HomeMy WebLinkAbout05-199 1
Resolution No.05-199
RESOLUTION
APPROVING CHANGE ORDER NO. 1 AND FINAL IN THE CONTRACT WITH
MARTAM CONSTRUCTION, INC.
(Lawrence and McClure Water Main Project)
WHEREAS, the City of Elgin has heretofore entered into a contract with Martam
Construction, Inc. for the Water Main on Lawrence Avenue from State Street to Airlite Water
Treatment Plant and McClure from Lawrence to Murray Avenue Project; and
WHEREAS,it is necessary and desirable to modify the terms of the contract as is described
in Change Order No. 1 and Final, attached hereto.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
ELGIN,ILLINOIS,that Olufemi Folarin,City Manager,be and is hereby authorized and directed to
execute Change Order No. 1 and Final,a copy of which is attached hereto and made a part hereof by
reference.
s/Ed Schock
Ed Schock, Mayor
Presented: June 22, 2005
Adopted: June 22, 2005
Omnibus Vote: Yeas: 7 Nays: 0
Attest:
s/Dolonna Mecum
Dolonna Mecum, City Clerk
ALVORD, BURDICK & HOWSON, L.L.C.
ENGINEERS CHICAGO, IL.
Change Order No. 1 and Final
City of Elgin SHEET 1 OF 12
PROJECT: Lawrence Avenue from State Street to Airlite Water
Treatment Plant Watermain
CHANGE ORDER NO . 1 AND FINAL
LOCATION: Elgin, Illinois
CONTRACTOR: Martam Construction, Inc .
DATE: May 2 , 2005
I . A. DESCRIPTION OF CHANGES INVOLVED
1 . Reduction of watermain diameter from 20-inch to 16-inch
diameter from Station 124+00 to Station 133+23
(Lawrence Avenue from Jackson Street to State Street) .
Item Bid
No . Description L. F . Price Total
61A 16-inch Pipe, In Trench 623 $ 82 $51, 086
62A 16-inch Pipe, In Casing 285 $174 $49, 590
Add: $100, 676
Deletion of 20-inch diameter pipe, in trench and in
casing is accounted for under subsection 16, final
quantity adjustments ( See Page 7 ) .
2 . Furnish and install two 8-inch service connections
between Stations 129+50 and 130+50 to comply with the
easement agreement between the City and Fox River Hills
Condominium ( Developer: Thomas Hartwell) for easement
granted to the City.
Add: $11 , 200 . 00
3 . Furnish and install 18 . 1 feet of 36" D. I . P. Storm Sewer
at Thomas Moore Drive and Country Knoll Lane . 30-inch
Storm Sewer shown on Contract Plans .
Add: $ 5, 506 . 12
4 . 6-inch sewer replacement and structure at Hubbard
Avenue .
Add: $ 2 , 905 . 00
Change Order No . 1 SHEET 2 OF 12
City of Elgin
Lawrence Avenue from State Street
to Airlite Water Treatment Plant Watermain
5 . Additional work for replacement of Thirteen (13 ) Lead
Water Services on Mc Clure Avenue .
Add: $ 6, 500 . 00
6 . Replace Brick manhole with 4-foot diameter precast
manhole, relocated to not be above Sanitary service
Connection, on Mc Clure Avenue .
Add: $ 1, 500 . 00
7 . Disconnection of sanitary service line from storm sewer
and Reconnection of sanitary sewer to City sanitary
sewer in Mc Clure Avenue .
Add: $ 3 , 200 . 00
8 . Repair of damaged fiber optic conduit in Mc Clure
Avenue .
Add: $ 1, 905 . 11
9 . Materials purchased by Contractor per the Contract but
not installed due to design changes and instead
delivered to the City. Design change required to
increase the capacity of the transfer line to meet
growing demand in the west zone .
Unit
Item Quantity Price Total
20-inch Butterfly Valve 1 $2 , 980 $2 , 980 . 00
Flushing Hydrant 2 $2 , 090 $4, 180 . 00
15% Mark -up $1, 074 . 00
$8, 234 . 00
Add: $8 , 234 . 00
10 . Additional 997 square yards of pavement restoration on
Hoxie Avenue . The original street was chip and seal and
could not be reasonably patched. Additional quantities
were required to pave the section of Hoxie Avenue
between Lawrence Avenue and Highland Avenue .
Add: $32 , 901 . 00
Change Order No . 1 SHEET 3 OF 12
City of Elgin
Lawrence Avenue from State Street
to Airlite Water Treatment Plant Watermain
11 . Additional 890 square yards of parking lot pavement
restoration at Airlite Water Treatment Plant .
Add: $30 , 800 . 00
12 . Removal and Replacement of 236 lineal feet of curb and
gutter at Airlite Water Treatment Plant .
Add: $ 4 , 012 . 00
13 . Credit to City for City response to resident complaint
regarding pavement patch at Lawrence Avenue and Crytal
Avenue .
Delete: $ 140 . 73
14 . Credit of City to paint eight (8) Fire Hydrants
installed by Contractor .
Delete : $ 600 . 00
15 . Additional control valve vault, interior piping, and
the Exterior Piping from watermain Station 7+05
(Stationing per Contract) to the Clear Water Reservoirs
(Nos . 1 & 2 ) at the Airlite Water Treatment Plant in
accordance with Drawings 1R1, 2R1, D5a, D6a, E1R1 and
E2R1 . (The deletion of the Contract quantities of
piping and appurtenances is listed under Subsection 5) .
