HomeMy WebLinkAbout05-267 Resolution No. 05-267 RESOLUTION APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH MARTAM CONSTRUCTION, INC. FOR CLARK STREET WATER MAIN PROJECT WHEREAS, the City of Elgin has heretofore entered into a contract with Martam Construction, Inc. for the Clark Street Water Main Project; and WHEREAS,it is necessary and desirable to modify the terms of the contract as is described in Change Order No. 1, attached hereto. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that Olufemi Folarin,City Manager,be and is hereby authorized and directed to execute Change Order No. 1,a copy of which is attached hereto and made a part hereof by reference. s/Ed Schock Ed Schock, Mayor Presented: September 14, 2005 Adopted: September 14, 2005 Omnibus Vote: Yeas: 6 Nays: 0 Attest: s/Dolonna Mecum Dolonna Mecum, City Clerk ALVORD, BURDICK&HOWSON, L.L.C. ENGINEERS CHICAGO, IL CHANGE ORDER NO. 1 AND FINAL THE CITY OF ELGIN SHEET 1 OF 5 PROJECT: CLARK STREET WATERMAIN CHANGE ORDER NO. 1 AND FINAL LOCATION: Elgin, Illinois CONTRACTOR: Martam Construction, Inc. DATE: July 11, 2005 A. DESCRIPTION OF CHANGES INVOLVED 1. Furnish and install 48" diameter valve vault, install 4" Owner furnished gate valve, and abandon 4" diameter water main all at intersection of Clark Street and Wing Street. Add: $4,306.77 2. Directional bore fiber optic conduit under Union Pacific Railroad. Add: $3,200.00 3. Hot tap existing 10" watermain in State Street at Frazier Avenue to interconnect to existing 24" watermain in Frazier Avenue. Add: $3,000.00 4. Bypass pump sanitary sewage from broken unmarked 12" sanitary sewer at jacking pit at approximate Station 53+75. Add: $3,108.45 5. Furnish and install 34 lineal feet of 20" storm sewer at McClure Avenue and Goethe Street, approximate Station 47+25 @ $115.00/LF. Add: $3,910.00 6. Furnish and install 22 lineal feet of 20" D.I.P. storm sewer at jacking pit @$115.00/LF. Add: $2,530.00 7. Grind 1-1/2" and overlay Murray Avenue, from McClure Avenue to Clark Street; Clark Street from Murray Avenue to Wing Street; and McClure Avenue, from Goethe Street to receiving pit at approximate Station 51+75 for a total of 3,000 square yards @$9.50/square yard. Add: $28,500.00 8. Undercut 38 cubic yards at intersection of Buckeye Street and Clark Street @ $52.00/cubic yard. Add: $1,976.00 9. Contract Quantity Adjustments based on Final Quantities - See next sheet Delete: $141,660.00 SHEET 2 OF 5 Change Order No. 1 and Final City of Elgin Clark Street Watermain B. REASON FOR CHANGES REVISION IN PRICE 1. Structure and valve required to abandon old 4" Add: $ 4,306.77 diameter water main at intersection of Clark Street and Wing Street 2. Directional boring required to install fiber optic Add $ 3,200.00 conduit under Union Pacific Railroad. 3. Hot tapping existing 10" watermain in State Street Add: $ 3,000.00 at Frazier Avenue required to avoid interrupting water supply to businesses along State Street. 4. Bypass pumping required to avoid flooding jacking Add: $ 3,108.45 pit with sanitary sewage from a damaged unmarked 12" sanitary sewer. 5. Replacement of 34 lineal feet of 20" storm sewer at Add: $ 3,910.00 McClure Avenue and Goethe Street required to satisfy IEPA watermain and sewer separation requirement. 6. Replacement of 22 lineal feet of 20" D.I.P. storm Add: $ 2,530.00 sewer at jacking pit required to satisfy IEPA watermain and sewer separation requirement. 7. Grind 1-1/2" and overlay Murray Avenue, Clark Add: $ 28,500.00 Street, and McClure Avenue required to restore the streets. 