HomeMy WebLinkAbout05-232 1
Resolution No.05-232
RESOLUTION
APPROVING CHANGE ORDER NO. 1 IN THE CONTRACT WITH
SHALES McNUTT CONSTRUCTION FOR
THE FULTON STREET PARKING DECK
WHEREAS, the City of Elgin has heretofore entered into a contract with Shales McNutt
Construction for the design and construction of the Fulton Street Parking Deck; and
WHEREAS,it is necessary and desirable to modify the terms of the contract as is described
in Change Order No. 1, attached hereto.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
ELGIN,ILLINOIS,that Olufemi Folarin,City Manager,be and is hereby authorized and directed to
execute Change Order No. 1,a copy of which is attached hereto and made a part hereofby reference.
s/Ed Schock
Ed Schock, Mayor
Presented: July 27, 2005
Adopted: July 27, 2005
Omnibus Vote: Yeas: 7 Nays: 0
Attest:
s/Dolonna Mecum
Dolonna Mecum, City Clerk
1
ELGIN, ILLINOIS
PROJECT 039528
CHANGE ORDER No. 1
CONTRACT: Fulton Street Parking Deck Project
SCOPE: This Change Order No. 1 will provide additional items necessary to add a surface
parking lot adjacent to the parking deck and streetscape improvements to the Fulton Street
Parking Deck Project.
This change order affects a contract entered into between the City of Elgin and Shales McNutt
Construction, Elgin, IL, an Illinois corporation, dated March 11, 2005 for the Fulton Street
Parking Deck Project.
REASONS FOR CHANGE: This Change Order No. 1 is in the best interests of the City and is
authorized by law. The necessity for the changes was unforeseen at the time of the original
agreement, and the changes contemplated hereby are germane to the original agreement.
SUMMARY OF CHANGES IN CONTRACT AMOUNT: The original contract will be
amended as to scope and costs as provided by Attachment A hereto:
See Attachment A
The original contract with Shales McNutt Construction is $8,673,800.00. By reason of Change
Order No. 1, the contract for the Fulton Street Parking Deck Project will be increased in the
amount of six hundred seventy three thousand two hundred seventy nine and 55/100 dollars
($673,279.55) or approximately 7.76% of the original contract amount. The new contract
amount, inclusive of Change Order No. 1 is nine million three hundred forty seven thousand
seventy nine and 55/100 dollars ($9,347,079.55).
CHANGE ORDER No.1
June 22,2005
Page 2
OTHER CONTRACT PROVISIONS: All other contract provisions shall remain the same.
Agreed to this day of -j' u _, 2005.
Recommended:
ENGINEERING DIVISION
By:
Title: _- �
Date: 7— C
Accepted:
SHALES MCNUTT CONSTRUCTION
Party of the Second Part(Contractor)
By:
Title: V ,�•
Date:
Approved:
CITY OF ELGIN
Party of the First Part(Owner)
By: c
Title: s
Date: S
EliShales MNut
425 Renner Drive Elgin.It OB123 P)847-622-1214 F)847-622-1224 www.shelesmcnutt.cani
February 3, 2005
Mr. Steve Pertzborn, P.E.
Senior Engineer
City of Elgin
150 Dexter Court
Elgin, IL 60120-5555
Re: Fulton Street Parking Structure
January 20, 2005 South Lot Breakdown - REVISED
Dear Steve,
Per your request, our breakdown for the $346,000 pricing for the on-grade parking lot to
the south of the proposed new parking structure contained within my letter to Dave
Lawry dated January 20, 2005 is as follows. I have added quantities at Dave Lawry's
request.