a. Electrical
(2 ) 2 . 5 " Electrical Ducts
(2 ) 245 LF @ $7 . 50/LF $3 , 675 . 00
Concrete Encasement
8 . 5 CY @ $360/CY $3 , 060 . 00
Pull Box (4 'x4 'x2 ' ) $1, 800 . 00
Electrical for Vault and Building
$32 , 565 + 7 . 47% (Negotiated) $35 , 000 . 00
Subtotal $43 , 535 . 00
b. Add Control Vault Structure
Concrete Slab: 4 . 2 CY @ $700/CY $ 2 , 940 . 00
Concrete Walls : 11 . 75 CY @ $770/CY $ 9 , 047 . 50
Concrete Roof : 3 . 3 CY @ $1, 600/CY $ 5, 280 . 00
Excavation, Backfill and
Spoil Removal : 112 CY @ $26/CY $ 2 , 912 . 00
Shoring $ 3 , 000 . 00
Access Hatch $ 2 , 645 . 00
Change Order No . 1 SHEET 4 OF 12
City of Elgin
Lawrence Avenue from State Street
to Airlite Water Treatment Plant Watermain
Bilco Ladder $ 1 , 200 . 00
Reinforcing Steel
2 , 865 lbs x $1 . 60/lb $ 4 , 584 . 00
Subtotal $31, 608 . 50
c . Add Control Vault Piping and Valves
16-inch Solenoid Controlled
Throttling Valve, Cla-Val
Model No . 131-37BCDSYKCKK $19 , 205 . 00
16-inch Propeller Meter
Sparling Model No .
FM184-161-1-2-00
Register Model No . FT194 $ 5, 960 . 00
12-inch Butterfly Valve, Flanged $ 2 , 800 . 00
16-inch Victaulic Coupling $ 395 . 00
12-inch Victaulic Coupling $ 239 . 00
(2 ) 16-inch Flg x MJ Sleeve $ 1 , 360 . 00
(2 ) 12-inch Flg x MJ Sleeve $ 832 . 00
(2 ) 16-inch fig X PE 1 ' 9 " pipe $ 1 , 000 . 00
(4) 12-inch Flg x PE 2 ' 6" pipe $ 1, 600 . 00
12-inch Flg 5 ' 1" Spool $ 534 . 00
Labor for installation
and painting $ 8, 500 . 00
Subtotal $42 , 425 . 00
d. Outside Vault Structure, Piping and Valves
i) 20-inch Piping
Contract : 705 LF (Credit under Unit
Prices)
Revised: 965 LF
Add 155 LF
ii) Granular Backfill
Contract : 120 CY (Credit under Unit
Prices)
Revised 1500 CY
Add 1380 CY
iii) Pavement Removal and Replacement
Contract : 97 SY (Credit under Unit
Prices)
Revised: 305 SY
Add 208 SY
iv) 20-inch bends
Add: 45° bend, 11 1/4° Bend &
20 " x 16 " Reducer
Delete : 22 1/2° Bend & 20 " Tee
v) 20-inch Remotely Operated Valve and Vault
Contract : 1 Ea. (Credit under Unit
Prices)
Change Order No . 1 SHEET 5 OF 12
City of Elgin
Lawrence Avenue from State Street
to Airlite Water Treatment Plant Watermain
Revised: None
vi) Sewer Replacement
Contract : 18-inch Sewer, 22 LF (Paid
under change order)
Revised 8-inch Sewer, 20 LF
vii) Air Release Manhole
Contract : None
Revised: 1 EA.
viii) Clearwell Connection
Contract : 13 LF of 20-inch Pipe
(2 ) 20-inch 90° Bends
Revised: 3 LF of 16-inch Pipe
(2 ) 16-inch 90° Bends
ix) Clearwell Core Holes and Linkseals
Contract : For 20-inch Pipe
Revised For 16-inch Pipe
x) 16-inch Pipe & 16-inch Fittings
Contract : None
Revised: 64 LF of Pipe
(2 ) 16" x 12 " Tees
(2 ) 90° Bends
16" Tee
16" x 6" Tee
xi) 12-inch Pipe, in trench
Contract : None
Revised: 22 LF
xii) 16-inch Butterfly Valve and Vault
Contract : None
Revised: 4 EA.
xiii) Flushing Hydrants
Contract : 2 EA. (Credit under Unit
Prices)
Revised: None
xiv) Fire Hydrants
Contract : None
Revised: 1 EA.
xv) 20-inch Butterfly Valve Vault
Contract : 2 EA. (Credit under Unit
Prices)
Revised: None
xvi) Topsoiling and Sodding Restoration
(No Change in quantity or price - To be paid
at unit prices in Contract)
Summary of above subsection d(The Contractor will be
paid a Lump Sum Price for Work between Sta . 7+05 and
the Clearwell Connections, broken down in the following
manner) :
•
Change Order No . 1 SHEET 6 OF 12
City of Elgin
Lawrence Avenue from State Street
to Airlite Water Treatment Plant Watermain
Change
Order Unit
Item Description Quantity Price Total
i 20-inch Pipe 965 LF $ 82 $79, 130
ii Granular Backfill 1500 CY $ 19 $28, 500
iii Pavement Removal 305 SY $ 8 $ 2 , 440
Pavement Rep1 . 305 SY $ 36 $10, 980
iv Additional Bends $ 2 , 795
Deleted Bends <$5 , 560>
v 20-inch Remotely Operated Valve
vi 8-inch Sewer
Replacement 20 LF $ 28 $ 560
18-inch Sewer
Replacement 22 LF $69 $ 1, 518
vii Air Release Manhole 1 EA $2500 $ 2 , 500
viii Clearwell
Pipe (Net) 3 LF $ 82 $ 246
90° Bends 2 EA $ 790 $ 1, 580
ix Core Holes
(See Credits in next section)
x 16-inch Pipe 64 LF $ 82 $ 5, 248
& Fittings $ 5, 640
xi 12-inch Pipe 22 LF $ 68 $ 1, 496
xii 16-inch BF Valve 4 EA $5, 400 $21, 600
xiii Flushing Hydrants
xiv Fire Hydrant 1 EA $3 , 000 $ 3 , 000
xv 20-inch BF Valve
xvi Topsoiling and Sodding
(No Change)
Subtotal $161, 673
Prices Revised
Connection to Clear
Water Reservoir No . 1
Contract Price: $8, 500
Deletions :
6 . 5 LF of 20-inch Pipe <$533>
20-inch 90° Bend <$980>
Core Hole and Link Seal <$295>
Revised Price $6, 692
(Contract Item No . 5, Connection to Reservoir
No . 1, not paid, deleted from Contract . )
Change Order No . 1 SHEET 7 OF 12
City of Elgin
Lawrence Avenue from State Street
to Airlite Water Treatment Plant Watermain
Connection to Clear
Water Reservoir No . 2
Contract Price : $9 , 800
Deletions :
6 . 5 LF of 20-inch Pipe <$533>
20-inch 90° Bend <$980>
Core Hole and Link Seal <$295>
Revised Unit Price $7 , 992
(Contract Item No . 6 , Connection to Reservoir
No . 2 , not paid, deleted from Contract)
Total $176, 357
Summary of Item 15 .