8. Undercut at intersection of Buckeye Street and Add: $ 1,976.00 Clark Street required to replace unsuitable soil. 9. Contract quantity adjustments based on final Delete:$141,660.00 contract quantities to tv • Plan Unit Quantity Percent " Contract Contract 7 p Item �4 ' t 9 l tgmount fn fro t unit Quantity Pd Complete f Total Addition Credit m ' 1 Twenty Four(24')Inch Diameter Pipe In Trench L.F 3,676 133 3676 100.00 488,908.00 _ 0.00 0.00 N ET 0 5. n LF 100 223 100 100.00 22,300.00 0.00 0.00 2 Twenty Four(24')Inch Diameter Pipe in Casing ,CD 3 Thirty Six(36')Inch Diameter Steel Casing-Rail Road Crossing LF 100 480 100 100.00 48,000.00 0.00 0.00 Z 4 Connection to 6'Main at St.40+00(W/saddle,valve&Vault) LS 1 5,800 1 100.00 5,800.00 0.00 0.00 tp O 5 Connection to existing 24"and 10"Mains at State Street 8,Frazier Avenue(W/saddle,tee valve and vault) LS 1 18,000 1 100.00 18,000.00 0.00 0.00 3 8 Replace Catch Basin Each 1 1,800 1 100.00 1,800.00_ 0.00 0.00 N 7 24'Inline Butterfly Valve In Vault Each 3 9,300 3 100.00 27,900.00_ 0.00 0.00 p, 8 Fire Hydrant Assembly Each 3 3,200 3 100.00 9,600.00 0.00 0.00 -_n 9 Air Release Manhole Each 2 4,800 2 100.00 9,600.00 0.00 0 00 N 10 8'Dia.Sewer Replacement L.F. 323 32 227 70.28 7,264.00 0.00 (3,072.00) 11 10'Dia.Sewer Replacement L.F. 15 85 50 333.33 3,250.00 2,275.00 0.00 12 12'Dia.Sewer Replacement L.F. 64 70 55 85.94 3,850.00 0.00 (630.00) 13 Granular Trench Backfill C.Y. 4,851 20 4573 94.27 91,460.00 0.00 (5,560.00) 14 Roadway Pavement Removal S.Y. 1,960 6 1226 62.55 7,356.00 0.00 (4,404.00) . 15 Roadway Pavement Replacement S.Y. 1,960 26 1226 62.55 31,876.00 0.00 (19.084.00) 16 Bituminous Treated Earth Surface Roadway Removal S.Y. 7,200 6 7230 100.42 43,380.00 180.00 0.00 17 Bituminous Treated Earth Surface Roadway Replacement S.Y. 7,200 8 0 0.00 0.00 0.00 (43,200.00) • 18 Curb and Gutter Removal LF. 360 6 1170 325.00 7,020.00 4,860.00 0.00 19 Curb and Clutter Replacement . ,S.F, 360 22 1170 326.00 25,740.00 17,820.00 0.00 • y 20 Sidewalk Removal • S.F. 3,875 2 4550 117.42 6,825.00 1,012.50 0.00 21 Sidewalk Replacement S.F. 3,875 5 4550 117.42 20,475.00 3,037.50 0.00 22 Asphalt Driveway Removal S.Y. 52 10 228 438.46 2,280.00 1,760.00 0.00 23 Asphalt Driveway Replacement S.Y. 52 40 228 438.46 9,120.00 7,040.00 0.00 24 Concrete Driveway Removal S.Y. 40 10 40 100.00 400.00 0.00 0.00 25 Concrete Driveway Replacement S.Y. ' 40 58 40 100.00 2,240.00 0.00 0.00 26 Topsolling and Sodding S.Y. 1,000 6 1000 100.00 6,000.00 0.00 0.00 27 Topsoiling and Seeding S.Y. 350 4 350 100.00 1,225.00 0.00 0.00 28 Sediment and Erosion Control LS. • 1 3,000 0 0.00 0.00 0.00 (3,000.00) • 29 Traffic Control Protection LS. 1 74,500 1 100.00 74,500.00 0.00 0.00 30 Temporary Surface Over Trench S.Y. 4,360 4 0 0.00 0.00 0.00 (17,440.00) 31 Video Filming LS. 1 1,200 1 100.00 1,200.00 0.00 0.00 . 32 Ductile Iron Pipe House Sewer Replacement LF. 1,325 25 516 38.94 12,900.00 0.00 (20,225.00) 33 2-1/2"Diameter Fiber Optic Duct LS. I 113.900 1 100.00 113,900.00 0.00 0.00 • 33a Auger Under Trees Each 10 100, 0 0.00 0.00 0.00 (1,000.00) • INDETERMINATE ITEMS 34 Granular Foundation Material C.Y. 100 20 0 0.00 0.00 0.00 (2,000.00) 35 Class'B'Concrete C.Y. 20 20 0 0.00 0.00 0.00 (400.00) 38 Removal and Disposal of Petroleum Contaminated Soll C.Y. '50 30 0 0.00_ 0.00 0.00 (1,500.00) 37 Fluorocarbon Ruber(Viton Gasket) Each 10 100 0 0.00 0.00 0.00 (1,000.00) 38 Rock Excavation C.Y. 20 50 0 0.00 0.00 0.00 (1,000.00) 39 Sewer Manhole Replacement Each 2 2,000 0 0.00 0.00 0.00 (0,000.00) 40 Hand Mining LF. 50 100 0 0.00 0.00 0.00 (5,000.00) 41 Replacement of Existing Lead House Water Service with 1'Copper Pipe Each 47 800 17 36.17 13,600.00 0.00 (24,000.00) 42 Replacement of Existing Lead House Water Service with 1-1/2'Copper Pipe Each 3 900 0 0.00 0.00 0.00 (2,70000) 43 Replacement of Existing Lead House Water Service with 2'Copper Pipe Each 3 1.000 0 0.00 0.00 0.00 (3,000.00) 44 Connection to Existing 24'and 10"Mains at State Street and Frazier Avenue(W/24'x10-tee,tee,valve and vault) LS. 1 18,000 0 0.00 0.00 0.00 (18,000.00) to . 