Description Amount Percent
Supervision- PM, Assist. PM, Superint. $ 20,800 6.01%
General Conditions- Traffic cntr'l, road clean, etc. $ 10,465 3.02%
Bonds - $ 3,260 .94%
Site Utilities- 971f 12" Storm $ 28,065 8.11%
2ea 2' dia. Catch basin
lea 4' dia. Catch basin
lea 5' dia. Manhole
Survey, layout, tbf
Landscaping- Allowance $ 30,000 8.67%
Site Demolition- 1401f curb/gutter $ 14,944 4.32%
1670sy asphalt
2205sf concrete
Haul off debris
Excavation/Structural Fill - Excavate haul off 838cy$ 56,674 16.38%
Excavate / structural fill 360cy
Sub-grade asphalt, sidewalks, curbs, aprons, retaining walls 2,612sy
Granular structural fill place €t compact 2,469 tons
Top soil re-spread 320cy
Asphalt- 1960sy of4l' asphalt $ 29,890 8.64%
Site Concrete/Retaining Walls- 3061f retaining wall $ 103,800 30.00%
880 if of curb
1875sf of sidewalk
2ea Concrete aprons
Electrical- 2'poles $ 7,000 2.02%
Overhead/Profit/Fee- $ 20,760 6.00%
Civil/Architectural Design Fees- $ 20,342 5.88%
SUN McNutt
425 Renner Drive Elgin,IL 60123 P);47-622"171'4 04T672-1224 www.shales mcnattxam CORSIPUCUOR
Proposal Total- $346,000 100%
Please review this information and let me know if you have any questions. We took
forward to working with you on this project.
Sincerely,
John M. Shales
Shales McNutt Construction
E3snales mcnutt
425 Renner Drive, Elgin, IL 60123 P) 847-622-1214 F) 847-622-1224 W) www.shalesmcnutt.com Construction
May 24, 2005
Mr. Steve Pertzborn
City of Elgin
150 Dexter Court
Elgin, IL 60120
Re: Fulton Street Parking Deck
Fagade Lighting
Dear Steve,
Per our previous conversation, we have developed pricing to enhance the lighting along
the north and south fagade of the structure. This proposal provides for (22) surface
mounted light fixtures mounted between the second and third levels and will provide
up/down lighting on the elevation. We have included the additional cost of$590.00 for
the custom color.
The following represents the costs associated with this work:
Associated Electrical- $26,410.00
SMC Mark-Up (6%)- $ 1,584.60
SMC Bond (1%)- $ 279.95
Total this CO Request- $28,275.00
If this proposal is acceptable to the City of Elgin, we will forward a formal change order
for signature.
We thank you in advance for your time and consideration in this matter.
Sincerely,
Steve Hendri son
Shales McNutt Construction
Cc: J. Shales
D. Schmitt
File
E3shales menutt
425 Renner Drive, Elgin, IL 60123 P) 847-622-1214 F) 847-622-1224 W) www.shalesmcnutt.com Construction
May 24, 2005
Mr. Steve Pertzborn
City of Elgin
150 Dexter Court
Elgin, IL 60120
Re: Fulton Street Parking Deck
Entry Lighting
Dear Steve,
Per our previous conversation, we have developed pricing to provide additional lighting
at the (2) vehicle entrances (3 per entrance) and upgraded fixtures at each pedestrian
entrance. This proposal provides for (10) gooseneck light fixtures at the locations noted
above.
The following represents the costs associated with this work:
Associated Electrical- $22,530.00
SMC Mark-Up (6%)- $ 1,351.80
SMC Bond (1%)- $ 238.82
Total this CO Request- $24,121.00
If this proposal is acceptable to the City of Elgin, we will forward a formal change order
for signature.
We thank you in advance for your time and consideration in this matter.
Sincerely,
Steve Hen ' son
Shales McNutt Construction
Cc: J. Shales
D. Schmitt
File
Jun 27 2005 10: 00RM HP LASERJET 3330 P• 3
Shales hinuit
425 Renner Drive, Elgin,IL 60123 P) B47-622-1214 F)847-622-1224 W)www.shalesmcnutt.corn construction
June 27, 2005
Mr. Steve Pertzborn
City of Elgin
150 Dexter Court
Elgin, IL 60120
Re: Fulton Street Parking Deck Revised
C.I.P. Planters
Dear Steve,
Per our previous conversation, we have developed pricing for the (7)C.I.P. planters that are to be
installed along Fulton and Prairie Street. This proposal is based on the schematic design by the
City of Elgin and structural design by Carl Walker and includes a standard gray concrete color.