15a. Electrical $ 43 , 535 . 00
15b. Structure $ 31, 608 . 50
15c . Interior Piping and Valves $ 42 , 425 . 00
15d. Exterior Piping and Valves $176 , 357 . 00
Add: $293 , 925 . 50
16 . Contract Quantity Adjustments based on Final Quantities
- See next Sheet .
Delete : $583 , 090 . 00
-
Final Payment:No.8-April 26,2005--- Plan _--_--_�_ i
fI Pla Unit Quantity _Percent Contract Contract _ Contract Amount
Item I Description Unit Quantity Price Completed of Total Amount Addition Credit
1720-Dia.Water Main in trench L.F 12871 $82.00 11,676 90.7 957,432.00 _-($97,990.00)_ $1,055,422_00
2 20'in Casing L.F 24 $180.00 24 100.0 4 320.00 _ $4_320.00 "
3 24"in trench L.F 1770 $98.00 1,770 100.0 173,460.00 $173 460.00 -
4 30"Casing LF 24 $132.00 24 100.0 3 168.00 _ $1168.00
5 Connection to Res#1 ,LS , 1$8,500.00 0 0.0 0.00 ($8,500 00) $8,500.00 6Y t-t n n
______
6 Connection to Res#2 LS 1 $9 800.00 0 0.0 0.00 ($9,800.00) - $9 800.00 0 511 Imo-
7 Conn. 16"at Lawrence LS 1, $14,000.00 1 100.0 14,000.00 $14,000.00 CT X11
B Conn.16'at Wilson LS 1 $14,000.00 1 100.0 14,000.00 $14 000.00 11
9120"BFV 8 vault EACH, 9 $4,600.00 7, 77.8 32,200.00 ($9,200.00) _-$41,400.00 I-'- (D LQ
10120•ROVs EACH 1 $19,200.00 0 0.0 0.00 ($19,200.00) $19200.00 1-) tj O (1)
1 1124"BEV 8 VAULT EACH 2 $6,200.00 2, 100,0 12,400.00 7$12,400.00 I-. n I-11
12 Flushing Hydrant EACH) 7 $2500.00 5 71.4 12,500.00 ($5000.00) _ $1;500.00 N- CD a
13 Fire Hydrant EACH 1 4, $3,000.00 3 I 75.0 . 9,000.00 ($3,0_00.00) $12,000.00 CT ['J 11
14 4"Sewer Replacement L.F 22 $20.00{ 0 0.0 0.00 ($440.00) __$44000 (D >4 I-4 ci
15 8"Sewer Replacement L.F 596 $28.00 657 110.2 18,396.00, $1,708.00 __$16 688.00 (D
16 10"Sewer Replacement L.F 872 $32.00 833 95.5 26,656.00 ($1,243.00) _ $277904 00 ,D 1-4- I-1
17 12'Sewer Replacement IL.F 342 $40.00 300 87.7 12,000.00 ($1,680.00) _-_$13,660.00 (11
18 15_SSewer Replacement L.F 160 $50.00 1 160 100.0 8 000.00. $6 000.00 Fy- Z
19 18"Sewer Replacement L.F 66', $69.00 74 112.1 5,106.00 1 $552.00 $4,554_00 (D (D O
20 24"Sewer Replacement L.F 85, $92.00 15 17.6 1,380.00 ($6,440.00) $7,820.00_ Ij
21 30'Sewer Replacement L.F 18 $120.00 I 24 133.3 2,880.00 I $720.00 $1160.00 t"h
22 Granular Trench Backfill C.V. 23280 $19.00 17,962 77.2 341,278.00 ($101,042.00) $442,320_00 y N I-'
23 Roadway Pavement Removal S.Y. 9680 $8.00 9,586 99.0 76,688.00 I ($752.00) 577,440 00 Q
24 Roadway Pavement Replacement S.Y. 9680 $36.00 7 9, 88 82.5 287,496.00 _ ($60,984.00) 53413,480.00 (D
25 Sidewalk Removal S.F 126901 $1.00 3,140, 24.7 3,140.00 ($9,550.00) _$12,690.00_ (11
26 Sidewalk Replacement S.F 12690 $3.50 3,140 _ 24.7 10,990.00 ($33,425.00) $44,415 A
15.00 l
27 Ashphalt Driveway Removal S.Y. 356 $5.00 52 _ 14.6 260.00 ($1,520.00) $1,780.00 (-1-28 Ashphalt Driveway Replacement S.Y, 356' $30.00 52 _ 14.6 1,560.00 ($9,120.00) $10,680.00
29 Concrete Driveway Removal S.Y. _ 371 $5.00 351 94.6 1,755.00' ($100.00) _ • $1,855.00 (D W
30 Concrete Driveway Replacement S.Y. 371_ $38.00 351 94.6 13,338.00 ($760.00) $14-_,098 00 C CT
31 Combination Curb and Gutter Removal L.F 6174 $4.00 4,931 79.9 19,724.00 ($4972.0) _$24,6,90.00_ CT
32 Combination Curb and Gutter Replacement L.F 6174 $13.00 4,155 67.3 54,015.00 __($26,247.00) $00,262.00
33 Topsoil and Sodding S.Y. 4556 $5.50- 4,556 100.0 25,058.00 $25,058.00
34 Auguring under Trees EACH 52 $100.00 12 23.1 - 1,200.00 ($4,000.00) $5,200_00 l' CT
35 Traffic Control LS 1 $170,000.00 1 100.0 170,000.00 5170,000.00 (1) 11
36 Temporary Sort ace over Trench S.Y. 7162 $8.00 5,418 75.6 43,344.00 ($13,952.00) $57,296.00 (D
37 Video Filming__ _ _- LS 1 $2500.00 1 100.0 2,500,00 $2,500 00 FT a)
