HomeMy WebLinkAbout05-156 Resolution No. 05-156
RESOLUTION
AUTHORIZING EXECUTION OF AN AGREEMENT WITH
STANLEY CONSULTANTS, INC.
(Street Signage Upgrade &Inventory Project)
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELGIN,ILLINOIS,that
Olufemi Folarin,City Manager,and Dolonna Mecum,City Clerk,be and are hereby authorized and
directed to execute an agreement on behalf of the City of Elgin with Stanley Consultants, Inc. for
engineering services in connection with the Street Signage Upgrade and Inventory Project,a copy of
which is attached hereto and made a part hereof by reference.
s/Ed Schock
Ed Schock,Mayor
Presented: May 11, 2005
Adopted: May 11, 2005
Omnibus Vote: Yeas: 7 Nays: 0
Attest:
s/Dolonna Mecum
Dolonna Mecum, City Clerk
AGREEMENT
THIS AGREEMENT is hereby made and entered into this t(rgiay of frit Ig y , 2005, by
and between the CITY OF ELGIN, Illinois, a municipal corporation (hereinafter referred to as
"CITY") and Stanley Consultants, Inc. an Iowa corporation(hereinafter referred to as
"ENGINEER").
WHEREAS, the CITY desires to engage the ENGINEER to furnish certain professional
services in connection with Street Sign Inventory and Replacement Project (hereinafter referred
to as the "PROJECT"); and
WHEREAS, the ENGINEER represents that it is in compliance with Illinois Statutes relating
to professional registration of individuals and has the necessary expertise and experience to
furnish such services upon the terms and conditions set forth herein below.
NOW, THEREFORE, for and in consideration of the mutual promises and covenants
contained herein, the sufficiency of which is hereby mutually acknowledged, the CITY and
ENGINEER hereby agree that the CITY hereby retains ENGINEER to act for and represent
CITY in the engineering matters involved in the Project as set forth herein, subject to the
following terms, conditions and stipulations:
I. SCOPE OF SERVICES
A. All work hereunder shall be performed under the direction of the Director of Public
Works of the CITY, herein after referred to as the "DIRECTOR".
B. The work under this project includes:
During the 2005 calendar year:
• Windshield Survey
• Pilot Program for Data Collection
• Bid Documents and Bidding Assistance for Sign Replacements
During the 2006, 2007 and 2008 calendar years, subject to contract amendment by
- 2 -
City:
• Sign Data Collection
• Development of Sign Standards
• Project Set-up and Database Testing
• Engineering Analysis of Sign Locations
• Bid Documents and Bidding Assistance for Sign Replacements /
Additions
C. A detailed Scope of Services is attached hereto as Attachment A.
II. PROGRESS REPORTS
A. A detailed project schedule for the Project is included as Attachment B, attached
hereto. Progress will be recorded on the project schedule and submitted monthly
as a component of the Status Report described in B. below.
B. The Engineer will submit to the Director monthly a Status Report keyed to the Project
Schedule. A brief narrative will be provided identifying progress, findings and
outstanding issues.
III. WORK PRODUCTS
All work products prepared by the ENGINEER pursuant hereto including, but not limited
to, reports, designs, calculations, work drawings, studies, photographs, models and
recommendations shall be the property of the CITY and shall be delivered to the CITY
upon request of the DIRECTOR; provided, however that the ENGINEER may retain
copies of such work products for its records. Such work products are not intended or
represented to be suitable for reuse by the CITY on any extension to the PROJECT or on
any other project, and such reuse shall be at the sole risk of the CITY without liability to
the ENGINEER.
IV. PAYMENTS TO THE ENGINEER(Not To Exceed Method)
A. For services provided in 2005 the ENGINEER shall be paid at the rate of 3.0 times
the direct hourly rate of personnel employed on this PROJECT, with the total fee not
- 3 -
to exceed $84,606 regardless of the actual costs incurred by the ENGINEER unless
substantial modifications to the scope of the work are authorized in writing by the
CITY. A summary of these fee calculations is attached hereto as Attachment C.
B. For outside services provided by other firms or subconsultants, the CITY shall pay the
ENGINEER the invoiced fee to the ENGINEER, plus 10%. Any such invoiced fees
to ENGINEER shall be included with and construed as part of the above-referenced
amount of$84,606.
C. The CITY shall make periodic payments to the ENGINEER based upon actual
progress within 30 days after receipt and approval of invoice. Said periodic payments
to the ENGINEER shall not exceed the amounts shown in the following schedule, and
full payments for each task shall not be made until the task is completed and accepted
by the DIRECTOR.
D. Services to be performed in 2006-2008 and compensation to the Engineer therefore
will require a written amendment to this agreement approved by the City Council of
the City. In the event of such an amendment to the agreement and a funding
appropriation therefore approved by the City Council of the City it is agreed that the
City shall reimburse the Engineer for such services with a total fee not to exceed
$320,000 regardless of the actual time expended or actual costs incurred by the
Engineer unless substantial modifications to the scope of work to be performed in
2006-2008 are authorized in writing by the City. The $320,000 fee represents an
estimate of$80,000 fee for each of the years 2006, 2007 and 2008. This estimate
shall be revised with each Amendment to this contract, and a detailed summary of the
costs shall be provided at that time.
V. INVOICES
A. The ENGINEER shall submit invoices in a format approved by the CITY.
Progress reports (IIC above) will be included with all payment requests.
- 4 -
B. The ENGINEER shall maintain records showing actual time devoted and
cost incurred. The ENGINEER shall permit the authorized representative of the
CITY to inspect and audit all data and records of the ENGINEER for work done
under this Agreement. The ENGINEER shall make these records available at
reasonable times during the Agreement period, and for a year after termination of this
Agreement.
VI. TERMINATION OF AGREEMENT
Notwithstanding any other provision hereof, the CITY may terminate this Agreement
at any time upon fifteen (15) days prior written notice to the ENGINEER. In the event
that this Agreement is so terminated, the ENGINEER shall be paid for services
actually performed and reimbursable expenses actually incurred prior to termination,
provided, however, that such payment shall not exceed the task amounts set forth
under Paragraph IV above.
VII. TERM
Unless terminated for cause or pursuant to Article VI or IX, this Agreement shall
terminate on the date CITY issues a written determination that all of ENGINEER's
work pursuant to this agreement is finally completed and is accepted by CITY. Such
a determination of completion and acceptance shall not constitute a waiver of any
rights or claims which the CITY may have or may thereafter acquire with respect to
any term or provision of this agreement.
VIII. NOTICE OF CLAIM
If the ENGINEER wishes to make a claim for additional compensation as a
result of action taken by the CITY, the ENGINEER shall give written notice of his
claim within 15 days after occurrence of such action. No claim for additional
compensation shall be valid unless so made. Any changes in the ENGINEER's fee
shall be valid only to the extent that such changes are included in writing signed by
the CITY and the ENGINEER. Regardless of the decision of the DIRECTOR
relative to a claim submitted by the ENGINEER, all work required under this
Agreement as determined by the DIRECTOR shall proceed without interruption.
- 5 -
IX. BREACH OF CONTRACT
If either party violates or breaches any term of this Agreement, such violation
or breach shall be deemed to constitute a default, and the other party has the right to
seek such administrative, contractual or legal remedies as may be suitable to the
violation or breach; and, in addition, if either party, by reason of any default, fails
within fifteen (15) days after notice thereof by the other party to comply with the
conditions of the Agreement, the other party may terminate this Agreement.
X. INDEMNIFICATION
To the fullest extent permitted by law, ENGINEER agrees to and shall indemnify,
defend and hold harmless the CITY, its officers, employees, agents, boards and
commissions from and against any and all claims, suits,judgments, costs, attorney's
fees, damages or other relief, including but not limited to workers' compensation
claims, in any way resulting from or arising out of negligent actions or omissions of
the ENGINEER in connection herewith, including negligence or omissions of
employees or agents of the ENGINEER arising out of the performance of this
Agreement. In the event of any such action against the CITY, its officers, employees,
agents, boards or commissions, covered by the foregoing duty to indemnify, defend
and hold harmless such action shall be defended by legal counsel of the CITY's
choosing. The provisions of this section shall survive any termination or expiration
of this agreement.
XI. NO PERSONAL LIABILITY
No official, director, officer, agent or employee of the CITY shall be charged
personally or held contractually liable under any term or provision of this Agreement
or because of their execution, approval or attempted execution of this Agreement.
XII. INSURANCE
A. Comprehensive Liability. The ENGINEER shall provide, pay for and
maintain in effect, during the term of this Agreement, a policy of comprehensive
general liability insurance written in occurrence form with limits of at least
$1,000,000 aggregate for bodily injury and $1,000,000 aggregate for property
damage.
The ENGINEER shall deliver to the DIRECTOR a Certification of Insurance
naming the CITY AS ADDITIONAL INSURED. The policy shall not be
modified or terminated without thirty (30) days prior written notice to the
- 6 -
DIRECTOR.
Such Certificate of Insurance shall include, but not be limited to, coverage for the
obligations assumed by ENGINEER pursuant to Article X herein entitled
"Indemnification".
Such above-referenced insurance shall apply as primary insurance with respect to
any other insurance or self-insurance programs afforded to the CITY. There shall
be no endorsement or modification of this insurance to make it excess over other
available insurance, alternatively, if the insurance states that it is excess or
prorated, it shall be endorsed to be primary with respect to the CITY.
B. Comprehensive Automobile Liability. Comprehensive Automobile
Liability Insurance written in occurrence form covering all owned, non-owned
and hired motor vehicles with limits of not less than $500,000 per occurrence for
damage to property.