The following represents the costs associated with this work:
T. Manning Concrete- $54,972.00
V3 Construction Group(budget)$ 3,200.00
Railings (budget)- $ 13,200.00
SMC Mark-Up (6%)- $ 4,282.32
SMC Bond (1%)- $ 756.54
Total this CO Request- $76,411.00
If this proposal is acceptable to the City of Elgin, we will forward a formal change order for
signature.
We thank you in advance for your time and consideration in this matter.
Sincerely,
Steve Hendric on
Shales McNutt Construction
Cc: J. Shales
D. Schmitt
File
snares mcnuit
425 Renner Drive, Elgin, IL 60123 P) 847-622-1214 F) 847-622-1224 W)www.shalEsmcnutt.com Construction
May 24, 2005
Mr. Steve Pertzborn
City of Elgin
150 Dexter Court
Elgin, IL 60120
Re: Fulton Street Parking Deck
Brick Pavers
Dear Steve,
Per our previous conversation, we have developed pricing to provide brick pavers along
Fulton and Prairie Streets. This proposal is based on the design and paver type
("Embassy Row") that was provided to us by the City of Elgin and includes the reduction
of sod for these areas.
The following represents the costs associated with this work:
Pedersen Co.- $18,806.00
SMC Mark-Up (6%)- $ 1,128.36
SMC Bond (1%)- $ 199.34
Total this CO Request- $20,134.00
If this proposal is acceptable to the City of Elgin, we will forward a formal change order
for signature.
We thank you in advance for your time and consideration in this matter.
Sincerely,
Steve Hendric son
Shales McNutt Construction
Cc: J. Shales
D. Schmitt
File
shales meNutt
425 Renner Drive, Elgin, IL 6D123 P) 847-622-1214 E) 847-622-1224 W) www.shalEsmcnutt.com construction
May 24, 2005
Mr. Steve Pertzborn
City of Elgin
150 Dexter Court
Elgin, IL 60120
Re: Fulton Street Parking Deck
Irrigation System
Dear Steve,
Per our previous conversation, we have developed pricing to provide an irrigation
system within (7) planters along Fulton and Prairie Streets. This proposal is based on
the design that was provided to us by the City of Elgin.
The following represents the costs associated with this work:
Pedersen Co.- $11,900.00
Associated Electrical- $ 970.00
FJ Bero & Co.- $ 5,680.00
SMC Mark-Up (6%)- $ 1,113.00
SMC Bond (1%)- $ 196.63
Total this CO Request- $19,860.00
If this proposal is acceptable to the City of Elgin, we will forward a formal change order
for signature.
We thank you in advance for your time and consideration in this matter.
Sincerely,
Steve Hendr kson
Shales McNutt Construction
Cc: J. Shales
D. Schmitt
File
uun eU eUUS 2: U7PM HP LRSERJET 3330 p. 2
snales menutt
425 Renner Drive, Elgin, IL 69123 P) 847-622-1214 F)847-622-1224 W) www.shelesmunutt.cum construction
June 20, 2005
Mr. Steve Pertzborn
City of Elgin
150 Dexter Court
Elgin, IL 60120
Re: Fulton Street Parking Deck
Fulton Street Additional Storm "REVISED"
Dear Steve,
Per discussion between our civil designer(V3) and Mime Hall from the City of Elgin
Engineering Department, the following represents pricing for revisions to the previously
submitted 36" storm line. The revision incorporates a reduction in pipe diameter(36"to 30")
and an additional 40'-0"of storm line. Please note that we have added an allowance of
$3,500.00 to cover the cost of sawcutting and pavement patching.
The following represents the costs associated with this work:
River Valley Land Improvement Co.- $32,216.00
Paving Allowance (SMC)- $ 3,500.00
SMC Mark-Up(6%)- $ 2,142.96
SMC Bond (1%)- $ 376.59
Total this CO Request- $38,237.55
If this proposal is acceptable to the City of Elgin, we will forward a formal change order for
signature_
We thank you in advance for your time and consideration in this matter.