311 Relocate Power Pole EACH 1 $3,200.00 0 0.0 000 ($3,200_0C) _$3,200 00 C-f
39 Remove Existing Wire Fence L.F 125 $4.00 0 0.0 0,00 ($500.00) _ $50n 00
40 Replace Existing Wire Fence L.F 125 $16.00 0 0.0 0.00 ($2,000.00) $2,000.00 (11
41 Air Release Valve and Manhole EACH 4 $2,500.00 4 100.0 10,000.00 $10,000_00_ CT
42 Inlet Removal EACH 11 $100.00 7 63.6 700.00 ($400.00) $_1,10000 ID
43 Inlet Replacement EACH 11 $700.00 7 63.6 4,900.00 ($2,800.00) $7,700.00' Ij
44 2-1/2 Dia.Fiber Optic Conduit LS I $160,000.00 1 100.0 160,000.00 $160,000.00
45 Conn.to e_on Murray LS 1 $4,800.00 1 100.0 4,800.00 $4,600.00 D1
46 DI Pipe House Sewer Replacement LF 1000 $42.00 918 91.8 38,556.00 (53,444.00) $42 00000 N-
47 Granular Trench Backbit C.Y. 100 $46.00 10 10.0 460,00 ($4,140.00) $4,600.00_
48 Class B Concrete C.Y. 20 $360.00 0 0.0 0,00 1$7,200.00) $7,200.00
49 Contaminated Soil C.Y. 50 $120.00 i 225 450.0 27,000.00 521,000.00 $6,000.00
50 Fluorocarbon Rubber EACH 10 $1,100.00 8 80.0 8,800.00 ($2,200.00) $11,000.00 (n
51 Rock Excavation C.Y. 20 $120.00 0 0.0 0_00 I ($2,400.00) $2,400.00
z
52 Hand Mining ,L.F 25$600.00 15 60.0 9,000.00 _ ($6,000.00) 515000.00_
53 Special Roadway Pavement Replacement S.Y. 50 $8.00 0' 0.0 0.00' ($400.00) $400 00
LI
54 Replacement of Ext.Lead House Service 1" EACH 69 $1,700,00 41 59.4 69,700.00 ($47,600.00) $117,300_00 y
55 Replacement of Ext.Lead House Service 1-1/2" EACH 3 L $3,200,00 0 0.0 0.00 ($9,600 00) 59,600.00
56 Replacement of Ext.Lead House Service 2_ LEACH 3$3 800.00 0, 0.0 0.00 ($11,400.00) $11,400.00 CO
57 Not Used `
58 Not Used
59 Not Used t - 0
60 Not Used rij
61420"Pipe in Trench L.F 153 88.00 0 0.0 0.00 ($13,464.00) $13,464.00 N
62 20"Pipe in Casing� � L.F 280, 180.00 0 0.0 0.00 ($50,400. $50400.00_
-63 36"Casing Under Railroad L.F 60 400.00 60 100.0 24,000.00 I ~ $24 0000 00 NJ
64 36"Casing_Under Road Crossing L.F 220 360.00- 225 102.3 81,000.00 $1,800.00 $79,20.00
65 Conn.to 12"at Kimball LS 1 9,600.00 1 100.0 9,600.00 $1160.00
66 Fire Hydrant EACH- 1 3,000.00 1 100.0 3,000.00 __$3,000_00
~67 Granular Trench Backlit! C.Y. 280 19.00 280 100.0 5,320.00 $_5,320.0
F
68 Sidewalk Removal _ S ( 825 1.00 825 100.0 825.00] 582500
69 Sidewalk Replacement S.F 825 3_50 825 100.0 2,887.50 _ 52,867.50
70 Traffic Control LS 1 15,000.00 1 100.0 15,000.00 $15,000 00
71 Video Filming LS 1 2000_00 1 100.0 2,000.00 _ $2,000.00
72 8"Water Conn W/24"x8'Tee and Gate Valve EACH 2 6,400.00 0, 00 • 0.00 $11600 00 $12,800.00
$25,780.00 ($608,870.00) ($583,090 00)
-
--- __ 2,636,792.50 $2,830,7_92 50 $3,41,1882.50
Change Order No . 1 SHEET 9 OF 12
City of Elgin
Lawrence Avenue from State Street
to Airlite Water Treatment Plant Watermain
B. REVISION IN PRICE C . REASON FOR CHANGES
1 . Add $100, 676 . 00 1 . Pipe size reduced due
(Deletions included in to recommendations to
subsection 16) the City based on
hydraulic model study
conducted after bid.
2 . Add $11, 200 . 00 2 . Service connections
requested, after bid,
by Fox River Hills
Condominium (Developer:
Thomas Hartwell) to
comply with easement
agreement .
3 . Add $5 , 506 . 12 3 . Pipe encountered in
field was 36-inch
diameter.
4 . Add $2 , 905 . 00 4 . Buried structure
encountered along
watermain route.
Replacement to comply
with IEPA standards .
5 . Add $6, 500 . 00 5 . Utility ductbank owned
by SBC precluded
directionally drilling
house services .
6 . Add $1, 500 . 00 6 . Relocation of manhole
to not be above
sanitary sewer service
connection.
7 . Add $3 , 200 . 00 7 . Requested by City to
separate sanitary and
storm sewer.
8 . Add $1, 905 . 11 8 . Fiber Optic damaged by
City Contractor .