C. Combined Single Limit Policy. The requirements for insurance coverage
for the general liability and auto exposures may be met with a combined single
limit of$1,000,000 per occurrence subject to a$1,000,000 aggregate.
D. Professional Liability. The ENGINEER shall carry Engineer's
Professional Liability Insurance covering claims resulting from error, omissions
or negligent acts with a combined single limit of not less than $1,000,000 per
occurrence. A Certificate of Insurance shall be submitted to the DIRECTOR as
evidence of insurance protection. The policy shall not be modified or terminated
without thirty (30) days prior written notice to the DIRECTOR.
XIII. CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES
PROCEDURES AND SAFETY
The ENGINEER shall not have control over or charge of and shall not be
responsible for construction means, methods, techniques, sequences or procedures, or
for safety precautions and programs in connection with the construction, unless
specifically identified in the Scope of Services.
XIV. NONDISCRIMINATION
In all hiring or employment made possible or resulting from this Agreement,
there shall be no discrimination against any employee or applicant for employment
because of sex, age, race, color, creed, national origin, marital status, of the presence
of any sensory, mental or physical handicap, unless based upon a bona fide
- 7 -
occupational qualification, and this requirement shall apply to, but not be limited to,
the following: employment advertising, layoff or termination, rates of pay or other
forms of compensation and selection for training, including apprenticeship.
No person shall be denied or subjected to discrimination in receipt of the benefit
of any services or activities made possible by or resulting from this Agreement on the
grounds of sex, race, color, creed, national origin, age except minimum age and
retirement provisions, marital status or the presence of any sensory, mental or
physical handicap. Any violation of this provision shall be considered a violation of a
material provision of this Agreement and shall be grounds for cancellation,
termination or suspension, in whole or in part, of the Agreement by the CITY.
XV. ASSIGNMENT AND SUCCESSORS
This Agreement and each and every portion thereof shall be binding upon the
successors and the assigns of the parties hereto; provided, however, that no
assignment shall be made without the prior written consent of the CITY.
XVI. DELEGATIONS AND SUBCONTRACTORS
Any assignment, delegation or subcontracting shall be subject to all the terms,
conditions and other provisions of this Agreement and the ENGINEER shall remain
liable to the CITY with respect to each and every item, condition and other provision
hereof to the same extent that the ENGINEER would have been obligated if it had
done the work itself and no assignment, delegation or subcontract had been made.
Any proposed subcontractor shall require the CITY's advanced written approval.
XVII. NO CO-PARTNERSHIP OR AGENCY
This agreement shall not be construed so as to create a partnership,joint venture,
employment or other agency relationship between the parties hereto, except to such
extent as may be specifically provided for herein.
XVIII. SEVERABILITY
The terms of this agreement shall be severable. In the event any of the terms or
provisions of this agreement are deemed to be void or otherwise unenforceable for
any reason, the remainder of this agreement shall remain in full force and effect.
XIX. HEADINGS
The headings of the several paragraphs of this Agreement are inserted only as
- 8 -
a matter of convenience and for reference and in no way are they intended to define,
limit or describe the scope of intent of any provision of this Agreement, nor shall they
be construed to affect in any manner the terms and provisions hereof or the
interpretation or construction thereof.
XX. MODIFICATION OR AMENDMENT
This Agreement and its attachments constitutes the entire Agreement of the
parties on the subject matter hereof and may not be changed, modified, discharged or
extended except by written amendment duly executed by the parties. Each party
agrees that no representations or warranties shall be binding upon the other party
unless expressed in writing herein or in a duly executed amendment hereof, or change
order as herein provided.
XXI. APPLICABLE LAW
This Agreement shall be deemed to have been made in, and shall be construed
in accordance with the laws of the State of Illinois. Venue for the resolution of any
disputes or the enforcement of any rights pursuant to this agreement shall be in the
Circuit Court of Kane County, Illinois.
XXII. NEWS RELEASES
The ENGINEER may not issue any news releases without prior approval from
the DIRECTOR, nor will the ENGINEER make public proposals developed under
this Agreement without prior written approval from the DIRECTOR prior to said
documentation becoming matters of public record.
XXIII. COOPERATION WITH OTHER CONSULTANTS
The ENGINEER shall cooperate with any other consultants in the CITY's
employ or any work associated with the PROJECT.
XXIV. INTERFERENCE WITH PUBLIC CONTRACTING
The ENGINEER certifies hereby that it is not barred from bidding on this
contract as a result of a violation of 720 ILCS 5/33E et seq. Or any similar state or
federal statute regarding bid rigging.
XXV. SEXUAL HARASSMENT
As a condition of this contract, the ENGINEER shall have written sexual harassment
policies that include, at a minimum, the following information:
- 9 -
A. the illegality of sexual harassment;
B. the definition of sexual harassment under state law;
C. a description of sexual harassment, utilizing examples;
D. the vendor's internal complaint process including penalties;
E. the legal recourse, investigative and complaint process available through the
Illinois Department of Human Rights, and the Illinois Human Rights
Commission;
F. directions on how to contact the department and commission;
G. protection against retaliation as provided by Section 6-101 of the Human Rights
Act.
A copy of the policies must be provided to the Department of Human Rights upon
request 775 ILCS 5/2-105.
XXVI. WRITTEN COMMUNICATIONS
All recommendations and other communications by the ENGINEER to the
DIRECTOR and to other participants which may affect cost or time of completion,
shall be made or confirmed in writing. The DIRECTOR may also require other
recommendations and communications by the ENGINEER be made or confirmed in
writing.
XXVII. NOTICES
All notices, reports and documents required under this Agreement shall be
in writing and shall be mailed by First Class Mail, postage prepaid, addressed as
follows:
A. As to CITY:
JOHN LOETE, P.E.
Director of Public Works
City of Elgin
150 Dexter Court
Elgin, Illinois 60120-5555
- 10 -
B. As to ENGINEER:
ROB GETZ, P.E.
Project Principal
Stanley Consultants, Inc.
8501 W. Higgins, Suite 730
Chicago, IL 60631
- 11 -
1N WITNESS WHEREOF, the undersigned have placed their hands and seals upon and
executed this Agreement in triplicate as though each copy hereof was an original and that there
are no other oral agreements that have not been reduced to writing in this statement.
For the CITY:
ATTEST: THE CITY OF ELGIN
BY By t -
City Clerk C 5' Manage
(SEAL)
For the ENGINEER:
Dated this day of , A.D., 2005
ATTEST:
B. ' A .. _ � •'ai 4 BY
ecret.T Senior Vice President
(SEAL)
Attachment A
Scope of Services
Many of the existing signs in the older areas of the City of Elgin are in poor
condition and require replacement. The City proposes that a sign inventory
be conducted to develop a coordinated program for the replacement of these
defective signs. In conjunction with this effort, the City also wishes to
upgrade their existing signs to meet current Manual of Uniform Traffic
Control Devices (MUTCD) standards.
By creating this inventory of City signs in their CASSWORKS database,
City staff will be able to track future sign work against existing assets. The
sign inventory and replacement program must be a seamless process, and
the completed database must work as intended without additional debugging
and reprogramming.
This proposal provides for engineering services for the inspection, design
and bidding services for the replacement of existing signing. The work
includes inventory of existing regulatory, warning and directional signage
and subsequent evaluation to determine required replacement. The program
is anticipated to be a multi-year program starting in 2005.
First Year Services (2005)
This following work is proposed as part of the First Year Services to be
performed in 2005. The scope of services for subsequent years in the sign
replacement program is listed below but not included in our fee.
Windshield Survey
Stanley Consultants, Inc will perform a windshield survey of all arterial,
collector, and local routes within the City to identify signs with obvious
visual damage. We will note the type of sign, type of damage, and collect
information relevant to its location (latitude and longitude as well as address
if easily identifiable). Upon completion of the survey, a meeting with the
City will be held to review which signs should be replaced in the first year
contract.
Pilot Program
A pilot program for the collection and processing of detailed database
information will be performed. This will give us an idea of what type of
production rate can be expected when collecting this information over future
5GCCL-7915.MGOV5.EIginSigns I
Attachment A
ED
project years. Stanley Consultants will collect inventory data for a pilot
project area. A sample geodatabase will then be developed and the
inventory data will be downloaded into the CASS WORKS. RJN Group
will perform bench testing to make sure that required the data collection
process works smoothly. A meeting will be held with the City to review the
results of the pilot program and to establish required database elements for
subsequent year surveys.
Bid Documents and Bidding Assistance
Stanley Consultants will prepare bid documents for a contract to replace
damaged signs identified during the windshield survey. The number of
signs to be replaced in the contract will be according to available budget.
Bid specifications and standard details for replacement will be prepared in
accordance with IDOT guidelines, policies and standards, as well as in
accordance with the requirements of the City of Elgin. A table of sign
replacement locations will be included that indicates sign types and their
location according to approximate latitude and longitude that was recorded
during the windshield survey.
Special provisions included in the bid documents will supplement the
"Standard Specifications for Road and Bridge Construction", adopted
January 1, 2002 by the Illinois Department of Transportation. A Project
Manual will be prepared that includes bid forms, instruction to bidders,
contract bid form, bonding and insurance requirements, State and Federal
compliance requirements (where and if necessary) and special provisions.
All contract documents will be prepared in accordance with City
requirements. Final quantities and an Engineer's Estimate will be submitted.
Stanley Consultants will assist City staff in bidding the project and awarding
the contract. We will also conduct the prebid meeting.