Sincerely,
Steve Hend ckson
Shales McNutt Construction
Cc: J. Shales
D. Schmitt
File
shales mcnutt
425 Renner Drive, Elgin, IL 60123 P) 847-622-1214 F) 847-622-1224 W) www.shalesmcnutt.com Construction
May 24, 2005
Mr. Steve Pertzborn
City of Elgin
150 Dexter Court
Elgin, IL 60120
Re: Fulton Street Parking Deck
Additional Lot Signage @ Prairie Street
Dear Steve,
Per our previous conversation, we have developed pricing for the additional car counter that
is to be placed at the entrance drive along Prairie Street. We did not include the optional
back lit neon sign as noted on Parking Systems proposal.
The following represents the costs associated with this work:
Parking Systems, Inc.- $1,461.00
Associated Electrical- $1,490.00
SMC Mark-Up(6%)- $ 177.06
SMC Bond (1%)- 31.28
Total this CO Request- $3,159.00
If this proposal is acceptable to the City of Elgin, we will forward a formal change order for
signature.
We thank you in advance for your time and consideration in this matter.
Sincerely,
Steve Mend kson
Shales McNutt Construction
Cc: J. Shales
D. Schmitt
File
Jun 27 2005 10: 00AM HP LRSERJET 3330 p' 4
Shales MOUtt
425 Renner Drive, Elgin,IL 60123 P) 847-622-1214 F)847-622-1224 W)www.shalesmcnuti.com construction
June 27,2005
Mr. Steve Pertzborn
City of Elgin
150 Dexter Court
Elgin, IL 60120
Re: Fulton Street Parking Deck
Redesigned Center Retaining Wall REVISED
Dear Steve,
Per our previous conversation, we have developed pricing for the redesigned single retaining wall to
be installed along the center of the south parking lot. This price includes a standard gray color
concrete without form liner(see summation sheet for alternate pricing). This price also includes the+/-
170'-0°of concrete"edge"to be installed east of the retaining wall. We have deducted the costs for
the single retaining wall that was included in our breakdown proposal dated February 3,2005
The following represents the costs associated with this work:
T. Manning Concrete.- $ 40.852.00
Deduct for single wall (+/- 142'-0"L x6'-0"H x$30.001Sq. Ft.)- ($ 25,560.00)
V3 Construction Group- $ 23,574.50
SMC Mark-Up (6%)- $ 2,331.99
SMC Bond (1%)- $ 411.98
Total This CO Request $ 41,610.00
If this proposal is acceptable to the City of Elgin,we will forward a formal change order for signature.
We thank you in advance for your time and consideration in this matter.
Sincerely,
Steve Hendn son
Shales McNutt Construction
Cc: J. Shales
D. Schmitt
File
Jun 27 2005 10: 00AM HP LRSERJET 3330 P. 5
Shales McNutt
425 Renner Drive.Elgin. IL 60123 P) 847-622-1214 F)847-622-1224 V9)www.shelesmcnutt.cnm construction
June 27, 2005
Mr. Steve Pertzborn
City of Elgin
150 Dexter Court
Elgin, I L 60120
Re: Fulton Street Parking Deck
Colored Concrete/Form Liner
Dear Steve,
Per our previous conversation,we have developed pricing to provide colored concrete("Buff
Color") and farm liner for the two(2)south lot retaining walls and the seven (7) concrete planters
The following represents the costs associated with this work:
T. Manning Concrete- $70,495.00
SMC Mark-Up (6%)- $ 4,229.70
SMC Bond (1%)- $, 747.25
Total this CO Request- $75,472.00
If this proposal is acceptable to the City of Elgin, we will forward a formal change order for
signature.
We thank you in advance for your time and consideration in this matter.
Sincerely,
Steve Hendrickson
Shales McNutt Construction
Cc: J. Shales
D. Schmitt
File
City of Elgin Agenda Item No.
0
_0
July 8, 2005
FINANCIALLY STABLE CITYCiCNERNMEM
TO: Mayor and Members of the City Council
EFFICIENT INSFRA TFUI
AND QUALIT V INFRASTRUCTURE
FROM: Olufemi Folarin, City Manager
David Lawry, General Services irector
SUBJECT: Change Order No. 1, Fulton Street Parking Deck
PURPOSE
The purpose of this memorandum is to provide the Mayor and members of the City Council with
information to consider authorizing Change Order No. 1 to the contract with Shales McNutt
Construction(SMC) for the design and construction of the Fulton Street Parking Deck.