9 . Add $8, 234 . 00 9 . Consumable special
order materials
purchased by City since
Contractor could not
return items deleted
from Contract after
purchase .
Change Order No . 1 SHEET 10 OF 12
City of Elgin
Lawrence Avenue from State Street
to Airlite Water Treatment Plant Watermain
10 . Add $32 , 901 . 00 10 . Restoration required by
impact of Project .
11 . Add $30 , 800 . 00 11 . Restoration required by
impact of Project .
12 . Add $4, 012 . 00 12 . Restoration required by
impact of Project .
13 . Delete $140 . 73 13 . Contractor did not
respond to City' s
request . Work performed
by the City.
14 . Delete $600 . 00 14 . City assumed
responsibility for
painting the Fire
Hydrants .
15 . Add $293 , 925 . 50 15 . Flow Control Valve and
pipe invert elevation
designed based on
hydraulic model study
conducted after bid.
New watermain route
from Station 7+05 to
Clear Water Reservoirs,
at the Airlite Water
Treatment Plant,
selected to save City
$140 , 000 in pipe casing
and soil bracing work.
16 . Delete $583 , 090 . 00 16 . Contract Quantity
Adjustments
Net Deletion of $ 80 , 566 . 00
Change Order No . 1 SHEET 11 OF 12
City of Elgin
Lawrence Avenue from State Street
to Airlite Water Treatment Plant Watermain
II . CHANGE ORDER CONDITIONS
1 . This Change Order does not relieve the Contractor form
strict compliance with the guarantee provisions of the
Original Contract, particularly those pertaining to
performance and operation of equipment .
2 . The Contractor expressly agrees that he will place
under his coverage of his Performance and Payment bonds
and Contractor' s Insurance . All work covered by the
Change Order .
3 . The Contractor waives all rights to claims against the
Owner for any indirect costs with this or any other
change order.
III . STATUTORY BASIS FOR CHANGE ORDER
1 . The above changes were not foreseeable, for the reasons
listed, at the time the Contract with Martam
Construction, Inc . was authorized.
2 . The subject changes are in the best interests of the
City and are authorized by law.
3 . The above listed changes are germane to the intent and
scope of the original contract .
Change Order No . 1 SHEET 12 OF 12
City of Elgin
Lawrence Avenue from State Street
to Airlite Water Treatment Plant Watermain
IV. ADJUSTMENTS IN AMOUNT OF CONTRACT
1 . Amount of Original Contract $ 3 , 419 , 882 . 50
2 . Net addition due to all previous
Change Order Nos . 0 through 0 0 . 00
3 . Amount of Contract, not including
this Change Order $ 3 , 419, 882 . 50
4 . Deletion to Contract due to
this Change Order ($80 , 566 . 00)
5 . Amount of Contract including
this Change Order $ 3 , 339 , 316 . 50
6 . Change in Final Contract Amount
Compared to Original Contract Amount -2 . 36%
RECOMMENDED FOR ACCEPTANCE BY ALVORD, BURDICK & HOWSON L.L. C . :
‘7070.r.-
Bon G. Mui Date
Principal
ACCEPTED BY MARTAM CONSTRUCTION INC. (CONTRACTOR) :
----
By: - ��:-- 61e1/0
(
Tamas Kutrovatz Date
President
APPROVED BY THE %TY OF .m N:
By: 144' tt oil"'
Olufemi F. Da e
Ci Mana -
f
`A
,cy°F Etc, Agenda Item No. `l.
�` o"`.. City of Elgin
ti..
tr
E
Rqt DFEO. L
June 3, 2005 G r 0
TO: Mayor and Members of the City Council N
FROM: Olufemi Folarin, City Manager ...No.QUALITY FRA ICES, RE
EF FK[ENT SERVICES,
AND QUALITY INFRASTRUCTURE
Paul Miller, Interim Water Syst m Superintendent
SUBJECT: Change Order No.1 and Final Acceptance of the Water Main on Lawrence
Avenue from State Street to Airlite Water Treatment Plant and McClure from
Lawrence to Murray Avenue project.
PURPOSE
The purpose of this memorandum is to provide the Mayor and members of the City Council with
information to approve Change Order No. 1, and final acceptance of the water main project on
Lawrence Avenue, from State Street to the Airlite Water Treatment Plant, completed by Martam
Construction.
RECOMMENDATION
rik It is recommended that the City Council approve Change Order No. 1 and the final acceptance
for the Lawrence Avenue from State Street to Airlite Water Treatment Plant and McClure from
Lawrence to Murray Avenue water main project and authorize the execution of final Change
Order No. 1 in the amount of$80,566.00 (deduct)with Martam Construction.
BACKGROUND
The Lawrence Avenue to Airlite water main project extended a 20-inch water main from the 24-
inch main at Lawrence and McClure Avenues to the Airlite Water Treatment Plant (WTP). The
project was approved by the City Council on May 12, 2004. This main transfers water from the
Riverside WTP to the Airlite reservoirs, where it can be re-pumped to the high and west pressure
zones.
Change Order No. 1 and Final covers 16 items, which includes 13 additional and 3 deducts. The
additional items are as follows:
16-inch pipe on Lawrence Avenue from Jackson to State Street $100,676.00
Two 8-inch services connections 11,200.00
18.1 ft of 36-inch storm sewer at Thomas More 5,506.12
6-inch sewer replacement at Hubbard Avenue 2,905.00
Replacement of 13 lead water services on McClure Avenue 6,500.00
r. Replacement of a brick manhole on McClure Avenue 1,500.00
Miscellaneous storm and sanitary sewer repairs 3,200.00
Repair of damaged fiber optic in McClure Avenue $1,905.11
•
C.O. #1 &Final Lawrence Ave. Water Main
June 3,2005
Page 2
Material not installed due to design changes 8,234.00
997 square yards of pavement restoration on Hoxie Avenue 32,901.00
890 square yards of parking lot restoration at Airlite WTP 30,800.00
Replacement of 236 lineal feet of curb and gutter at Airlite WTP 4,012.00
Control valve vault, piping, and electrical work 293,925.50
Total of additional items $503,264.73
The deduct items are as follows:
Response to a resident's complaint about pavement at Lawrence/Crystal ($140.73)
Credit for eight(8)unpainted underground flushing hydrants (600.00)
Contract quantity adjustments ($583,090.00)
Total of the deduct items ($583,830.73)
For a complete list of add and deduct items with descriptions, please see the attached change
order document.