45 Pavement Replacement-6'Base Course,3'Asphalt S.Y. 7,200 19 7,230.00 100.42 137,370.00 570.00 0,00 II . rn 1,255,139.00 38,555.00 (180,215.00) -I Net Quantity Adjustment (141,660.001 W 0 71 C11 SHEET 4 OF 5 Change Order No. 1 and Final City of Elgin Clark Street Watermain C. CHANGE ORDER CONDITIONS 1. This Change Order, unless otherwise provided herein, does not relieve the Contractor from strict compliance with the guarantee provisions of the Original Contract,particularly those pertaining to performance and operation of equipment. 2. The Contractor expressly agrees that he will place under coverage of his Performance and Payment Bonds and Contractor's Insurance, all work covered by this Change Order. The Contractor agrees that it will include all work covered by this Change Order in the scope of coverage of its performance and payment bonds and Contractor's insurance immediately upon execution of this Change Order by city. 3. The Contractor waives all rights to claims against the Owner for any indirect costs associated with this or any other change order. D. ADJUSTMENTS IN AMOUNT OF CONTRACT 1. Amount of Original Contract $ 1,396,799.00 2. Amount of Contract, not including this Change Order $ 1,396,799.00 3. Deletion to Contract due to this Change Order No.1 and FINAL ($ 91,128.78 ) 4. Amount of Contract including this Change Order $1,305,670.22 5. Percentage of change from original Contract price 6.5% Reduction E. REASON FOR CHANGE 1. Refer to Section A DESCRIPTION OF CHANGES INVOLVED and Section B REASON FOR CHANGES. 2. The circumstances necessitating the change in performance were not reasonably foreseeable at the time the original contract was executed; the changes contemplated herein are germane to the original contract as signed; and this change order is in the best interests of the City of Elgin and is authorized by law. SHEET 5 OF 5 Change Order No. 1 and Final City of Elgin Clark Street Watermain RECOMMENDED FOR ACCEPTANCE BY ALVORD, BURDICK&HOWSON L.L.C.: By: 12f7 7/2 2/vr— Bon G. Mui, Partner Date ACCEPTED: CONTRACTOR: MARTAM CONSTRUCTION, INC. By. —,�- 7—Z6 —p Tamas Kutrovatz, President Date isLOIlk THE CITY OF ELGIN: 1 _ — `' — &OS 0 : . anager Date > ` �§ A enda Item No City of Elgin g L osi August 19, 2005 G TO: Mayor and Members of the City Council 4. ' _�. FINANCIALLY STABLE CITYGOVERNMENT EFFICIENT SERVICES. FROM: Olufemi Folarin, City Manager AND QUALITY INFRASTRUCTURE Kyla Jacobsen, Water System S perintendent SUBJECT: Final Payment, Authorization of Change Order No. 1 And Acceptance of Clark Street Water Main Project PURPOSE The purpose of this memorandum is to provide the Mayor and members of the City Council with information to consider final payment, authorization of Change Order No. 1, and acceptance of the Clark Street Water Main Project completed by Martam Construction, Inc. RECOMMENDATION It is recommended that the City Council accept the completed Clark Street Water Main Project and authorize both the final payment in the amount of$482,205.32 and the execution of the final Change Order No. 1 in the amount of$91,128.78 (deduct) with Martam Construction, Inc. BACKGROUND The Clark Street Water Main Project, previously titled State Street to Lawrence Avenue Water Main