RECOMMENDATION
It is recommended that City Council authorize execution of Change Order No. 1 in the amount of
$673,279.55 to the contract with SMC for design and construction of the Fulton Street Parking
Deck.
BACKGROUND
At its meeting on March 9, 2005, the City Council awarded a contract to Shales McNutt
Construction (SMC) for the design and construction of a new 504 stall parking deck at 245
Fulton Street. The total contract award to design and construct the deck is $8,673,800. As
mentioned in the initial council memorandum, the construction of the proposed 53 stall surface
lot to the south of the new deck was not included in the contract award. The subject change
order will add this to SMC's contract. The proposed cost for a "basic" parking lot is $346,000.
This includes the 53 additional parking stalls, two concrete retaining walls and landscaping
sufficient to meet city code requirements.
The City received a request from the DNA for consideration of items to improve the aesthetic
appeal of the parking deck. In addition, staff requested SMC to provide pricing for several
upgrade alternates to the parking deck site. The DNA requested alternates include aluminum
framing for the exterior wall openings ($208,446), fagade lighting on the exterior of the structure
($28,275) and enhanced entry lighting ($24,121). Staff does not recommend the aluminum
framing because the wall panels would need to be redesigned to meet the minimum requirement
for wall opening area which would not be met if the framing is installed in the openings. This
C.O. # 1,Fulton St. Parking Deck
July 8, 2005
Page 2
redesign would delay the project by at least 3 months and result in certain construction activities
to be suspended over the winter months. The staff suggested alternates include, cast in place
concrete planter boxes on Fulton St. and Prairie St. ($76,411), brick pavers adjacent to planter
boxes and sidewalk($20,134), an irrigation system for all landscaped areas ($19,860) and a taller
retaining wall between the two levels of the parking lot to facilitate landscaping installation and
maintenance ($41,610). In addition, staff requested alternates for the use of form liners to give
the retaining walls and planter boxes the appearance of a segmented block/stone wall ($42,684),
integral colorized concrete ($32,788) to give the concrete a more natural stone color and
additional electronic signage for the Prairie St. deck entrance ($3,159) to indicate if the deck is
full.
The final alternate item is for installation of approximately 150 L.F. of 36 inch storm sewer on
Fulton St. ($38,237.55). This will provide for the separation of the existing combination
storm/sanitary sewer along the street in front of the parking deck. It is being recommended that
this work be done at this time because Fulton St. is being reconstructed in front of the deck. The
cost to install this storm sewer would be paid from the sewer fund.
A copy of change Order No. 1 is attached as Exhibit A.
COMMUNITY GROUPSANTERESTED PERSONS CONTACTED
The DNA contacted City Staff regarding aesthetic improvements to the parking deck. A copy of
the letter is attached as Exhibit B.
TINANCIAL IMPACT
Change Order No. 1 with SMC will total $673,279.55. The total budget for the Fulton St.
Parking Deck Project is $10.542 million. To date $9,598,658 has been encumbered for this
project leaving a balance of$943,342 to fund Change Order No. 1. The installation of the storm
sewer ($38,237.55) will be funded from the Sewer portion of the 2001 GO Bond Fund, account
number 381-4200-795.92-41, "Distribution Systems",.project number 339691, "2005 Combined
Sewer Separation", which has a budget and available balance of$165,000. The remainder of the
change order ($635,042) will be funded from the Riverboat Fund, account number 275-0000-
791.92-36, "Buildings/Structures", project number 039528, "Fulton Street Parking Deck" which
has a budget of$2,175,285 and $942,714 available. The revised contract amount with SMC will
total $9,347,079.55.
L GALIMPACT
V�Kone
r
C.O. # 1, Fulton St. Parking Deck
July 8, 2005
Page 3
ALTERNATIVES
1. Approve Change Order No. 1 to the contract with SMC.
2. Do not approve Change Order No. 2 to the contract with SMC.
Respectfully submitted for Council consideration.
(do)
Attachments