Subsequent Year Services
These services are not included in our proposal for First Year Services 2005
but are proposed for subsequent years
Data Collection
Stanley Consultants, in conjunction with City staff, will prioritize the order
of streets and finalize the list of attributes to be collected during the sign
inventory. A work plan for sign inventory work will then be developed
based on budgetary and schedule constraints. Existing Elgin geodatabase
information will be used in setting up the sign inventory geodatabase
5GCCL-7915.MGOV5.ElginSigns 2
Attachment A
Stanley Consultants will review signage for conformity with the Manual on
Uniform Traffic Control Devices (MUTCD). Missing signs that are needed
to meet safety requirements will be noted as well as signs that do not meet
standards. Inventory tags will be placed on each sign. Stanley Consultants
also proposes to photograph unique signs (i.e. stop signs are not unique and
probably would not need to be photographed) and include them in the ESRI
database.
Per our discussions with the City, street signs are to be excluded from the
sign inventory.
Field data will be collected using the Thales Mobilemapper equipped with
GPS and ArcPad. The GPS receiver attached to the Mobile mapper will
record the location of each sign using a signal broadcast by satellites. The
location will be differentially corrected with a beacon receiver to provide
submeter accuracy. Each Mobilemapper will be equipped with Arcpad and
will have City GIS layers installed so that sign locations can be immediately
verified when measurements are taken.
Sign Standards
Stanley Consultants will assist the City in developing standards for signing
school zones, crosswalks, parking and lane additions and deletions. These
standards will be used to evaluate required signing improvements as well as
provide guidelines for future development within the City
Project setup and Database Testing
Based on the pilot project performed during the first year, a geodatabase will
be developed and the inventory data will be downloaded into the CASS
WORKS Sign Inventory. RJN Group will perform additional bench testing
to make sure that required the data collection process works smoothly.
Upon satisfactory completion of the benchtest, the desired database fields
will be reviewed with the City and refined
CASS WORKS and the ESRI Database
Field data collected with the Mobilemapper will be downloaded into an
ESRI geodatabase. Once the data has been checked, it will be downloaded
into CASS WORKS. Information downloaded into CASS WORKS will
help track work orders on signs that need to be changed, installed, fixed or
just routinely inspected. Work done on the signs can also be tracked easily
for future reference. After inventory data is entered into the CASS WORKS
system, Stanley Consultants will run a series of queries and reports to ensure
that the database works. Hours have also been provided for our
subconsultant, RJN Group, Inc, to assist with this task. This work will be
5GCCL-7915.MGOV5.EIginSigns 3
Attachment A
done in the offices of the City and our staff would be glad to assist your staff
in the use of CASS WORKS during database startup and testing.
The ESRI geodatabase will also be delivered to the City and provide
additional information that may not be contained in the CASS WORKS
database. It will contain both spatial and non-spatial data including digital
images. This data, combined with the physical attributes of the sign, will
provide an accurate representation of the location and condition of each sign
in the inventory and will allow for prioritization of signs to be replaced.
Signs that were replaced in 2005 will be added to the database as new signs.
Engineering Analysis
Signs entered into the ESRI geodatabase will be analyzed for replacement.
A rating system for prioritizing sign replacement will be jointly developed
with the City. Sign deficiencies to be prioritized may include missing or
damaged signs, unsigned hazards, low legibility or retroreflectivity.
Essential signs with one or more deficiencies would be recommended as top
priorities. In addition, signs that do not meet City Standards would also be
recommended for replacement.
Sign prioritization will also consider the requirements of the MUTCD
concerning non-compliant devices on existing highways. These would be
brought into compliance with the 2003 edition of the MUTCD as part of a
systematic upgrading of substandard traffic control devices as required the
Highway Safety Program.
Bid Documents and Bidding Assistance
Stanley Consultants will prepare bid documents for a contract to replace and
install signage. Signs replacement will be prioritized as identified in the
engineering analysis and according to available budget. Add alternates will
be included to maximize the use of the available budget. Bid specifications
will include exhibits showing sign location and standard details for
replacement and will be prepared in accordance with IDOT guidelines,
policies and standards, as well as in accordance with the requirements of the
City of Elgin
Special provisions included in the bid documents will supplement the
"Standard Specifications for Road and Bridge Construction", adopted
January 1, 2002 by the Illinois Department of Transportation. A Project
Manual will be prepared that includes bid forms, instruction to bidders,
contract bid form, bonding and insurance requirements, State and Federal
compliance requirements (where and if necessary) and special provisions.
All contract documents will be prepared in accordance with City
requirements. Final quantities and an Engineer's Estimate will be submitted.
5GCCL-7915.MGOV5.EIginSigns 4
Attachment A
Stanley Consultants will assist City staff in bidding the project and awarding
the contract. We will also conduct the prebid meeting and field check
representative areas of the project area to insure that sign sizes, types and
placement are in compliance with the specifications.
Deliverables
Deliverables for this portion of the project include a working CASS
WORKS sign database; an ESRI geodatabase sign layer and bidding
documents for the signs that are inventoried in 2005. All signs that are
identified for replacement in the bidding documents will be entered into
CASS WORKS and the ESRI database as new signs.
5GCCL-7915.MGOV5.ElginSigns 5
Exhibit B
Street Sign Inventory and Upgrade Program
2005 Program
City of Elgin, Illinois
ID 'Task Name ( Duration ! Start ,
I_
Feb I Mar Apr 1 May Jun Jul I Aug 1 Sep I Oct 1 Nov
1 21 elgin 164 days 3/1/05 ---- -- -
2 0. Kickoff Meeting 0 days 3/1/05 3/1
3 j2 Windshield Survey 30 days 3/1/05 11111
4 !3 Pilot Program 70 days 3/1/05
5 Review survey results 0 days 4/11/051 4/11 '
6 Review pilot study results 0 days6/7/05 1 -1
7 - Prefinal Contract Documen 30 days 4/12/05 ■
8 City Prefinal Review 10 days 5/24/05 I Ms
9 Final Contract Documents 15 days 6/8/05 ■
10 City Review 5 days 6/29/051 EN
11 Issue for Bid 0 days 7/5/05 7/5
12 Bid Award 29 days 7/6/05 I ■■
13 Sign Replacement 45 days 8/16/05 im
14 Work Completion 0 days 10/17/05 ♦ 10/17
Task :---:. ::--:=:=:i Milestone ♦ External Tasks _-
Project:elginsig.mpp Split Summary External Milestone •
Date:2/8/05
Progress IMIMIIIIIIIIIII Project Summary VIIIIIIIIIMIIIIIV Deadline
Page 1
Attachment C-1
City of Elgin
Street Sign Inventory and Upgrade Program -Year 2006
Estimated Hours
Sr.GIS GIS
TASK Principal Proj.Mgr. Sr.Engr Engr. Specialist Specialist Technician Secretary Total MH Total Cost Total Cost
ESRI Database
Database Administration 2 16 24 42 $1,183 $3,548
Load previous year survey data 1 16 17 $484 $1,452
Download into CASSWORKS 8 12 20 $537 $1,611
Database testing in Elgin Offices _ 20 20 $537 $1,611
ESRI sign layer 4 4 $107 $322
Subtotal $2,848 $8,544
Contract Documents
Estimate signs to be replaced per budget 8 16 16 40 $1,294 $3,882
Contract specifications for sign replacement 16 24, 12 52 $1,735 $5,206
Exhibits(Area location map and sign mounting details) _ 16 32 48 $1,162 $3,487
Sign Replacement tables 2 8 10 $269 $806
Cost Estimate 2 12 14 $376 $1,128
Bid Assistance 6 2 8 $380 $1,139
Subtotal $5,216 $15,648
Administration
QA/QC _ 8 8 16 $430 $1,289
Coordination 8 24 32 $1,519 $4,558
Administration 16 32 48 $2,169 $6,506
Subtotal $4,118 $12,353
Meetings with City
Coordination meetings(2 mtg) 8 8 16 $650 $1,949
Prebid Meeting(1 mtg) 4 4 8 $325 $974
Subtotal _ $974 $2,923
Data Collection 260 240 500 $12,477 $37,431
Construction Assistance 8 8 16 $650 $1,949
Total Hours 36 109 10 340 24 108 272 12 911
%Total Man-Hours 4% 12% 1% 37% 3% 12% 30% 1%
Labor Cost x Multiplier $78,848 $78,848
Direct Costs(excludes data collection) $1,500 $1,500
TOTAL 911 $80,348 $80,348
Sign Construction Contract' $119,652 $19,652
'Assumes$100,000 construction budget for 2005-2006
Attachment C-2
City of Elgin
Street Sign Inventory and Upgrade Program -Year 2007
Estimated Hours
Sr.GIS GIS
TASK Principal Proj.Mgr. Sr.Engr Engr. Specialist Specialist Technician Secretary Total MH Total Cost Total Cost
ESRI Database
Database Administration 2 16 24 42 $1,183 $3,548
Load previous year survey data 1 16 17 $484 $1,452
Download into CASSWORKS __ 8 12 20 $537 $1,611
Database testing in Elgin Offices 20 20 $537 $1,611
ESRI sign layer 4 4 $107 $322
Subtotal $2,848 $8,544
Contract Documents
Estimate signs to be replaced per budget 8 16 16 40 $1,294 $3,882
Contract specifications for sign replacement 16 24 12 52 $1,735 $5,206
Exhibits(Area location map and sign mounting details) 16 32 48 $1,162 $3,487
Sign Replacement tables 2 8 10 $269 $806
Cost Estimate 2 12 14 $376 $1,128
Bid Assistance 6 2 8 $380 $1,139
Subtotal $5,216 $15,648
Administration
QA/QC 8 8 16 $430 $1,289
Coordination 8 24 32 $1,519 $4,558
Administration 16 32 48 $2,169 $6,506
Subtotal $4,118 $12,353
Meetings with City _ _
Coordination meetings(2 mtg) 8 8 16 $650 $1,949
Prebid Meeting(1 mtg) 4 4 8 $325 $974
Subtotal $974 $2,923
Data Collection 260 240 500 $12,477 $37,431
Construction Assistance 8 8 16 $650 $1,949
Total Hours 36 109 10 340 24 108 272 12 911
%Total Man-Hours 4% 12% 1% 37% 3% 12% 30% 1%
Labor Cost x Multiplier $78,848 $78,848
Direct Costs(excludes data collection) $1,500 $1,500
TOTAL 911 $80,348 $80,348
Sign Construction Contract' $119,652 $19,652
`Assumes$100,000 construction budget for 2006-2007
Attachment C-3
City of Elgin
Street Sign Inventory and Upgrade Program -Year 2008
Estimated Hours
Sr.GIS GIS
TASK Principal Proj.Mgr. Sr.Engr Engr. Specialist Specialist Technician Secretary Total MH Total Cost Total Cost
ESRI Database
Database Administration 2 16 24 42 $1,183 $3,548
Load previous year survey data 1 16 17 $484 $1,452
Download into CASSWORKS _ 8 12 20 $537 $1,611
Database testing in Elgin Offices 20 20 $537 $1,611
ESRI sign layer 4 4 $107 $322
Subtotal $2,848 $8,544
Contract Documents
Estimate signs to be replaced per budget 8 16 16 40 $1,294 $3,882
Contract specifications for sign replacement 16 24 12 52 $1,735 $5,206
Exhibits(Area location map and sign mounting details) 16 32 48 $1,162 $3,487
Sign Replacement tables 2 8 10 $269 $806
Cost Estimate 2 12 14 $376 $1,128
Bid Assistance 6 2 8 $380 $1,139
Subtotal $5,216 $15,648
Administration
QA/QC 8 8 16 $430 $1,289
Coordination 8 24 32 $1,519 $4,558
Administration 16 32 48 $2,169 $6,506
Subtotal $4,118 $12,353
Meetings with City
Coordination meetings(2 mtg) 8 8 16 $650 $1,949
Prebid Meeting(1 mtg) 4 4 8 $325 $974
Subtotal $974 $2,923
-
Data Collection 260 240 500 $12,477 $37,431
Construction Assistance 8 8 16 $650 $1,949
Total Hours 36 109 10 340 24 108 272 12 911
%Total Man-Hours 4% 12% 1% 37% 3% 12% 30% 1%
Labor Cost x Multiplier $78,848 $78,848
Direct Costs(excludes data collection) $1,500 $1,500
TOTAL _ 911 $80,348 $80,348
Sign Construction Contract* $119,652 $19,652
'Assumes$100,000 construction budget for 2007-2008
`0 OF F�Ci
` � ti
, City of Elgin
� � Agenda Item No.