Phase 2, consists of 3,776 feet of 24 inch diameter water main on Murray Avenue and on Clark Street from Murray to State Street (Route 31). This main has been connected to the newly installed 24-inch Riverside to State Street water main. This completes the transfer main from Riverside Water Treatment Plant to the Airlite plant reservoirs. On February 23, 2005, the City Council awarded a contract for the Clark Street Water Main Project to Martam Construction, Inc. of Elgin, Illinois. Change Order No. 1 (Final) covers 9 items, 8 additives and 1 deductive. The additive items includes: furnish and install 48-inch diameter valve vault, directional bore fiber optic conduit under Union Pacific Railroad, hot tap existing 10-inch water main in State Street at Frazier Avenue to interconnect to existing 24-inch water main in Frazier Avenue, bypass pump sanitary sewage from broken unmarked 12-inch sanitary sewer at jacking pit, furnish and install 34 lineal feet of 20-inch storm sewer at McClure Avenue and Goethe Street and 22 lineal feet of 20-inch e` ductile iron pipe at jacking pit, grind and overlay Murray Avenue from McClure to Clark Street; Clark from Murray Avenue to Wing Street; and McClure Avenue, from Goethe Street to the receiving pit. The total addition to the contract is $50,531.22 • J Acceptance and Change Order No. 1 for Clark Street Water Main AO"""' August 19, 2005 Page 2 The deductive item includes 96 lineal feet of 8-inch diameter sewer replacement, 9 lineal feet of 12-inch diameter sewer replacement, 278 cubic yards of granular trench backfill, 732 square yards of roadway pavement removal and replacement, 7,200 square yards of bituminous treated surface roadway replacement, sediment and erosion control, temporary surface over trench, 809 lineal feet of ductile iron house sewer replacement, auger under trees, 100 cubic yards of granular foundation material, 20 cubic yards of class "B" concrete, 50 cubic yards of removal and disposal of petroleum contaminant soil, 10 viton gaskets, 20 cubic yard of rock excavation, 2 sewer manhole replacement, 50 lineal feet of hand mining, replacement of 30 water service connections of 1-inch copper pipe, replacement of 3 water service connections of 1 1/2 -inch copper pipe, replacement of 3 water service connections of 2-inch copper pipe, and connection to the existing 24-inch and 10-inch water main in State Street at Frazier Avenue. The total deduct items from the contract is $141,660. The net deduct from the contract is $91,128.78. Attached is a copy of change order No. 1 (Final) for your consideration. This project was successfully completed by Martam Construction, Inc. in accordance to the plans and specifications provided by the consultant engineer, Alvord, Burdick & Howson. elk GROUPS/INTERESTED PERSONS CONTACTED None 91/A__ FINANCIAL IMPACT The final contract amount with Martam construction for project number 409649 is as follows: Original Contract Amount $1,396,799 Change Order No. 1 (Deduct) $ <91,129> Revised Contract Amount $1,305,670 Previous Payments $ 823,465 Final Payment $ 482,205 The final accounting for the project is as follows: Budget: Account Number Amount 365-4000-795.93-41 $980,000 420-0000-771.92-41 $520,000 Total Budget $1,500,000 ,, Expenditures Original Contract $1,396,799 Acceptance and Change Order No. 1 for Clark Street Water Main ' ' August 19, 2005 Page 3 Change Order No. 1 <$91,129> Final Contract $1,305,670 Balance Remaining $ 194,330 \ 2eIMPACT . ALTERNATIVES 1. Accept this deductive change order. 2. Do not accept this change order. Respectfully submitted for Council consideration. KJ/PLB Attachment