HomeMy WebLinkAbout05-28 Resolution No. 05-28
RESOLUTION
AUTHORIZING EXECUTION OF AN AGREEMENT WITH
AIR ONE EQUIPMENT, INC FOR SELF CONTAINED BREATHING APPARATUS
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that
pursuant to Elgin Municipal Code Section 5.02.020B(9) the City Council hereby finds that an
exception to the requirements of the procurement ordinance is necessary and in the best interest of
the city; and
BE IT FURTHER RESOLVED that Ed Schock,Mayor,and Dolonna Mecum,City Clerk,be
and are hereby authorized and directed to execute an agreement on behalf of the City of Elgin with
Air One Equipment;Inc., for self-contained breathing apparatus, a copy of which is attached hereto
and made a part hereof by reference.
s/Ed Schock
Ed Schock, Mayor
Presented: February 9, 2005
Adopted: February 9, 2005
Omnibus Vote: Yeas: 6 Nays: 0
Attest:
s/Dolonna Mecum
Dolonna Mecum, City Clerk
CITY OF ELGIN
AGREEMENT
This Agreement is made and entered into this day of;�akf&i1 '2005 by and between the CITY OF
ELGIN("the CITY"),a municipal corporation organized and existing under the laws of the State of Illinois,and
AIR ONE EQUIPMENT, INC., incorporated in the state of Illinois and having a principal place of business at
360 Production Drive, South Elgin, Illinois 60177-2637 ("the CONTRACTOR").
ARTICLE I. DEFINITION. "THIS CONTRACT"as used herein shall mean this Agreement,the Request for
Proposals (RFP) including all documents referenced therein and the Contractor's Proposal response
(Proposal)thereto incorporated by reference herein and made a part hereof. The CONTRACTOR agrees to
provide the goods and/or services all in accordance with the RFP and CONTRACTOR'S Proposal. In the
event there is a conflict between this Agreement and the Proposal documents, this Agreement shall
supersede the Proposal documents and control.
ARTICLE II. DURATION. The CONTRACTOR shall commence the performance of THIS CONTRACT upon
receipt of a fully executed Contract from the City. CONTRACTOR shall furnish all equipment and complete all
work within thirty(30)days.
ARTICLE III. TERMINATION. The following shall constitute events of default under THIS CONTRACT: a)
any material misrepresentation made by the CONTRACTOR to the CITY, b) any failure by the
CONTRACTOR to perform any of its obligations under THIS CONTRACT including, but not limited to, the
following: (1) failure to commence performance of THIS CONTRACT at the time specified in THIS
CONTRACT due to a reason or circumstance within the CONTRACTOR's reasonable control, (ii) failure to
perform THIS CONTRACT with sufficient personnel and equipment or with sufficient material to ensure the
completion of THIS CONTRACT within the specified time due to a reason or circumstance within the
CONTRACTOR's reasonable control, (iii) failure to perform THIS CONTRACT in a manner reasonably
satisfactory to the CITY, (iv) failure to promptly re-perform within reasonable time the services that were
rejected by the CITY as erroneous or unsatisfactory, (v) failure to comply with a material term of THIS
CONTRACT, including, but not limited to the Affirmative Action requirements, and (vi) any other acts
specifically and expressly stated in THIS CONTRACT as constituting a basis for termination for cause. The
CITY may terminate THIS CONTRACT for its convenience upon fourteen (14)days prior written notice.
ARTICLE IV. DAMAGES. From any sums due to the CONTRACTOR for goods or services,the CITY may
keep for its own the whole or any part of the amount for expenses, losses and damages as directed by the
Purchasing Director,incurred by the CITY as a consequence of procuring goods or services as a result of any
failure, omission or mistake of the CONTRACTOR in providing goods or services as provided in THIS
CONTRACT.
ARTICLE V. GOVERNING LAWS AND ORDINANCES. This CONTRACT is made subject to all the laws of
the State of Illinois and the ordinances of the CITY and if any such clause herein does not conform to such
laws or ordinances, such clause shall be void (the remainder of the contract shall not be affected) and the
laws or ordinances shall be operative in lieu thereof.
