthrene ND ND ND ND --- Anthracene ND ND ND ND 2.1 Fluoranthene ND ND ND ND 0.28 Pyrene ND ND ND ND 0.21 Chrysene ND ND ND ND 0.0015 Benzo (a) anthracene ND ND ND ND 0.00013 Benzo (b) fluoranthene ND ND ND ND 0.00018 Benzo (k) fluoranthene ND ND ND ND 0.00017 Benzo (a) pyrene ND ND ND ND 0.0002 Dibenzo (a,h) anthracene ND ND ND ND 0.0003 Benzo (g,h,i) perylene ND ND ND ND --- Indeno (1,2,3-cd) pyrene ND ND ND ND 0.00043 ND - Not Detected -- = A Tier 1 soil remediation objective has not been established for this parameter. A shaded cell indicates that this value exceeds Tier 1 groundwater remediation objectives. ESTIMATED AREA OF LEGEND IMPACTED SOIL -1 MOATTORNG WELL LOCATION s4sou D BY G1 AND DESTROYED IN AUGUST 1992. LIMITS OF EXCAVATION - - - - -;- - - I- — — -4'— — —° — — '- - - - - --s - - II ( I I GTI BETWEEN APRIL O AND FEBRUARY 1992 w�s1E a usT I' • — — • — — ,w-,s Wilt* I t,w-„ MO/STORM w4J LOCATION NSMLLED BY IlliNia- -_� „ -iii PEC IN OCTOBER 1999 AND OCTOBER 2000. m- y��-IA �,, !' �� r,, I lI I I ems' sal WRING LOCATION COLLECTED BY BUILDING 5;;, sw-1 _APR- T�' `1. I �, Gn N APRIL,990 1 ' ,' dL o o w-w fl I I . 8 suw BORING LOCATION COLLECTED BY ICj i I I G 1 N JUNE 1992 I I 441//s-5 4 T i`40 �' I I tut Sal BO NNG LOCATION COUECWFD BY ovtovr I 'As =..A. . 90-4 I i ' W I GII N MARCH ,993 PUMP SUNOS�I MIGRATNNd PATHWAY SAMPLE LOCATION I 1 • 1 t �Str-� �J � �I , II COLLECTED BY PEC N OCTOBER 1999 7 ,w-3 B-2 • • a-,o, L-ib°_•• - SITE CLASSIFICATION sal BORING 'jI �� �, COLLECTED BY PEC N OCTOBER 1999 I i 1 R llN(WAJER « 1 I Awl TANK(PULL SOIL SAMPLE LOCATION Fi 0,,-ii-a-rer� I un-, I 1 M-3 '121'0 1 ;�y COLLECTED BY GT IN AUGUST 1992 II ,a „ _�.. lS2J e O 2 I 1 !so-� I wi(s a7 T�OiLEC D BYY PEC FEBR NR1•1999 -1 SA-2 SYE�3 s 1 SOIL VAPOR EXTRACTION LOCATIONS a'L �J � �' I INSTALLED BY GR IN AUGUST 1992 1 L I- ` TIP-2f J , , mR,-, 12'RECOVERY WELL LOCATION + .11 STORM SEWER ®sa-z 91-I --s -JI ® I CAS r i w WATER BIG TIMBER ROAD I N__ ____. SA MY SEWER %---- - 11 I 7 - TELEPHONE II I l ELECTRIC 1011-14 1 1 II 111: - --r- - - - — __ __. e -- r — — __ — __r__ - -0 TELEPHONE >N OiMri€Y Imo — — r — - — — r — r — —ti -..-,._ MANHOLE' o 13' 30' 1 _ -I NOTE ALL WELL AND UTILITY LOCATIONS ARE APPROMIATE. Practical Environmental Consultants, Inc. -69 -—--- --- 413— — 4- --s w -- -- f 919 Nor h Plum Qew Road Phone (847)517 1977 Sults 1 SahamEburp, R Wi73 o Fao>dmp, (847)517 1988 11111 11 11 N III II INN I III -L 111 IL L I� -L II 1I -U -1 111 II I IL Ill 1 .1- N 111 1 a L 10 I It! Ill - I1 � EstruteD AREA SPEEDWAY STATION #7514 OF IMPACTED 1370 1110 T MBER R0A0 SOIL ELGIN, ILLINOIS DATE SCALE APPROVED OWN.BY - FIGURE 7/14/2004 AS SHOWN WES AJR 1 I LEGEND /—ESTIMATED AREA OF IMPACTED GROUNDWATER w" c,, °rim msTiteE2D. BY LIMITS OF EXCAVATION I i I I wa BY MONITORING WELL LOCATION INSTALLED — -; — -.4— — — E- — — —+— — — — E- — — — — -' — — I GR BETWEEN ORE 1990 NO FEBRLMY 1992 -12 wE Us> r — __—_--__—_-- �--,r --- — — — — I - mo.,. N w u.LOCN NSA n or II4 L -u FEC N OCTOBER 1999 AND OCTOBER 2000. I-- I, •8-1 SOIL BORING LOCATION COLLECTED Br r 'A __•, —__ =7 "n II I � GD N APRIL 1990 BUILDING ;I _� I. I 59-1 _= SOB.BORING LOCATION COLLECTED BY ' i �` ° ) M►-10 i I ® GR N 1992• o o �° • �, I 1 '� 9-101 SON.BORING LOCATION COLLECTED BY•I �w-s + FI Vii- y" W Gn N MARCH 1993 - I cMtow I �t f__ _, I I. I , RAP