,
%TED
E
April 22, 2005
GI
rod.
* 01
N 'l11
�
TO: Mayor and Members of the City Council FINANCIALLY STABLE CITY GOVERNMENT
EF FK IENT SERVICES,
AND OUAUTY INFRASTRUCTURE
FROM: Olufemi Folarin, City Manager
John M. Loete, Public Works D ector
SUBJECT: Engineering Services Agreement with Stanley Consultants for the Street Signage
Upgrade and Inventory Project
PURPOSE
The purpose of this memorandum is to provide the Mayor and members of the City Council with
information to consider entering into an agreement with Stanley Consultants for engineering
services for the Street Signage Upgrade and Inventory Project.
en, RECOMMENDATION
It is recommended that the City Council authorize the City Manager to execute an agreement
with Stanley Consultants in the not-to-exceed amount of $84,606.00 for the Street Signage
Upgrade and Inventory Project.
BACKGROUND
Included in the current five year capital budget is funding for a multi-year project to upgrade
street signage throughout the City. The subject project will survey the signage throughout the
City for condition and appropriateness under the newly released edition of the Manual for
Uniform Traffic Control Devices (MUTCD) and then develop an annual bid specification for the
removal, replacement, or relocation of the signs that do not meet the standard. The new
MUTCD has compliance dates for implementing the new standards like minimum reflectivity,
increased sign sizes, and supplemental plaques on stop signs. This multi-year program will give
us the ability to plan for and meet those deadlines. In addition, all sign placements will have an
inventory tag and be tabulated in the department's computerized maintenance management
system.
Requests for proposals were solicited from six firms, with five firms submitting proposals on
December 20, 2004. The firms responding were:
• Ciorba Group
• H.W. Lochner
• Smith Engineering
tom.. Street Signage Upgrade and Inventory
April 22, 2005
Page 2
• Stanley Consultants
• Strand Associates
A staff selection committee evaluated the five proposals, with Stanley Engineering being
selected as the most qualified firm for the project. A copy of the results of the selection process
is attached.
Upon selection, Stanley met with staff to finalize the project scope and negotiate a fee. Based
on discussions with Stanley, the project approach for the first year was adjusted to include a City
wide visual survey of all signs so that the replacement contract in 2005 will address all visually
deficient signs. In addition, a pilot project will be done to establish and test the procedures for a
more thorough survey that will be downloaded into our maintenance management system in the
subsequent years. The negotiated fee for this work is $84,606 in 2005. The remaining budget
($115,394)will be used for the signage replacement contract.
In 2006, 2007, and 2008, the proposed project budget is $100,000 per year for the completion of
the more thorough survey. It will examine the correctness of the sign installations, place an
identity tag on each sign, tests its reflectivity, determine its location with GPS, and download the
r information into our computerized management system. Bids for sign replacement will be
completed each year based on the findings and the inventory data will be updated to reflect the
most recent changes. The fees for the work during these three subsequent years will be $80,400
per year. A copy of the proposed agreement is attached.
COMMUNITY GROUPS/INTERESTED PERSONS CONTACTED
None
?jobiu
FINANCIAL IMPACT
The agreement with Stanley Consultants will total $84,606.00. Adequate funds are budgeted and
available in the Riverboat Fund, account number 275-0000-791.93-80, "Public Ways", project
number 039587, "Street Signage Upgrade and Inventory Project" in the amount of $200,000.
For work in subsequent years (estimated at $80,400 per year for 2006, 2007 and 2008), the same
funding source is proposed to be used provided approval by the City Council as part of the
annual budgeting process.
04EGAL IMPACT
None
r
r. Street Signage Upgrade and Inventory
April 22, 2005
Page 3
ALTERNATIVES
1. Approve the Engineering Services Agreement with Stanley Consultants.
2. Do not approve the Engineering Services Agreement with Stanley Consultants
Respectfully submitted for Council consideration.
JML
Attachments
QUALIFICATIONS RATING SHEET
FOR
SIGNAGE UPGRADE/INVENTORY
QUALIFICATIONS RATING SHEET 12/27/2004
QUALIFICATIONS RATING SHEET FOR SIGNAGE UPGRADE/INVENTORY •
• Strand Stanle Lochner
Steve John Joe Tom Chad Steve John
Joe Tom Chad Steve John Joe Tom Chad
EVALUATION FACTORS WEIGHT Pertzbom Loete
^{y�Evers Mi•atz Butzow •emrtzttborn Loete Evers Mi•atz Butzow Pertzbom LOete Evers Mi•atz Butzow l
115.7 ;v4:7,,•: '1'i__1r$l>''MGR.F,7:1 TIi.',;g..;Tlip;l.1, �5'+'fr "T 1P.1!}I'. r.: '': .,,,,, "Ip'f +fit ' - 'i.1. IrvF,''; .�qk�: ?,rilR'+•' 91 1I4I`'`�' ____I
Project Manager Qualifications 0-20 15 _ 14 14 18 16 18 18 16 15 16 17 10
I d,•1N I �l, I 1'� I I.q r''99 I1 - I I'1,,�IIJJ1���,'r t "..411:1. Ha' c.7"1�+.� r')I qp Io ,ir I A� y, ��/ rri""';I"t�
R,a::41• +''Zir l 'i 11 lG 9'fb.,'14.'4',�.,... dry111101.1r'i1 'IP ",.Ih..;:''.lrq`t 1:.'71111.11,II - : 8 :.4,:ll': 'II;IT .til INI;�r �yr 1 O�4"�;: �r`iro 4,.1. ii,T.4, 1!ti' .es_I•s.l:'-�114':I
Project Team Qualifications 0-20 17 15 15 16 16 18 17 16 19 18 15 15 16 17 15
I A i�py 1 4,..;;,.1;.i,',
i i, 1 �p , I I l.l.. { , * I l r V. l 11,1 r „ I I M ��}'rl l•i
!i.e...1 ?.: Il ,Id I + IkY 0d,:i�? ' i'i I 1:s,', l Edi r� Q: i 1, ,II 11 '1• Yl i "I' ,111.''r4''',, y •g��I� 0'i!I 9 i�l a?t�l s �l i
Firm Experience 0-15 13 12 11 12 13 11 3 • 13 14 14 13 g 12 14 14 11 13
I( aV.'i X11111 1j r11'I' ?}.P,i it t ��.`�'!�+ •I,II ,/. 1"I.t•�n}ij II •4. 1.' CI. •q<d ,V I�i i• 1Y''6i1�304, I r F; ?: 11 bh., �+ i , r 'fn� i 14 1
Scope of Services Proposed 0-20 15 16 18 16' 15 16 15 19 18 13 12 it 16 17 10 1
.� �� -' q !,', I'J1 1 t1 1 ,,F :ry^h 9 !, 9, yi ,I,'.'FIS _d;,.., .J I r �pI '' ..'i"" IN
IrI4�,'....SII . .