eillik The net change is a deduction of$80,566.00
COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED
None
Vik...F NANCIAL IMPACT
The final contract with Martam Construction is as follows:
Amount of the original Contract $3,419,882.50
Change Order No. 1 (Deduct) ($ 80,566.00)
Riverside to State portion (project number 409583) ($ 30,220.50)
Revised Contract Amount $3, 309,096.50
The final accounting for the project is as follows:
Account Number Project No. Budget Amount
382-4000-795.92-41 409587 $ 27,200.00
384-4000-795.92-41 409587 2,850,000.00
420-0000-771.92-41 409587 25,000.00
384-4000-795.93-41 409598 $ 540,000.00
Total Budget $3,442,200.00
C.O. #1 &Final Lawrence Ave. Water Main
June 3, 2005
Page 3
Expenditures:
Martam Construction $3,309,096.50
Alvord, Burdick& Howson 50,000.00
Miscellaneous $ 2,538.00
Total Expenditures $3,361,634.00
Balance Remaining $ 80,566.00
LEGAL IMPACT
None
ALTERNATIVES
1. Accept Change Order#1 and Final.
2. Do not accept this Change Order.
Respectfully submitted for Council consideration.
PLB/PM
Attachment
ALVORD, BURDICK & HOWSON, L.L.C.
ENGINEERS CHICAGO, IL.
Change Order No. 1 -Final
City of Elgin SHEET 1 OF 12
PROJECT: Lawrence Avenue from State Street to Airlite Water
Treatment Plant Watermain
CHANGE ORDER NO. 1
LOCATION: Elgin, Illinois
CONTRACTOR: Martam Construction, Inc .
DATE: May 2, 2005
I . A. DESCRIPTION OF CHANGES INVOLVED
1 . Reduction of watermain diameter from 20-inch to 16-inch
diameter from Station 124+00 to Station 133+23
(Lawrence Avenue from Jackson Street to State Street) .
Item Bid
No. Description L.F. Price Total
61A 16-inch Pipe, In Trench 623 $ 82 $51, 086
62A 16-inch Pipe, In Casing 285 $174 $49, 590
Add: $100, 676
Deletion of 20-inch diameter pipe, in trench and in
casing is accounted for under subsection 16, final
quantity adjustments ( See Page 7) .
2 . Furnish and install two 8-inch service connections
between Stations 129+50 and 130+50 to comply with the
easement agreement between the City and Fox River Hills
Condominium ( Developer: Thomas Hartwell) for easement
granted to the City.
Add: $11, 200. 00
3 . Furnish and install 18 . 1 feet of 36" D. I .P. Storm Sewer
at Thomas Moore Drive and Country Knoll Lane. 30-inch
Storm Sewer shown on Contract Plans .
Add: $ 5, 506. 12
4 . 6-inch sewer replacement and structure at Hubbard
Avenue .
Add: $ 2, 905. 00
Change Order No. 1 SHEET 2 OF 12
City of Elgin
Lawrence Avenue from State Street
to Airlite Water Treatment Plant Watermain
5 . Additional work for replacement of Thirteen (13) Lead
Water Services on Mc Clure Avenue.
Add: $ 6, 500 . 00
6. Replace Brick manhole with 4-foot diameter precast
manhole, relocated to not be above Sanitary service
Connection, on Mc Clure Avenue.
Add: $ 1, 500.00
7 . Disconnection of sanitary service line from storm sewer
and Reconnection of sanitary sewer to City sanitary
sewer in Mc Clure Avenue.
Add: $ 3, 200.00
8 . Repair of damaged fiber optic conduit in Mc Clure
Avenue.
Add: $ 1, 905. 11
9. Materials purchased by Contractor perr the Contract but
not installed due to design changes and instead
delivered to the City. Design change required to
increase the capacity of the transfer line to meet
growing demand in the west zone.
Unit
Item Quantity Price Total
20-inch Butterfly Valve 1 $2, 980 $2, 980 .00
Flushing Hydrant 2 $2, 090 $4,180. 00
15% Mark -up $1, 074 .00
$8, 234 . 00
Add: $8, 234 .00
10 . Additional 997 square yards of pavement restoration on
Hoxie Avenue. The original street was chip and seal and
could not be reasonably patched. Additional quantities
were reuired to pave the section of Hoxie Avenue
between Lawrence Avenue and Highland Avenue.
Add: $32, 901 . 00
Change Order No. 1 SHEET 3 OF 12
City of Elgin
Lawrence Avenue from State Street
to Airlite Water Treatment Plant Watermain
11 . Additional 890 square yards of parking lot pavement
restoration at Airlite Water Treatment Plant.
Add: $30, 800.00
12 . Removal and Replacement of 236 lineal feet of curb and
gutter at Airlite Water Treatment Plant.
Add: $ 4, 012. 00
13. Credit to City for City response to resident complaint
regarding pavement patch at Lawrence Avenue and Crytal
Avenue.
Delete: $ 140. 73
14 . Credit of City to paint eight (8) Fire Hydrants
installed by Contractor .