MIGRATION PATHWAY SAMPLE LOCATION COLLECTED BY PEG IN OCTOBER 1999 11 �s�e°���' �-o-0 i I I ± 1 COLLECTED ECTED IC TIONEC L BANG 1999 twa 9-21 C—J• •C-7 I 8-101 �`°_ 43j e-1w 1I "' + ,® I II II . , I NoAe1, • I A TANK Put SOIL SAMPLE LOCATION S,RO,, *Rt n:-,N I'-t _� COLLECTED BY Gil IN AUGUST 1992 I i,'w n, I ��ill i = J 8--io2 wa s9 O 1,0(3-91 T( ECTED SS PE FEBRUARY 1999 _,,- I I ii , I j 1 e C--] = ] I 0 O o srE t SOL VAPOR EXIRACT10N LOCATIONS _ - I 1 5 rE-2 srEa I INSTALLED BY GR N AUGUST 1992 L. haw t 12'RECOVERY WELL=ANON ss v — ...AMR_ -/ I-ss ss STORM SEWER 5B-I 1---Y s-- GAS ®s9-2 r 14 WATER BIG TIMBER ROAD 1 " ._---- SANITARY SEVER — — — —�— — ....,i_I _ TE1J PILONE _1 1_ t ELECHRI i I I M L 09-14 APPROXIMATE — —r-- — — — — r —_ — —_ � — r r —0TELEPHONE SCALE — �- - • - - • - - • - - • - - • - - • - - • - - • - -_— s, MANHOLE 0 15' 30' — — — — --r— -- — — —r — — — — r— -- NOTE:ALL WELL AND MIRY LOCATIONS ARE APPROBATE. 1 — ,— — —I Practical Environmental Consultants, Inc. + — ------- -- - -t24"-- -- -- I 919 North Plum Grove Rood Phone (847)517 1977 ri FaotdmRo (847)517 1988 I[ 11 L III LI �I Il Ill 111 1. 111 _ lU II III - �I I11 Ill III 111 111 lU I III 11 II II I� I I� Schaumburg. TED AREA SPEEDWAY STATION f 7514 of IMPACTED 1570 BIG TRIER ROAD GROUNDWATER ELGIN. ILi1NOIS DATE - SCALE APPROVED Dw11.BY FIGURE 7/14/2004 AS SHOWN WES AJR 2 HIGHWAY LEGEND AUTHORITY AGREEMENT LOCATION - -1...i ' LIMITS OF EXCAVATION MN-3 I S- — — -J — —� I BY 1♦I ,,�♦♦�♦♦, MOMTORING INSTALLED ! N APRIL 1990 AND FEBRUARY Y 1992 92 r - � -_. — - - - — IM-,2—P kMSTE UST. 17- w-11 MONITORING YEL LOCATION INSTALLED BY ILYA 1414-13 i ,.._�.. PEC N OCTOBER 1999 AND OCTOBER 2000. I t ' � A BUILDING ` ' ♦ >- I L.'I ♦ r■ID I,. � ♦ '1 MIL BORING LOCATION COLLECTED BY CFI IN APRL 1990• + • ) MW- {I .0—' - ` ®N-101 G MLOCATION COLECTED BY JUNE I ( u-s r - L ,° o -y— I ♦I 4 • o , I I. N 4 o SOIL BORING LOCATION COLLECTED BY Gil N MARCH 1993 HI MAP IL - - r 1 MGPA10N PATHWAY SAMPLE LOCATION I 4. o * ♦ . COLLECTED BY PEC N OCTOBER 1999 C"] •C'i7 I is-To' `o d , s�Ct�ISSffIY PECI sag.TOBER �► ♦, COLLECTED BY PEC N E LOCATION ,999 NI-167 Hpw�`t?_-" _=-- �sM-, TANK PULL SOIL SAMPLE LOCATION - CpRIr;TI)N I _1 MP-1,t1.1 I �.� COLLECTED BY GM N AUGUST 1992 w,a ,,,_, �JJ ; 8-102 ♦ i,w(3-57 TALK PILL SOIL SAMPLE LOCATION - y- I X11 e �ii� I ,\ I rr. ♦ . COLLECTED BY PEC N FEBRUARY 1999 I 1""-'t ___-- I I 0, S1E�3 SYE�I I I I ♦ ♦♦. t INSTALLED BY LOCATIONS 992 T7 _+ - L,v- � ♦,, — -f 5Y-, 12'RECOVERY WELL LDGTION as s t'� STORM SEWER I 41Ill' *VT. 10'V-Ak Ifie GAS =BIG TIMBER ROAD lo'4.∎a A=�1��;,I _._____ sANTTAn SEWER .♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦�'♦;, i -- TaCTRIC )�♦N♦�♦�♦�♦N♦N♦N_,LNNNN♦�♦�'�� . 1 H r — — — — �AL����;L.∎����A`���. AL A. TELEPHONE SCALE ._-.. .._. —— — .�T`—_ ^ —_. _ — -q___. MANHOLE 0 15 30' -I NOTE:ALL WELL AND UTILITY LOCATIONS ARE APPROXIMATE 3— + rs' Practical Environmental Consultants, Inc. - ;5-------------—as--——----------4's___._-_._.--—,�.------- ---—-- f H NoYlh Plum Grow Rood Phone (847)517 1977 Smile E • fomdmfo (847)517 1988 1 I I II I 1 11 HI I H II H 1 1 I II 11 11 1 II 11 1 I II 1 11 H I 1 H H I Schaumburg, 1.60173 HIGHWAY SPEEDWAY STATION /7514 G AUTHORITY AGREEMENT 1570 BIG TUNER ROAD LOCATION ELGIN, ILLINOIS DATE SCALE APPTROIED OWl&BY FIGURE 7/14/2004 AS SHAWN WES AJR 3