�il'`� � Yui. `.J'Al r��'1111��',r,..1�Xtll iilr4�yNi,l+ulietll,M�u'11Y'I I��'y�. 4�7� .�I.hnJ'� AM-0fl . r F��it 1�'� 1;'1119 �.I:��Il�rdilY+,t'�"'14n ,:In':F_ 'I �IRIIIfu'G:i.T.S a.�l'a.l
Familiarity With Conditions 0-10 i 3 8 7 7 6T NN 9 "!IU q 10 9 8 5 9 8 66
V .'.'y1NI'','Y�"r 1 'f ',;. t 4111 'NII 1' I'r 1, :,ii' 4,-,;Iii Ni ���{ s1� I' pI fy''� , I .1.•. ��y4314,,;,:,7e..I I r��. r'•-,i'rl .
a .4 �i :.b I i�� I .f,'4'Idill'I l�ll Ail .Iii 'I't I } •f2l nAl�lli[I, ;� w 'I'�h�ll`k�e xll . I 't{,.gym.
Technology •0-15 13 12 9 11 13 _ 15 13 14 11 10 11 11 6 9
r r t� I ( 4121 1 h ig 1 t II ' I u I �7'. r; I ,7 I u I ' If,: o 1
111 Mt 1 ll� .�P.Y"4�:f, I�� l JU �I p !I I �„( I 11, ! 1 {�1 II.+�•1.7 j r �T"� l �i � .y� °� , �l�lw�' I�Iki1?U'
t��•ri�G17.«J7 >l�'�J dP� ��' IHA 1 �t� Ik4��;'a` A �'•��li)Ql �r��l f�fi�uY1?rlr 11.1��:1 ;Ib1�tf.r��„I. i:t �i�7 Mil >�•�'3 'J: �1�"i,� .�. ,�,r.5 ;Ar r.
TOTALS 100 I 76 I 78 I 75 1 75 I 76 86 1 87 86 ) `93 I 84 ` 70 I 77 82 I 67 I 67 I
Smith _ Ciorba
Steve John Joe Tom Chad Steve . John Joe Tom Chad
EVALUATION FACTORS WEIGHT Pertzborn Loete Evers Mi•atz Butzow Pertzborn Loete Evers Mi•atz Butzow
•ERVIN IN 11 !" ,I lililli l I(ti Pi .. 41`I n ,t "!1:i))".1111I it 11"-1 ti NW"ii:1i 1311,111, n Mil,,*
Project Manager Qualifications 0-20 14 15 15 15 14 17 16 15 12 15
j MITI'jIf, o ,,11,1'III:I:JF.'siong n;lhli.okkl'I'1i �11..'-I Tr..,I al 11: goo 1 . „I �• 11::
Project Team Qualifications 0-20 18 13 16N�e�e 17 14�M, 16 13 15 15 18
t'P�1!'.r11 a1 RNLIe'F 1'•r Im '�'>WUNIWpy� I ��d✓LN� 1 rI' ILiLNI<:1')0LN1,t0 10 Iq.' l.. p1;.;I,11L '.11:II, %.
Firm Experience 0-15 16 11 5 14 13 13 10 13 10 13
Ni 11;1. lgkh 0Il'I' i 1.'K,'-',:9,1 1 I. I,1'.IIINII 1i t lir iI,Ill VI,p,'•`}I rill LI :;I -1011(1. •'r
. t:.911 AMIN
Scope of Services Proposed 0-20 1412 16 .19 18 13 13 15 15 10
i'1i 1
y I� 40.111i lig`'i01'f'1 1IJµi,lift II,`'!1 all 1, ' 30114;.tlr.I>'.d411 1,01„ 41 I T I 1,,,,,il
Familiarity With Conditions 0-10 9 10 9 9 9 4 8 7 6 7 J
11114.411
+ 1.1 .111.; 411+(�I ' 1 ,}��� t 'r III OI+' 1 y ''' 6S! 1.'11
' �ii tib1'II�4�'� •!'. � Y� ��fw• 4� :a,�'�' ,k!i� �11G , i w1 Fl � �l��l a q' �1
Technology 0-15 14 14 14 14 11 10 10 9 7 11
)i.412.K.1';,,11..`I''r'xitile'b5.�r:lr 'ti NM 1'i VAS;N;} :.' ' r11 114 141 r?]h I I 3t;ii til
TOTALS 100 I 84 I 75 I 85 88 L 79 , 73 170 74 I 65 1 71
•
AVERAGE SCORE SHEET
SIGNAGE UPGRADE/INVENTORY PROGRAM
CONSULTANTS
SELECTION TEAM Lochner Strand ion Smith CiorbaLan
1111111111 111111111111111.111
wYa."' aZ .•7E-ktWi::+'+ti711'�.' {g '.`�.•,'„yt :U:''�Y, i'i"tsYJ'1 iird
Steve Pertzbom Ill= 3 1 2 4
,� sk"'T 1st' ,.x:6 ��. u .1�:'k cu'"`syu'k��J,�'�,' sy
IIMM.^"gtr.M3 fi' -'-.�.`'��'NRKME?..5�+'.2 r ..2
John Loete 3 2 111110111 ®
LiffMicaNMETAZTOMEM
Joe Evers 3 110M111 2 5
mairamitatmrammEmimatz
Tom Migatz 4 3 1 2
Chad Butzow 5 3 1 2 4
MAW
TOTAL SCORE 20 15 5 12 23
Notes: Assign Scores based on the following formula:
(1 -first,,2=second,3-third, 4-forth,5-fifth)
Total Score Indicates Top Ranked Firm
•
� JJMI WHOVLLV
Attachment A
•
Scope of Services
Many of the existing signs in the older areas of the City of Elgin are in poor
condition and require replacement. The City proposes that a sign inventory
be conducted to develop a coordinated program for the replacement of these
defective signs. In conjunction with this effort, the City also wishes to
• upgrade their existing signs to meet current Manual of Uniform Traffic
Control Devices (MUTCD)standards.
By creating this inventory of City signs in their CASSWORKS database,
City staff will be able to track future sign work against existing assets. The
sign inventory and replacement program must be a seamless process, and
the completed database must work as intended without additional debugging
and reprogramming.
•
This proposal provides for engineering services for the inspection, design
and bidding services for the replacement of existing signing. The work
includes inventory of existing regulatory, warning and directional signage
• and subsequent evaluation to determine required replacement. The program
is anticipated to be a multi-year program starting in 2005.
First Year Services (2005)
This following work is proposed as part of the First Year Services to be
performed in 2005. The scope of services for subsequent years in the sign
replacement program is listed below but not included in our fee.
Windshield Survey
Stanley Consultants, Inc will perform a windshield survey of all arterial,
collector, and local routes within the City to identify signs with obvious
visual damage. We will note the type of sign, type of damage, and collect
information relevant to its location(latitude and longitude as well as address
if easily identifiable). Upon completion of the survey, a meeting with the
City will be held to review which signs should be replaced in the first year
contract.
Pilot Program
A pilot program for the collection and processing of detailed database
• information will be performed. This will give us an idea of what type of
production rate can be expected when collecting this information over future
5GCCL-7915.MGOV5.eiginSigns 1
Attachment A
project years. Stanley Consultants will collect inventory data for a pilot
project area. A sample geodatabase will then be developed and the
inventory data will be downloaded into the CASS WORKS. RJN Group
will perform bench testing to make sure that required the data collection
process works smoothly. A meeting will be held with the City to review the
results of the pilot program and to establish required database elements for
subsequent year surveys.
Bid Documents and Bidding Assistance
Stanley Consultants will prepare bid documents for a contract to replace
damaged signs identified during the windshield survey. The number of
signs to be replaced in the contract will be according to available budget.
Bid specifications and standard details for replacement will be prepared in
accordance with IDOT guidelines, policies and standards, as well as in
accordance with the requirements of the City of Elgin. A table of sign
replacement locations will be included that indicates sign types and their
location according to approximate latitude and longitude that was recorded
during the windshield survey.
•
Special provisions included in the bid documents will supplement the
"Standard Specifications for Road and Bridge Construction", adopted
January 1, 2002 by the Illinois Department of Transportation. A Project
Manual will be prepared that includes bid forms, instruction to bidders,
contract bid form, bonding and insurance requirements, State and Federal
compliance requirements (where and if necessary) and special provisions.
All contract documents will be prepared in accordance with City
requirements. Final quantities and an Engineer's Estimate will be submitted.
Stanley Consultants will assist City staff in bidding the project and awarding
the contract. We will also conduct the prebid meeting.
Construction Assistance
Stanley Consultants will provide the City with assistance during
construction. Site visits during construction, answering questions related to
sign installation and other construction assistance will involve 16 hours of
time by Stanley Consultants personnel.
Subsequent Year Services
•
These services are not included in our proposal for First Year Services 2005
but are proposed for subsequent years
Data Collection
•
5GCCL-7915.MGOV5.ElginSigns 2
•
Attachment A
Stanley Consultants, in conjunction with City staff, will prioritize the order
of streets and finalize the list of attributes to be collected during the sign
inventory. A work plan for sign inventory work will then be developed
based on budgetary and schedule constraints. Existing Elgin geodatabase
• information will be used in setting up the sign inventory geodatabase
Stanley Consultants will review signage for conformity with the Manual on
Uniform Traffic Control Devices.(MUTCD). Missing signs that are needed
to meet safety requirements will be noted as well as signs that do not meet
standards. Inventory tags will be placed on each sign. Stanley Consultants
also proposes to photograph unique signs (i.e. stop signs are not unique and
probably would not need to be photographed) and include them in the ESRI
database.
Per our discussions with the City, street signs are to be excluded from the
sign inventory.
Field data will be collected using the Thales Mobilemapper equipped with
GPS and ArcPad. The GPS receiver attached to the Mobile mapper will
record the location of each sign using a signal broadcast by satellites. The
location will be differentially corrected with a beacon receiver to provide
submeter accuracy. Each Mobilemapper will be equipped with Arcpad and
will have City GIS layers installed so that sign locations can be immediately
•
verified when measurements are taken.