Delete: $ 600. 00
15. Additional control valve vault, interior piping, and
the Exterior Piping from watermain Station 7+05
(Stationing per Contract) to the Clear Water Reservoirs
(Nos. 1 & 2) at the Airlite Water Treatment Plant in
accordance with Drawings 1R1, 2R1, D5a, D6a, E1R1 and
E2R1 . (The deletion of the Contract quantities of
piping and appurtenances is listed under Subsection 5) .
a. Electrical
(2) 2 . 5" Electrical Ducts
(2) 245 LF @ $7 . 50/LF $3, 675. 00
Concrete Encasement
8 . 5 CY @ $360/CY $3, 060. 00
Pull Box (4 'x4 'x2 ' ) $1, 800 . 00
Electrical for Vault and Building
$32, 565 + 7 .47% (Negotiated) $35, 000.00
Subtotal $43, 535 . 00
b. Add Control Vault Structure
Concrete Slab: 4 .2 CY @ $700/CY $ 2, 940 . 00
Concrete Walls: 11 .75 CY @ $770/CY $ 9, 047 . 50
Concrete Roof: 3 .3 CY @ $1, 600/CY $ 5, 280 . 00
Excavation, Backfill and
Spoil Removal : 112 Cl @ $26/CY $ 2, 912 . 00
Shoring $ 3, 000 . 00
Access Hatch $ 2, 645. 00
Change Order No. 1 SHEET 4 OF 12
City of Elgin
Lawrence Avenue from State Street
to Airlite Water Treatment Plant Watermain
Bilco Ladder $ 1, 200 . 00
Reinforcing Steel
2, 865 lbs x $1 . 60/lb $ 4, 584 . 00
Subtotal $31, 608 . 50
c . Add Control Vault Piping and Valves
16-inch Solenoid Controlled
Throttling Valve, Cla-Val
Model No. 131-37BCDSYKCKK $19, 205 . 00
16-inch Propeller Meter
Sparling Model No.
FM184-161-1-2-00
Register Model No. FT194 $ 5, 960. 00
12-inch Butterfly Valve, Flanged $ 2, 800. 00
16-inch Victaulic Coupling $ 395. 00
12-inch Victaulic Coupling $ 239. 00
(2) 16-inch Fig x MJ Sleeve $ 1, 360.00
(2) 12-inch Flg x MJ Sleeve $ 832 .00
(2) 16-inch fig X PE 1 ' 9" pipe $ 1, 000. 00
(4) 12-inch Fig x PE 2 ' 6" pipe $ 1, 600 . 00
12-inch Flg 5 ' 1" Spool $ 534 . 00
Labor for installation
and painting $ 8, 500. 00
Subtotal $42, 425.00
d. Outside Vault Structure, Piping and Valves
i) 20-inch Piping
Contract: 705 LF (Credit under Unit
Prices)
Revised: 965 LF
Add 155 LF
ii) Granular Backfill
Contract: 120 CY (Credit under Unit
Prices)
Revised 1500 CY
Add 1380 CY
iii) Pavement Removal and Replacement
Contract: 97 SY (Credit under Unit
Prices)
Revised: 305 SY
Add 208 SY
iv) 20-inch bends
Add: 45' bend, 11 1/4 ' Bend &
20" x 16" Reducer
Delete: 22 1/2' Bend & 20" Tee
rv) 20-inch Remotely Operated Valve and Vault
(, Contract: 1 Ea. (Credit under Unit
Prices)
Change Order No. 1 SHEET 5 OF 12
City of Elgin
Lawrence Avenue from State Street
to Airlite Water Treatment Plant Watermain
Revised: None
vi) Sewer Replacement
Contract: 18-inch Sewer, 22 LF (Paid
under change order)
Revised 8-inch Sewer, 20 LF
vii) Air Release Manhole
Contract: None
Revised: 1 EA.
viii) Clearwll Connection
Contract: 13 LF of 20-inch Pipe
(2) 20-inch 90' Bends
Revised: 3 LF of 16-inch Pipe
(2) 16-inch 90' Bends
ix) Clearwell Core Holes and Linkseals
Contract: For 20-inch Pipe
Revised For 16-inch Pipe
x) 16-inch Pipe & 16-inch Fittings
Contract: None
Revised: 64 LF of Pipe
(2) 16" x 12" Tees
(2) 90' Bends
16" Tee
16" x 6" Tee
xi) 12-inch Pipe, in trench
Contract: None
Revised: 22 LF
xii) 16-inch Butterfly Valve and Vault
Contract: None
Revised: 4 EA.
xiii) Flushing Hydrants
Contract: 2 EA. (Credit under Unit
Prices)
Revised: None
xiv) Fire Hydrants
Contract: None
Revised: 1 EA.
xv) 20-inch Butterfly Valve Vault
Contract: 2 EA. (Credit under Unit
Prices)
Revised: None
xvi) Topsoiling and Sodding Restoration
(No Change in quantity or price - To be paid
at unit prices in Contract)
Summary of above subsection d (The Contractor will be
paid a Lump Sum Price for Work between Sta. 7+05 and
the Clearwell Connections, broken down in the
following) :
Change Order No. 1 SHEET 6 OF 12
City of Elgin
Lawrence Avenue from State Street
to Airlite Water Treatment Plant Watermain
Change
Order Unit
Item Description Quantity Price Total
i 20-inch Pipe 965 LF $ 82 $79, 130
ii Granular Backfill 1500 CY $ 19 $28, 500
iii Pavement Removal 305 SY $ 8 $ 2, 440
Pavement Repl . 305 SY $ 36 $10, 980
iv Additional Bends $ 2, 795
Deleted Bends <$5, 560>
v 20-inch Remotely Operated Valve
vi 8-inch Sewer
Replacement 20 LF $ 28 $ 560
18-inch Sewer
Replacement 22 LF $69 $ 1, 518
vii Air Release Manhole 1 EA $2500 $ 2, 500
viii Clearwell
Pipe (Net) 3 LF $ 82 $ 246
90' Bends 2 EA $ 790 $ 1, 580
ix Core Holes
(See Credits in next section)
x 16-inch Pipe 64 LF $ 82 $ 5, 248
& Fittings $ 5, 640
xi 12-inch Pipe 22 LF $ 68 $ 1, 496
xii 16-inch BF Valve 4 EA $5, 400 $21, 600
xiii Flushing Hydrants
xiv Fire Hydrant 1 EA $3, 000 $ 3, 000
xv 20-inch BF Valve
xvi Topsoiling and Sodding
(No Change)
Subtotal $161, 673
Prices Revised
Connection to Clear
Water Reservoir No. 1
Contract Price: $8, 500
Deletions :
6.5 LF of 20-inch Pipe <$533>
20-inch 90' Bend <$980>
Core Hole and Link Seal <$295>
Revised Price $6, 692
(Contract Item No. 5, Connection to Reservoir
No. 1, not paid, deleted from Contract)
Change Order No. 1 SHEET 7 OF 12
City of Elgin
Lawrence Avenue from State Street
to Airlite Water Treatment Plant Watermain
Connection to Clear
Water Reservoir No. 2
Contract Price: $9, 800
Deletions:
6.5 LF of 20-inch Pipe <$533>
20-inch 90' Bend <$980>
Core Hole and Link Seal <$295>
Revised Unit Price $7, 992
(Contract Item No. 6, Connection to Reservoir
No. 2, not paid, deleted from Contract)
Total $176, 357
Summary of Item 15 .