ARTICLE VI. AFFIRMATIVE ACTION. The CONTRACTOR will not discriminate against any employee or
applicant for employment because of race,color,religion,sex,ancestry,national origin, place of birth,age or
physical handicap which would not interfere with the efficient performance of the job in question. The
contractor will take affirmative action to comply with the provisions of Elgin Municipal Code Section 3.12.100
and will require any subcontractor to submit to the CITY a written commitment to comply with those provisions.
The CONTRACTOR will distribute copies of this commitment to all persons who participate in recruitment,
screening, referral and selection of job applicants and prospective subcontractors.
ARTICLE VII. ASSIGNABILITY. The CONTRACTOR shall not assign, sell or transfer any interest in THIS
CONTRACT without prior written consent of the CITY.
ARTICLE VIII. AMENDMENTS. There shall be no modification of the CONTRACT, except in writing and
executed with the same formalities of the original.
ARTICLE IX. NOTICES.Any notice given under this CONTRACT shall be in writing and shall be deemed to
have been given when hand delivered or deposited in the U.S. mail, certified or registered, return receipt
requested, addressed, if to CONTRACTOR, at the address set forth above to the attention of the project
manager or undersigned representative, and if to the City, to the attention of the City Manager, 150 Dexter
Court, Elgin, IL 60120 or to such other address and/or authorized representatives as either party shall
designate in writing to the other in the manner herein provided.
ARTICLE X. INDEMNIFICATION. To the fullest extent permitted by law, Contractor agrees to and shall
indemnify, defend and hold harmless the City, its officers, employees, boards and commissions from and
against any and all claims, suits, judgments, costs, attorney's fees, damages or any and all other relief or
liability arising out of or resulting from or through or alleged to arise out of any acts or negligent acts or
omissions of Contractor or Contractor's officers,employees,agents or subcontractors in the performance of
this agreement, including but not limited to, all goods delivered or services or work performed hereunder. In
the event of any action against the City, its officers, employees, agents, boards or commissions covered by
the foregoing duty to indemnify,defend and hold harmless,such action shall be defended by legal counsel of
the City's choosing.
ARTICLE XI. PUBLICITY. The CONTRACTOR may not use, in any form or medium,the name of the City of
Elgin for public advertising unless prior written permission is granted by the CITY.
ARTICLE XII. APPROPRIATIONS.The fiscal year of the CITY is the 12 month period ending December 31.
The obligations of the CITY under any contract for any fiscal year are subject to and contingent upon the
appropriation of funds sufficient to discharge the obligations which accrue in that fiscal year and authorization
to spend such funds for the purposes of the contract.
If, for any fiscal year during the term of the CONTRACT, sufficient funds for the discharge of the CITY=S
obligations under the contract are not appropriated and authorized,then the CONTRACT shall terminate as of
the last day of the preceding fiscal year, or when such appropriated and authorized funds are exhausted,
whichever is later, without liability to the CITY for damages, penalties or other charges on account of such
termination.
ARTICLE XIII. ENTIRE AGREEMENT. This CONTRACT embodies the whole agreement of the parties.
There shall be no promises, terms, conditions or obligations other than those contained therein; and this
agreement shall supersede all previous communications, representations, or agreements, either verbal or
written, between the parties.
The person signing THIS CONTRACT certifies that s/he has been authorized by the CONTRACTOR to
commit the CONTRACTOR contractual and has been authorized to execute THIS CONTRACT on its behalf.
IN WITNESS WHEREOF the parties have hereto set their hands the day and year first above written.
&R/l CITY OF ELGIN
Name and Title Ed S ck
Mayor
FEIN NO-3L:3(O9�
Attest:
City Clerk
F:\Legal Dept\forms\Bid Doc-Agreement for RFP-Air One Equipment.doc
«.,..,.--- 1 1/GL I vu-t 1 1:=Dam r. laioz
360 Production Drive
South Elgin, IL 60177-2637
'Coll Free: 888-247-1204 NO. 00/00/00
AIR O N E Fax: 847-289-900
EQUIPIVIENT11 INC.