Sign Standards
Stanley Consultants will assist the City in developing standards for signing
school zones, crosswalks, parking and lane additions and deletions. These
standards will be used to evaluate required signing improvements as well as
provide guidelines for future development within the City
Project setup and Database Testing •
Based on the pilot project performed during the first year,a geodatabase will
be developed and the inventory data will be downloaded into the CASS
WORKS Sign Inventory. RN Group will perform additional bench testing
to make sure that required the data collection process works smoothly.
Upon satisfactory completion of the benchtest, the desired database fields
will be reviewed with the City and refined
CASS WORKS and the ESRI Database
Field data collected with the Mobilemapper will be downloaded into an
ESRI geodatabase. Once the data has been checked, it will be downloaded
into CASS WORKS. Information downloaded into CASS WORKS will
help track work orders on signs that need to be changed, installed, fixed or
5GCCL-7915.MGOV5.EIginSigns 3
Attachment A
just routinely inspected. Work done on the signs can also be tracked easily
for future reference.After inventory data is entered into the CASS WORKS
system,Stanley Consultants will rim a series of queries and reports to ensure
that the database works. Hours have also been provided for our
subconsultant, RJN Group, Inc, to assist with this task. This work will be
done in the offices of the City and our staff would be glad to assist your staff
in the use of CASS WORKS during database startup and testing.
The ESRI geodatabase will also be delivered to the City and provide
additional information that may not be contained in the CASS WORKS
database. It will contain both spatial and non-spatial data including digital
images. This data, combined with the physical attributes of the sign, will
provide an accurate representation of the location and condition of each sign
in the inventory and will allow for prioritization of signs to be replaced.
Signs that were replaced in 2005 will be added to the database as new signs.
Engineering Analysis
Signs entered into the ESRI geodatabase will be analyzed for replacement.
A rating system for prioritizing sign replacement will be jointly developed
• with the City. Sign deficiencies to be prioritized may include missing or
damaged signs, unsigned hazards, low legibility or retroreflectivity.
Essential signs with one or more deficiencies would be recommended as top
priorities. In addition, signs that do not meet City Standards would also be
recommended for replacement.
Sign prioritization will also consider the requirements of the MUTCD
concerning non-compliant devices on existing highways. These would be
brought into compliance with the 2003 edition of the MUTCD as part of a
systematic upgrading of substandard traffic control devices as required the
Highway Safety Program.
Bid Documents and Bidding Assistance
Stanley Consultants will prepare bid documents for a contract to replace and
install signage. Signs replacement will be prioritized as identified in the
engineering analysis and according to available budget. Add alternates will
be included to maximize the use of the available budget. Bid specifications
will include exhibits showing sign location and standard details for
replacement and will be prepared in accordance with IDOT guidelines,
policies and standards, as well as in accordance with the requirements of the
City of Elgin
Special provisions included in the bid documents will supplement the
"Standard Specifications for Road and Bridge Construction", adopted
January 1, 2002 by the Illinois Department of Transportation. A Project
5GCCL=7915.MGOV5.ElginSigns 4
Attachment A
C•••
Manual will be prepared that includes bid forms, instruction to bidders,
contract bid form, bonding and insurance requirements, State and Federal
compliance requirements (where and if necessary) and special provisions.
All contract documents will beprepared in accordance with City
requirements. Final quantities and an Engineer's Estimate will be submitted.
Stanley Consultants will assist City staff in bidding the project and awarding
the contract. We will also conduct the prebid meeting and field check
representative areas of the project area to insure that sign sizes, types and
placement are in compliance with the specifications.
Deliverables
•
• Deliverables for this portion of the project include a working CASS
WORKS sign database; an ESRI geodatabase sign layer and bidding
documents for the signs that are inventoried in 2005. All signs that are
identified for replacement in the bidding documents will be entered into
CASS WORKS and the ESRI database as new signs.
•
5GCCL-7915.MGOV5.EIginSigns 5
•
S LNEIIAIH3VLLV
Exhibit B
Street Sign Inventory and Upgrade Program
2005 Program
City of Elgin, Illinois
•ID Task Name Duration Start
0 eb Mar A.r Ma Jun Jul Au. S . Oct Nov
® '
1 algin 164 days` 3/1/05 . . g•
♦ a air♦
2 ® i Kickoff Meeting 0 days 3/1/05 311
3 Windshield Survey 30 days 3/1/05 M,4
4 _ El ! Pilot Program 70 days' 3/1/05
5 I Review survey results 0 days. 4/11/05 4/11
6 I Review pilot study results 0 days, 6/7/05
•
7 Prefinal Contract Documen I 30 days' . 4/12/05 EMEMIl
•
8 I City Prefinal Review 10 days 5/24/05 Eni
9 i Final Contract Documents ; 15 days. 6/8/05 MS
10 I City Review I 5 days, 6129/05 N.
11 I Issue for Bid 0 days' 7/5/05 7/5
12 ( Bid Award ' I 29 days 7/6/05 EggennS
13 i Sign Replacement I 45 days 8/16/05 s
14 i Work Completion 0 days• 10/17/05 ♦ 10/17
•
•
•
•
•
Task Oii Mi :: Milestone • External Tasks symagew
Project:elglnsig.mpp Split Summary External Milestone
Date:2/8/05
Progress Project Summery graallaillaglV Deadline < i
• Page 1
•
3 LNEIIAIH3VJSLV
Attachment C
•
City of Elgin
Street Sign Inventory and Upgrade Program-Year 2004-2005
2117/05
Estimated Hours
Sr.GIS. GIS
TASK Principal Prot.Mgr. Sr.Engr Ergr, Speciaret Special-It Technician Secretary Total MN Total Cost
Initial Tasks
Establish Required Database elements 2 4 8 8 4 26 $2,380
Obtain existing data/Arcpad setup 1 _ 16 40 57 $5,172
Subtotal r $7,552
Benchtest _
Collect test data 2 16 18 $1,615
CASSW ORKS workshop - 8 32 40 $3,552
Database Modifications _ — 1_ 16 16 33 $3,077
Subtotal $8,244
ESRI Database
1
Database setup - 16 32 , 48 $4,310
Subtotal $4,310
Contract Documents
Estimate signs to be replaced per budget 8 16 16 40 $3,990
Contract specifications for sign replacement 16 24 12 52 $5,206
Exhibits(Area location map and sign mounting details) t 16 _ 32_ 48 $3,487
Sign Replacement tables 2 8 10 $860
Cost Estimate . 2 12 14 $1,156
Bid Assistance 6 2 8 $1,139
Subtotal - $15,839
Administration
FONOC r 8 8 16 $1,457
Coordination 8 24 32 $4,672.
Administration 16 32 48 $6,734
Subtotal $12,863
Meetings with City _
Kckoff Meeting(1 mtg) 4 4 4 12 $1,381
Prioritize streets/database attributes(2 mlgs) 8' 8 8, 24 $2,647
(Coordination meeting(1 mtg) 4 4 8 $1,031
Prebid Meeting(1 mtg) 4 4 8 51,031
Subtotal $6,091
Data Collection• 120 120 240 $17,910
ConstructionrAssistance 8 8 . 16 $1949
t- -
'
Total Hours 36 120 10 228 64 172 156 12 798
%Total Man-Hours 5% 15% 1% 29% 8% 22% 20% 2%
Labor Cost xMultiplier 1 r $74,756
Direct Costs(excludes data coliectlo) $1,500
RJN Engineers $8,350
TOTAL798 $84,696
Sign Construction Contract" $115.394
' Windshield survey of city streets
—Assumes$200,000 construction budget for 2004-2005
Attachment C-1
City of Elgin
Street Sign Inventory and Upgrade Program -Year 2006
Estimated Hours
Sr.GIS GIS
TASK Principal Proj.Mgr. Sr.Engr Engr. Specialist Speciakst Technician Secretary Total MH Total Cost Total Cost
ESRI Database •
Database Administration 2 16 24 42 $1,183 $3,548
Load previous year survey data 1 16 17 $484 $1,452
Download into CASSWORKS 8 12 20 $537 $1,611
Database testing in Elgin Offices 20 20 $537 $1,611
ESRI sign layer 4 4 $107 $322
Subtotal $2,848 $8,544
Contract Documents
Estimate signs to be replaced per budget 8 16 16 40 $1,294 $3,882
Contract specifications for sign replacement 16 _ 24 12 52 $1,735 $5,206
Exhibits(Area location map and sign mounting details) 16 32 48 $1,162 $3,487
Sign Replacement tables 2 8 10 $269 $806
Cost Estimate 2 12 14 $376 $1,128
Bid Assistance 6 2 8 $380 $1,139
Subtotal • $5,216 $15,648
Administration _
QA/QC 8 8 16 $430 $1,289
Coordination 8 24 32 $1,519 $4,558
Administration 16 32 48 $2,169 $6,506
Subtotal $4,118 $12,353
Meetings with City
Coordination meetings(2 mtg) 8 8 16 $650 $1,949
Prebid Meeting(1 mtg) 4 4 8 $325 $974
Subtotal $974 $2,923
Data Collection260 240 500 $12,477 $37,431
Construction Assistance 8 8 16 $650 $1,949
Total Hours 36 109 10. 340 24 108 272 12 911
%Total Man-Hours 4% 12% 1% 37% 3% 12% 30% 1%
Labor Cost x Multiplier $78,848 $78,848
Direct Costs(excludes data collection) $1,500 $1,500
TOTAL 911 $80,348 $80,348
Sign Construction Contract' $119,652 $19,652
'Assumes$100,000 construction budget for 2005-2006
Attachment C-2
•
City of Elgin
Street Sign Inventory and Upgrade Program -Year 2007
- Estimated Flours
Sr.GIS GS
TASK Principal Proj.Mgr., Sr.Engr Engr. Spadallst Specialist,Technician Secretary Total MH Total Cost , Total Cost
