HomeMy WebLinkAbout05-45 Resolution No. 05-45 RESOLUTION APPROVING CHANGE ORDER NO. 1 AND FINAL IN THE CONTRACT WITH DIMEO BROTHERS, INC. FOR THE FOX LANE TO RANDALL ROAD WATER MAIN PROJECT WHEREAS, the City of Elgin has heretofore entered into a contract with DiMeo Brothers, Inc. for the Fox Lane to Randall Road Water Main Project; and WHEREAS, it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1 and Final, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN, ILLINOIS, that Olufemi Folarin, Acting City Manager, be and is hereby authorized and directed to execute Change Order No. 1 and Final, a copy of which is attached hereto and made a part hereof by reference. s/Ed Schock Ed Schock, Mayor Presented: February 23, 2005 Adopted: February 23, 2005 Omnibus Vote: Yeas: 6 Nays: 0 Attest: s/Dolonna Mecum Dolonna Mecum, City Clerk ALVORD,BURDICK & HOWSON, L.L.C. ENGINEERS CHICAGO, IL. CHANGE ORDER NO. 1 AND FINAL City of Elgin SHEET 1 OF 4 PROJECT: Section I - Fox Lane Watermain CHANGE ORDER NO. 1 AND FINAL LOCATION: Elgin, Illinois CONTRACTOR: Di Meo Brothers, Inc . DATE: February 11, 2005 I . A. DESCRIPTION OF CHANGES INVOLVED 1 . In accordance with the property easement agreement between the City of Elgin and Matsushita Electric Corporation of America ( Panasonic) , the City is required to furnish and install 12 inches of topsoil over all disturbed areas . Since this proposal would result in a $76, 000 cost to the City to furnish 8 inches of additional topsoil , an unstable slope condition and maintenance costs, the City negotiated with Panasonic to furnish the following in place of the additional topsoil : A. 48 Ornamental Shrubs and 6 Ornamental Trees (Including two year warranty) B. Two Year Warranty on 40 Shrubs and 28 trees to be planted by Contract C. Removal of Additional Trees and Shrubs D. Incremental Cost of Ornamental Varieties of 40 Shrubs and 28 trees to be planted by Contract 2 . Removal of 1, 742 feet existing Illinois State Toll Highway Authority ( ISTHA) Fence and installation of 1, 742 feet temporary fence provided access for the equipment to install the watermain without requiring trees to be augered. Augering trees was a $22, 100 pay item which was not expended. After the watermain was installed, the 1, 742 feet of permanent fence was installed to restore the ISTHA property line fence to original condition. 3 . Kane County Division of Transportation denied access from Randall Road after Project was Bid requiring additional handling of material . 4 . Adjustments to Final Contract quantities . 5 . Adjustments to Final Contract quantities . Change Order No. 1 SHEET 2 OF 4 City of Elgin Section I - Fox Lane Watermain B. REVISION IN PRICE C. REASON FOR CHANGES 1 . Add $12, 400 as detailed 1 . Changes requested by in Items A-D Panasonic in easement agreement . A. Add $5, 900 A. Additional ornamental plantings requested by Panasonic. B. Add $1, 300 B. Warranty of two years from one year in Contract . C. Add $1, 600 C. Removal of natural growth trees to prepare for ornamental plantings . D. Add $3 , 600 D. Incremental cost of ornamental plantings in lieu of natural growth plants. 2 . Add $17, 420 . 00 2 . Removal and installation of Fence eliminated the augering of trees saving the City $4, 680 . 3 . Add $ 9, 000 . 00 3 . Negotiated cost of additional material handling. 4 . Adjustments to Unit Prices PLAN UNIT UNITS INCREASE INCREASE ITEM DESCRIPTION UNIT NUMBER PRICE COMPLETED IN QUANTITY IN COST 2 20"Watermain in Casing L.F. 146 $60 160 14 $840 3 36"Steel Casing L.F. 146 $330 160 14 $4,620 10 Fire Hydrant Assembly EA 3 $3,000 4 1 $3,000 19 Parking Lot Pvmnt. Removal S.Y. 100 $5 148 48 $240 20 Parking Lot Pvmnt Replace S.Y. 100 $40 148 48 $1,920 27 Curb & Gutter Removal L.F. 165 $5 229 64 $320 28 Curb& Gutter Replacement L.F. 165 $22 229 64 $1408 Total Addition for this Item $12,348 a Change Order No. 1 SHEET 3 OF 4 City of Elgin Section I - Fox Lane Watermain 5 . Adjustments to Unit Prices PLAN UNIT UNITS INCREASE INCREASE ITEM DESCRIPTION UNIT NUMBER PRICE COMPLETED IN QUANTITY IN COST 1 20"Watermain in Trench L.F. 4,775 $73 4,685 (90) ($6,570) 18Granular Trench Backfill CY 2,655 $20 2415 (240) ($4,800) 21 Roadway Pvmnt Removal SY 50 $5 11 (39) ($195) 22Roadway Pvmnt Replace SY 50 $42 11 (39) ($1638) 29Topsoil &Sodding SY 1635 $8 1630 (5) ($40) 30Topsoil &Seeding SY 4,550 $5 4,490 (60) ($300) 31Auger Under Trees L.F. 85 $260 0 (85) ($22,100) 41 Granular Foundation Mtl. CY 50 $20 10 (40) ($800) 42Class"B"Concrete CY 10 $75 0 (10) ($750) 43Rock Excavation CY 10 $60 0 (10) ($600) 46Sewer Manhole EA 2 $3,000 0 (2) ($6,000) 476"Ductile Iron Pipe L.F. 60 $30 20 (40) ($1,200) Total Credit for this Item ($44,993) Total Additions (Items 1-4) $51,168 Total Credit ( Item 5) $44,993 Net Addition of$6,175.00 II . CHANGE ORDER CONDITIONS 1 . This Change Order does not relieve the Contractor form strict compliance with the guarantee provisions of the Original Contract , particularly those pertaining to performance and operation of equipment . 