Email: airone@aoe.net QUOTATION Page 1
129
Sold ELGIN FIRE DEPARTMENT Ship ELGIN FIRE DEPARTMENT
To: CITY OF ELGIN To: ATTN; A/C MIKE BAKER
150 DEXTER COURT 550 SUMMIT STREET
ELGIN, IL 60120 5527 ELGIN, IL 60120 4219
(847)931-6183
Custr P . O. . . _ : 11/22/04 Air One order:7182
Custr Fax. . . . : (847)931-6179 Salesman. . . . . :SS
Ship Date. . . . . 00/00/00 Terms . . . . . . . . :Net-30 Daps
Ship Via . . . . . -.UPS Due Date . . . . . . 11/22/04
Ordered Item ID#/Descrip. Ship Unit B/O Price Discount Ext . Price
3.00 MMR XTREME X45 EA 3.00 3750.00 11250.00 N
MSA MMR XTREME X45 COMPLETE WITH: VULCAN DOUBLE PULL
HARNESS, 1/4 TURN REGULATOR, 30 MINUTE (4500 PSIG) CARB
FIBER CYLINDER, SHOULDER MOUNT QUICK-FILL ADAPTOR, R.I.
FITTING, ICM 2000 IMNTEGRATED PASS/REDUNDANT ALARM, LES
FACEPIECE.
--------------------------------------------------------------------------------
3.00 807587 3.00 EA 750.00 2250.00 N
CYL&VLV 1/2 HR CARBON H/P
Subtotal 13500.00
Tax
TOTAL 13500.00
0.00
Balance Due 13500.00
T b. apes
' We accept VISA/MASTER CARD/AMERICAN EXPRESS
C Ity Of Elgin
Agenda Item No.
y
December 10, 2004
TO: Mayor and Members of the City Council
SAFE COMMUNITY
FROM: David M. Dorgan, City Manager
Michael Falese, Fire Chief
SUBJECT: Purchase of Self Contained Breathing Apparatus — Sole Source Air One
Equipment, Inc.
PURPOSE
The purpose of this memorandum is to provide the Mayor and members of City Council with
information to consider an exception to the procurement ordinance for the purchase of three self
/�► contained breathing apparatus (SCBA) from Air One Equipment, Inc. for Ambulance 3.
RECOMMENDATION
It is recommended that the purchase of three self contained breathing apparatus (SCBA)be
authorized from Air One Equipment, Inc. in the amount of$13,500.00.
BACKGROUND
During 2004, the Fire Department was authorized to purchase and staff an additional ambulance
and required accessory equipment and supplies. The Elgin Fire Department outfits all of its front
line emergency response vehicles (including ambulances) with SCBAs. It is required that this
equipment be the same as the existing SCBA equipment.
The Elgin Fire Department has conducted extensive field testing with different manufacturers of
SCBA.During live fire scenarios and actual response use, the SCBA manufactured by Mine
Safety Appliance (MSA)best fit the Fire Department's needs for the ease of use, reliability, and
maintenance schedules. Firefighters are required by law to train extensively and be fit tested for
the SCBA that they will be using. It is critical for firefighter safety that there is no confusion as
to the location or operation of any part of the SCBA.
Telecommunication tax revenue is funding the purchase of required accessory equipment and
supplies.
Sole Source-Air One Equipment, Inc.
December 10,2004
Page 2
COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED
None
A IMPACT
The total purchase price of three self contained breathing apparatus (SCBA) from Air One
Equipment, Inc. is $13,500.00. There are sufficient funds budgeted ($180,000) and available
($58,388.35) in the General Fund, Fire Department, Station 3 Ambulance, account number 010-
2802-735.92-46,project number 289540, to make this purchase.
LEGAL IMPACT
WwThe proposed contract requires an exception to the procurement ordinance.
ALTERNATIVES
1. Purchase the three self contained breathing apparatus (SCBA) from Air One Equipment,
Inc.
2. Solicit bids for similar products and have a mix of equipment for this use.
Respectfully submitted for Council consideration.
MWF/wmb