ESRI Database
Database Administration 2 16 24 42 $1,183 $3,548
Load previous year survey data 1 16 17 $484 $1,452
Download into CASSWORKS 8 12 20 $537 $1,611
Database testing in Elgin Offices 20 T 20 $537 $1,611
ESRI sign layer 4 4 $107 $322
Subtotal $2,848 $8,544
Contract Documents
Estimate signs to be replaced per budget 8 16 16 40 $1,294 $3,882
Contract specifications for sign replacement 16 24 12 52 $1,735 $5,206
Exhibits(Area location map and sign mounting details) 16 32 48 $1,162 $3,487
Sign Replacement tables 28 10 $289, $806
Cost Estimate 2 12 14 $376, $1,128
Bid Assistance 6 2 8 $380 $1,139
Subtotal $5,216 $15,648
Administration
QA/QC 8 8 16 $430 $1,289
Coordination 8 24 32 $1,519 $4,558
Administration 16 32 48 $2,169 $6,506
Subtotal $4,118 $12,353
Meetings with City _ _.Coordination meetings(2 mtg) 8 8 16 $650 $1,949
Prebid Meeting(1 mtg) 4 48 $325 $974
Subtotalr $974 $2,923
Data Collection 260, 240 500 $12,477 $37,431
Construction Assistance •
8 i 8 16 $650 $1,949
Total Hours 36 109 10 340 24 108 272 12 911
%Total Man-Hours 4% 12% 1% 37% 3% 12% 30% 1%
Labor Cost x Multiplier $78,848 $78,848
Direct Costs(excludes data collection) $1,500 $1,500
TOTAL 911 $80,348 $80,348
Sign Construction Contract• $119,652 .,$19,652
Assumes$100,000 construction budget for 2006-2007
. Attachment C-3
City of Elgin
Street Sign Inventory and Upgrade Program -Year 2008
, Estimated Hours
Sr.GIS GIS
TASK _ Principal Prof.Mgr. Sr.Engr Engr. Specialist Specialist Technician Secretary Total AAM Total Cost Total Cost
ESRI Database
Database Administration 2 16 24 42 $1,183 $3,548
Load previous year survey data 1 16 17 $484 $1,452
Download into CASSWORKS 8 12 20 $537 $1,611 '
Database testing in Elgin Offices 20 20 $537 $1,611
ESRI sign layer 4 4 $107 $322
Subtotal $2,848 $8,544
Contract Documents
Estimate signs to be replaced per budget 8 16' 16 40 $1,294 $3,882
Contract specifications for sign replacement 16 24 12 52 $1,735 $5,206
Exhibits(Area location map and sign mounting details) 16 32 48 $1,162 $3,4874
Sign Replacement tables 2 8 10 $269 $806
Cost Estimate 2 12 14 $376 $1,128
Bid Assistance 6 2 8 $380 $1,139
Subtotal $5,216 $15,648
Administration
QA/QC ' 8 816 $430 $1,289
CoordinationI 8 24 32 $1,519 $4,558
Administration 16 32 48 $2,169 $6,506
Subtotal r $4,118 $12,353
Meetings with City
Coordination meetings(2 mtg) 8 8 16 $650 $1,949
Prebid Meeting(1 mtg) 4 4 8 $325 $974
Subtotal $974 $2,923
•
Data Collection _ 260 240 • 500 $12,477 $37,431
r
Construction Assistance 8 8 16 $650 $1,949
Total Hours 36 109 10 340 24 108 272 12 911
%Total Man-Hours 4%, 12% 1% 37% 3% 12% 30% 1%
Labor Cost x Muttiplier $78,848 $78,848
Direct Costs(excludes data collection) $1,500 $1,500
TOTAL 911 $80,348 $80,348
Sign Construction Contract' $119,652 $19,652
•
•Assumes$100,000 construction budget for 2007-2008
Q J,M3WHOVIIV
AGREEMENT
THIS AGREEMENT is hereby made and entered into this day of , 2005, by
and between the CITY OF ELGIN,Illinois, a municipal corporation(hereinafter referred to as
"CITY") and Stanley Consultants, Inc. an Iowa corporation(hereinafter referred to as
"ENGINEER").
WHEREAS,the CITY desires to engage the ENGINEER to furnish certain professional
services in connection with Street Sign Inventory and Replacement Project (hereinafter referred
to as the'PROJECT");and
WHEREAS,the ENGINEER represents that it is in compliance with Illinois Statutes relating
to professional registration of individuals and has the necessary expertise and experience to
furnish such services upon the terms and conditions set forth herein below.
NOW, THEREFORE, for and in consideration of the mutual promises and covenants
contained herein, the sufficiency of which is hereby mutually acknowledged,the CITY and
ENGINEER hereby agree that the CITY hereby retains ENGINEER to act for and represent
CITY in the engineering matters involved in the Project as set forth herein, subject to the
following terms, conditions and stipulations:
I. SCOPE OF SERVICES
A. All work hereunder shall be performed under the direction of the Director of Public
Works of the CITY,herein after referred to as the "DIRECTOR".
B. The work under this project includes:
During the 2005 calendar year:
• Windshield Survey
• Pilot Program for Data Collection
• Bid Documents and Bidding Assistance for Sign Replacements
During the 2006, 2007 and 2008 calendar years, subject to contract amendment by
,""' -2 -
City:
• Sign Data Collection
• Development of Sign Standards
• Project Set-up and Database Testing
• Engineering Analysis of Sign Locations
• Bid Documents and Bidding Assistance for Sign Replacements/
Additions
C.A detailed Scope of Services is attached hereto as Attachment A.
II. PROGRESS REPORTS
A. A detailed project schedule for the Project is included as Attachment B, attached
hereto. Progress will be recorded on the project schedule and submitted monthly
as a component of the Status Report described in B.below.
B. The Engineer will submit to the Director monthly a Status Report keyed to the Project
Schedule. A brief narrative will be provided identifying progress, findings and
outstanding issues.
III. WORK PRODUCTS
All work products prepared by the ENGINEER pursuant hereto including,but not limited
to,reports,designs, calculations,work drawings, studies,photographs,models and
recommendations shall be the property of the CITY and shall be delivered to the CITY
upon request of the DIRECTOR;provided,however that the ENGINEER may retain
copies of such work products for its records. Such work products are not intended or
represented to be suitable for reuse by the CITY on any extension to the PROJECT or on
any other project, and such reuse shall be at the sole risk of the CITY without liability to
the ENGINEER.
IV. PAYMENTS TO THE ENGINEER(Not To Exceed Method)
A. For services provided in 2005 the ENGINEER shall be paid at the rate of 3.0 times
the direct hourly rate of personnel employed on this PROJECT, with the total fee not
""' -3 -
to exceed$84,606 regardless of the actual costs incurred by the ENGINEER unless
substantial modifications to the scope of the work are authorized in writing by the
CITY. A summary of these fee calculations is attached hereto as Attachment C.
B. For outside services provided by other firms or subconsultants,the CITY shall pay the
ENGINEER the invoiced fee to the ENGINEER,plus 10%. Any such invoiced fees
to ENGINEER shall be included with and construed as part of the above-referenced
amount of$84,606.
C. The CITY shall make periodic payments to the ENGINEER based upon actual
progress within 30 days after receipt and approval of invoice. Said periodic payments
to the ENGINEER shall not exceed the amounts shown in the following schedule, and
full payments for each task shall not be made until the task is completed and accepted
by the DIRECTOR.
D. Services to be performed in 2006-2008 and compensation to the Engineer therefore
will require a written amendment to this agreement approved by the City Council of
the City. In the event of such an amendment to the agreement and a funding
appropriation therefore approved by the City Council of the City it is agreed that the
City shall reimburse the Engineer for such services with a total fee not to exceed
$320,000 regardless of the actual time expended or actual costs incurred by the
Engineer unless substantial modifications to the scope of work to be performed in
2006-2008 are authorized in writing by the City. The$320,000 fee represents an
estimate of$80,000 fee for each of the years 2006,2007 and 2008. This estimate
shall be revised with each Amendment to this contract,and a detailed summary of the
costs shall be provided at that time.
V. INVOICES
A. The ENGINEER shall submit invoices in a format approved by the CITY.
Progress reports(HC above)will be included with all payment requests.
-4-
B. The ENGINEER shall maintain records showing actual time devoted and
cost incurred. The ENGINEER shall permit the authorized representative of the
CITY to inspect and audit all data and records of the ENGINEER for work done
under this Agreement. The ENGINEER shall make these records available at
reasonable times during the Agreement period,and for a year after termination of this
Agreement.
VI. TERMINATION OF AGREEMENT
Notwithstanding any other provision hereof,the CITY may terminate this Agreement
at any time upon fifteen(15)days prior written notice to the ENGINEER. In the event
that this Agreement is so terminated,the ENGINEER shall be paid for services
actually performed and reimbursable expenses actually incurred prior to termination,
provided,however,that such payment shall not exceed the task amounts set forth
under Paragraph N above.
VII. TERM
�► Unless terminated for cause or pursuant to Article VI or IX,this Agreement shall
terminate on the date CITY issues a written determination that all of ENGINEER's
work pursuant to this agreement is finally completed and is accepted by CITY. Such
a determination of completion and acceptance shall not constitute a waiver of any
rights or claims which the CITY may have or may thereafter acquire with respect to
any term or provision of this agreement.