15a. Electrical $ 43, 535. 00
15b. Structure $ 31, 608 .50
15c. ' Interior Piping and Valves $ 42, 425 . 00
15d. Exterior Piping and Valves $176, 357 .00
Add: $293, 925 .50
16. Contract Quantity Adjustments based on Final Quantities
- See next Sheet.
Delete: $583, 090.00
Change Order No. 1 SHEET 8 OF 12
City of Elgin
Lawrence Avenue from State Street
to Airlite Water Treatment Plant Watermain
•
Change Order No. 1 SHEET 9 OF 12
City of Elgin
Lawrence Avenue from State Street
to Airlite Water Treatment Plant Watermain
B. REVISION IN PRICE C . REASON FOR CHANGES
1 . Add $100, 676 .00 1 . Pipe size reduced due
(Deletions included in to recommendations to
subsection 16) the City based on
hydraulic model study
conducted after bid.
2 . Add $11, 200 . 00 2 . Service connections
requested, after bid,
by Fox River Hills
Condominium (Developer:
Thomas Hartwell) to
comply with easement
agreement.
3 . Add $5, 506. 12 3 . Pipe encountered in
field was 36-inch
diameter.
4 . Add $2, 905 . 00 4 . Buried structure
encountered along
watermain route .
Replacement to comply
with IEPA standards .
5 . Add $6, 500 . 00 5 . Utility ductbank owned
by SBC precluded
directionally drilling
house services .
6 . Add $1, 500 . 00 6. Relocation of manhole
to not be above
sanitary sewer service
connection.
7 . Add $3, 200 . 00 7 . Requested by City to
separate sanitary and
storm sewer.
8 . Add $1, 905 . 11 8 . Fiber Optic damaged by
City Contractor.
9 . Add $8, 234 . 00 9 . Consumable special
order materials
purchased by City since
Contractor could not
eik return items deleted
from Contract after
purchase.
Change Order No. 1 SHEET 10 OF 12
City of Elgin
Lawrence Avenue from State Street
to Airlite Water Treatment Plant Watermain
10. Add $32, 901.00 10. Restoration required by
impact of Project.
11 . Add $30, 800 . 00 11 . Restoration required by
impact of Project.
12 . Add $4, 012 .00 12 . Restoration required by
impact of Project.
13. Delete $140 . 73 13. Contractor did not
respond to City' s
request. Work performed
by the City.
14 . Delete $600. 00 14 . City assumed
responsibility for
painting the Fire
Hydrants .
(00‘ 15. Add $293, 925 . 50 15. Flow Control Valve and
pipe invert elevation
designed based on
hydraulic model study
conducted after bid.
New watermain route
from Station 7+05 to
Clear Water Reservoirs,
at the Airlite Water
Treatment Plant,
selected to save City
$140, 000 in pipe casing
and soil bracing work.
16. Delete $583, 090 . 00 16. Contract Quantity
Adjustments
Net Deletion of $ 80, 566. 00
rub.
Change Order No. 1 SHEET 11 OF 12
City of Elgin
Lawrence Avenue from State Street
to Airlite Water Treatment Plant Watermain
II . CHANGE ORDER CONDITIONS
1 . This Change Order does not relieve the Contractor form
strict compliance with the guarantee provisions of the
Original Contract, particularly those pertaining to
performance and operation of equipment.
2 . The Contractor expressly agrees that he will place
under his coverage of his Performance and Payment bonds
and Contractor' s Insurance. All work covered by the
Change Order.
3 . The Contractor waives all rights to claims against the
Owner for any indirect costs with this or any other
change order.
III . STATUTORY BASIS FOR CHANGE ORDER
1 . The above changes were not anticipated, for the reasons
listed, at the time the Contract with Martam
Construction, Inc. was authorized.
2 . It is in the best interest of the City to approve the
above listed changes .
3 . The above listed changes are germane to the intent and
scope of the original contract.
r
•
Change Order No. 1 SHEET 12 OF 12
City of Elgin
Lawrence Avenue from State Street
to Airlite Water Treatment Plant Watermain
IV. ADJUSTMENTS IN AMOUNT OF CONTRACT
1 . Amount of Original Contract $ 3, 419, 882 .50
2 . Net addition due to all previous
Change Order Nos . 0 through 0 0 . 00
3 . Amount of Contract, not including
this Change Order $ 3, 419, 882 .50
4 . Deletion to Contract due to
this Change Order ($80, 566. 00)
5 . Amount of Contract including
this Change Order $ 3, 339, 316.50
RECOMMENDED FOR ACCEPTANCE BY ALVORD, BURDICK & HOWSON L.L.C. :
By:
Bon G. Mui Date
Principal
ACCEPTED BY MARTAM CONSTRUCTION INC. (CONTRACTOR) :
By:
Tamas Kutrovatz Date
President
APPROVED BY THE CITY OF ELGIN:
By:
Olufemi Folarin Date
City Manager
eow