2 . The Contractor expressly agrees that he will place under his coverage of his Performance and Payment bonds and Contractor' s Insurance. All work covered by the Change Order. 3 . The Contractor waives all rights to claims against the Owner for any indirect costs with this or any other change order. III . STATUTORY BASIS FOR CHANGE ORDER 1 . The above changes were not foreseeable at the time of the original contract . 2 . It is in the best interest of the City to approve the above listed changes . 3 . The above listed changes are germane to the intent and scope of the original contract . } Change Order No. 1 SHEET 4 OF 4 City of Elgin Section I - Fox Lane Watermain IV. ADJUSTMENTS IN AMOUNT OF CONTRACT 1 . Amount of Original Contract $ 619, 900 . 00 2 . Net addition due to all previous Change Order Nos . 0 through 0 0 . 00 3 . Amount of Contract, not including this Change Order $ 619, 900 . 00 4 . Addition to Contract due to this Change Order $ 6, 175 . 00 5. Amount of Contract including this Change Order $ 626, 075 . 00 a. The Final Contract Amount represents A 0 . 99% increase in the Original Contract Amount . RECOMMENDED FOR ACCEPTANCE BY ALVORD, BURDICK & HOWSON L.L.C. : By: 1,777/6' l� 1 ,Z/if/v 3� Bon G. Mui Date Principal ACCEPTED BY DI MEO B THERS, INC. (CONTRACTOR) : By: anny Di Meo Date Secretary/Treasurer APPROVED BY THE CITY 0 GIN: eat '414L 9- - Olufemi . dlarin ' Date Acti•• C ' ty - • =ger ! `C OF FCC ` City of Elgin Agenda Item No. n s OA'�TEDFE�. E tai L 0 0! February 4, 2005 G on OF N TO: Mayor and Members of the City Council I! ;.I . � FINANCIALLY STABLE CITY GOVERNMENT EFFICIENT SERVICES, FROM: Olufemi Folarin, Acting City Manager RNDC}4AALITY INFRASTRUCTURE Larry E. Deibert, Director of the Water epartment SUBJECT: Final Payment, Authorization of Change Order No. 1 and Acceptance of Fox Lane to Randall Road Water Main Project. PURPOSE The purpose of this memorandum is to provide the Mayor and members of the City Council with information to consider final payment, authorization of Change Order No. 1, and acceptance of Fox Lane to Randall Road water main project completed by Di Meo Brothers, Inc. RECOMMENDATION It is recommended that the City Council, accept the completed Fox Lane to Randall Road water main project, and authorize both the final payment in the amount of $160,734.50 and the execution of final Change Order No. 1 in the amount of$6,175 (add) with Di Meo Brothers, Inc. BACKGROUND The Fox Lane to Randall Road water main is a 20-inch transmission main that begins at Fox Lane Pumping Station and proceeds approximately 4920 feet west to Randall Road near the intersection with 1-90. On April 14, 2004, the City Council awarded a contract for Fox Lane to Randall Road water main to Di Meo Brothers, Inc. of Park Ridge, Illinois. Change Order No. 1 (Final) covers 5 items, 4 additives and 1 deductive. The additive items include additional landscaping to meet easement obligations with Matsushita Electric Corporation (Panasonic) ($12,400); fence removal and replacement along the Illinois Toll Highway Authority property line to eliminate auguring trees on Panasonic Property ($17,420); Kane County Division of Transportation required a new access for material delivery ($9,000); and an adjustment in unit price items ($12,348). Total additions are $51,168. r The deductive items include 90 lineal feet of 20-inch water main in trench, 240 cubic yards of granular trench backfill, 39 square yards of roadway pavement removal, 39 square yards of roadway pavement replacement, 5 square yards of topsoil and sodding, 60 square yards of topsoil seeding, 85 lineal feet auger under trees, 40 cubic yards of granular foundation material, 10 cubic • Acceptance and Change Order No. 1 for Fox Lane to Randall Rd. Water Main rib* February 4, 2005 Page 2 yards of class `B" concrete, 10 cubic yards of rock excavation, 2 sewer manholes, and 40 lineal feet of 6-inch ductile iron pipe. Total deduction is $44,993. The net addition to the contract is $6,175. Attached is a copy of change order No. 1 (Final) for your consideration. This project was successfully completed by Di Meo Brothers in accordance to the plans and specifications provided by the consultant engineer, Alvord, Burdick & Howson. GROUPS/INTERESTED PERSONS CONTACTED None yk,FINANCIAL IMPACT The final contract amount with Di Meo Brothers is as follows: Original Contract Amount $619,900.00 Change Order No. 1 (addition) $ 6,175.00 Revised Contract Amount $626,075.00 Previous Payments $465,340.50 Final Payment $160,734.50 The final accounting for project number 409600 is as follows: Budget: Account Number Amount 384-4000-795.92-41 $730,790 396-4000-795.92-41 235,000 Total Budget $965,790 Expenditures De Meo Brothers $626,075 Matsushita Electric Corporation 62,000 Miscellaneous $ 40 Total Expenditures $688,115 rilik Funds Remaining $ 277,675 rok Acceptance and Change Order No. 1 for Fox Lane to Randall Rd. Water Main February 4, 2005 Page 3 EGAL IMPACT None. ALTERNATIVES 1. Accept this deductive change order. 2. Do not accept this change order. Respectfully submitted for Council consideration. LED/PLB Attachment