VIII. NOTICE OF CLAIM
If the ENGINEER wishes to make a claim for additional compensation as a
result of action taken by the CITY,the ENGINEER shall give written notice of his
claim within 15 days after occurrence of such action. No claim for additional
compensation shall be valid unless so made. Any changes in the ENGINEER's fee
shall be valid only to the extent that such changes are included in writing signed by
the CITY and the ENGINEER. Regardless of the decision of the DIRECTOR
relative to a claim submitted by the ENGINEER, all work required under this
Agreement as determined by the DIRECTOR shall proceed without interruption.
poim-
- 5 -
IX. BREACH OF CONTRACT
If either party violates or breaches any term of this Agreement, such violation
or breach shall be deemed to constitute a default, and the other party has the right to
seek such administrative,contractual or legal remedies as may be suitable to the
violation or breach; and, in addition,if either party,by reason of any default,fails
within fifteen(15)days after notice thereof by the other party to comply with the
conditions of the Agreement,the other party may terminate this Agreement.
X. INDEMNIFICATION
To the fullest extent permitted by law,ENGINEER agrees to and shall indemnify,
defend and hold harmless the CITY,its officers,employees, agents,boards and
commissions from and against any and all claims, suits,judgments, costs, attorney's
fees,damages or other relief,including but not limited to workers' compensation
claims,in any way resulting from or arising out of negligent actions or omissions of
the ENGINEER in connection herewith,including negligence or omissions of
employees or agents of the ENGINEER arising out of the performance of this
Agreement. In the event of any such action against the CITY,its officers,employees,
agents,boards or commissions,covered by the foregoing duty to indemnify,defend
and hold harmless such action shall be defended by legal counsel of the CITY's
choosing. The provisions of this section shall survive any termination or expiration
of this agreement.
XI. NO PERSONAL LIABILITY
No official,director,officer, agent or employee of the CITY shall be charged
personally or held contractually liable under any term or provision of this Agreement
or because of their execution, approval or attempted execution of this Agreement.
XII. INSURANCE
A. Comprehensive Liability. The ENGINEER shall provide,pay for and
maintain in effect,during the term of this Agreement,a policy of comprehensive
general liability insurance written in occurrence form with limits of at least
$1,000,000 aggregate for bodily injury and$1,000,000 aggregate for property
damage.
The ENGINEER shall deliver to the DIRECTOR a Certification of Insurance
naming the CITY AS ADDITIONAL INSURED. The policy shall not be
modified or terminated without thirty(30)days prior written notice to the
- 6-
DIRECTOR.
Such Certificate of Insurance shall include,but not be limited to, coverage for the
obligations assumed by ENGINEER pursuant to Article X herein entitled
"Indemnification".
Such above-referenced insurance shall apply as primary insurance with respect to
any other insurance or self-insurance programs afforded to the CITY. There shall
be no endorsement or modification of this insurance to make it excess over other
available insurance, alternatively, if the insurance states that it is excess or
prorated, it shall be endorsed to be primary with respect to the CITY.
B. Comprehensive Automobile Liability. Comprehensive Automobile
Liability Insurance written in occurrence form covering all owned,non-owned
and hired motor vehicles with limits of not less than$500,000 per occurrence for
damage to property.
C. Combined Single Limit Policy. The requirements for insurance coverage
for the general liability and auto exposures may be met with a combined single
limit of$1,000,000 per occurrence subject to a$1,000,000 aggregate.
D. Professional Liability. The ENGINEER shall carry Engineer's
Professional Liability Insurance covering claims resulting from error, omissions
or negligent acts with a combined single limit of not less than $1,000,000 per
occurrence. A Certificate of Insurance shall be submitted to the DIRECTOR as
evidence of insurance protection. The policy shall not be modified or terminated
without thirty(30) days prior written notice to the DIRECTOR.
XIII. CONSTRUCTION MEANS,METHODS,TECHNIQUES, SEQUENCES~
PROCEDURES AND SAFETY
The ENGINEER shall not have control over or charge of and shall not be
responsible for construction means, methods, techniques, sequences or procedures, or
for safety precautions and programs in connection with the construction, unless
specifically identified in the Scope of Services.
XIV. NONDISCRIMINATION
In all hiring or employment made possible or resulting from this Agreement,
there shall be no discrimination against any employee or applicant for employment
because of sex, age,race, color, creed, national origin,marital status, of the presence
of any sensory, mental or physical handicap, unless based upon a bona fide
•
- 7-
occupational qualification, and this requirement shall apply to,but not be limited to,
the following: employment advertising,layoff or termination,rates of pay or other
forms of compensation and selection for training, including apprenticeship.
No person shall be denied or subjected to discrimination in receipt of the benefit
of any services or activities made possible by or resulting from this Agreement on the
grounds of sex,race, color, creed,national origin,age except minimum age and
retirement provisions,marital status or the presence of any sensory,mental or
physical handicap. Any violation of this provision shall be considered a violation of a
material provision of this Agreement and shall be grounds for cancellation,
termination or suspension, in whole or in part,of the Agreement by the CITY.
XV. ASSIGNMENT AND SUCCESSORS
This Agreement and each and every portion thereof shall be binding upon the
successors and the assigns of the parties hereto;provided,however,that no
assignment shall be made without the prior written consent of the CITY.
XVI. DELEGATIONS AND SUBCONTRACTORS
Any assignment, delegation or subcontracting shall be subject to all the terms,
conditions and other provisions of this Agreement and the ENGINEER shall remain
liable to the CITY with respect to each and every item,condition and other provision
hereof to the same extent that the ENGINEER would have been obligated if it had
done the work itself and no assignment,delegation or subcontract had been made.
Any proposed subcontractor shall require the CITY's advanced written approval.
XVII. NO CO-PARTNERSHIP OR AGENCY
This agreement shall not be construed so as to create a partnership,joint venture,
employment or other agency relationship between the parties hereto, except to such
extent as may be specifically provided for herein.
XVIII. SEVERABILITY
The terms of this agreement shall be severable. In the event any of the terms or
provisions of this agreement are deemed to be void or otherwise unenforceable for
any reason,the remainder of this agreement shall remain in full force and effect.
XIX. HEADINGS
The headings of the several paragraphs of this Agreement are inserted only as
- 8 -
a matter of convenience and for reference and in no way are they intended to define,
limit or describe the scope of intent of any provision of this Agreement,nor shall they
be construed to affect in any manner the terms and provisions hereof or the
interpretation or construction thereof.
•
XX. MODIFICATION OR AMENDMENT
This Agreement and its attachments constitutes the entire Agreement of the
parties on the subject matter hereof and may not be changed,modified,discharged or
extended except by written amendment duly executed by the parties. Each party
agrees that no representations or warranties shall be binding upon the other party
unless expressed in writing herein or in a duly executed amendment hereof, or change
order as herein provided.
XXI. APPLICABLE LAW
This Agreement shall be deemed to have been made in, and shall be construed
in accordance with the laws of the State of Illinois. Venue for the resolution of any
disputes or the enforcement of any rights pursuant to this agreement shall be in the
Circuit Court of Kane County, Illinois.
�,. XXII. NEWS RELEASES
The ENGINEER may not issue any news releases without prior approval from
the DIRECTOR,nor will the ENGINEER make public proposals developed under
this Agreement without prior written approval from the DIRECTOR prior to said
documentation becoming matters of public record.
XXIII. COOPERATION WITH OTHER CONSULTANTS
The ENGINEER shall cooperate with any other consultants in the CITY's
employ or any work associated with the PROJECT.
XXIV. INTERFERENCE WITH PUBLIC CONTRACTING
The ENGINEER certifies hereby that it is not barred from bidding on this
contract as a result of a violation of 720 ILCS 5/33E et seq. Or any similar state or
federal statute regarding bid rigging.
XXV. SEXUAL HARASSMENT
As a condition of this contract,the ENGINEER shall have written sexual harassment
policies that include,at a minimum, the following information:
-9-
A. the illegality of sexual harassment;
B. the definition of sexual harassment under state law;
C. a description of sexual harassment,utilizing examples;
D. the vendor's internal complaint process including penalties;
E. the legal recourse,investigative and complaint process available through the
Illinois Department of Human Rights, and the Illinois Human Rights
Commission;
F. directions on how to contact the department and commission;
G. protection against retaliation as provided by Section 6-101 of the Human Rights
Act.
A copy of the policies must be provided to the Department of Human Rights upon
request 775 ILCS 5/2-105.
XXVI. WRITTEN COMMUNICATIONS
All recommendations and other communications by the ENGINEER to the
DIRECTOR and to other participants which may affect cost or time of completion,
shall be made or confirmed in writing. The DIRECTOR may also require other
recommendations and communications by the ENGINEER be made or confirmed in
writing.
XXVII. NOTICES
All notices,reports and documents required under this Agreement shall be
in writing and shall be mailed by First Class Mail,postage prepaid,addressed as
follows:
A. As to CITY:
JOHN LOETE,P.E.
Director of Public Works
City of Elgin
150 Dexter Court
Elgin, Illinois 60120-5555
- 10 -
B. As to ENGINEER:
ROB GETZ, P.E.
Project Principal
Stanley Consultants, Inc.
8501 W.Higgins, Suite 730
Chicago, IL 60631
el' - 11 -
IN WITNESS WHEREOF,the undersigned have placed their hands and seals upon and
executed this Agreement in triplicate as though each copy hereof was an original and that there
are no other oral agreements that have not been reduced to writing in this statement.
For the CITY:
ATTEST: THE CITY OF ELGIN
By By
City Clerk City Manager
(SEAL)
For the ENGINEER:
Dated this day of ,A.D.,2005
ATTEST:
By By
Secretary President
(SEAL)